Hi all,
I am in a issue. I have done UD for in process inspection. i.e 03 type. Now when I am looking for the inspection lot updateion to inspection type in QA32 I am not able to find it.
This is a live issue,
Please advice as soon as possible.
I have chaecked all the setting ,I dont think there is any issues in it .
Regards

Hey Vivek you ask too many questions at once.
To check the follow - up action. See in the UD screen itself below the ud code you enter.
I checked this & I found :for each order item
batch storage location.
It means it will create inspection lot if any of the mentioned condition changes either order,batch,or storage location. In other words it will create unique inspection lot for Order,Batch and storage location combination.
Now, remember  why I have directed to this field because Craig has furnished that it will create a lot with 04 type as soon as you release the order but for that you need to select the option for "Early Lot creation". Correct?
And you were not able to find the way how and where to do. So I just guided to you but sorry dear I have never ever used this functionality.
Now what are you doing? waiting for another two hrs to have the lot? Simultaneously you should check what is happening with the Order from where the lot is generated.
Have you completed UD for Lot 03 this time?
Most importantly pls let us know what is the Inspection points you have selected for the inspection plan for 04 type lot and at the Routing/Master Recipe from where the 03 lot get the MICs?
It may possible as you described the lot is getting triggered after 2hr from UD of 03 lot then the inspection points for the lot 04 or 03 would be time based inspection.
Regards,
Shyamal

Similar Messages

  • Inspection lot not created on GR for production order

    I want to create an inspection lot upon receipt from production. Task list is set up. Inspection type 04 is assigned in material master. But when I do the goods receipt for a production order, inspection lot is not created. In the quantity tab of material document, I see that the staus GR doc is 7(Inspection lot is created at inbound delivery). I don't know where it is coming from.
    Please help.

    I'm not sure what you mean by creating lot after receiving.
    When you do a GR from production the proper inspection type is the 04 inspection type.  Not 05.  This is pretty standard SAP functionality.
    Check the material movements for 101 (I assume you're using a 101 GR material movement), and make sure in config no one has deactivated QM for the material movement.
    Then, make sure you start with a freash production order. Don't copy from a previous one.
    FF

  • Inspection lot not generated after goods reciept?

    Dear SAPIENTS,
    Inspection type 01,0101,08,89 and all activated in material master but then allso inspection lot not generated after goods reciept. Can anybody suggest here that what could be the reason.
    Regards,
    Kaushal Rai

    Hi Kaushal,
    For Inspection lot from GR, 01 Inspection type is enough.
    - Ensure 01 Insp type is active and Post to Inspection stock indicator is active for that inspection type.
    - Ensure the QM is active for 101 Movement type, SPRO>Quality Management>Quality Inspection>Inspection Lot Creation>Inspection for Goods Movements>Deactivate Quality Inspection for a Movement Type
    Regards,
    Keerthi.

  • Integration with EWM-Inspection lot not getting created

    Hi,
    Inspection lot not getting created after GR is done.
    The scenario is Storage location is connected to external warehouse management,so after the GR is done in the legacy system via interface it is updated in ECC.so while checking the material document inpection lot is not created.
    Can anyone please tell me the necesaary check points and integeration steps  between WM and QM in this case .
    Thanks in advance.......

    Hi,
    Since you didn't say much, I assume you are creating stock into ECC via LSMW using 561 movement. Now to get inspection lot for these batches/ docs, you need to activate inspection type 05.
    Go to material master QM view, assign and activate inspection type 05.
    Additionally, create a respective inspection plan/ task list for the material(s) to carry out RR and get the consistent inspection lots.
    ntn

  • Inspection lot not getting generated after PurcGR

    Hi,
    Inspection lot not generated after doing GR for a purchase order. what could be the reasons?
    for the first 2 puchase orders, Inspection lot was created. however, for the 3rd Purchase order of 100qty, i did GR for 50 qty only. after then for new purchase orders, the material status has become unrestricted and directly going to stock.
    Inspection type 01 is mainted in material master
    QM info record has been maintained.
    please clarify

    Hi Nagaraj,
    Try the following.
    1. Check the inspection set up in the Material Master record for inspection type 01 whether 'post to inspn stock' is selected. If not, select it.
    2. Check in Customizing for 'QM in Procurement' in 'Define QM system' activity, 'certified QM system - skip' is marked(Actual QM system). If this indicator is selected no inspection lot is created even if there is an active inspection type. This is valid if you maintain a target QM system in QM view of Material Master (Purchase data).
    3. Check in IMG set up :
    Quality Inspection -> Inspection lot creation -> Inspection for goods movement  - whether inspection lot origin 01 is specified for movement type 101 and also ensure that QM is active for this movement type.
    Please revert after trying these options.
    Regards,
    Swati

  • I'm having problem with my printer the carriage is not moving from si

    My printer carriage is not moving from side to side, It's like something not connecting and the light is blinking.

    Please review this post and then post some details.  What printer model?  What operating system?  How is the printer connected?  Are there any error messages?
    Bob Headrick,  HP Expert
    I am not an employee of HP, I am a volunteer posting here on my own time.
    If your problem is solved please click the "Accept as Solution" button ------------V
    If my answer was helpful please click the "Thumbs Up" to say "Thank You"--V

  • Inspection lot not getting generated by Z inspection type

    Hi,
    I created a inspection type Z1 , copying the inspection type 01. I guess I maintained all the required configurations or conditions.
    I maintained the inspection type Z1 in the QM view of a material with status Active, but I am not able to do MIGO, neither the stock type is coming as Quality Inspection automatically in both the Purchse Order creation and MIGO. As a reslut, the inspection lot is not getting generated.
    I am also not able to create a manual lot but QA01, Its giving error as "Inspection type Z1 not maintained for material X" .
    Thanks in advance for your valuable suggestions.
    Regards
    Kunal

    Dear check preffered inspection type in material master QM view and do the GRN.
    Check and Revert.
    Cheers
    KK

  • Inspection Lot not creating for 657 mvt type

    Hello,
    I am unable to create inspection lot for customer returns. Mvt type used by SD module for customer return is 657 ( to blocked stock). While sales to return order with this mvt type, no inspection lot is getting generated.
    But when returns are done with 651 mvt type (Returns to QI), I am able to create inspection lots.
    Can anyone tell me how to activate inspection for 657 mvt type as I want this stock to go directly to Blocked stock.
    Thanks in advance.
    Jason

    Dear,
    Quality inspection stock (movement type is  655)
    Blocked stock (movement type 657)
    If the given quantity is posted to blocked stock returns first, you can make a manual goods movement posting in the Inventory Management component to transfer the quantity to valuated stock.
    Tcode vov6 - there will be schedule line category DN.
    go to details of DN.In Business data,check which movement type is assigned here change it to 655 and try.
    Also go to material master, select "Quality Management" view and execute. There click on "Insp.setup" and press "F5". Assign "06" under tbe tab "Inse.Type" and save.
    Now if that material returns from any customer, the stock will be blocked for quallity clearance. Only quality people can give clearance for that material.
    Regards,
    R.Brahmankar

  • Inspection lot not created for movement type 101 O

    Dear all,
    . We are creating a PO (ME21N) indicating in the view u201CDelivery addressu201D the same vendor than the PO and the flag u201CSubcontracting vendoru201D
    . The material has in MM02 the inspection type 0130 Receiving Insp. from External Processing.
    . There is QM plan with the Usage 53 GR external process.
    . When we do MIGO 101 u201CSpecial Stock Indicatoru201D O Parts prov. Vendor. The system doesnot create an inspection lot.
    But in MMBE the stock appears in u201CStock Provided to Vendoru201D u201Cquality stocku201D. The customer wants to control that stock in u201CQuality inspection:
    Can somebody help me?
    regards
    shilpa

    SPRO - QM - Quality inspection - Inspection lot creation - inspection of goods movement - Deactivate Quality Inspection for a Movement Type
    Check in this setting, whether QM is deactivated for 101 and special stock O

  • Inspection lot not being created against inspection type 10 or 02

    Hi
    We need to inspect material at the time of goods being delivered to material. I did the following steps:
    1. in SPRO, Assign Inspection Lot Origin to Delivery Type, against Delivery Type LF we mentioned insp. origin 10 
    2. Assigned insp. type 10 in material master QM view
    3. Created Sales Order using the same material code
    4. Created Outbound Delivery against Sales order, but when we press button for Post Good Issue, the system issues the message "Status of inspection lot 100000000004 / partial lot 000000 does not allow good issue" BUT NO INSPECTION LOT IS BEING SEEN WHEN WE USE QA32/QA02. I have also seen the QALS table using SE16 and no record for inspection 100000000004 is seen.
    Please also note that
    1) other inspection lots are being created and processed normally such as inspection origin 01, 14, 15, etc.
    2) each time we try again to create delivery and press post good issue button, IL number is incremented say 100000000005, then 100000000006, 100000000007, so on.
    3) the issue is the same for insp. origin 02
    Please reply
    Chris

    Hello,
    Check if this is helpful to you.
    qm in sd

  • Inspection Lot not generated, with MIGO 561

    Hello All,
    Please help me with this issue.
    WHen i do MIGO with 561, inspection lot is not generated.
    So there is a setting in spro, if we check that, inspection lot wont be generated.
    So now in my IDES, i tried to uncheck that box.
    When i save this setting, I get the following error.
    "Fill table key for table T156Q only up to position 010".
    Please help with this issue.
    Regards,
    Piyush

    To load initial inventory in Quality stock and release it using Inspection lot  UD,   use movement type 563 instead of 561.
    With 561 movement stock is directly posted to un-restricted status. So there is nothing to be released from Quality stock.

  • Inspection lot not appearing in QA32

    Dear Experts,
    We have transfered a batch  from a storage location of one plant to the storage location of another plant through movement type 909 with all require datas entered and saved the transaction . But while we checked in MB51 and QA32 , no material document or a Inspection lot for stock transfer not appearing.
    When checked for the logs Message QA 150 appearing for ' Errror inserting QALS as update was terminated ' . What to do ?
    Thanks.

    Hi
    Is 909 is SAP's standated Mvt type?
    Check the setting for this mvt type in QCC0->Qulity inspection->Inspection for goods Mvt.--->Inspection lot origine & Deactivate Quality inspection.
    I have a suggesion.for transfering Material from one plant to other SAP has own Mvt type:301(single step--->Without purchse Order).You can active 08 inspection type for Material at receiving plant.It will create a lot at receiving plant.
    In addition to this 351& 352 are used when purchse order(STO) is there.
    In hop this will help me.
    revert back for any Querries.
    Regards
    Sujit Gujar

  • Calibration process : inspection lot not created

    Hello,
    When creating a maintenance order (PM05) , i can not get the inspection lot created .
    There has been some thread about this process , i believe i followed the instructions :
    -equipment category is production ressource/tool
    -master inspection characteristics created (released)
    -sampling procedure created for PM
    -equipment task list created with inspection point at header level , with control key including inspection characteristic , with master inspection characteristic , with sampling procedure
    -configuration for inspection type and order type is done
    then when creating the order manually (or via a maintenance plan) : the order is created and released but with no inspection lot assigned...
    does anyone have an idea where the error might come from?
    Thanks again,
    Pete

    Hi Pete
    Weather this is correct or not for your scenario but please check the below spro setting.
    Plant Maintenance and Customer Service --> Maintenance and Service Processing --> Functions and Settings for Order Types --> Assign Inspection Types to Maintenance/Service Order Types
    click on the symbol
    in Change view " Assign Inspection Types to Maintenance/Service Order Types" :Overview screen assign inspection type against plant and order type combination. for PM 14 is inspection type.
    please confirm.
    regds,
    Venkat

  • Stock relevant inspection lot with return from customer

    Dear Gurus,
    What settings should I make so that when I make a sales order return from customer, I get a stock relevant inspection lot. What is available for me now is these 2 options:
    1. To activate insp. type 06, and upon return, the stock will fall in the returns logic in the storage location, and an inspection lot will be created, but it is not stock relevant.
    2. To activate insp. type 05, the stock will fall in the returns logic in the storage location, after that transfer from return to quality using mvt type 457, upon this transfer a stock relevant inp. lot is created.
    Both solutions are not suitable for me because for the first option I do not have a stock relevant inp. lot, and for the second option, I loose the refernce to which customer this lot is relevant, and this information is very important for the process.
    Regards,
    MaX

    Hi MaX,
    Well I would suggest to with 1st method as this is standard practice.
    No doubt you can have option to inward the material for customer returns directly in to quality inspection also. Follow the following steps.
    1.     Assign inspection type 05 in material master
    2.     Deactivate inspection type 06
    3.     Go To transaction VOV6
    4.     Double click on appropriate schedule line category that you are using for your return process
    5.     Change movement type there to 655. i.e. returns to quality inspection stock
    6.     Run a cycle. As a result of this stock will be posted to QI with stock relevant  inspection lot
    7.     You can record results and post stock with UD as in normal case of GR.
    8.     Do not forget to check the effect of accounting and controlling document for this movement with your FI consultant.
    Regards,
    Anand Rao

  • Inspection lot not generated via CO07

    Hi QM Gurus,
    Does anyone know how we can generate inspection lot via CO07 (production order without material number)?
    I have done the steps below:
    Customized inspection type 03 in order type PP03 (OPL8).
    Created Reference Operation Sets 50000008.
    Created Inspection plan for ROS 50000008 and assign IMC in the operation.
    OSS note 675643
    Anything I missed?
    Any help would be appreciated.
    Cheers,
    Sun

    Hi,
          I think the problem is no material will be maintained. The background is user reference operation set & CO07 to create production order without material. Generally, oritinal insp. type should be maintaind in MM02 QM Tab, then 03 insp. lot can be created while Pro Order released. But now, as no material master is maintained, so we can not trigger 03 in QM TAB, and no insp. lot will be generated.
          I made the moderation like Sun listed, but no insp. lot can be generated. What the note says,it will take the material number from the superior order, conflicts with our purpose (without material).
           So my question is:
          1) whether SAP can generate insp. lot from Pro. order without material
          2) What's the superior order mean?
          Thanks
    Edited by: Margaretji on May 4, 2009 4:22 AM

Maybe you are looking for