RBA - use of rounding profile/settings during Interchangebility

Hi,
We are using the product-location interchangebility dung RBA ATP check at the time when PR's get converted into PO's.
Rounding profile/value of predecessor product is different than that of successor product. We want both the values to be considered while system perform ATP check through Rules maintained at location level.
The illustration of the same is -
Product A has rounding profile/value = 54, it has stock of 30 at location L1
Product B has rounding profile/value = 84, it has stock of 100 at location L1.
PR of quantity 54 is been created at location L1 for product A. We confirm this PR into PO & during this time, ATP check is performed for product A@L1. As it has not sufficient stock, product A is been replaced by product B (the substitution is maintained in RBA). But, in our case, the PR of 54 is getting created for product B wherein it should get created for 84 as rounding profile/value = 84 is maintained for product B@L1.
Can anyone come across the same problem?
Your inputs on the same are highly appreciated...
Thanks for looking into the issue.
Rgds
Jay

Data is always maintained on an article, sales organization and distribution channel basis. It can be made customer-specific through the creation of customer-article information.
You have the following control options:
1. <u>Customer master</u>
You can deactivate rounding at customer level for each distribution chain by deselecting an indicator.
2. <u>Item category in Customizing</u>
In Customizing for sales documents, you use an indicator for each item category to switch the rounding function on or off.
3. <u>Article master / customer-article information</u>
Minimum quantity (Minimum order quantity or Minimum delivery quantity field)
Maximum quantity (Max. delivery quantity field)
Delivery unit (two fields for Delivery unit)
The delivery unit comprises an increment and a unit of measure. If you define an increment, the system rounds off the delivery quantity so that it can be divided into whole numbers by the increment.
You only have to enter a unit of measure for the increment if the unit of measure is not the base unit of measure. Otherwise, the increment refers to the base unit of measure.
Rounding profile (Rounding profile field)
Unit of measure group (Unit of measure group field)
Variable sales unit

Similar Messages

  • I get "App Store Disabled" on my MacBook Pro due to profile issues. What Terminal command can I use to reset profile settings?

    After transferring documents from one MacBook Pro to another I get some weird errors due to settings that seem to have transferred over. One is that the Mac App Store is disabled.
    Are there any Unix / Terminal commands I can use to reset these?

    Forgot Your Account Password
    For Lion/Mountain Lion
        Boot to the Recovery HD:
    Restart the computer and after the chime press and hold down the COMMAND and R keys until the menu screen appears. Alternatively, restart the computer and after the chime press and hold down the OPTION key until the boot manager screen appears. Select the Recovery HD and click on the downward pointing arrow button.
         When the menubar appears select Terminal from the Utilities menu.
         Enter resetpassword at the prompt and press RETURN. Follow
         instructions in the dialog window that will appear.
         Or see Reset a Mac OS X 10.7 Lion Password and
         OS X Lion- Apple ID can be used to reset your user account password.

  • Rounding Profile for Material Staging

    To All
    Is it possible to use a rounding profile for materials used in material staging transaction LP12?
    Currently it totals production order demands. e.g.
    Prod Order 1000000
    Material A
    Requirement 0.6kg
    Prod Order 1000001
    Material A
    Requirement 0.7kg
    So quantity to be staged to the PSA is shown as 1.3kg.
    I know I can manually overide the quantity and enter 2 kg and process. However, how can I get LP12 to 'round up' the total quantity so that the screen diplays 2 kg to process instead of manually entering it?
    Do I use the Rounding Profile in MRP1?

    Rounding Profile is used to define the quantity of the planned orders during MRP run. It's not related to staging.
    I wonder if you can use some different strategy in the control cycle : "2" crate parts and this can solve your issue...
    But if you can work wtih cummulative quantities from released order, there is no solution in the standard.
    Another option to explore is the HU (handling units) .

  • Rounding Profile in Quota Arrangement

    Hello all Gurus,
    Can somebody please explain me how to use the rounding profile in quota arrangement? When I am trying to give a rounding profile in quota arrangement in MEQ1 transaction, the system is asking me to create the rounding profile. Can somebody please explain me how to create a rounding profile in SPRO?
    Kindly give me the details explanation and steps involved in creating/maintaining a rounding profile value in quota arrangement.
    Thanks and Regards,
    Umakanth
    Moderator message: not directly related to ABAP development, please have a look in the appropriate functional forum.
    Edited by: Thomas Zloch on Nov 30, 2010 12:46 PM

    Hi ,
    If the order qty is 44,  operation qty should become  3 because 21 + 21  = 42 and one more 21 should come into picture.
    Currently it is becoming 2 and this is wrong.
    Increasing decimal place will  not hep.
    Regards.

  • Rounding profile in material master sales view

    Hi, can anyone advise if we can use the rounding profile to check the qty entered rather than system rounding the qty automatically in the sales order?
    Thanks
    PP

    Pls ignore...this is a duplicate thread.

  • How do I access profile settings in ios 6? I used to be under general settings in ios 5.

    I am trying to access profile settings in ios 6.0.1, but it is not there on my iphone 4s. It used to be under general settings in ios 5. Can anyone help? I am trying to delete a profile setting that I do not use anymore.

    So, the profile section is the place where you can add, for example, a wifi profile from your school that is used for authentication, or a profile from freemyapps. This is the profile I am talking about. I am not able to find it on the 4s in ios 6 for some reason. Do you guys know? Would really appreciate it.

  • GoPro Camera Raw Lens Profile settings not working for image sequence in Photoshop/AE/Premiere CS6

    Hey Everyone,
    I'm in need of assistance in either Photoshop CS6, After Effects CS6, or Premiere Pro CS6.  I just installed the trials after seeing Russell Brown demo the GoPro Lens Profile correction feature in Camera Raw.  Basically what I'm looking to do is make adjustments (in Adobe Camera Raw) to a series of still images (shot with the time-lapse mode on the GoPro) and then either export those stills through Photoshop or Bridge to a temporary movie file that will be imported into a timeline (with other video clips), or import the JPG files (with Camera Raw settings) directly into After Effects or Premiere as an image sequence.  The latter would be preferable as it'd avoid the extra step of having to render the intermediate/temporary movie file.
    Right now, my current workflow for GoPro time-lapses is:
              - use Bridge CS4 to do basic color correction on the still images
              - save those as TIF files
              - run the TIF files through a custom script to have Hugin 2012.0.0 (open source pano stitcher) remove the fisheye distortion
              - open the new TIF image sequence into QuickTime Player 7 (Pro)
              - export the image sequence as a QuickTime movie file
              - import the movie file into Premiere Elements 10 to place on a timeline with other video clips (as Premiere Elements can't handle the sequence(s) of thousands of still images without crashing)
    If I can go directly from Bridge to a timeline, it'd save a lot of processing time (and it'd be much nicer to preview the images in Bridge without the fisheye distortion)!
    I can prepare the GoPro JPG files through Adobe Camera Raw in Bridge CS6, though when I go to import the JPEG image sequence into Premiere Pro CS6 or After Effects CS6, none of the Camera Raw settings are applied.  If I export the Camera Raw files in Bridge CS6 as DNG files (a step I'd really prefer to avoid) and then import the DNG image sequence into After Effects CS6, the Camera Raw settings are applied except for the Lens Profile settings -- I can pick other cameras but not the GoPro lens profiles when the DNG image sequence loads in After Effects.  It also appears that once I open the DNG files in After Effects CS6, I can no longer access the GoPro Lens Profile in Adobe Bridge CS6 -- the list changes to the same list I get in After Effects.  Premiere Pro CS6 doesn't let me import the DNG files at all.  I've also tried to import the JPG files (as well as the converted DNG files) into an image sequence in Photoshop CS6, though it doesn't allow me to do so (the Image Sequence checkbox is grayed out after I apply the Camera Raw settings in Bridge).
    There could be an issue going on with different Camera Raw versions.  I didn't have Premiere Pro CS6 installed during my initial testing, though now do notice that the Camera Raw dialog in Bridge CS6 only lets me choose compatibility up to "Camera Raw 7.1 and later" when I choose to export the files as DNG.  I thought Camera Raw 8.2 was an option there a couple days ago when I only had installed Photoshop CS6 and After Effects CS6 (though am not 100% certain).
    Please let me know if there is some workaround to get the GoPro lens profile Camera Raw corrections applied in an image sequence in one of the Adobe CS6 products (without having to export the files as temporary TIF or JPG files out of Camera Raw).  I'd greatly prefer to shorten my current workflow for these files.  (I just updated the CS6 trials and have tested all three programs again though I still get the same results described above.)
    Does Lightroom 5 have any option to export Camera Raw image sequences as movie files (or any other feature that might help in simplifying my current workflow)?  I can't install the trial right now as it's not compatible with OS X 10.6.8.  I'd consider upgrading OS X if I knew Lightroom 5 would do what I need, though am waiting for any potential color profile issues to be resolved in OS X 10.9.
    I can open the image sequence in Photoshop CS6 if no Camera Raw settings are applied and then use the Lens Correction Filter to apply the GoPro Lens Profile settings, though I really prefer the Camera Raw interface in Bridge for tweaking image settings.  As soon as I apply Camera Raw settings to the first image, Photoshop CS6 grays out the image sequence checkbox.
    If there isn't a way to take Camera Raw files straight from Adobe Bridge to a timeline, I may stick with my current workflow using CS4 and see what I can do to better automate some of the steps as the TIF export in Bridge, fisheye distortion removal in Hugin, and render in QuickTime Player all take quite a while.  I won't mind waiting for all the processing if I can set it and check back on it in later the next day when it's fully complete.  Is there a way to have Adobe ExtendScript execute an external shell command (i.e.: a command I could type into the bash shell in Terminal in OS X)?  If not, is there a way to call/run an ExtendScript script from the command line and pass a parameter to it that my custom script could use?
    Thanks in advance,
    Mark

    Can you zip up a few of your GoPro images, upload them to dropbox.com and post a share link, here, so others can experiment with them, or do you mean this issue is global to all camera models?

  • Delivery unit / Rounding profile for a specific customer

    Dear Expert,
    A specific customer has to receive full case/box for specific products (for ex 1 case = 20 EA, if the customer orders 24 EA, he will receive 20 EA = 1full case). For other customers there is no restriction, they can order 1EA... The orders come via EDI and customer service is not able to control each order.
    Thank you very much for your help!
    Regards,
    Robert

    Hello Robert
    Csaba gave a good suggestion but it won't completely resolve your issue because it won't handle the Delivery Unit part of it.  It may take care of the rounding up/down business but won't change the units to Cases when Eaches are ordered.
    I tested with Material Determination, it may take care of Delivery Unit  angle but can't handle rounding up/down.
    So I think best option for you is to try one of these 3:
    1) Control at mapping software end to change the order quantity/units based on customer and material.
    2) Using customer functions in Function Module IDOC_INPUT_ORDERS
    See OSS note: 753153 - FAQ: Customer-functions in IDOC_INPUT_ORDERS
    For both of these 2 above, you need to work with your EDI specialist team.
    3) Use user exits during sales orders processing- Set up a custom table which specifies the delivery unit and rounding profile to be used for the set of customers and materials, preferably create a customer group and material group and use that in table rather than specific customers and materials. Probably you could use MV45AFZB-USEREXIT_CHECK_VBAK/USEREXIT_CHECK_VBAP.
    Hope this helps.

  • Contract vs inforecord - rounding profile

    Hi,
    can someone please help me with the following problem:
    Currently we are using inforecords for maintaining price conditions and other characteristics for a material / vendor combination. We now want to use contracts. Contracts have a higher priority than inforecords in source determination.
    Now we are struggling with the fact that following fields in an inforecord are not present in a contract:
    - Rounding Value
    - Minimum Order Quantity
    How can we deal with this?
    1) Can the system be set up to use contracts and inforecords together and refer to these two documents in the Purchase Requisition (preferably automatically during source determination)? Is this a normal business process ?
    2) You can indicate in the field 'info-update' that an inforecord needs to be created upon saving of the contract. What is the purpose of this from a business perspective ?
    3) Can these fields be added to a contract in a standard way ? As far as I can tell, these fields cannot be selected for contracts in customizing.
    thx
    Lode

    hi,
    Please check in Material Master -MRP1 view where you can enter the
    Minimum Order Quantity
    For rounding profile you have to do the customization in SPRO
    G.Ganesh Kumar

  • How can I share the same Firefox profiles / settings among multiple users on Windows XP?

    I am installing Firefox on Windows XP and have imported all settings, add-ons, etc, from a previous installation.
    I did the installation under the Admin account, but I would like to have the same settings and everything else available to some of the other users on the machine (but not all). How can I do this?
    Thanks.
    -Danny.

    I understand what is in and where the profiles are, but my issue is that I want Firefox to let me use the same profile whether, for example, I am logged onto the XP system as "Admin" or "User1" I do not want to share the same profile for all users of the machine, just specific users, and I do not want to have to duplicate all of the information that is in the profile in each of the specific user's Application Data settings folders under XP (C:\Documents and Settings\USER-NAME\Application Data\Mozilla\Firefox\Profiles\[profile-name]) for the user's in question.
    Am I making sense here?
    Thanks,
    -Danny

  • Rounding profile in the material master doesn't copy to the inforecord

    RT,
    Dear all, have you ever encountered this kind of problem?
    Wishing get the answer as soon as possible from you!

    HI,
    Did you customize teh rounding profile appropriately in SPRO?? you need to maintain them. moreover this should happen even before a PO is created, i.e while a requirement generates. the rounding takes place during planning run in MRP

  • Why Won't Photoshop Sync my Color Profile Settings?

    I am using a Lynda.com tutorial for color management by DEKE MCLELLAND and after following his instruction to change my color management settings in BRIDGE AND ILLUSTRATOR to use the color profile ADOBE RGB (1998), I receive this message when switching to Photoshop to check if it has synced as well as the other two programs: "The color settings file contains settings that are not supported by this version of Photoshop running on this system.  These unsupported settings will be reset to their default values."
    I have tried several times and it simply will not sync
    I am using a MAC PRO (late 2007) 10.9.4.

    You are the perfect candidate for Adobe Support CHAT. You will speak with someone from India, but they are very smart, and very polite. It may take an hour or so, but every problem of this type I've had, they have been able to solve.
    http://helpx.adobe.com/contact.html?step=PHSP
    Just fill in the stuff until you see the "Contact Us" link, after which you will see the CHAT link.
    Be patient, and good luck.

  • Profile settings not saved when OS shuts down! :(

    Hi guys! I'm a proud Mac convert but I'm having a little bit trouble with saving my profile settings. My Macbook was purchased in TX, my sister played with the settings for a while before it was shipped to me here in the Philippines. She just put it to sleep mode,so I shut it down, but when I tried to restart it, all the settings were set to the default - the desktop wallpaper, the dock size and magnification, my aliases, and even the library files I add to my ITunes I have to do all over again!
    The files that I saved were not lost though, it seems to me that a new profile loads whenever I shut down the computer. I have verified that hunch when I saw multiple profile names under USERS (ComputerName1,ComputerName2, ComputerName3, ComputerName4, so forth and so on).
    Is there something that I did wrong?
    Macbook 2.0 GHz   Mac OS X (10.4.7)   Black Model

    What you are calling "Profiles" are actually called "Users." And from reading your description more than one User has been setup on your MacBook. So it seems the issue is that you are logging into a user account other than the one you originally started using.
    When you restart the MacBook does it automatically login to a user account or do you have have to type a password to login? If it is automatically logging in, then you need to determine which user account your sister was using when she sent it to you. Once you do that you can set the MacBook to automatically login to that account and ignore the others.
    To set up automatic login go to System Prefs > Accounts and click Login Options. Click the "automatically log in as:" check box and choose the account from the pull down menu.
    But before you do that you need to find out from your sister what usernames and passwords she applied to each user account. When you have that information you can login to each account and when you see your custom desktop you will know which account you were originally using and set that one for automatic login.

  • I have been having a issue with getting the colors on my monitor to match the colors fro my print lab. I now have the monitor calibrated to match the prints but when I open elements it doesn't use the same colors. If i have it use the calibrated profile b

    I have been having a issue with getting the colors on my monitor to match the colors fro my print lab. I now have the monitor calibrated to match the prints but when I open elements it doesn't use the same colors. If i have it use the calibrated profile by changing the color management settings, the color picker no longer shows true white or black. How do I get elements 12 to honor the new calibrated settings?

    Ok so I've done what you said and this is what it's come back ....
    I don't know that these are the errors , but they're the things which don't look right ...
    Throughout the shut down there is a recurring line ;
    It says ;
    Com.apple.launchd 1 0x100600e70.anonymous.unmount 301 PID still valid
    Then there are 2 more which I think are related ;
    Com.apple.securityd 29 PID job has I overstayed its welcome , forcing removal.
    Then the same with fseventd 48 and diskarbitrationd 13
    Oh and on Launchd1 : System : stray anonymous job at shut down : PID 301 PPID13 PGID 13 unmount...
    Then the last process says "about to call: reboot (RB_AUTOBOOT).
    Continuing...
    And stops ...
    Hope this means something to you ... Thanks again for your help so far :-)

  • Usage of rounding profile in manual created production order

    Hi,
    We are making usage of various static rounding profiles.
    For each of the materials produced, the rounding qty can be different, depending on the workcenters used to produce the materials (but for one material, there is only 1 rounding profile possible)
    This works fine as long as we create planned orders via MRP runs (rounds up according the values set)
    However, this rounding value is not taken into account (proposal, warning, error,..) when a user creates a planned order manually via MD11 or a production order via CO01.
    Furthermore there is no warning message or whatever at the moment a user is converting a planned order (with a correct calculated rounded value) into a production order and manuaaly adapts the order qty.
    As were are talking about a few 1000 different materials, the production planner cannot know all by heart and the rounding proposal would be excellent.
    Anybody an idea how to implement this ?
    Thanks and regards?

    Hello again,
    thanks for you prompt answer.
    This would certainly solve our problem in case we would have always one and the same quantity to produce for a given material; but this is not always te case.
    Perhaps it was not clearly explained in my first mail, but we would like to work with one (1) ROUNDING PROFILE per material.
    Example, material A can be produced in multiples of 14; as such it should be possible for the production planner to create production orders for 14, 28, 42 , 56,..... pieces. When entering a order for eg. 25 pieces (= example the qty needed for a certain sales order), the system shpuld round to 28.
    Other materials (having another rounding profile) are produced in multiples 3, im mulitples of 5,...
    For this particular plant we have about 50 different rounding profiles in place.
    So it somewhat logic that a production planner does not know all these by heart.
    If you have a solution for this as well, please let me know.
    Anyway already my thanks for feedback.
    Regards.
    Danny

Maybe you are looking for

  • Getting a syntax error while creating the simple OData service.

    Hi Folks, That is what I typed in a in .xsodata file but it is giving me a syntax error..any idea why this can be? Thank you for your help. service namespace "sap.hana.test.service" { "SYS" , "AFL_AREAS_" as "TEST";

  • Print web page to PDF file with live links in PDF file like Apple Safari's pdf prints?

    With Firefox for Macintosh, can I print a web page to PDF in such a manner that when I option the PDF file and click on a link, it is a live link that opens in my system's default web browser? With Apple Safari, when I print a web page to a PDF file,

  • Edited pdf does not display properly

    I scanned in doc to a .pdf. It displayed properly on iPad (iBooks). I added some text using preview. It did not display when reading it to iBooks. Thinking it was a layering issue, I "Flattened" the file with Adobe Acrobat Pro, and freaked it to iBoo

  • How to get Material standard price: MBEW-STPRS?

    Hi BW experts, I am wondering what is the best way to extract data for <u>material standard price</u> in Material master data - Accounting view (<b>MBEW-STPRS</b>)? I checked existing extractors for material master, but I didin't find one which could

  • Why won't movie save with changes in lighting?

    Hi All, I lighted a movie and I want to save it this way to play in all media (like regular QT). It seems I can save it and play  the new 'lighter' version only in QT7 pro. Not in regular quicktime. How can I save it to be light forever and play in a