Range chart in SPC inspection

Hi Gurus,
How can implement range chart in SPC inspection? I can't find the range chart in the default chart of SAP QM module.My system version is R/3 46c SR2.

Lykin
U meant iSPCChart Display Template with Range Chart Type? or Wat?
There is one type of Range Chart called <b>XBAR-RANGE</b> in the iSPCChart Display Template available in the 'Chart' DropDown List in General Tab
This type shows two charts,one - upper Chart(an XBAR) another - lower chart(a Range).  A range chart plots the range of the characteristic values within the subgroup (Requires a subgroup greater than 1)
Regards
Som

Similar Messages

  • Problem in XBAR-RANGE Chart

    Hi All,
    I had created a XBAR-RANGE Chart which is showing the BAR chart in upper chart and RANGE chart in lower chart correctly. But the problem is that it is always missing a point in the bottom chart.For Ex: If there are 10 points in upper BAR chart, it is missing the 1st point and showing the remaining 9 corresponding points in the Lower RANGE Chart. Please provide the reason for happening so and the necessary modifications to be done.
    Regards,
    Srikanth.

    Number of points plotted would depend on the SubGroup size and the Sample Size you mention in your chart.
    Check those parameters.
    Then take a look @ the data details of your chart. May be that might give you a clue.
    Also look @ note number 1027407 , because if you are on a lower 11.5 version then your issue was fixed with 11.5.3.

  • Plot all rows on range chart

    Hi, I create a range chart and on my axis I have the task and for the values I have starttime with top value starttime and bottom value endtime.  It works, but I only see the first row for process file task it 8:00 - 8:15 and for export file its 9:00
    - 9:15.  I want to plot all the rows for task.  Any suggestions?
    Task Starttime endtime
    Process file 8:00         8:15
    Process file 8:30        8:45
    Process file 9:30        10:00
    Process file 10:30 11:00
    Export file 9:00   9:30
    Export file 11:15 11:45
    LISA86

    Hi LISA86,
    According to your description, you want to plot all rows in a range chart.
    In your scenario, you could create a range bar chart. Then specify the Top value as starttime and Bottom value as endtime. Then set the Minimums, Maximums, Intervals and Interval Types for Horizontal Axis Properties. Please refer to screenshots below:
    If you have any question, please feel free to ask.
    Best regards,
    Qiuyun Yu
    Qiuyun Yu
    TechNet Community Support

  • Ranged chart

    Hey...
    I'm making a small application where employees can put there vacation and get a grafical view with a chart.
    Thought that a horizontal ranged chart would be usable showing that, with the dates on the x-Axis and the employees along the y-axis.
    But I have problemes with my sql and can't find any information wether a ranged chart kan have 2 intervals on the same person in the same view (e.g. a employe having 3 days vacation, comes back for work a day and then have another 3 days vacation) ?
    Perhaps ranged chart can't use dates as values because I have this error in my sql (or perhaps its my sql abilities :). In sql below for the horizontal ranged chartquery I have tried to convert the dates to chars and have also tried without convering. None of them seems to work.
    select null, ferie_medarb_init, to_char(ferie_periode_start,'dd-mm-yyyy'), to_char(ferie_periode_****, 'dd-mm-yyyy') from ferie_periode
    Does anyone have any suggestion on how I can make it either with the ranged chart or in any other way ?
    Best regards
    Hans

    Post Author: jsanzone
    CA Forum: WebIntelligence Reporting
    satwar,
    There is no "trick", we're just victims of the limitation that WebI has in portraying XYZ type charts to our better liking.  I submitted a request to Business Objects Tech Support in Oct 2006 and became the proud holder of two ADAPTs:
    ADAPT00676587 u2013 for the scaling issueADAPT00676609 u2013 for the stacked bar chart, line graph issue
    When fully implemented, the scaling for Y and Z should be able to correspond to each other.  For instance, max value of Y and max value of Z will set on both scales the same max value.  I don't discourage you from submitting a trouble-ticket, perhaps if they get more noise on this situation they'll resolve my (our) ADPAT sooner, but just hoping....

  • Number Range for '01' type inspection lot

    Dear QM gurus,
    Inspection lot numebr getting increment by two instead one when doing GR against purchase order, please guide.
    Thanks in advance
    Kailash Thakkar

    It is impossible in SAP standard because the inspeciton lot origin can have one number range only.
    You can check why it is impossible in configuration.
    Customizing > Quality Management > Quality Inspection > Inspection Lot Creation > Maintain Inspection Lot Origins and Assign Inspection Types
    Regards
    Luke

  • Range chart to display timeline (start and end dates) side by side

    Hi everyone,
    I've explained my scenario in the image below. I'm using SQL Server 2008 R2 BIDS to accomplish this. Can someone help me or shed some light to get this going?

    Hi crmsurfer,
    If there are only those three fields in the database, the first question couldn’t be solved as per my understanding. As to other questions, we can use the following method to fix them.
    Click the StartDate value in the Values pane, set DrawSideBySide property to False under the CustomAttributes section in the Properties Windows. Then the two ranges in same group can be stay in the same level.
    Right-click the StartDate1 value in the Values pane, modify the top and bottom values as below:
    Top value: =IIF(Fields!Start_Date.Value=Last(Fields!Start_Date.Value),NOTHING,Last(Fields!Start_Date.Value))
    Bottom value: =IIF(Fields!End_Date.Value=LAST(Fields!End_Date.Value),NOTHING,LAST(Fields!End_Date.Value))
    Then it can fix the second issue you occurred.
    If there is another field named task in the database, then we can refer to the following steps to achieve your all requirement:
    Add Start_Date field in the Values pane as below:
    Top value: [Start_Date]               Bottom value: [End_Date]
    Add Name field to Category Groups pane.
    Add task field to Category Groups pane.
    Click the Start_Date value in the Values pane, set DrawSideBySide property to False under the CustomAttributes section in the Properties Windows.
    The following screenshot is for your reference:
    If there are any other questions, please feel free to let me know.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • I keep getting a Subscript Out of Range: 'Chart Month Index' error when running my data in Diadem 2012. I have Excel 07

    Can someone send me an email so I can get some help with this? I cannot post my data here as it is confidential, but I would email it to someone from support for assistance.

    Hi,
    In order to work directly with a support engineer, I would recommend creating a service request at http://www.ni.com/support/
    Regards,
    Lindsey W. | Applications Engineer | National Instruments

  • How to see Control chart for a specific date range in QGC3

    Hi
    I am developing SPC for my client.I am facing one problem.
    I am using one control chart for all inspection lot for a particular MIC.Free inspection point is used in inspection plan.
    Control chart is used 516.(XMR chart)
    Now when i am calling control chart for MIC executing QGC3,chart is showing results since creation chart date to todays date.
    Now if i want to see chart for a particular period or date range,what is the procedure.
    Thanks in advance
    Nilanjan

    Hi,
    1. Even though when i give the Created on, and to date the system is displaying the report which is prior to the created on date.
    2. Similarly the report data is different when the field is maximum no of Hits is given. for example when i giving this field as 10, 20, 30, etc the report is showing only 10 line items. if i enter 50, 60 etc it is showing the list for half i given.
    Note that system is having more than 1000 line items to display..
    Regards,
    R. Loganathan

  • Issue with displaying QM control chart for specific date range

    Dear All
    In our chemical mfg organisation, we just implemented SAP QM solution and things are working fine. I have implemented control  chart functionalities as below:
    SPC Criteria in Inspection Plan: Task List Charateristics / Material (0020)
    Sampling Procedure: Fixed Sample / SPC Inspection (without inspection point)
    We use process orders to get the inspection lots for products (material) and record results for the MICs and UD the inspection lots.
    Currently all our Control Chart have status 1 (created) and we have not moved any of those charts to status 3 and 5 yet.
    Using QGC1 when user trying to run control chart for any particular material in the plant and for a specific date range, report showing all the charts for that material with different MICs as expected. Though the result is NOT restricted to the selection dates either against "Lot Created On" or " Insp. Start Date" ( may be due to SPC criteria????) , its always showing all the result for any particular MIC for that material starting from go live till today.
    How to restrict the dispaly of result on the chart for any particular MIC against the Material / Plant within a specific date range ?
    Looking forward for your response.
    Best Regards
    SK

    Hi,
    1. Even though when i give the Created on, and to date the system is displaying the report which is prior to the created on date.
    2. Similarly the report data is different when the field is maximum no of Hits is given. for example when i giving this field as 10, 20, 30, etc the report is showing only 10 line items. if i enter 50, 60 etc it is showing the list for half i given.
    Note that system is having more than 1000 line items to display..
    Regards,
    R. Loganathan

  • SPC Chart step by step procedure

    Dear All,
    We are implementing SAP in one automobile industry, now they r using SPC for Inprocess Analysis. Suppose If production going for 10 hrs every 2 hrsd once they taking 5 samles and recording in sheet. After that the weighted average of sample and range they ploting in SPC. So every month once they checking Graph.
    Now Guide Me how to address this scenerio step by step procedure.
    In sampling Procedure what Valuation Mode and Control chart type i hve to use ( Here lot of chart type available)?
    In MIC what are all Prerequisites required.?
    In Inspection for spc mic which spc criterion i have to choose?
    Kindly explain me step by step procedure for this scenerio.
    What are all configuration required for SPC Chart in background
    Regards,
    sakthivel
    Edited by: ssakthivel on Nov 3, 2010 11:55 AM
    Edited by: ssakthivel on Nov 3, 2010 12:02 PM

    Hi,
    Here is the step by step procedure.
    In MIC in the control indicators activate the indicator SPC characteristic.
    in the sampling Procedure use valuation mode as SPC inspection as shown below and  then assign the control chart type. What control chart type to be used it depends on the business or client requirement.
    Now SPC criteria also depends on the business requirement. accordingly choose the required one in the inspection plan for MIC.
    Normally configuration is not required much here.
    Hope this helps
    Thanks
    Kumar

  • Spc chart

    hi,
    can some one tell how to get the spc charts from  the system- config, master data,etc. settings. how to export it to excel
    thanks in advance

    Create sampling procedure with fixed sample and valuation mode as SPC inspection with free inpection point-tick.
    Select suitable control chart type.
    In MIC maintain-
    lower limit,uper limit,target value,sampling procedure,spc characterictic,single result,fixed scope.
    Assign this MiC to inspection plan.
    After doing result recording,click control chart.
    Vishal

  • Control chart tolerance limits lines not shown

    As Run chart displays values of Single result, SPC Control charts also Displays these reults with tolerance limit  with Showing lines of uper and lower limit Tolerence. I have an issue while showing these lines .when i am doing result recording control charts Some times shows tolerance limit lines and some times not ? Kindly clarify me the SPC control chart process too?but my main question is that why SAP some times shows Results and sometimes not .
    More over I  already did all settings as below
    Sapmling procedure with Fixed samples ,and SPC inspection crieteria,
    Inspection plan -Inspection task list cahracterstics
    MIC
          Sampling proceudre -active
          SPC - Active
          Required Chrac.-Active
          Single result -Active
          Fixed scope -Active
    All settings of number ranges is set
    Control chart 115 -Shewchart X bar is using .

    Hi Vineeth,
    We are using SPC inspection chars, in results recordin it is not calulating the control limits automatically. When i click to calculate the control limits, getting the message Control limits for track 1 could not be calculated.
    Can you please let me know
    1) The process flow for SPC inspection results recording
    2) How to get the control limits automatically for SPC inspection chars.
    3) System will require some results to calculate control limts, right? So, till system calculates those control limits, how system will valuate results (will it be with specificaiton limits specified at inspection characteristics level), do we have any option of entering preliminary results so that system can control limits on bases of those results and so from very first inspection lot we have control limits for valuation?
    Thanks in advance
    Bob

  • Control Chart Query

    Dear Experts
    As part of SAP QM Implementation we are implementing control chart functionality to get graphical representation against measured values for pre-defined parameters. I am facing two issues mainly:
    1. When I try to calculate control limits (clicking calculator button) getting message "Control limits for track 1 could not be calculated". MICs has the upper limit and lower limit maintained which I can see in QAMV table for the inspection lots.
    2. In the attached control chart , I am getting Upper Limit, Lower Limit and the Valuated Result in graphical form, when I try to display the inspection date, for the characteristics against inspection lot, I get lost. System is showing some date 7/14/14 against all the characteristics which I am not sure how to achieve.
    Settings I made:
    Sampling type: Fixed sample
    Valuation mode: SPC inspection
    W/O inspection point
    Sample size: 5
    Chart type:115 Shewhart chart for X bar/USA
    MIC Settings:
    Quantitative / Lower / Upper Sp. Limit / Sampling Procedure / SPC Characteristics / Summerised Recording / Required Char.
    Inspection plan setting is:
    SPC criterion : 020 task list char/material
    Base qty : 1KG
    Control Chart Configurations:
    1. Control Chart Type -115
    a) Change Control Limit not checked
    b) Characteristics Type- Fixed Scope, Record measured values
    c) Reference Axis (x-axis) - Time of Creation ( Do I need to change here to "Object Number" or "Time Of Inspection" ?)
    Any input will be highly appreciated.
    Regards
    SK

    Hello,
    For Control limits your chart needs to closed. and offcourse for calculation u need to have more than one inspection lot. then system will calculate the same. UD is also required against lots.
    Regards

  • QM-Control charts

    Dear all
    i have checked all the parameters required to maintain control charts. but when i enter data for in process insp. lot and display control chart an error message occur
    "track 1 of the control chart does not contain any data"
    so please guide me how can i see the control chart and explain me to rectify that fault.

    Hi Shoaib,
    Check the following.
    Condition 1:
    In sampling valuation mode should be SPC Inspection and Control choose any control chart type.
    Condition 2:
    In result recording your MIC should be single result entry as well as you have to enter more than one result.
    Check and revert.
    Regards,
    Babu

  • Control chart limit calculation not being done

    Hi
    I have maintained MIC, sampling procedure and Insp plan for a char and have made two lots with them. Though charts are being displayed correctly, control limit calculation is not being possible. Msg is "Control limits for track 1 could not be calculated".
    What customization should be made for this?
    And in QGC1/2/3, only one insp lot is there, what went wrong?

    Dear Gajesh,
    I tried with status 3. When i remove lot created start date, it shows me the fist lot with which we statred SPC in SAP. But If i put any specified start date, it returns no value. Does that mean with status 3 it will show the very 1st lot with which SPC usage started? Then what are the cases for status 1 and 5?
    My sampling procedure setting is:
    sampling type: Fixed sample
    Valuation mode: SPC inspection
    W/O inspection point
    Sample size: 1
    Chart type:115 Shewhart chart for X bar/USA
    Inspection plan setting is:
    SPC criterion : 020 task list char/materia
    Base qty : 1KG
    Thanks!

Maybe you are looking for

  • Activation of imbedded files in Acrobat 9

    I created a pdf-file from a word document which contains objects like pdf-files, word documents (*.doc) and powerpoint presentations (*.ppt). In Word the embedded files are opened and can be handled whereas  in the pdf-version of my word document not

  • Crystal 2008 Runtimes Upgrade

    Previously, using InstallShield, I have installed the original version of the Crystal 2008 Runtimes as a prerequiisite to my application. I am now looking to deploy a new version of my application and with this I would like to include the SP1 (Fix pa

  • How to move object in z direction using the mouse

    I have some problems with java3d. Could you please help me with it? I am designing a user interface and so would like to allow the user to interactively move the objects in the 3d world, using the mouse. But presently I can allow them to move it only

  • When the iPhone 4 with IOS 5 is connected by cable to iTunes and check for update results in Error 1630. plz help me

    When the iPhone 4 with IOS 5 is  connected by cable to iTunes and check for update results in Error 1630, plz help me to update plz

  • Optical digital audio cuts in and out

    I am connecting my new Apple TV 2010 to our Bose Lifestyle 28 (Apple TV HDMI to VS-2 and Apple TV Optical Digital to the Bose Lifestyle). After power cycling the Apple TV the audio works but cuts in and out every few seconds. All thoughts appreciated