How do you schedule the daily job for closing the reconciliation key FPG4 and transferring them to R3 FPG1.
Regards
Charvi
Hi,
I seen this transaction running on back ground, unfurtunately I didnt run it but this is my experience.
We used it to run availability check every 4 hours and the system performance gets lows, of course it depends on technical architecture and volume of material. It reads every line on sales ordes that, in ours scenarios was so high (about 5000 lines in one day or more).
It works perfectly, but buffers get alarme on pics of the operations.
If you program it on low transaction volume, if can be very good, you may also talk before with your basis and explain him this performance issue, maybe he can help.
I hope you find this hopeful.
Regards,
RP
Similar Messages
-
How to schedule the background job if report have Presentation server files
Hi All,
I have searched the forums and found , the way for the scheduling the background job if report selection screen have the presentation server file input.
1. Using the Open data set method.
And my client is not OK with Open dataset way, it there any other way to do this, As we are using the EXCEL file.
Thanks and Regards,
BharaniHi,
As said above it is generally not possible. Since your client most obviously doesn't like graphical background I would recomend storing data as till now, but show it with your own report in more userfriendly way. For example:
- as ALV Grid
- in excel with use of OLE either as embedded in SAP or new window (check transaction OLE for example)
- with use of webdynpro
BR
Marcin Cholewczuk -
How to schedule the background job using current selection screen field val
Hello Friends,
How to schedule the background job using current selection screen field values.
after completion of the job the spool should be sent as a mail to SAP Inbox.
Is there any way to create the variant dynamically by reading the current selection screen values.
Thanks,
RaviHi,
To get the variant details you can use teh following FM.
'RS_VARIANT_CONTENTS'.
Regards,
Ankur Parab -
How to schedule the background job daily twice?
Hi,
How to schedule the background job daily twice? any conditions?
Regards,
Srihithasee the step by step procedure.
Scheduling Background Jobs:
1. Background jobs are scheduled by Basis administrators using transaction SM36.
2. To run a report in a background, a job needs to be created with a step using the report name
and a variant for selection parameters. It is recommended to create a separate variant for each
scheduled job to produce results for specific dates (e.g. previous month) or organizational units (e.g.
company codes).
3. While defining the step, the spool parameters needs to be specified
(Step-> Print Specifications->Properties) to secure the output of the report and help authorized users
to find the spool request. The following parameters needs to be maintained:
a. Time of printing: set to Send to SAP spooler Only for now
b. Name abbreviated name to identify the job output
c. Title free form description for the report output
d. Authorization a value defined by Security in user profiles to allow those users to access
this spool request (authorization object S_SPO_ACT, value SPOAUTH). Only users with matching
authorization value in their profiles will be able to see the output.
e. Department set to appropriate department/functional area name. This field can be used in
a search later.
f. Retention period set to Do not delete if the report output needs to be retained for more
than 8 days. Once the archiving/document repository solution is in place the spool requests could
be automatically moved to the archive/repository. Storage Mode parameter on the same screen
could be used to immediately send the output to archive instead of creating a spool request.
Configuring user access:
1. To access a report output created by a background job, a user must have at
least access to SP01 (Spool requests) transaction without restriction on the user
name (however by itself it will not let the user to see all spool requests). To have
that access the user must have S_ADMI_FCD authorization object in the profile with
SPOR (or SP01) value of S_ADMI_FCD parameter (maintained by Security).
2. To access a particular jobs output in the spool, the user must have
S_SPO_ACT object in the profile with SPOAUTH parameter matching the value used
in the Print Specifications of the job (see p. 3.d above).
3. Levels of access to the spool (display, print once, reprint, download, etc) are
controlled by SPOACTION parameter of S_SPO_ACT. The user must have at least
BASE access (display).
On-line reports:
1. Exactly the same configuration can be maintained for any output produced
from R/3. If a user clicks Parameters button on a SAP Printer selection dialog, it
allows to specify all the parameters as described in p. 3 of
Scheduling background jobs section. Thus any output created by an online report
can be saved and accessed by any user authorized to access that spool request
(access restriction provided by the Authorization field of the spool request
attributes, see p. 3.d of Scheduling background jobs section).
Access to reports output:
1. A user that had proper access (see Configuring user access above) can
retrieve a job/report output through transaction SP01.
2. The selection screen can be configured by clicking Further selection
criteria button (e.g. to bring Spool request name (suffix 2) field or hide other
fields).
3. The following fields can be used to search for a specific output (Note that
Created By must be blank when searching for scheduled jobs outputs)
a. Spool request name (suffix 2) corresponds to a spool name in p. 3.b in
Scheduling background jobs section above).
b. Date created to find an output of a job that ran within a certain date range.
c. Title corresponds to spool Title in p. 3.c in Scheduling background jobs
section above).
d. Department - corresponds to spool Department in p. 3.e in Scheduling
background jobs section above).
4. Upon entering selection criteria, the user clicks the Execute button to
retrieve the list of matching spool requests.
5. From the spool list the user can use several function such as view the
content of a spool request, print the spool request, view attributed of the spool
request, etc. (some functions may need special authorization, see p.3 in
Configuring user access)
a. Click the Print button to print the spool request with the default attributes
(usually defined with the job definition). It will print it on a printer that was
specified when a job was created.
b. Click the Print with changed attributed button to print the spool request
with the different attributes (e.g. changing the printer name).
c. Click the Display contents button to preview the spool request contents. A
Print and Download functions are available from the preview mode. -
How to schedule a background job in realtime
Hi,
Can you tell me how to schedule a background job in realtime.
give some example scenerios in scheduling the background jobs in realtime.
Thanks.
sam.And also.....
There are two ways for you to handle,
one manually setting up the job through SM36 which is better and convinient,
secondly through program using FM's JOB_OPEN, SUBMIT, JOB_CLOSE.
Find below steps in doing both:
Procedure 1:
1. Goto Trans -> SM36
2. Define a job with the program and variant if any
3. Click on start condition in application tool bar
4. In the pop-up window, click on Date/Time
5. Below you can see a check box "Periodic Job"
6. Next click on Period Values
7. Select "Other Period"
8. Now give '15' for Minutes
9. Save the job
Procedure 2 via Program:
Below is a sample code for the same. Note the ZTEMP2 is the program i am scheduling with 15mins frequency.
DATA: P_JOBCNT LIKE TBTCJOB-JOBCOUNT,
L_RELEASE(1) TYPE c.
CALL FUNCTION 'JOB_OPEN'
EXPORTING
JOBNAME = 'ZTEMP2'
IMPORTING
JOBCOUNT = P_JOBCNT
EXCEPTIONS
CANT_CREATE_JOB = 1
INVALID_JOB_DATA = 2
JOBNAME_MISSING = 3
OTHERS = 4.
IF SY-SUBRC 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF.
SUBMIT ZTEMP2 VIA JOB 'ZTEMP2' NUMBER P_JOBCNT
TO SAP-SPOOL WITHOUT SPOOL DYNPRO
WITH DESTINATION = 'HPMISPRT'
WITH IMMEDIATELY = SPACE
WITH KEEP_IN_SPOOL = 'X' AND RETURN.
CALL FUNCTION 'JOB_CLOSE'
EXPORTING
JOBCOUNT = P_JOBCNT
JOBNAME = 'ZTEMP2'
STRTIMMED = 'X'
PRDMINS = 15
IMPORTING
JOB_WAS_RELEASED = L_RELEASE
EXCEPTIONS
CANT_START_IMMEDIATE = 1
INVALID_STARTDATE = 2
JOBNAME_MISSING = 3
JOB_CLOSE_FAILED = 4
JOB_NOSTEPS = 5
JOB_NOTEX = 6
LOCK_FAILED = 7
INVALID_TARGET = 8
OTHERS = 9.
IF SY-SUBRC 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF.
Hope the above helps you.
***********reward points,if found useful -
How to cancel the background job?
Hi,
I have schedule the backgroud job.How to cancel the background the job.
When i select the job and click on stop button, iam getting message "job is not active - cancellation not possiable".How to schedule the background job.
Regards,
T.sureshgoto sm37
SM36 Define Background Job
SM37 Background Job Overview
SM39 Job Analysis
U can Moniter the background Jobs through T code SM37
In the Simple Job Selection window enter the name of the Job and User of that Job and u can check the status of that Job like JobName, Job CreatedBy, Status, Start date, Start time Duration(sec.) Delay (sec.). -
Certain Maintenance Plan not getting scheduled in the background job
Hi Gurus,
I am facing an issue here.
A weekly background job (RISTRA20) runs every weekend and schedules the maintenance plans.
But we have noticed that some maintenance plans are not getting scheduled. i.e no orders or schedule is getting generated.
When I run IP30 manually for these plans then the schedule gets generated and orders get called.
I have checked up the background job and it is running fine.
Also, i have noticed a similarity in all these plans which are not getting scheduled. There schedule has been restarted (through IP10) at somepoint or the other.
But i don't see any direct impact of this?
Can any of you provide some help on this?? Points will be rewarded.
Thanks and regards,
Nitin SainiHi Narender,
Thanks for replying.
The message number for 'Groups don't match' is ME303.
I think this does not have anything to do with the restart as i have done further investigation.
Whenever I run IP30 with sortfield input as AS02*, i get the error as mentioned above for a certain number of maintenance plans while the remaining plans get scheduled.
If i run IP30 for any other sort fields, it runs fine and i don't encounter the error
mentioned above.
If you send me ur email address, i could forward you screen-shots of the issue. -
Scheduling a background job depending on the output lenght.
Hi every one,
I have a small requirement. My client want me to run a program in a foreground if the output is small and should the program in background if the output is large.This has to be achieved through coding. The program downloads the netprices of products. The downloaded file is of .dat format. It is an urgent requirement.
Guys you would throughly rewarded for your help.
Thanks,
Kumar.9886185040.Hi Nag
that is not possible with codeing. To create a schedule a background job for the same program depending on its output is not possible.
being a programmer you need to decide, how long the code will take to execute.. accordingly you can either schedule or run in foreground. You can make some mandatory fields in the selection screen, so that the output is big mostly.
see the sample code for the Job scheduling using the fun modules
IF p_bjob = 'X'.
CONCATENATE sy-cprog sy-datum sy-uzeit
INTO jobname SEPARATED BY '_'.
CALL FUNCTION 'JOB_OPEN'
EXPORTING
jobname = jobname
IMPORTING
jobcount = jobcount
EXCEPTIONS
cant_create_job = 1
invalid_job_data = 2
jobname_missing = 3
OTHERS = 4.
CALL FUNCTION 'GET_PRINT_PARAMETERS'
IMPORTING
out_archive_parameters = arc_params
out_parameters = print_params
valid = valid
EXCEPTIONS
archive_info_not_found = 1
invalid_print_params = 2
invalid_archive_params = 3
OTHERS = 4.
IF valid = chk.
SUBMIT yREP WITH s_kunnr IN s_cust
AND RETURN
USER sy-uname
VIA JOB jobname
NUMBER jobcount
TO SAP-SPOOL
SPOOL PARAMETERS print_params
ARCHIVE PARAMETERS arc_params
WITHOUT SPOOL DYNPRO.
CALL FUNCTION 'JOB_CLOSE'
EXPORTING
jobcount = jobcount
jobname = jobname
strtimmed = 'X'
EXCEPTIONS
cant_start_immediate = 1
invalid_startdate = 2
jobname_missing = 3
job_close_failed = 4
job_nosteps = 5
job_notex = 6
lock_failed = 7
invalid_target = 8
OTHERS = 9.
IF sy-subrc 0.
* MESSAGE ID sy-msgid TYPE sy-msgty NUMBER sy-msgno
* WITH sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
ELSE.
MESSAGE i029 WITH jobname.
ENDIF.
ELSE.
MESSAGE s000 WITH text-003.
STOP.
ENDIF.
ENDIF.
Also,
Yes you can use job functions:
JOB_OPEN
JOB_SUBMIT
JOB_CLOSE
* You can add multiple steps into one job by using JOB_SUBMIT.
Regards
JJ -
How to schedule a background job using the Event concept..?
Hi Folks,
I have a requirement that, I need a schedule a background job.
Once after the previous job successful only, new job should get triggered. How to go ahead with this..?
For Eg, I am scheduling a job called ZTEST periodically for 1 minute. If the job is not get completing with in 1 minute, I dont want to start my new job. Only after the success of my old job, I want my new job to run.
Waiting for ur replies.
Regards,
Savi.Hi,
You can use events that have already been defined, or you can create new events for scheduling background jobs.
If you wish to use new events, do the following to implement the event scheduling:
Define and transport the event as a user event with transaction SM62.
You must define only event IDs; event arguments are not defined in the R/3 System. Instead, you specify event arguments when you schedule a job to wait for an event and when you trigger the event.
If you define a new event, you must also transport it to your production systems. The event transaction does not have a connection to the transport system. Instead, you must create a transport request for the event yourself.
Do this to transport an event:
Create a transport request.
Start the editor in the transport request and enter the following:
R3TR TABU <table name> where table name is BTCSEV for a system event ID, BTCUEV for a user event ID.
Press F2 with the cursor on the table name to call up the screen for specifying the table entries to transport. In this screen, enter the event IDs that you have created.
Save and release the transport request. Ensure that it is imported into your production system(s).
To trigger an event, add:
the function module BP_EVENT_RAISE to your ABAP program, or
the program SAPEVT to your external script, batch file, or program.
When your programs execute these keywords, an event will be triggered in the R/3 background processing system. The event-based scheduler is started immediately. It in turn starts all jobs that were waiting upon the event, subject to normal background processing restrictions, such as the requirement that the job has been released to start.
Schedule the jobs that are to run when your events are triggered.
You can schedule jobs for one-time start or to be started whenever an event is triggered.
Regards,
Raj. -
Scheduler and the background jobs page
I have just added a job to the sling scheduler, I thougt once added i was be shown in the background jobs page in the tools of cq5.
Does Sling scheduler nothin to do with that? how could add a job background to the background jobs page in the tools of cq5??
Thanks.For your use case you should be able to see at http://localhost:4502/system/console/events
For the background jobs ex:- [1] will be displayed in tools.
[1] http://localhost:4502/system/bgservlets/test.html?sling:bg=true&cycles=1 -
Scheduling one background job inside another
Hi All,
Is it possible to Scheduling one background job inside another.? i.e In my Z program I am calling job_open, job_submit, job_close and to execute one standard report in background. And after that I am executing my Z program itself from SE38 as Program->Execute->Background->Execute Immediately. Is this logically correct? I am asking this because I am not getting the desired result
Thanks & Regards,
Neethu.HI,
Check the job steps in SM36.
First schedule the Standard job and in the job steps schedule the z report.
Schedule job in chain -
Scheduling a background job using Job_Submit and Job_Close FM
Hi Guys,
I am calling a report in background using Job_Submit and Job_Close FM's.
I am not providing start time and date in the Job_close FM, in this case, when the job will be scheduled to start.
Even after an hour, job status is still scheduled.
I am not exporting variant, since I am using memory ID.
Thanks
Edited by: sapgeek007 on May 11, 2009 4:11 AMIn Job_close fm use the parameter 'STRTIMMED'
CALL FUNCTION 'JOB_CLOSE'
EXPORTING
jobcount = LV_NUMBER
jobname = LV_NAME
STRTIMMED = 'X'
EXCEPTIONS
CANT_START_IMMEDIATE = 1
INVALID_STARTDATE = 2
JOBNAME_MISSING = 3
JOB_CLOSE_FAILED = 4
JOB_NOSTEPS = 5
JOB_NOTEX = 6
LOCK_FAILED = 7
INVALID_TARGET = 8
OTHERS = 9
IF sy-subrc <> 0.
MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
ENDIF.
That would start the background job immediately.
Regards,
Deepak -
Can MC.9 be scheduled as background job?
Hi experts,
I would like to schedule MC.9 to run monthly. However, I find that no spool list is generated for the background job. I wonder if there is any way to make it to run in backgroud mode with result shown in spool. Or is there any similiar report which serves the same purpose?
Thanks in advance. Points will be awarded for useful answers.If I am not wrong, Spool generation depends on your system settings. I am sure that I have executed all MC** reports and got the spool list. Chk your basis administrator for your system config.
-
Hi all,
I have a requirement in which i need to run a job only after 5th of everymonth to untill end of month in one hour gap.
So it should be like that,job start from
Nov---5th to nov 30th then
Dec---5th to Dex31th.How can i acheive this?I cannot modify the program since it is a standard program?
Apart from creating the customized program and call the standard program from there...i would like to have some other
solution than this since there are variants in the standard program.
Rgards,
Arun.Hi Arun ,
You can use Background Processing Event.
An event is a signal stating that a predefined status in the system has
been reached. The background processing system receives events and then
starts the background job/jobs that is/are linked to an event.
So in the "After Events" tab in SM36 you specify a perticular event which will be triggered on 5th of every month and you will schedule your job after that with periodicy as "every hour"
Hope this will help to you .
Regards,
Nikhil -
Schedule a background job for a program using ABAP code.
Hi,
I have to write a program to schedule a background job for another program.
Need your help to understand how we can achieve this functionality.Any example of an abap code would be of great help.
Need it urgently.
Thanks in advance.
Sandeep.Hi Sandeep,
Here is the demo program regarding the BDC For the background job.
report zprprbdc1
no standard page heading line-size 255.
include bdcrecx1.
parameters: dataset(132) lower case.
*** DO NOT CHANGE - the generated data section - DO NOT CHANGE ***
* If it is nessesary to change the data section use the rules:
* 1.) Each definition of a field exists of two lines
* 2.) The first line shows exactly the comment
* '* data element: ' followed with the data element
* which describes the field.
* If you don't have a data element use the
* comment without a data element name
* 3.) The second line shows the fieldname of the
* structure, the fieldname must consist of
* a fieldname and optional the character '_' and
* three numbers and the field length in brackets
* 4.) Each field must be type C.
*** Generated data section with specific formatting - DO NOT CHANGE ***
***data: begin of itab occurs 0 ,
*** matnr(20) type c,
*** mbrsh(30) type c,
*** mtart(30) type c,
*** kzsel(20) type c,
*** maktx(40) type c,
*** meins(5) type c,
*** end of itab.
data: begin of record occurs 0,
* data element: MATNR
matnr_001(018),
* data element: MBRSH
mbrsh_002(001),
* data element: MTART
mtart_003(004),
* data element: XFELD
kzsel_01_004(001),
* data element: MAKTX
maktx_005(040),
* data element: MEINS
meins_006(003),
* data element: MTPOS_MARA
mtpos_mara_007(004),
end of record.
*** End generated data section ***
start-of-selection.
*perform open_dataset using dataset.
perform open_group.
**do.
**read dataset dataset into record.
**if sy-subrc <> 0. exit. endif.
call function 'GUI_UPLOAD'
exporting
filename = 'c:\jitu\bdc\10002.txt'
filetype = 'ASC'
has_field_separator = 'x'
* HEADER_LENGTH = 0
* READ_BY_LINE = 'X'
* DAT_MODE = ' '
* CODEPAGE = ' '
* IGNORE_CERR = ABAP_TRUE
* REPLACEMENT = '#'
* CHECK_BOM = ' '
* VIRUS_SCAN_PROFILE =
* NO_AUTH_CHECK = ' '
* IMPORTING
* FILELENGTH =
* HEADER =
tables
data_tab = record
* EXCEPTIONS
* FILE_OPEN_ERROR = 1
* FILE_READ_ERROR = 2
* NO_BATCH = 3
* GUI_REFUSE_FILETRANSFER = 4
* INVALID_TYPE = 5
* NO_AUTHORITY = 6
* UNKNOWN_ERROR = 7
* BAD_DATA_FORMAT = 8
* HEADER_NOT_ALLOWED = 9
* SEPARATOR_NOT_ALLOWED = 10
* HEADER_TOO_LONG = 11
* UNKNOWN_DP_ERROR = 12
* ACCESS_DENIED = 13
* DP_OUT_OF_MEMORY = 14
* DISK_FULL = 15
* DP_TIMEOUT = 16
* OTHERS = 17
if sy-subrc <> 0.
* MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
* WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
endif.
loop at record .
perform bdc_dynpro using 'SAPLMGMM' '0060'.
perform bdc_field using 'BDC_CURSOR'
'RMMG1-MATNR'.
perform bdc_field using 'BDC_OKCODE'
'/00'.
perform bdc_field using 'RMMG1-MATNR'
record-matnr_001.
perform bdc_field using 'RMMG1-MBRSH'
record-mbrsh_002.
perform bdc_field using 'RMMG1-MTART'
record-mtart_003.
perform bdc_dynpro using 'SAPLMGMM' '0070'.
perform bdc_field using 'BDC_CURSOR'
'MSICHTAUSW-DYTXT(01)'.
perform bdc_field using 'BDC_OKCODE'
'=ENTR'.
perform bdc_field using 'MSICHTAUSW-KZSEL(01)'
record-kzsel_01_004.
perform bdc_dynpro using 'SAPLMGMM' '4004'.
perform bdc_field using 'BDC_OKCODE'
'=BU'.
perform bdc_field using 'MAKT-MAKTX'
record-maktx_005.
perform bdc_field using 'BDC_CURSOR'
'MARA-MEINS'.
perform bdc_field using 'MARA-MEINS'
record-meins_006.
perform bdc_field using 'MARA-MTPOS_MARA'
record-mtpos_mara_007.
perform bdc_transaction using 'MM01'.
**enddo.
endloop.
perform close_group.
*perform close_dataset using dataset.
&*****************Reward point if helpful************&
Maybe you are looking for
-
How can I convert a poorly exported project from 6.* to 7.0?
I made a critical mistake some years ago. I used the advanced features of the save option to write out my project with all the sub-vi's and libraries. Now I have a version 7 LabView I am attempting to convert it. The trouble is that many of the fe
-
Upgrade of Sourcesystem SAP EHP3 SAP ECC 6.0 to SAP EHP4 SAP ECC 6.0
Hi, I noticed there is a lot of questions on the testing procedures for BI side when Upgrading the source system from R/3 to ECC 6.0. But noticed there aren't many posts on when doing Ehancement Packs. But I believe the process would be more or less
-
Why can you create and not edit a form in Forms Central with fields not available in Adobe Pro
I have developed a form in Adobe pro which I want to use the extra fields that are available in Form Central such as ranking. I can create a form with these extra fields but cannot edit it once saved. Whats the trick?
-
Hey all, I just read the admin guide for the SPA 3102 but I wanna make sure I didn't misunderstand anything so, could someone confirm that I can do all the stuff below, and note I'm in the UK. 1. Register 1 voip provider (VA) for outgoing calls, 1 di
-
Generalisation relations in blazeds services are not generated on flex side
Hi, I'm trying to create an application that will do the hard work in java with services exposed by blaze and use flex as a thin front-end. However, I'm having difficulties with the code generated by flash builder using the rds servlet. When I create