RE: Prod order automatic scheduling at creation level

Hi All,
         While creating Production order thru Backward scheduling, the system automatically scheduling but I need to schedule after creation manually. Any solutions to this issue.

Hi,
If you have maintain scheduling type as Backward then system will ask you to maintain the Basic Finsh Date.
So my doubt is with your order type.Is it correct one for which you are creating the production order.
Now if you don't want to do the automatic scheduling and do this one manually then try this.
For that order type maintain scheduling type as only capacity requirements.After this system will not schedules the order automatically.All the dates you have to maintain manually.There is no scheduling at all.And if you want to schedules the order then change that scheduling type to backward in order itself (not in OPU3) and then press that scheduling tab.
Regards,
Dhaval

Similar Messages

  • Prod Order's Scheduled finish time

    Hi PP Experts,
    Could you please advise where's Scheduled finish time (field GLUZS) in the production order coming from?
    Some prod order has 24:00 and other has 23:59.
    We want it as 23:59.
    I changed the work centre's capacity Finish time (ENDZT), but still didn't get it right.
    Many thanks in advance.
    Regards,
    Thomas

    Hi,
    2 Things:
    1. Are you sure you clicked on schedule order after changing values in WC?
    2. Control key ZT02 relevant for scheduling? Check in OP00
    At my end, i did a small test & it works, so do a re-test at your end.
    Regards,
    Vivek
    Added
    Also notice that active version is maintained as 1, so go intervals & shift in capacity details tab (shift + F12) & check the timings there.

  • No prod.order created after setting creation flag in APO

    Hi all,
    I'm encountering a new problem. I created a material, and some data adjacent to it (planned order, prod. order, planned ind. rep., various stocks, a routing and various BOMs) in ECC 6.0, which I successfully CIF-fed to APO 5.0.
    When I modify the quantity of the prod. order in the prod.view in APO everthing works out just fine, i.e. the modification is taken over in ECC, BUT when I set the conversion flag in order to create a production order in ECC triggered from APO... absolutely nothing happens.
    I get no error-message (only planning result successfully saved). When I try to remove the conv. flag again, the system says that it's not possible.
    Any ideas what could be the problem?
    Thanks in advance!
    Regards, Bobby

    Hi y'all,
    as an add-on-information to the previously written:
    if a planned order exists in R/3 and is CIF-fed afterwards the conversion works fine (i.e. the planned ord. is converted to a prod. order in R/3 and the prod.ord.number is made known to APO).
    In case the production order has yet to be created, the whole process is stuck!
    Anybody help, please!
    Regards,
    Bobby

  • Regarding prod order operations scheduling

    Hi all,
    We are using CTM planning scenario.
    After CTM planning, the operations in a planned order are scheduled as per the capacity available at
    resource for each operation. So there is may be a gap between end time of one operation and start time of
    the successive operation which is as expected.
    Now the issue is:
    In ECC, when the planned order is converted into production order, it is eliminating the time gaps between
    operations and next operation is started immediately after end time of the preceding operation.
    This is happening even after converting planned order into production order using conversion indicator in
    APO.
    The requirement is, in ECC, system should keep the operation times as scheduled in APO.
    Please let me know if any details required.
    Regards,
    Yogesh

    Hi,
    Can you check the " Scheduling parameters for production orders" defind in ECC under Adjust scheduling tab
      the the various options defined.
    Also enable the scheduling with breaks indicator and see whether you get the proper results.
    Thanks,
    nandha

  • Automatic schedule lines creation from PR

    Hi,
    We have a scheduling agreement for certain material
    We have maintained a Automatic PO tick in Material master as well as in vendor master
    We have also maintained purchasing info fo records and source list
    Now we have created a manual PR.
    And when we are running the T code ME59 system is creating the PO.
    Is it possible to generate schedule lines (automatically through ME59) against a scheduling agreement instead of creating a new PO?
    Regards,

    Hello,
    The transaction ME59 does not select the purchase requisitions assigned to a scheduling agreement. The reason for this is that the Scheduling agreement itself is equivalent to a purchase order. For a purchase requisition assigned to a scheduling agreement, you have to create a delivery schedule only and not a purchase order. Automatic conversion program currently does not handle creation of delivery schedules.                                                               
    Please use ME58 instead.        
    br,Gabor

  • Scheduling agreement creation against Sales Order

    Hi All,
    Can we create a Scheduling agreement automatically against a Sales order in Standard SAP? Whenever Sales order is generated, system will be creating a Scheduling agreement automatically in the background for further processing -- is the requirement.
    Or if there is any user exit available please let me know.
    Satisfactory answers will be rewarded.
    Thanks & regards,
    Indrashish

    Hi
    This requirement can be handled with user exit.This can be done by developing customized program.For customized program you need to define a variant for back ground job scheduling or u can use a exit to trigger the customized program.
    you have to pass the details like Materials,Quantity,Delivery schedules from sales order top scheduling agreement creation program.
    Normally, we will use scheduling agreement to generate automatic schedule linesby running MRP for Sales orders or Planned independent requirements.I think u can use this std functionality to map your requirements.
    Regards
    Ramakrishna

  • Restricting prod order quantity from being higher than sales order quantty

    Dear Experts,
       I create production order interactively through co08 ( prod order with respect to sales order). the prod order automatically picks up the quantity in the sales order which is desired, but this order quantity field in the prod order is editable (i.e can be made higher or lower). Please how do I restrict this prod order quantity from being  higher than the sales order quantity?i mean what should be done to make system disallow the prod order qty being fixed higher than thesales order qty?

    Hi,
    Even though you create the production in refernce to the SO, the order quantity can be alter.
    This is a normal behaviour of the system.
    To restrict any change in the order quantity, you can use tarnsaction variant for CO08. T code is SHD0.
    Secondly you can use the following enhancements to restrict the same,
    PPCO0006
    PPCO0007
    Hope this helps you.
    SmanS

  • Different batch no in prod order at the time of creation of prod order

    Hi, we need different batch numbers in production order at the time of creation of production order. tried in system, i can able to create only one batch no at the time of creation of order. we need different batch no at the time of order creation and same no should be assigned at the time of GR from prod order. pls advise how to map this.

    Dear,
    Use the Exit EXIT_SAPLCOBT_001 under enhancement PPCO0001 where-in based on your requirement you can create batch for your order. You can use CALL FUNCTION 'VB_CREATE_BATCH' to create the batches as per your requirement.
    Also make sure the automatic batch creation setting in Prodn Scheduling profile has been turned-off so that the batch is created only through the user-exit.
    Refer this thread,
    Re: Batch creation
    Please try and revert back.
    Regards,
    R.Brahmankar

  • Creation of  purchase order automatically  by taking  purchase requesition

    Hello Gurus
    Is it possible to create purchase order  automatically  by taking purchase  requesition  no from  sales order?
    i checked in all the  forms  couldn't find  any answer .
    thank you  in advance
    regards
    venkat

    Hi Venkat,
    When you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. But If you want the Purchase orders to be created automatically, then you should automate the creation of purchase order by creating a job or using workflow. Other wise to create a PO from PR use ME57. A third-party order is usually created referencing a third-party item in a purchase requisition. You can create purchase orders in this way individually or collectively. For Configuring Automatic PO kINDLY PLEASE LOOK into this.
    "http://help.sap.com/saphelp_47x200/helpdata/en/94/da2e3b2bdab96be10000000a114084/frameset.htm"
    Kindly please let me know If you need any more information on this.
    Regards,
    Ram Pedarla

  • LO-VC  Variant Config - update STPO-SANKA field at Plan/Prod Order Creation

    Hi All VC Expert,
    We are facing an issue with the update by reference characteristic of the field STPO-SANKA Cost relevancy indicator on the BOM.
    We are on SAP ECC 6.0 release 700 on Oracle
              Hot Package
                   - SAPKA70015 on ERP Cross Application componenent
                   - SAPKH60013 on SAP-APPL Logistics and accouting
    We are using material variant
    We are on the first level of configuration
    Classically, we built a procedure to set X to this data base field as below :
    $self.STPO_SANKA = 'X'
    We assigned this procedure to the relevant items
    Here is the result we have:
    At the creation of the Plan Order, this is not working
    At the creation of the Prod Order, this is not working
    When we do a Reload PP master data, this is working very well
    On CU50/VA02 when we check the trace,  the procedure is executed.
    Do somebody have an idea or already facing this and solve it ?
    Thanks in advance for your appreciated help.
    Edited by: Fabien MAUPIN on Jan 24, 2012 11:49 AM
    I still have issue with this object characteristics. I didn't find Oss note to correct the issue.
    Do somebody is facing the same issue as me and find a solution ?
    Edited by: Fabien MAUPIN on Jan 24, 2012 11:51 AM

    Hi Fabien,
    I have series of questions to ask.
    1. How are you creating the Planned order or Production Order. Is it created directly in PP module or through the requirement transfer from SD.
    2. What do you mean by PP master data.
    If you trigger the BOM for the planned order or production order from Sales order and some other reqmt trigger, what is your precondition for updating the cost relevancy indicator.  If you some script some lines of your process, I can check if you should include the $PARENT clause somewhere. I think the problem lies somewhere in the origin of configuration.

  • Sales order and automatic release of prod order

    please tell me how a sales order can be automatically converted into production order by running MRP.
    please give me configuration details

    Hi Kumar
    Please letus know the planning startegy .
    If MTO  u can use planning startegy = 82,
    When  u create sale order for header material , assembly prod  order will be created automatically with out MRP Run.If u have Multi level Bom u have to run MRP.
    MRP will not create prod order directly, it will create planned order based on cutomer requirements, u have to convert it to prod order manually.   
    Regards
    Pradeep

  • Link between Prod Order and Sale Order schedule line

    Dear all,
    Ours is a MTO (81).
    In Scheduling Agreement / Sale Order , there are multiple schedule lines for a single item .
    Production Orders are generated for every schedule line of the Item.
    The client wants to know (for a custom developed report) , against which schedule line of the Sched Agreement/ Sale Order, the Production Order is generated ?
    This Information can be seen in MD04.But  I am not able to fetch from the tables .
    The schedule line field (KDEIN ) is not updated in AFPO table & the order no (AUFNR) is not updated in VBEP table .
    Say,
    Sale Doc No : 42000506
    Schedule line/Dely date            Order qty          Prod Order No
    06.10.09                                    500kg               100170
    15.10.09                                    300kg               100171
    Pls give your valuable inputs.
    Regards,
    Sheik

    Hi,
    Only Sales Order No & Sales Order Item No is updated in the table.
    Whereas , I want to know the Sales Order Schedule Line no.
    Regards,
    Sheiki

  • Block creation of multiple prod. order against single sales order in CO08

    Hi All,
    We have a requirement of blocking the creation of multiple production order against single sales order in CO08 if the production order is already created for that item.
    How to achieve this?
    SmanS

    Hi,
    you need to check if any user exit is there which will check order haeder table for the said sales order if any Prod Order exist for the same and flag custome error whicle prod order save.
    Pls revert if you need any further information.

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Automatic Settlement for Prod.orders & Product Cost Collectors.

    Dear all,
    Please help me how to carryout the Automatic settlement of Production orders &
    Product Cost collectors on every month last working day mid night.
    Please tell me how to schedule this as an automatic scheduled job.
    This program is not been allowed to schedule as a job.
    Waiting for your inputs.
    Please help me.
    Regards
    Mangalraj.S

    Hi
    Create a Variant with the order types need to be setteled at the period and schedule the same in background processing.
    Regards
    Venkat