Raw material procurement based on the LTP Plan

Dear Friends,
How can I create a procurement proposals based on the LTP Plan. For example for material A, I am doing the LTP planning for entire Year. As per the LTP plan I got the Raw material requirements. I don't want to make the total plan as active. That means I don't want to create PIRs for my finished material A for the entire year. But  as per the LTP plan of finished material A... I want to create a procurement proposals for the raw materials for the entire month through schedule lines... How can we do it?
If any further clarification is required... please let me know.
Regards.

Hi,
Based on the forecast for the material A, the simulative planned orders will generated for its raw material duirng the LTP run.
If you want to convert hte planned proposal into PR then you can run MD43 for the particular Raw material.
Before running MD43, in MS04 - set firming date and then run MD43, planned orders will get converted to PR (firmed). Then run LTP again using MS02 (then the planned orders get deleted)
Please check and come back if you need any clarification
Thanks,
JK

Similar Messages

  • Raw Material Costing with Overhead, Product Cost Planning

    Hi,
    I have an issue applying overhead to purchased raw materials. We need to apply this overhead for only a certain materials. So, I have defined a overhead key/overhead Group, and assigned the group in the material master of the raw material. The overhead is 2% freight on raw material costs.
    In the std.costing variant, I have assigned the costing sheet under Overhead on material components tab of the corresponding valuation variant. I have also included the Freight OH in the cost component structure.
    However, when I run the costing with CK11N for the raw material, it is showing only the raw material cost, not the overhead.
    What could be the problem?
    I appreciate your help.
    Thanks,
    Ram

    Is the overhead rate a percentage type or quantity based?
    Have you maintained both actual and plan rates (1 & 2) under define % based OH rates or Qty based OH rates accordingly?
    Does the validity date (in define OH rates )cover the date of costing?
    Is the Costing sheet assigned to the valuation variant at plant level?
    Is the OH base in the costing sheet includes the cost element of the raw material?

  • Material Statuses based on the Purchase order Document type

    Hi Experts,
    We need to maintain the Plant material status based on the purchase order document type.
    Example - If I am using NB for normal purchase orders and ZB for STO procurement then, there should be a material status which should give warning message - 'do not use ' for ZB STO purchase orders and it should allow to create NB purchase orders for that same materials.
    Please advise what are the possibilities?
    Thanks
    Regards
    MM

    Hi Gurus,
    Thank you for  your reply, Please find my replies below
    @@ - Mallinath - We need this restrictions for some type of materials ( with specific Material types) which should not be procured through inter company STO process, buying plant should use the normal purchase. for other Material types they should be able to use the inter company STO process.
    @@ DEV - We are already using the Spl. Procurement keys for inter company STO process.
    Example - Material type ZXYX should not use the inter company STO process, but it should be allowed all other processes.
    Please advise how we can control this process?
    Thanks
    Regards
    Raja

  • Raw Material Procurement, Purchasing

    Hi,
            We have a plant in which they do Raw Material Procurement,Purchasing everything manually which is SAP WM managed,they are planning to bring Raw material Procurement,Purchasing into SAP now.Can any one help me in what needs to be done or considered in terms of Configuration,Master data and Procedural steps.
    Thanks In Advance,
    Balu
    Edited by: Csaba Szommer on Aug 29, 2011 10:58 PM

    HI,
    too big a question to reply
    if u need specific info any one of us wud be happy to help
    Reg
    Dheeraj

  • Regarding Raw Material Procurement Cockpit

    Hello everybody.
    I am test the new business function named raw material procurement cockpit(RMP Cockpit).
    I just checked the following SAP information.
    Raw Material Procurement Cockpit - Consumer Products for Food and Beverage Industry (PP-PI-CFB) - SAP Library
    But I cannot find the restrictive condition information for RMP cockpit.
    For example, if use the subcontracting function for Japan-specific, the cost calculation cannot be used.
    Would you like to tell me the restrictive condition for RMP cockpit?
    or show me the way to find the information about RMP cockpit restrictive condition.
    Thanks in advance.
    BR,
    Tadayoshi Son

    In SFW5, click on impact analyzer and then details for the business function.
    Check the transaction codes that are affected.

  • About Raw Material Procurement Cockpit

    Hello everybody,
    I am testing the function for raw material procurement cockpit.
    It is a web dynpro application and executed in the SAP NetWeaver Business Client.
    Has anyone know the effect for it?
    Your information will help me to decide this function to use or not.
    Thanks advanced.
    Best regard,
    Tadayoshi Son

    Thanks for your reply.
    I have read the info you mentioned aboved.But I cannot find the restrictive condition for RMP cockpit.
    If the new business function is activated, I must check the extent of the impact for it.
    For example, if use the subcontracting function for Japan-specific, the cost calculation cannot be used.
    Would you like to tell me the restrictive condition for RMP cockpit?
    or show me the way to find the information about RMP cockpit restrictive condition.
    Thanks in advance.
    BR,
    Tadayoshi Son

  • Material Valuated based on the % content

    Hi experts,
    I have a business scenario where I buy a raw material from a vendor which will be managed in batches.
    When goods receipt is made accounting documents are created based on the active component (in %) available in the batch.
    For e.g.: if the batch is 100% pure, then the GR is made at the PO price.
    if the batch is 50% pure, then the GR is made at half the PO price.
    I have created class and characteristics and attached to the material.
    But when I make a GR I am getting an error "No proportion valuations exist for material XXX in valuation area XXX".
    Expecting Ur guidance,
    Adhi.

    Hi
    In class have you maintained organizational area "S"?. And there are many check points you need to check.
    See the below link. it will help you
    http://help.sap.com/saphelp_46c/helpdata/en/dd/6a5c580f6011d383720000e8a5eb64/content.htm
    Regards
    Antony

  • QM process in Raw material procurement

    Dear friends
    I wanted to know what is the QM role in procurement of Raw Material. I know that at the time of GRN, we can post the GRN to Quality stock( blocked stock). But after that what would be the process from a QM perspective. Do we need to transfer the QM stock to unrestricted stock after inspection? If yes, then what movement type will be used.
    A small process flow would be very useful, starting from the GRN.
    Pointss will be rewarded for replies.
    Thanks in advance
    Amit

    Hi
    Buyser creates PO>GRN is made in factory>Before that MM should maintain QM view & inspection type 01 should be active.>after GR made(101 Mvt) material comes to QI stock-->Quality perpole will take usage decison of accept or reject immediatly after lot create in QA32
    If they accept the material-->321 mvt
    if they reject the material-->122 mvt
    if they put in block stock-->350 mvt.
    when Quality post material to unresticted from there it is issued to stores...
    I hopw i have made you understand.
    Regards
    Sujit

  • How to find the list of material variant based on the characteristics value

    Hi
    We are creating materials variants for FERT Material Type in material master in MRP-3 view .There we configure the variant by attaching characteristics value 
    Now we want to have a report , which can give the list of material variants , if char value is given in selection
    Can somebody guide me if there is standard report for this OR what is the linkage in Table , so that we can develop a report
    rgds
    Sandeep

    I couldn't find a standard report to get the material variants based on characteristic values (the nearest I could find was CT12) but I wrote a report some time back here's the table join logic for the main select statement.
    select a~matnr
            e~atwrt
            h~atwtb
    into table i_tab
          from MARC as a
          inner join IBIN as b
          on b~instance eq a~cuobj
          inner join IBIB as c
          on c~ibase eq b~ibase
          inner join IBINVALUES as d
          on d~in_recno eq b~in_recno
          inner join IBSYMBOL as e
          on e~symbol_id eq d~symbol_id
          inner join CABN as f
          on f~atinn eq e~atinn
          inner join CAWN as g
          on g~atinn eq e~atinn
          and g~atwrt eq e~atwrt
          inner join CAWNT as h
          on h~atinn eq g~atinn
          and h~atzhl eq g~atzhl
         where     a~matnr in s_matnr
                and e~atinn in s_atinn
                and e~atwrt in s_atwrt
               and b~valto eq '99991231235959'. "This is important condition
    I included bare minimum fields to suite your requirement needs you can add whatever other field you want . Though I tested the table join, I suggest you to test it again before writing your own ABAP program using SE16N.

  • Check in migo while gr raw material should equal with the challan materials

    hi friends,
    while doing gr in migo there should be a check for  the raw material's which we are giving should match with challan materials. Here challan no is entered at the excise invoice tab- subcontracting challan level.
    points will be rewarded,
    thanks in advance ,
    prasad.

    Thanks for your kind reply,
    But is there a way solve this problem?
    And what is the use of leaving a field in the account assignment tab for an internal order while creating a PO and it will not take advantage of the settlement rule????????
    And as you know the internal order settlement is a way to create a multiple account assignment
    Can we solve the problem by making an automatic fake transaction that reverse the value of the GR/IR and creating another transaction can apply on it the settlement rule??
    You know that settlement rule process is one of the best features in the SAP system it save time and effort to make distributions manually

  • Optimization of raw material while issuing from the stores

    Dear Techies,
    I need a small information regarding,Optimization of raw materials of "arc shape "while issuing from the stores it self.
    I will explain this with an example.
    Say we require a flange ring.This flange ring can be manufactured using three -120 deg segments.
    while calling the raw material below the flange rings material ,we have to give raw material dimensions of " 1X120 deg segment".System will accordingly multiply for the requirement of 3-segments.
    In this situation is there any possibilty to " Club" the raw material to minimize the scrap,ie., we can accomdate another segment just below the other segment.With this type of arrangement I can optimize raw material required.
    Is there any possibility in SAP that I can address this situation.
    Thanks In advance,
    With best regards,
    Kiran.

    Hello,
    according to my knowlege it is not possible in SAP.
    you have to create interface with Softwares like PRO-E sheet metal.
    Regards
    AM

  • Restiction of material types based on the industry sector?

    I have developed  specific industry sector for my client and also developed specific material types (Z*) for them.         
    But then i cannot prevent my user from creating the material master with the incorrect industry sector and also they are able to create material types choosing the incorrect material type?
    Can somebody please advise how to restric this.
    Thanks
    Regards

    In the MM01 trxn ..
    Enter Industry sector & Material Type.
    then Click > Defaults > Industry Sector > Put tick to Industry sector ..
    So, that the Z* Industry sector will become Default..
    As user will not see Industry sector , there is no Question of changing..
    Pls do it for All Users..

  • Raw material Planning

    Suppose I am raising Sales order for same material from different plants.When i run MRP the sales order will be taken into consideration & it will create planned for base materail for which it sales order has been created.Will it create Planned order for
    the raw material required for manufacturing the base material if raw material is not available.

    Hi,
    If raw material is not available, then system will raise a PR automatically as per lot size you have specified in the material master.
    Regards / US

  • Where we enter raw material reservation qnty for planned order in monthwise

    sir,
    as per client requirement in every month raw material reservation quantity fixed for planned order in monthwise.
    in sap Where we entere raw material reservation   for planned order in month wise nov, dec, jan and whre its show.
    is it possible after mrp run.can we check that raw material reserve stock in mmbe for planned order.
    pl guide me step by step

    Dear Prakash,
    1) in MMBE, you cannot see Reserved qty against plan order ( it is not a confirmed receipt )
    2) the reserved qty which is shown in MMBE is against production order
    3) only after converting plan order to production order ( Header material )
    4) dependent requirements will convert into reservations
    Regards
    kumar

  • MRP for FG not looking at Raw Material

    HI all,
    I'm running MRP for finished goods material against my production plan (created in MD61).   The material has a BOM component but when I run MRP for the FG its not looking at BOM component to consider raw material) availability and thus proposing dates solely based on the Production Plan and not any other requirements.  
    It simple creates the planned orders based on the production plan entered into MD61.  The dates for the planned orders don't take into consideration that on the suggested Production date there is not enough raw material to actual produce the product.   
    The Production plan does drive requirements to purchase the raw material but the dates are not neccessarily correct to get product to the warehouse on time for production run.   
    FG set up:
    RP Type:                                PD - MRP
    Lot Size:                                 EX u2013 Lot-for-lot Order Quantity
    Safety Stock:                         125  - EA
    Availability Check:                   02 u2013 Individual Requirements
    Procurement Type:                   E - In-House Production
    In-house Production:                 1 - days
    Planning Strategy:                   10 u2013 Make-to-stock production
    BOM / Raw Material set up:
    RP Type:                                PD - MRP
    Lot Size:                                 EX u2013 Lot-for-lot Order Quantity
    Availability Check:                   02 u2013 Individual Requirements
    Procurement Type:                    F - External Purchased
    Pland Del Time:                         3 - days
    GR Process time                       1 - days
    Planning Strategy:                   40 u2013 Planning with Final Assembly
    How do I get the MRP for the FG to not only create the planned orders from the production plan but also take into consideration raw material availability?   Thanks for your help!!

    VC,
    I need to the PlndOrd date for FG to take into consideration raw material availability...otherwise it's pretty useless to the site.
      I guess you are unfamiliar with the workings of standard MRP.  MRP in ECC as delivered by SAP will not support this requirement.
    There are a couple of assemble to order strategies that may be suitable for you, if all of your RM materials exist in the FGs BOM.  Strat 81 and 82, which are intimately linked to the Sales order ATP check.  These strategies are not compatible with FGs forecasts.
    http://help.sap.com/erp2005_ehp_06/helpdata/EN/41/19206a45fd11d188ff0000e8322f96/frameset.htm
    In SAP ERP, MRP just does not check the availability of components during the MRP run.  The Net Requirements calculation of a component part (which is the closest concept within MRP to an Availability check) takes place ONLY after all parent parts are completely planned, and all parent part planned orders have been already been generated and saved.  In effect, when MRP is running, information is neither gathered nor considered as to what the planning situation will be for the components.
    APO has several solutions that, depending upon the detailed requirements, might provide a solution.  A common one is to first run an MRP type heuristic, to create planned orders for all the shortages, and subsequently run a 'Bottom-up' scheduling heuristic to bring supply and demand dates into alignment, based upon pegging information.  ERP does not have this functionality.
    Of course, SAP ERP is infinitely modifiable.  If you have enough time and money, you can write custom code that will torture ERP into filling any Business Requirement.
    Best Regards & Good Luck,
    DB49

Maybe you are looking for

  • Conversion of character sets (UCS2 of MSSQL to AL32UTF8 of Oracle Warehouse

    Hi all, I installed my enviroment as below. Server: Windows 7 Professional SQL Server 20012 Character Set: UCS2 Client: Linux REDHAT 5 Oracle Warehouse 11gR2 (11.2.0.1) Oracle Database Gateway for MSSQL Server 11.2.0.1 Character Set:AL32UTF8 I instal

  • How resource intensive is UIWebView?

    I need some variable text formatting while displaying a string. Unfortunately UITextView applies properties to the ENTIRE string. I am thinking about using UIWebView to format the string with HTML. I will need many UIWebViews though, because they wil

  • Acquiring DC Voltage Signal from HP3457

    I have a question that I believe to be easy to solve. I am using LabVIEW to acquire DC Voltage from a HP3457A DMM. I can acquire the signal OK, but when I write the data to an lvm file only about every 8th measurement is correct (with the others bein

  • Limit access for 1 month

    I would like to limit people access to a training course for a period, such as 1 year, from the time they have been given initial access, is this possible? Thanks

  • How To:  Loop Audio In Timeline

    Hi, Sorry if this is a bit newbieish but I am just learning the product and the MAC all at once. I am using a loop clip from Soundtrack, say the typewritter sound. I am typing some text on my screen and matching the typewritter sound up with it. The