Re:Upgrade from 4.6c - Ecc 6.0

Hello SAP Friends,
I am involved in a project of Technical Upgrade from 4.6 to ECC 6.0.I am a functional Consultant and with the Help of ABAPers i have to complete this Technical Upgrade. We have identified some Standard objects through SPAU/SPDD which need to be REMEDIATED.
Can someone please explain as to what is the detailed process and the Steps Involved for the Remediation process like how to compare the codes and testing and all.
Thanks in advance,
Julie Mehta

What you need to do is to make the programs that you've, UNICODE compatibel.
This will solve lots of errors in your SPAU.
greetings
Tom

Similar Messages

  • Error in upgrade from 46c to ecc 6.0

    hi experts,
    we are facing an error at the time of upgrade from 46c to ecc 6.0 in the phase JOB_RSUPGAIMEXE.
    did anyone face this error anytime during upgrade on windows plotform?
    Please let us know your comments..
    regards
    raghu

    Hello,
    Can you please look in the /put/log directory and copy the error from the appropriate log file. You should find a log file with a name similar the to upgrade phase that is causing the error.
    Thanks
    N.P.C

  • Upgrade from 46C to ECC 6

    Hello:
    We are planning to begin technical upgrade in SAP, from 46C to ECC 6.0.
    I have the next landscape:
    -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    We want to install SAP ECC 6.0 in NS and get the data from CS.
    Which is the best and easy way to do this? SAP manuals are quite generic. I have two ideas but I would like your comments:
    1st way
    1. Homogeneous copy of CS
    2. I install ECC 6.0 in NS with the option to import data generated in 1. (is this possible??)
    3. Finish installation and aditional configurations. I begin to test.
    2nd way
    1. Homogeneous copy of CS
    2. I install 4.6C in NS with the option to import data generated in step 1. (Not sure if 4.6C will accept Solaris 10 and Oracle 10.2).
    3. I suppose I don't need to reconfigure after installation and import.
    4. I do necessary tests. At this point I would have 46C on the new versions of Solaris and Oracle.
    5. I begin the SAP upgrade to ECC 6.0 in NS
    6. .... The remaining processes indicated by SAP
    Thanks for your attention.

    > -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    > -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    The database software is usually installed during the run of sapinst/R3setup, not before. You may run into problems if you pre-install Oracle (environment, necessary database options not set etc.)
    The easiest way would be do to a system copy.
    I would then
    - install the latest Oracle instantclient
    - install the latest kernel 46D_EX2 kernel
    Markus

  • Short dump in MIGO and VL02N when upgrading from 46C to ECC 6.0

    Hello,
    We are doing an upgrade from R/3 46C to ECC 6.0 and we face a shortdump in trx MIGO (upon saving the document).
    DBIF_RSQL_INVALID_REQUEST
    a BKPF_INSERT in program SAPLF005
    The same shortdump happens when doing a Goods Issue on the SD side.
    Looking at the program, this is not modyfied so I guess it is a standard SAP error.
    OSS however, up to know did not respond to my message and there does not seem to be a SAP Note on this issue!
    Anyone had this problem before. How did they solve it.
    Thanks for any reply,
    Aart

    Posted in another forum

  • Upgrade from 46B to ECC 6.0

    I'm planning to do an upgrade from 46B oracle 9i to ECC 6 oracle 10g.
    Is there someone who did it whith those version.
    I was wondering, do I have to apply all the sp from 46b before migrating to ECC 6?
    Somebody could help me?
    Thanks

    Hi,
    You need to follow the steps carefully.
    You first need to upgrade Oracle to 10g and then you need to upgrade your kernel to 46D_ext from 46D as 46D_ext ortace libraries support oracle 10g libraries and hence need to be very careful.
    You can follow certain notes like :
    SAPNote 932722 - Upgrade to Oracle 10.2 during a database copy
    SAPNote 976457 - Oracle 10g Support on Windows: 4.6D-Based SAP Systems
    Once you upgrade oracle and are able to start and work on SAP system (with Oracle 10.2.0.2 and 46D_ext kernel) then you can start the upgrade.
    Rest of the upgrade is similar to a normal upgrade.
    Regards,
    Suhas

  • Upgrade from 46C to ECC 6.0

    Hi All,
    We are upgrading from 4.6C to ECC 6.0.I have downloaded all the SOFTWARE from Service market place except ORACLE 10.2 which I am not able to locate it.
    Do I need to order ORALCE UPGRADE CDS from SAP? or is there any way to find out on the service market place...
    Would appreciate If any of you can throw some light in this regard...
    Thanks in Advance,
    Johnny.

    Of course the DVDs are available for download.
    I do not know your OS, but you can follow this path:
    http://service.sap.com/installations
    Entry by Application Group ( you should also have it available in "My Company's Application Components" )
    From here there are several ways. For example:
    SAP NetWeaver
    SAP NETWEAVER
    SAP NETWEAVER 2004S
    Installation and Upgrade
    Your OS
    ORACLE
    You get a list including oracle 10g

  • Upgrade from 46c to ECC 6.0 new components support package

    dear experts,
    we have upgraded our test system from 46C to ECC 6.0
    before upgrade in 46C we have support packages components
    SAP_BASIS 46C
    SAP_ABAP 46C
    SAP_APPL 46C
    SAP_HR
    PI 2003_1_46C
    SAP_NOTES 46C
    ST-A/PI 01B_R3_46C
    ST-PI 2005_1_46C
    after upgrade to ECC 6.0 we found
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_BW 700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    EA-IPPE 400 0003
    EA-HR 600 0003
    EA-GLTRADE 600 0003
    EA-PS 600 0003
    EA-RETAIL 600 0003
    EA-FINSERV 600 0003
    EA-DFPS 600 0003
    EA-APPL 600 0003
    FINBASIS 600 0003
    ECC-DIMP 600 0003
    ERECRUIT 600 0003
    FI-CA 600 0003
    FI-CAX 600 0003
    INSURANCE 600 0003
    IS-CWM 600 0003
    IS-H 600 0003
    IS-M 600 0003
    IS-OIL 600 0003
    IS-PS-CA 600 0003
    IS-UT 600 0003
    LSOFE 600 0003
    SEM-BW 600 0003
    we are planning to apply SPS 06. Is it mandatory we have to apply
    all the support packages in SPS 06.
    we are confused as we dont use IS-OIL,EA-,ERECUIT,INSURANCE,FI-
    please suggest which support packages we have apply relating to the
    functionality we have in 46C
    regards
    Raghu

    Hi,
    you have to apply the same type of packages as before.
    All other are included in ECC, but if you don't use the special services and applications (for example IS Oil or stuff like this), there is no need to apply all these packages.
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    should be enough
    Regards
    Timm

  • Upgrading from 46C to ECC 7.0

    Guys,
    My company is going to upgrade R/3 46C to ECC 7.0 later this year.  From the development (ABAP programs, any ABAP objects) standpoint, any suggestions on preparation, or what can be done in our current 46C environment to ensure a smooth transition from 46C to ECC (unicode, obsolete ABAP syntax, etc)?  Also any idea and recommendation on planning the upgrade, as well as things to watch out for are welcome.
    Thanks,
    Yan.

    First ECC 7.0 does not exist, so you will be upgrading to ECC 6.0.  And yes, you can start by doing a start for any calls to WS_UPLOAD and WS_DOWNLOAD.  You will need to change these calls to call the GUI_UPLOAD or GUI_DOWLOAD function modules.
    Other syntax issues will need to be handled after the upgrade, like using the ECODING extension on all OPEN DATASET statements.
    Regards,
    Rich Heilman

  • Add-On ST error in Prepare Upgrade from 46D to ECC 6.0

    I have getting Error Add-On ST 2D, and undecided, I don't know what to do, I had installed Solution Manager for 46D and ST 2D, If anybody has this situation, how do I download the Add on
    I will appreciate any help on this matter.
    Thanks
    Jagraj Dhillon

    > Dear,
    >
    > I believe you have the addon component 'SAPKITL02D
    > "SAP Solution Manager - Installation 4.6C (02D) "
    > installed in 4.6C , is that right?
    >
    > Since the ST (Solution Manager) cannot be upgraded
    > from current version
    > to the latest using the R3 upgrade, You need to
    > Deinstall the addon. (with import of SAPKITL029 in
    > SAINT) Please reset prepare as described in the
    > upgrade manual (SAPup reset prepare + empty DIR_PUT)
    > and next import the request SAPKITL029 using SAINT
    > which should take care of the de-installation of ST
    > 02D.
    >
    > I hope this helps.
    >
    > Lucio Rodrigues
    > SAP AGS
    Hello, Lucio.  I am in the same boat, only with R/3 version 4.6C, and ST 0.2C (SAPKITL02Y).  Would the SAPKITL029 work for me as well, or is there another SAINT package designed to remove ST 0.2C?
    SAP support has not been very helpful to this point.  If you have an import which would help with uninstalling the addon, please email it to [email protected], or please let me know where to download it if it is available for download.
    Mike McCrory - BMW Global Data Center America's
    Message was edited by:
            McCrory Michael

  • Recommandations for upgrading from 46C to ECC 6.0

    Hello
    Our SAP system landscape is actually in 46c and is only composed of 3 servers with almost 40 users declared (25 actives) on production system. Modules FI/CO HR MM are actually implemented.
    We plan to upgrade the system to ECC 6.0 between March and August of 2009. The evaluation of the upgrade should begin as soon as possible. Do you think it can be possible to realise the upgrade alone, without the help and expertise of a SAP consultant? Do you think the delay for preparing the upgrade is suffisant?
    Thank you.

    As suggested earlier, refer to Master and technological guides for reference.
    also for information, the upgrade can fall under any below scenarios.
    1. Strategic Business Improvement
    Focus on functionality extension and improvement
    Enablement of new and optimized business processes and scenarios based on new ERP core functionality
    2. Functional/Retrofit Upgrade
    New functionality to be implemented as part of the upgrade, modification clearing
    Focus on reduction of system complexity
    3. Technical Upgrade
    Focus on pure technology upgrade
    Retain functionality used
    Review Usage of custom developments
    As per the requirement.  knowledge and experience the decision can be made.

  • Error in Zreport while upgrading from 46C to ECC 6

    Hello Experts,
    I am facing problems in 1 Zreport while i have upgraded that report from 4.6C to ECC 6. Dump is reported while running the program.
    Error is : "Access non-existent storage area."
    error is coming @ line :  ADD <f1> THEN <f2> UNTIL <f3> GIVING v_totval.
    FIELD-SYMBOLS: <f1> TYPE ANY,
                   <f2> TYPE ANY,
                   <f3> TYPE ANY.
    DATA: v_totval LIKE lfc1-um01h.
    IF <f1> IS ASSIGNED  AND
         <f2> IS ASSIGNED  AND
         <f3> IS ASSIGNED.
        ADD <f1> THEN <f2> UNTIL <f3> GIVING v_totval.
    ENDIF.
    can you ppl please tell me any solution as its urgent !
    thanks in advance.

    this is fine for me.
      DATA: BEGIN OF numbers,
              one   TYPE p VALUE 10,
              two   TYPE p VALUE 20,
              three TYPE p VALUE 30,
              four  TYPE p VALUE 40,
              five  TYPE p VALUE 50,
            END OF numbers,
            sum     TYPE i.
      SELECT-OPTIONS position FOR sum.
      ADD numbers-one THEN numbers-two
                      UNTIL numbers-five
                      ACCORDING TO position
                      GIVING sum.
    A

  • Upgrade from 46c to ECC

    Hi,
    Can you please explain me the complete procedure to be followed and precautions to be taken for upgrading SPAU(program,func groups,data elements,tables,structures, etc) objects, SPDD objects and custom objects(programs,func grps etc..) from 4.6c to ECC version.
    Thanks,
    Laks.

    Hi ,
            The Precautions are .
    1 .SPDD transaction should be executed 14 days before the upgrade .
    2 .SPAU transcation should be executed after the Upgrade.
    3 .Maximum error in SPAU can be resolved using Basis and Function Consultant support .
    4 Maximum errors are in BDC,Sapscript ,Userexits which deal with standrad transaction .
    5 .Also take care about The Unicode errors.
    6 .For Unicode Use Transaction UCCHECK and SCOV.
    Please reward if useful .

  • Batch Jobs Running during upgrade from 46C to ECC 6!

    Hi All
    We are currently due to run our upgrade in the next two weeks and I have one final concern. The only testing we have not done relates to batch jobs.
    Our upgrade stratergy is downtime minimised.
    Does anyone know any best practices or issues that could effect our upgrade?
    Cheers
    Phil

    Hi Phil,
    If I remember correctly all background jobs in SAP R/3 are de-scheduled by the upgrade process. You have to manually reschedule them after the upgrade so make sure you have good scheduling documentation (or consider the central job scheduling provided by SAP NetWeaver for the future).
    One tip is that you need to make sure that jobs started from other systems are postponed until after the upgrade too (e.g. data extractions to BI). The upgrade process cannot determine job schedules and dependencies in other systems/scheduling tools.
    Cheers,
    Mike.

  • Tcode V23 - Program SDSPESTA - ECC Upgrade from 5.0 - ECC 6.0

    As I was testing transaction V23 I was prompted with a information message "Execute selection report SDSPESTA first".
    As I was investigating this program I had some questions - what is this program doing? I understand it is refreshing header status data in tables VBUK and VBUP since statuses are newly added fields in 6.0. However when investigating the status from 5.0 to 6.0 the tables were properly populated with the correct information. What is the purpose of this program then?
    Also - I ran this program for ONE sales order in TEST MODE only, and now I do not get the informational message anymore when running V23. Is only running for one order in test mode sufficient to not recieve the message anymore? If not, how do you run this program? Wide open to update all orders?
    Please advise.

    Posted in wrong forum.  reposted in Business Process forum.

  • Upgrade from 4.7 to ECC 6

    Hi Friends,
    My client wants to upgrade their system from 4.7ee to ECC6.00, they are in service sector.
    Can somebody tell me, what is the role of a FI/CO consultant during this upgradition. 
    Before starting of upgradition what kind of information to be gather from the client
    what are the major changes when upgrade from 4.7ee to ecc6.00.
    currently our client is not using Asset accouting and Product costing and CO-PA, this is for your additional information.
    May be during upgrade they will implement Asset accouting and CO-PA only, they may not implement Product costing, as they are in service sector.
    Awaiting for your feedback.
    Thanks & Regards,
    Prasad

    Please undersatnd that the upgrade from 4.7to ECC 6.0 is purely a technical upgrade. Since this activity results in update of the ABAP code. As a functional consultant, you need to ensure that all business processes are working fine post upgrade. You need to check for the Zreport giving the right results.
    You should be testing all the business processes. This also impacts some of the screen layout like cash journal, which needs to be brought back to its form in 4.7.
    Also during upgrade, before the system is down, take the count for key table in FICO including the last document number and compare the same post upgrade once the system is up and running.
    As far as, implementation of additional modules is concerned, the same is an independent activity post upgrade.
    Regards,
    Mamta Sarda