R/3 4.7 Enterprise upgrade to ECC 6.0 EHP4
Just want to ask anyone here who has done the upgrade from r/3 4.7 to ecc 6.0 inclusive of ehp4 - is the upgrade runtime extended/longer compared with the upgrade just to ECC 6.0 SR3 ?
I've personally executed an EHP4 installation using SAPehpi and the end to end time execution is really long and. Some background - we are deciding if we would want to include EHP4 during the 4.7 upgrade or to apply EHP4 separately once the upgrade is done, the downtime is of concern here as we are limited to just the weekend.
Hello Thom,
We did upgrade of R34.7 to ECC 6.0 SR3 EHP3 and we were able to complete this one day downtime. I am not sure about EHP4 but it should not take much longer. I beleive you should be able to accomplish this in weekend.
My suggestion is to do a system copy of PROD to a sandbox and perform test upgrade. By doing this you will know
1. what issues you will have during actual upgrade
2. Tunning that you can do to reduce downtime.
3. SPDD/SPAU adjustments can be evaluated.
By repeating couple of iteration on sandbox. You can estimate what would be your downtime and what you can do to reduce it.
Regards,
Praveen
Similar Messages
-
Hello experts,
We are currently on SAP R/3 4.7 (using ITS) and will be upgrading to ECC 6.0, Ehp4 (using Netweaver Portal). This upgrade will be purely technical, no changes to existing talent modules.
Our employee performance appraisals are currently accessed via ITS using the Old Appraisal System. Can you tell me if it is even possible to link the old appraisal system to the NW portal?
If yes, what kind of changes are required here? Which iviews will I need to activate?
All of your advice is greatly appreciated. Thank you in advance.
Dinahi,
THe old appraisal system runs on ITS , true .
In the new ECC 6 , there is a built in ITS , which should allow you to still run the old services . But it makes sense to explore the newer functionalites offered in EHP4.
Regards
sameer -
SE07 doesn't show Import status after upgrade to ECC 6.0
Hi,
we were on 4.7 and we recently upgraded to ECC 6.0 EHP4. When we were on 4.7, after a release, we used to monitor the import status of all the transports going in, using transaction SE07. Looks like this transaction wouldn't work anymore in ECC6.
I can access the transaction, but I cannot expand the "Execution" to see the status of the transports which went in today. 4.7 used to show all the transports which were impoerted on that day.
I know we can check the import logs by pulling up each transport, but SE07 will show you a consolidated list with all the detail and will be very easy to find what we are looking for.
We are on Oracle 11g on Solaris 10. Please help.
Regards,
VijayHi Tony,
I donot think it is an authorization problem. I have tried with a test user with full permissions and also with DDIC user, but still the same.
Regards,
Vijay -
/ASU/UPGRADE after the ECC6.0 EHP4 upgrade Finalization step
Hello all,
Needed some information on the ASU step in Postprocessing phase of the upgrade. We are upgrading form 4.7 to ECC 6 EHP4 and we are in the Postprocessing phase. The current step is to perform the /ASU/UPGRADE, and I wanted to know if I need to stop te upgrade to perform this step or I can proceed with the rest of the Post processing and Finalization phase and still do the /ASU/UPGRADE step. Please advice ASAP.
Thanks
DeepakHello,
we are in upgrade to ECC 6.0 EHP4 too and now at phase ASU/UPGRADE.
Note 1000009 advices to make adjusments in client 000, but we are working in client 100. And the procuced task list is client-dependent. So things like budget period or wage types are usually in working client.
Which is the correct client to use?
Regards,
Julia -
Technical differences between SAP Enterprise and SAP ECC 6.0
Hi,
Can anyone plz tell me what will change technically after the upgrade from SAP Enterprise to SAP ECC 6.0, in respect to reports, module pool programming and other technical logics?
Thx,
KKDifference b/t ABAP4.7 and ECC6.0.
Difference between R/3 4.7, ECC5 & ECC6 anyone?
http://help.sap.com/saphelp_nw2004s/helpdata/en/5b/8c3842bb58f83ae10000000a1550b0/frameset.htm
http://service.sap.com/releasenotes
/people/thomas.jung3/blog/2005/05/15/abap-46c-to-640-delta-training
Re: R/3 Enterprise v mySAP ERP 2003 v ECC 5.0 v mySAP ERP 2004
http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000497320&_SCENARIO=01100035870000000112&_OBJECT=011000358700000810532004E
http://help.sap.com/saphelp_nw2004s/helpdata/en/5b/8c3842bb58f83ae10000000a1550b0/frameset.htm
http://service.sap.com/releasenotes
See this weblog:
/people/thomas.jung3/blog/2005/05/15/abap-46c-to-640-delta-training
Re: R/3 Enterprise v mySAP ERP 2003 v ECC 5.0 v mySAP ERP 2004
http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000497320&_SCENARIO=01100035870000000112&_OBJECT=011000358700000810532004E
http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
A similar post
/message/1783778#1783778 [original link is broken]
You can go through the Release Notes for each of the versions after 4.6B (4.6C, 4.7 , ECC 5.0 & ECC 6.0)
http://help.sap.com/saphelp_erp2005/helpdata/en/43/688055b88f297ee10000000a422035/content.htm
For 4.7 SAP R/3 http://help.sap.com/saphelp_47x200/helpdata/en/12/9d78d6d8f74043a32e82be87e433b7/content.htm
Release Notes on SAP Web Application Server 6.30
http://help.sap.com/saphelp_47x200/helpdata/en/2b/64fc3e9d3b6927e10000000a114084/content.htm
http://solutionbrowser.erp.sap.fmpmedia.com/
http://solutionbrowser.erp.sap.fmpmedia.com/
http://service.sap.com/instguides
http://service.sap.com/erp
http://www.stonewayinc.com/clients/sap/bestoftour/presentations/SAP_BOT_2_Furlan_IBM.ppt
From the ABAP perspective, few differences are.
The WS_* function modules used in 4.6c has become obsolete from 4.7C. All the WS_* FMs have been replaced by GUI_* FMs.
(ii) Concept of Unicode is introduced.
(iii) Few tables have been modified in ECC6.0.
Tables TVARV & TTREX have been replaced by TVARVC & TTREXN respectively.
(iv) we have enhancement points and enhancement sections along with enhancemnts and BADI'S . and we can write the part of code in those points.
For functional differences please check out the following link:
http://solutionbrowser.erp.sap.fmpmedia.com/
ECC->enterprise central component.ECC 6.0 is the advanced version.if we consider in technical point of view then i can give u one example.
In the new version we have enhancement points and enhancement sections along with enhancemnts and BADI'S.SAP has provided these ,so that without going for access keys we can write our code in the enhancement points along with Standard SAP code.So now SAP has provided more user friendly environment.Also a new DEBUGGER also arrived with the new version.Now we can see more things in the new er version of DEBUGGER.
Reward points for useful Answers
Thanks
Murali Poli -
Advice on upgrade from Ecc 6.0 (No enhancement pack) to EHP 7
Dear Friends
Our customer is thinking about upgrading from ECC 6.0 (No enhancement) to EhP 7. Can anybody tell me what are major efforts, steps and approx. time and precautions to consider in this case.
thanks a lot in advance
VictorHi,
SAP Library for SAP ERP on the SAP Help Portal at http://help.sap.com/erp. Choose a
release and then choose Application Help. In SAP Library, choose Business Functions (SAP
enhancement package 7 for SAP ERP 6.0) -> Business Functions in SAP ERP -> Enterprise
Business Functions -> Accounting -> Financial Supply Chain Management -> SAP Treasury
and Risk Management.
Hope this helps.
Regards,
Jyoti -
Upgrade from ECC 6.0 to NW 7.10
Hi,
I'm trying to plan ahead for our upcoming hardware replacement (3 yr lease). We are also planning for an ECC 6.0 upgrade from 4.7 Enterprise (unicode). I know that the power 6 chip has a built in decimal floating point processing which I believe will be useable with Netweaver 7.10.
Is the upgrade from ECC 6.0(a NW7.00 product?) to NW 7.10 a full upgrade or is it more like a big hot pack?
The reason I'm interested is that I would like to think I could take advantage of the Decimal Floating point processor sooner than later. The other part of the equation is that we have a BI based on NW 7.00 now.
If I can avoid purchasing another i5OS and paying for a processor activation because there is now a math feature built into the processor , I'm all for it. I would like to start planning now if the upgrade to 7.10 isn't going to be too painful.Hi Craig,
From what I heard, there would not be another major ECC release in the near future. New functions have been and will be released in "Enhancement packages" - hopefully it is not another new term to you...
NetWeaver 7.1 has been released (Q3 2007? not Q3 2008 for sure). BI folks might know whether there will be a release 7.1 or not.
Best regards,
Victor -
Upgrade to ECC 6 - Changes in ABAP Features
Hi Fiiends,
Dear friends we are in process to Upgrade from version 4.7 to ECC6.
Can someone please help me with documentation about
changes in ABAP features ar any new features available in
ECC6
I have seen that there are ABAP debugger screen has totally
changes.
Thanks and Regards,
Gauravdiff between 4.7 to ECC 6.0 abap
main diffeences between SAP 4.7 and ECC 6.0 versions ?
diff between 4.6c to 4.7 abap
difference between SAP 4.6C and SAP ECC6.0
There is lot difference between 4.6c and 6.0
1) ecc 6.0 coming with inbuild webdynpro , BSP it is not 4.6c
2) In ecc we have interactive forms concept where it was not there in 4.6c
3) 4.6c there is no unicode concept here we have unicode and non unicode
ECC->enterprise central component.ECC 6.0 is the advanced version.if we consider in technical point of view then i can give u one example.
In the new version we have enhancement points and enhancement sections along with enhancemnts and BADI'S.SAP has provided these ,so that without going for access keys we can write our code in the enhancement points along with Standard SAP code.So now SAP has provided more user friendly environment.Also a new DEBUGGER also arrived with the new version.Now we can see more things in the new er version of DEBUGGER.
Few tables have been modified in ECC6.0.
Tables TVARV & TTREX have been replaced by TVARVC & TTREXN respectively.
Regards. -
SAP R/3 4.6B to SAP Enterprise UPGRADE landscape methodology
My primary question involves the upgrade landscape and its relationship with SAP's E-Buyer system.
We're upgrading R/3 in Q2 of 05. In all past upgrades I've done, I've used parallel landscapes; the existing DEV -> QAS -> PRD landscapes stays the same (for Production support throughout the upgrade process). However, since my last upgrade, we've implemented SAP's E Buyer application.
I do not think it's possible to maintain Dual E Buyer landscapes. This because of the configuration that's in our R/3 PRD environment that's dependent upon our EBP Prod system. It's all based on 1 logical system. Also, our E Buyer system was implemented in the CLASSIC scenario. Thus P.O.s are cut in R/3. This means that a symbiotic relationship exists between R/3 and E Buyer. Thus, critical E Buyer config is dependent on R/3 4.6b; it can't just be pointed at "the new R/3" AFTER the upgrade.
I believe the only way to upgrade now is to FREEZE E - Buyer and R/3 development in the "old" 4.6B landscape. In fact, I believe we have to come to the point in E Buyer and R/3 environments where the development landscape is "synched" i.e. all E Buyer Prod transports are in EBP PROD. This point has to be just prior to upgrading R/3. At that point, nothing short of a Prod break fix happens in the "old" landscape.
At that point in time, we simultaneously copy back Production R/3 to DV2 (where the R/3 Enterprise upgrade will occur) and E Buyer Prod to the EBD system. i.e. all post upgrade E Buyer-required work is done in EBD with the same (original) logical system.
It's important I understand this because my apps people are telling the business they can have multiple projects occurring in the "old" R/3 system landscape as well as E Buyer Development occurring concurrently to an R/3 Enterprise upgrade.
I don't see how that's possible.
To me, all new projects should occur in the UPGRADED landscape and be delivered at Prod cut over. Is there something I'm missing? I need to keep the business happy but being a Basis guy, I just don't see how they can have their cake and eat it to.
Any suggestions?Hi there!
I've done the same task in the very same type of Upgrade, I hope I can help you. SapScripts are not much affected by Unicode. You should check that the code (programs and functions) do not have any Unicode inconsistencies, by theese I mean not mixing type C with type X, not making assignments between variables of different structure and a lot of unimportant issues you will find, but I assure you they are very easy to fix. Just activate the unicode check and then check the syntax of the object.
Regards,
Pablo -
ERROR MESSAGE IN PPOME TCODE AFTER UPGRADE TO ECC 6.0
Hi Experts,
I have a question.
Recently our system went for upgrade and during testing phase we have found one issue.
Error message is appearing in PPOME transactio code after upgrade to ECC 6.0
The screen is getting defaulted to Budget section and unable to find the subtype as there are no subtypes available there and showing error message as "Fill in all required fields".
Please let me know your solution on this.
Regards,
Sekhar.Hi,
- you can deactivate the budget tab in the IMG-activity 'Hide/Show Tab Page'
(SIMG_CFMENUOHP1HFW20 alternatively use SM30 on view 'T77OCTABUS')
1. Create new entries for the following KEY:
a) Scenario OME0
b) Object type 'P', 'O', 'S'
c) Tab Page 'PBC_ORIG'
2. for each of this entries, set the 'Exclude Tab Page'-Flag.
- in case you do not want to deactivate the Budget tab:
The error occurs due to missing entries for subtypes in table T778U
for infotype 1516.
Please maintain the according subtyes you want to use if you create a
budget.
Regards,
Ana -
Asset query execution performance after upgrade from 4.6C to ECC 6.0+EHP4
Hi,guys
I am encounted a weird problems about asset query execution performance after upgrade to ECC 6.0.
Our client had migrated sap system from 4.6c to ECC 6.0. We test all transaction code and related stand report and query.
Everything is working normally except this asset depreciation query report. It is created based on ANLP, ANLZ, ANLA, ANLB, ANLC table; there is also some ABAP code for additional field.
This report execution costed about 6 minutes in 4.6C system; however it will take 25 minutes in ECC 6.0 with same selection parameter.
At first, I am trying to find some difference in table index ,structure between 4.6c and ECC 6.0,but there is no difference about it.
i am wondering why the other query reports is running normally but only this report running with too long time execution dump messages even though we do not make any changes for it.
your reply is very appreciated
Regards
BrianThanks for your replies.
I check these notes, unfortunately it is different our situation.
Our situation is all standard asset report and query (sq01) is running normally except this query report.
I executed se30 for this query (SQ01) at both 4.6C and ECC 6.0.
I find there is some difference in select sequence logic even though same query without any changes.
I list there for your reference.
4.6C
AQA0FI==========S2============
Open Cursor ANLP 38,702 39,329,356 = 39,329,356 34.6 AQA0FI==========S2============ DB Opens
Fetch ANLP 292,177 30,378,351 = 30,378,351 26.7 26.7 AQA0FI==========S2============ DB OpenS
Select Single ANLC 15,012 19,965,172 = 19,965,172 17.5 17.5 AQA0FI==========S2============ DB OpenS
Select Single ANLA 13,721 11,754,305 = 11,754,305 10.3 10.3 AQA0FI==========S2============ DB OpenS
Select Single ANLZ 3,753 3,259,308 = 3,259,308 2.9 2.9 AQA0FI==========S2============ DB OpenS
Select Single ANLB 3,753 3,069,119 = 3,069,119 2.7 2.7 AQA0FI==========S2============ DB OpenS
ECC 6.0
Perform FUNKTION_AUSFUEHREN 2 358,620,931 355
Perform COMMAND_QSUB 1 358,620,062 68
Call Func. RSAQ_SUBMIT_QUERY_REPORT 1 358,569,656 88
Program AQIWFI==========S2============ 2 358,558,488 1,350
Select Single ANLA 160,306 75,576,052 = 75,576,052
Open Cursor ANLP 71,136 42,096,314 = 42,096,314
Select Single ANLC 71,134 38,799,393 = 38,799,393
Select Single ANLB 61,888 26,007,721 = 26,007,721
Select Single ANLZ 61,888 24,072,111 = 24,072,111
Fetch ANLP 234,524 13,510,646 = 13,510,646
Close Cursor ANLP 71,136 2,017,654 = 2,017,654
We can see first open cursor ANLP ,fetch ANLP then select ANLC,ANLA,ANLZ,ANLB at 4.C.
But it changed to first select ANLA,and open cursor ANLP,then select ANLC,ANLB,ANLZ,at last fetch ANLP.
Probably,it is the real reason why it is running long time in ECC 6.0.
Is there any changes for query selcection logic(table join function) in ECC 6.0. -
Error during Upgrade of ECC 6.0 to EHP5
Hi,
I'm upgrading our ECC 6.0 system to EHP5 (on SLES 11) using SAPup.
The system check is blaming the os version (please see italic text):
Result of system check:
Window "SDTExecution Intervervention required":
Determined system information:
Type of operating system: Linux X86_64
Version of operating system: 2.11.1
Type of database: SAPDB
Version of database: 7.7.07.034
ERROR: OS version 2.11.1 out of range (too low) Upgrade the operating system at least to version 2.3. before you continue.
WARNING: OS version 2.11.1 out of range (too high) If this version is released for the downward compatible kernel you are using, please ignore this warning. If not, ask SAP for an individual release of your configuration. Do not continue before SAP supports your configuration.
So the ERROR message is wrong, the WARNING is correct. It seems the upgrade tool is expecting a version between 2.3 and 2.9. How can I handle this "wrong" error message?
Best regards,
Christian
Edited by: Christian Janson on Jul 11, 2011 8:24 AMHello,
under the link:
[http://service.sap.com/instguides]
in the left tree select:
--> SAP Business Suite Applications
--> SAP ERP
--> SAP ERP 6.0
--> SAP enhancement packages for SAP ERP 6.0
--> SAP enhancement package 5 for SAP ERP 6.0
i found the following text:
SAP Enhancement Package Installation on top of SAP ERP 6.0
The standard tool to install SAP ERP Enhancement Package 5 on top of SAP ERP 6.0 is the SAP Enhancement Package Installer.
Download the latest versions of the SAP enhancement package installer (SAPehpi) guide and the SAP enhancement package installer tool.
But in the download directory the tool SAPup is mentioned.
So I'm not sure, which tool to use. Sorry.
Regards, Michael -
What are the things to be test in Portal Upgrading the ECC from 5.0 to 6.0
Hi ,
I never been as part of the ECC upgrade project. we are going to upgrade our ECC system from 5.0 to 6.0. Also we have SAP portal in the landscape. Can any body guide me for the following points related to testing the Portal once ECC upgrade is done.
What is the approach need to be followed.
What are things need to be tested.
what kind of test scripts need to be created.
Please provide your suggestions and ideas..
Thanks
vijayHi,
In Upgrade you need to do all integration testing and check all functionalities.
Thanks
Sunny -
SAP R/3 4.6C Cable Solutions upgrade to ECC 6.0 DIMP
Hi all.
We are planning to upgrade SAP R/3 4.6C system (Cable solutions) to an SAP ECC 6.0 (EHP4 - DIMP). We have few questions related to this upgrade.
1. Since Cable solutions add-on is no more available in ECC 6.0 and its getting replaced with DIMP, what kind of data conversion/migration we need to perform before or after upgrade?
2. Is there a data migration document available in SDN or SMP? We could not find such document though the note 664712 says there is a document ""Migration from Cable Solution V4.6C/1A to DIMP""
3. Does the data conversion/migration will happen from SAP 4.6C to ECC 6.0 or it needs an SCM system?
Thanks & Regards
SenthilThank you for your reply Gerald & Sunny.
Still I am not clear on the following
1. Where do we get the CS-to-DIMP-Migration-Guide.pdf document?
2. Is SCM a mandatory? or all CS data can be migrated to ECC 6.0 DIMP system?
would appreciate, if someone can throw some insight
Regards
Senthil -
Hello,
I'm currently in upgrading a SAP R/3 4.7 system to a SAP ECC 6.0 EHP4.
Therefore I followed the Upgrade Guide from marketplace - installation- and upgrade guides - SAP ERP - SAP ERP 6.0 - SAP Enhancement Package 4 for SAP ERP 6.0 - Upgrade Guide SAP ERP including EHP4 SR1 - Unix on MaxDB.
I downloaded media from marketplace/swdc - Installations and Upgrades - SAP Application Components - SAP ERP - SAP ERP ENHANCE PACKAGE - EHP4 FOR SAP ERP 6.0 / NW7.01 - Upgrade.
I'm starting upgrade with upgrade master DVD 51036889_1 and 51036889_2.
Now upgrade breaks down in phase PREP_EXTRACT/PREIMP with error:
Severe error(s) occured in phase PREP_EXTRACT/PREIMP!
Last error code set: Single errors (code <= 8) found in logfile 'PREIMP.ELG'
PREIMP.ELG says:
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
R3trans preimport and RETURN CODE in R710VPE.REX
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
2EETW169 no connect possible: "maybe someone set invalid values for DIR_LIBRARY ('/usr/sap/REX/SYS/exe/run') or dbms_type ('ADA')"
Kernel is stored in /usr/sap/REX/SYS/exe/run and database is ADA (maxdb).
File R710VPE.REX says:
4 EPU201XBEGIN OF SECTION BEING ANALYZED
4 ETW000 R3trans version 6.13 (release 640 - 17.02.10 - 13:07:00).
4 ETW000 ===============================================
4 ETW000
4 ETW000 date&time : 07.03.2011 - 15:28:36
4 ETW000 control file: /usr/sap/REX/upg/abap/tmp/PREIMPTRANS.CTL
4 ETW000 > import
4 ETW000 > file='/usr/sap/REX/upg/abap/bin/R710VPE.SAP'
4 ETW000 > safeandslow=yes
4 ETW000 > buffersync =yes
4 ETW000 > commit =1048576
4 ETW000 > importtruncated =yes
4 ETW000 R3trans was called as follows: R3trans -w /usr/sap/REX/upg/abap/tmp/R710VPE.REX -u 1 /usr/sap/REX/upg/abap/tmp/PREIMPTRANS.CTL
4 ETW000 active unconditional modes: 1
2EETW169 no connect possible: "maybe someone set invalid values for DIR_LIBRARY ('/usr/sap/REX/SYS/exe/run') or dbms_type ('ADA')"
4 EPU202XEND OF SECTION BEING ANALYZED
Can anybody help me out here?
Regards,
JuliaHello,
I run 'R3trans -x' command, but there was no problem - connection to database was working.
Problem was following:
Before starting the sdt service on host, I set environment variables JAVA_HOME and LD_LIBRARY_PATH for sidadm. That's not neccessary and that was the problem. Without setting these variables it is working now.
Thanks,
Julia
Maybe you are looking for
-
Hi there! Perhaps you could help me with this issue. I have been trying to ugrade to OS X Mavericks but i keep getting this message: "Error 1004" Please help.
-
Advice for placing rotated graphics in a table
In order to help save some space, I would like to place 4 graphs in a 4 row x 2 column table and have the page in a landscape format (see attached PDF for the desired layout diagram). What type of cell should be used for the figure titles to get the
-
No Flash Video Playback on Internet
Flash Page with embedded video --- I can't figure out why the page plays locally just fine, but once it has been uploaded to a server, you only get the page and the controls - never the video. So, what is the secret? If you actually see the video, le
-
Variant YAE14 does not exist- F.27- Customer statement
Hi All, User is getting an error message as Variant YAE14 does not exist. Message no. DB612. Variant YAE14 is correctly assinged to the company code and variant and print program is correctly defined in OB77 and OB78 respectively. Kindly advice. Diag
-
Color match when printing problem
I have Snow Leopard, and I am having trouble getting blue to match when printing from Office. Can anyone help? I am running 10.6.8.