RE: BC Dev freelancer wanted

RE: BC Dev freelancer work
ROCKETDIGITAL is a design firm that is new to using the BC Hosting platform. We have strong content/design/marketing/eMarketing skills. 
We need someone to help with the back-end development of various Web Projects that will be hosting on ROCKETDIGITAL. (BC premiere platform).  From simple web sites, eVent sites with booking forms, landing pages, to more complex sites.
We can communicate scope of work to you and use the work flow program built into the BC platform project to help manage the projects.  You will be asked to estimate your fees for development projects for our client proposals.
Need you to be able to work with psd, dreamweaver, muse files and convert them to BC Platform?  Ability to work with the modules and apps and features of BC platform.
Please respond to [email protected] regarding a working relationship.
Thanks!
Scott
[email protected]
www.RocketDigital.com
(currently developing new site with the BC platform, could use your Dev skills on this project as well)
It’s not Rocket Science… it’s ROCKETDIGITAL
Current Project Dev needs:
• Product launch Site (new product introduction from manufacturer )
• LJT Artist Site
• Law Office Site
• RocketDigital Design Site

Hi Neel,
in our DEV system we have activate RE-FX successfully.
All fields are activated. We have now moved the customizing into the QAS system, but not all settings were imported.
So in table TBE11 is RE activ, but not EA-FIN. In RECACUST > Basic Settings > Real Estate Extension activation BTE-Application and RE-FX are activ but not Financial Extension (EA-FIN). I cannot activate this filed, because it is grey.
So thanks for the note, but it helps not really.
I can set the field to active over SE16n, but I don't think this is the right way.
Greetings.
Tobias

Similar Messages

  • CATT upload done in dev server, want to transport to QA / PRD

    Hi Experts,
    CATT upload is created in development server.
    I want to upload data in quality for testing and finally upload in production server.
    Should I transport CATT or it can be run by using RFC.
    Please advise.
    Regards,
    Irfan

    hii ranu,
    hope there wil be no transport path maintained from prodution to development server,it has to be from dev to prod only..
    u can go to se38 and concerned program and there u wil find a icon to export program to a file on PC..
    you can refer the foll link also
    ZFORM ( sapscript) copy from production server to developer server
    regards,
    Shweta
    Edited by: Shweta Joon on Aug 23, 2009 12:58 PM

  • Small project - Freelancer wanted (Netherlands - Brooks flowmeter)

    We are looking for a freelancer (or just someone with some knowledge) for a small labview project for our company;
    PanTerra Geoconsultants B.V.
    Laboratory Services
    Weversbaan 1-3
    2352 BZ, Leiderdorp
    Netherlands
    We are a small company in the oil and gas industry and recently bought a Brooks mass flowmeter. We still have an analogue board from a earlier (failed) project and now want to hook up a pressure transducer (10 V input - 100 mV output) and the Brooks flowmeter (Digital IO - Visa) together and store all data points in a datafile. Nothing special for people who know there way in Labview i think.
    There is a thread somewhere with a reply from "Albert Geven" where he attached some small files which can readout the mass flowmeter by using the HART protocol, but we couldn't get it to work as we have no labview experience what so ever. (Albert if you read this tread, please contact us as i tried to contact you)
    Contact details; p.steenbergen(at)panterra.nl
    Kind regards,
    Peter Steenbergen
    EDIT: If succesfull, maybe more and bigger projects can be the follow up.
    Message Edited by PeterSteenbergen on 07-23-2007 07:01 AM

    hello Panterra,
    Myself Vishal Solanki ,Pune Resident, Labview Developer, Pune University.Embedded,C.C++.,labview .
    I would like to freelance your project,
    please forward details for this labview project for your company and email ID.
    Currently working:Tata Institute of  Fundamental Research,Mumbai.
                              .Homi Bhaha road, Colaba.Mumbai
                              [email protected]
                              wk:  91-22-22782483
                              Res:91-20-24451126
                              Mob:9970679397
    Post: Research Fellow
    : Astronomical satellite Project. Design & development, software tools, program for  Data  acquicistion, graphical  data analysis and  reduction techniques
    (Using Labview 8.0, C, C++).NI DAQ 653X card.NI Hardaware patforms  cRIO Embedded Controller System(910X), Installataion, ConfigurationAnalog/digital Modules and integration with custom Software
    Total work experience : 1.5yrs

  • Tape to Flash Freelancer Wanted

    Hi. I have DV video tapes (recorded using a nice Canon
    camera) that I'd like to have converted into flash for presentation
    on a website. I'd like to find someone who I can give the tapes to,
    along with a short note on what scene on the tape to convert to
    flash. Usually I need a 4-5 minute scene edited down to a 2-3
    minute movie. It's educational-type material. I had someone helping
    me with this already, for the last year, but he's taken on a bigger
    project and can no longer deal with my small movie jobs on the
    side. My existing developer would do about 4 movies per month for
    me and I was paying him about $150 each. I can bundle the jobs into
    one bigger batch in order to have 20 of them done at once, if you'd
    prefer. I can show you samples of what's already been created. I'd
    like to find someone in the Bellevue or Seattle. If you know of
    anyone around here please pass this along to them, and if you're in
    the local area please feel free to email [email protected]
    along with some samples of your work. Thanks a lot.

    If i may suggest Toast is a must for a Mac. It worths every penny of it.
    (i dont work for Roxio)
    Toast can create a "disc image" of your DVD on your HD.
    If this procedure succeeds you can conclude your DVD is not damaged.
    Only IF this is done , you may then try burning on blanks, reducing wasting blanks. At least you have saved your treasure.
    The "disc image" on your HD can be "MOUNTED" by Toast anytime for you to view on your Mac.
    Using DVD copier service is expensive. Use your money to buy Toast.
    I believe a Mac without a Toast is like a penthouse without a bathroom

  • PRD Copy to DEV

    Dear all,
    Our current environment:
    Production:
    SAP ECC 6 on Windows 2003 with Oracle 10.2.0.4
    Database Size (DB02):
    Size:                   259.92 GB                       Total size:               361.56 GB
    Free Size:               15.25 GB                     Total free size:            116.89 GB
    Development:
    SAP ECC 6.0 on Windows 2003 with Oracle 10.2.0.4
    Database Size (DB02):
    Size:                   275.85 GB                       Total size:                 498.05 GB
    Free Size:               20.34 GB                       Total free size:            242.54 GB
    =================
    We have a 600 Client on Production system and want to copy it to DEV new Client while DEV server's Physical Space (OS) is 8.45 GB FREE Partition (MAIN DATA FILES)
    1. We have 3 clients (200,600,700) on DEV and want to keep only 600 client and make another new client to import the production 600 on new client.
    2. If I export PRD client 600 (Client Copy) and import it to DEV, will I be needing More Space?
    3. Do we need to increase our HDD Space? If yes then we will add another 300 GB HDD into the DEV system. is 300 GB enough because of the Size of PRD Client 600?
    4. What is the better solution? Client Copy or System Copy?
    5. What else can we do to make our Export/Import work properly?
    Please Help.

    Hi,
    > 1. We have 3 clients (200,600,700) on DEV and want to keep only 600 client and make another new client to import the production 600 on new client.
    >
    > 2. If I export PRD client 600 (Client Copy) and import it to DEV, will I be needing More Space?
    >
    If you will delete client 200 and 700 then also you will not get total space used by these clients. In order to get all space, you need to perform reorganization.
    > 3. Do we need to increase our HDD Space? If yes then we will add another 300 GB HDD into the DEV system. is 300 GB >enough because of the Size of PRD Client 600?
    >
    Considering above, I think you need add more space to your server. This much space will be fine.
    > 4. What is the better solution? Client Copy or System Copy?
    >
    > 5. What else can we do to make our Export/Import work properly?
    >
    Client Copy is the only option if you want to retain one client in DEV system.
    Thanks
    Sunny

  • Ff 3.04 seems to break libc6-dev dependeny, using linux eeepc xandros

    trying to install gcc depends on libc6-dev; which depends on libc6 ( they must be the same version) FF installed libc6=2.7-13; there is no compatible package (libc6-dev =2.7-13)
    when I run simulated install for libc6 2.6... ( which has compatible package for libc6-dev), it wants to back up to FF 2.0.

    WorMzy wrote:
    At a guess, there's a problem with the skge module. The latest commit was a month ago: https://github.com/torvalds/linux/commi … 29ccaa5d74
    You could try reverting it and see if that resolves your problem.
    EDIT: There were three commits: https://github.com/torvalds/linux/commi … ell/skge.c
    Excellent suggestion and spot on!  Reverting those three commits gives me a completely functional network again!  Need to report this upstream.  Thank you very much for the idea.
    Upstream report: http://marc.info/?l=linux-netdev&m=137884262727796&w=2
    Arch report: https://bugs.archlinux.org/task/36865
    Last edited by graysky (2013-09-10 19:58:17)

  • Dimension name changed in dev

    Hi guys,
            If i changed the dimension name in dev and want to transport to integration system which is having data in cube.Do i need to delete the data in integration system or while transporting it will delete automatically.

    dear Ajay,
    you mean change the description right ?
    since the 'techincal name' determined by system.
    and you didn't change the characteristics inside right ?
    if so you should have no need to delete the data, you can transport it. system won't automatically delete data, if characteristics inside dimension are changed, you may have error in transport.
    hope this helps.

  • Determining the instance (PROD or DEV) inside of BI publisher

    We have a problem in that all of our instances print to the same printers. However, when we clone an instance of PROD to DEV, we want the reports to say which instance they came from so no one gets confused. Right now, we have no distinguishable away to determine that. Is there any information coming through the raw XML data that could give us the instance name (PROD or DEV). If not, is there any built in variable we could grab?
    Thanks.

    Not sure, what is your datasource for the report.
    There is no identifier by default.
    But you can make use of some options:
    1. add query in the report itself to get the instance name of Db and display in the page footer/header.
    2. if you had used the common sub-templating concept, just changing the single template in the common , would have helped
    3. using custom properties
    but in all three, you have do identify something, that its not PROD instance.

  • New Value Fields in COPA

    hi
    All COPA configuration with characteristics and value fields is already transported to QAS.
    I have created three new Value fileds in DEV and want to transport in QAS?

    Use Tcode KE3I
    Select operating Concern
    Execute
    create bot customising and Wrokbench requests for that
    Select the operating concern Execute
    Select ABAP repository objects and Enter
    release the transports and Import them in QAs and you are done
    Thanks
    Naveen

  • Steps to export B2B Project and Source Control.

    Hi,
    I need steps to export a B2B project for source controlling it and deploying the code to higher environments.
    Right now the coding is done in DEV , We want to push it to TEST.
    Thanks for all the help.
    Regards,
    Sid.

    Documents which we have created newly will also be exported, provided it is part of the agreement.
    another answer
    First time all "export-import". Every change - incremental export and import

  • How to install and Configure sharepoint foundation on administrator account ??

    Hi there guys dev
    I want to try sharepoint foundation for first time .
    I installed windows server 2012 ans sql server 2012 and then installed sharepoint foundation 2013 .
    now when I want to create a new server farm enter my windows name as database name and then enter my administrator account name as username ans it's passwors as password but after then when I click on next to create new server farm give this error :
    "the administrator account can't use for new server "
    please help how can I create a new server farm with administrator account .
    I don't want to create it with  the active directory domain and add new forest and create it with my domain name ?
    if does it a way to create a new server farm with administrator account so please help to create it ?
    thanks dear
    Great Regards :
    Raha
    whit the best regard : Raha

    Hi Raha,
    According to your description, my understanding is that you got an error when you created a new farm with the administrator account by runnning configuration wizard.
    Is the SQL Server installed in the server that hosted SharePoint 2013 Foudation? If not, please make sure the server hosted SQL Server has the same account with the server hosted SharePoint 2013 Foudation.
    Please run the SharePoint 2013 Products Configuration wizard with ‘Run as administrator’.When you entered the user’s name, please use the format ‘domain\user_name’.
    In addition, please check the log file to find more information about this issue. The path is : C:\Program Files\Common Files\microsoft shared\Web Server Extensions\15\LOGS.
    Also , you can use Event Viewer to find the log by Start->Run->event viewer.
    Here is an article for installing and configuring SharePoint 2013,  please take a look at:
    http://sharepointv15.wordpress.com/2012/07/19/installing-sharepoint-2013-preview/
    I hope this helps.
    Thanks,
    Wendy
    Wendy Li
    TechNet Community Support

  • Problem with a transport order

    I release a transport order in DEV, I want to change the Target System because this field is initial (Local Change Requests).
    I want to tranport de order to QAS, I can't change the order when it is released.
    How do I to undo the release?
    Best Regards.

    Hi
    you can't move or transport the object developed in local [$tmp] package because if u want move or transport object u can save into global package then u can transport object depending upon that transport .
    thanks ,
    Suresh

  • An EFFECTIVE development directory structure for J2EE platform?

    Hi, here we r talking about deployment environment more than development
    environment. Have u ever think about designing an EFFECTIVE development
    directory structure for J2EE platform( e.g. weblogic )? u r not using the
    deployment directories for coding, r u? :)
    I used to construct a dir structure for dev and want to improve it.
    d:/wholesystem/*.prj // Project files
    ...../module1/src/com/.... // Module source files
    ...../module1/doc/... // Module doc files
    ...../module1/classes/... // Module class files
    ...../module2/...
    ...../web/*.jsp // web page files
    ...../web/images/... // web page images
    ...../web/WEB-INF/... //...
    Do u have any good ideas? Thanks!
    * Name: Gary Wang
    * Tele: 010-65546668-8119
    * Mail: [email protected]

    Create a web-inf folder at the same level of src and
    jsp folder inside src
    i mean
    /build.xml
    /src/
    /src/java/<package>/...../*.java
    /src/demo/<package/...../*.java
    /src/test/<package>/....../*.java
    /src/jsp
    /web-infSo, would you put in /src/jsp only the *.jsp?
    And what in /WEB-INF ? What woud you put there? Would you do something like:
    /WEB-INF/web.xml
    /WEB-INF/src/<package>/..../<my_servlets_and_j2ee_stuff>.java
    /WEB-INF/classes/<package>/..../<my_servlets_and_j2ee_stuff>.java
    In this manner sources and classes are in the same tree, it does not seem very clean to me, expecially if you consider that probably I must have a "test" directory to unit test some j2ee stuff (as for the j2se stuff in "src"): how would you do that?
    Is this directory structure anyway what you meant or not?
    alessio

  • Dump during mvt type 103.

    I am doing MIGO - GR against Outbound Delivery with Mvt type 103.
    I receive the following dump. If for the same case if I do MIGO via 101 then no dump observed.
    What could be the determining factor which creates dump while 103 & not with the case 101?
    Dump as follows -
    Category               ABAP Programming Error
    Runtime Errors         MESSAGE_TYPE_X
    ABAP Program           SAPMM07M
    Application Component  MM-IM
    Date and Time          03.09.2014 12:47:09
    Short text of error message:
    Posting termination to ensure data consistency - SAP Note 1776835
    Long text of error message:
    Diagnosis
         The material document posting was terminated to maintain data
         consistency. An expected COMMIT WORK or ROLLBACK WORK statement wa
         triggered which is in turn caught by this error.
         Data has already been preselected for the UPDATE at the time of th
         COMMIT or ROLLBACK. If a COMMIT WORK or ROLLBACK is initiated in a
         enhancement, these are then written or rolled back into the
         database. If another error occurs during subsequent processing
         after a COMMIT, a complete ROLLBACK can no longer be performed,
         since the data up until the point of the COMMIT has already been
         written to the database. Otherwise, if no further errors occur
         following a ROLLBACK statement, the part that is subsequently
         entered into the posting is also written to the database.
         This can result in an inconsistent status, for example a material
         document without accounting document or an accounting document
         without a material document, which can only be repaired with
         considerable cost and effort.
         Inconsistencies that were caused by an incorrect implementation
         must be corrected by SAP in accordance with SAP Note 83020, subjec
         to charge.
    System Response
    Procedure
         Remove the critical sections of code from your customer
           enhancements, such as MB_DOCUMENT_BADI. For more information about
           this error and how to avoid it, see SAP Note 1776835.
       Procedure for System Administration
    Anybod
      Technical information about the message:
      Message class....... "M7"
      Number.............. 685
      Variable 1.......... " "
      Variable 2.......... " "
      Variable 3.......... " "
      Variable 4.......... " "

    Dev,
    I want the BADI, which will trigger the GR-mail after the material document is posted by the system, so that there will be no conflict with the 'Commit Work' which I have written in customer enhancement before system is committing for posting.
    If I will get some BADI after the material DOC is posted in MIGO-GR-103Mvt type,then it will do my work of triggering the mail.
    Wanna BADI that can used/Triggered after posting the MM-Doc in GR-103 Mvt type.

  • Direct Database Request Error: illegal number at oci

    Hello, all.
    In Oracle BI Answers i get an error by building an direct database request: illegal number at oci.....
    The reason of error is in expression to_char((date_1-date_2)*24, '9990.99')
    The error disappears if i write expression to_char((date_1-date_2)/*24*/, '9990.99')
    BI doesn`t understand multiplying in SQl request?

    Hi,
    Couple of suggestions :
    1) Run your direct database queries in a SQL editor (SQL Developer, TOAD, SQLplus) etc to confirm the query runs OK - be carefull with Toad or SQL Dev - you want to return the entire dataset, not just the first xxxxK rows these tools tend to bring back, they sometimes hide the problem 'row' which maybe is causing the error.
    2) Once the error is returned via straight up SQL , maybe try the database / SQL forum as your problem I think lies there, not with the BI Server.
    3) My one stop shop for Oracle date arithmetic : http://www.akadia.com/services/ora_date_time.html
    4) assuming the SQL returns correctly, report back to us so we can help with OBIEE specific issues !
    what time period are you trying to bring back between your date 1 and date 2 ?
    Hope this helps a little,
    Alastair

Maybe you are looking for