Hi,
I have Convert the planned order to Production order but error message coming "Actual Cost Error".
what procedure that error avoid.
plz, Advise me.
By,
Jeevan.S
Hi
1.problem could be with the activity type costing.
check KP26 data maintained or not (for activity and costcentre assigned to work cneter)
2.IF order having CSER status then do the cost caliculation in the order, so that the status will go.(do thsi after correcting the KP26 data)
if still facing check the error
-ashok
Similar Messages
-
Costing Error in Production Order
Hi
I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
No itemization available for the corresponding material on the plant.
Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
Thanks in Advance.Hi
If you are creating first time production order for the material using standard price you have to do standard cost estimate using ck11n
In that screen you have to enter material no.. costing variant mostly PPC1, In the next tab page costing dates from and to and execute..Here only system asks for Itemisation.. Just press enter.
After that Update standard price using ck24
mark and release your standard price for the materail..
Reward points if useful..
Regards,
MSH -
Authorization for Cost Analysis in Production Order
Hi,
Can I maintain the authorization for displaying cost analysis in production order.
I try to create transaction variant....into ZCO02 and ZCO03
but in COOIS it is still branching to CO02 when changing and CO03 when displaying.
I want to disable the cost analysis view in production order so PP people can not access it.
is there any idea?
Please help.
Best regards,
Freddy HaHi,
as i know K_ORDER is authorization for internal order.
We have activate the check in SU24,
but when we tried to trace the authorization when CO02 -> GOTO -> COST _> ANALYSIS
this auth K_ORDER is never check.
Did I miss something here?
Best regards,
Freddy Ha -
Selection of Costing Sheet in Production Order
Hi friends,
I have one query, details of which are as follows.
Costing sheet in Requirement Class - Blank
This requirement class assigned to Requirement type which was derived in Sales order through Material master and hence Costing sheet in Sales order is blank.
Costing Sheet in Valuation variant (Plan) is Z0010 which is assigned to Costing Variant (Plan). It was assigned to Order type.
Costing sheet in Valuation variant (Actual) is Z0020 which is assigned to Costing variant (Actual). It was assigned to Order type.
I have created a new Valuation variant T01 in which Costing sheet is blank. It was assigned to a Particular Plant.
When i am creating the Production order with reference to the Sales order in that Particular plant, system is deriving the Costing sheet as per Valuation variant (Plan) which is common instead of picking from the plant specific valuation variant.
So, its calculating overheads and is impacting our Goods receipt valuation (In this plant, GR Valuation is as per Plan cost of the Production order).
I tried different combinations, and finally observed that it is picking the Costing sheet from the valuation variant (Plan) which is common and not Plant specific.
Is this system behavior correct as per SAP Standard?
Kindly advise on the same
Regards
Madhusekhar Gupta GHi Madhu
1. Production order gets coating sheet from the valuation variant assigned to order type
2. The valuation variant that you assign to Plant is for standard cost estimate only
3. For your case, create a new costing variant without costing sheet and assign the same to the order type for this plant
You can assign different costing variant to the same order type per plant
Br. Ajay M -
Actual Cost Calculation in Process Order
Hi All,
I updated Standard cost of a raw material through a cost estimate and also ran cost estimate of the FIN that is using this raw material but when I am creating a Process order, it is taking the cost of this particular raw material from the previous estimate not the recent one to calculate the target cost. Can any body help me with this.
Thanks
MKRHi Ashok,
My Valuation variants for the Costing Variant of Cost Estimate and Production order (Actual/Plan) cost calculation are in Sync to get the prices according to the price indicator in material master. But when it calculates cost for a production order, it is picking up cost from the previous period for that particular raw material. I have updated the standard cost by running the cost estimate but still its not working.
Any lead on this. This will be really appreciated.
Thanks
MKR -
Costing issue in production order
Dear all
My problem I have 25 pc component quantity . first6 I have issue (261) 1 quantity against that sys has generated one material doc and then issued(261) 24 quantity ,sys has generated second material doc. In production order cost analysis is showing 25 quantity planned cost but in actual cost showing only one quantity .why?
Means EX . material cost is 1 rs in material master .
planned cost is 25
actual cost is showing 1 rs for first issue material cost
why system is not showing rs 25 actual cost in cost analysis in production order?Surendra,
A silly question but worth asking, have you tired displaying the order after the 2nd goods Issue, so times database updation take time. Please check now.
Regards,
Prasobh -
Product cost v/s Production Order cost
Hi all Guru's,
Can any one help me in understanding difference between product cost and production order cost in SAP.
Will give full marks for helpful answer.
Thanks,
Abhishek
Edited by: ABHISHEK AGRAWAL on Jan 29, 2008 9:46 AMDear Abhishek,
Standard Cost Estimate or Material cost Estimate is nothing
but the standard cost for the Inhouse Manufactured materials
(FERT) = Raw Materials Cost + Activity(Operation Cost)
Cost+Overhead Cost if maintained for the Company code.
This cost will gets stamped in the material master in Costing2
view,under Current Planned Price field.
This cost will be the Planned Cost of the Production order and
after confirmation of the order the actual cost and the variances
for the production order can be viewed.
So the Production order cost is for the order quantity say for
Eg: for a quantity of 100.
The cost(variance) will be settled against that production order
after confirmation and TECO status.
I hope this will be helping you.
Regards
Mangalraj.S -
Cost center to production order
hi friends
i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
sapiansHi,
You have to check two things before executing this assessment cycle.
1. Check the allocation structure whether you have assigned the assessment cost element and
settlement of cost element to ORD (ticked in by cost element box).
2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
Have a check of the cycle before saving.
Regards,
Sadashivan -
Error creating Production Orders in UNCONSTR version
I am copying prodcution orders from version 000 to unconstr version through Report I am getting following error.
Error creating Production Orders in UNCONSTR version and Message no. ZSXXPAPO140.
when I am executed in background it is giving following error.
PPM FG100203.01_19_FR04_P for product FG100203.01 is not valid at the required explosion date 14.01.2010 /SAPAPO/RRP 325 E
Please suggest me any one it is a great help to me.Hi Venkat,
It seems there is an inconsistent PPM FG100203.01 exists
in your planning version from which you are copying.
Check the possibilities of repairing that PPM and retry
copying. Orelse In the /SAPAPO/VERCOP transaction,
under the product selection criteria, exclude that item and
try copying the version.
Regards
R. Senthil Mareeswaran. -
Error during Production Order Confirmation
I get a real wierd error during production Order confirmation. The error message is
"Additional items are not allowed
Message no. ZOAL010"
Can anyone throw some light on this?
Regards
Rajit is not std SAP message.
you can check the user exit for confirmation.
check in transaction code CMOD/SMOD for CONF* -
Is there a process for moving costs from maintenance work orders to capital
Is there a process for moving costs from maintenance work orders to capital projects?
We have reversed the settlements on the work orders, and then trying to put the relevant NWA in , then receive error message :
Rule for allocation of PM order to PS network is not maintained.hi
check the allocation structure and the settlement related customization settings. -
Permit not assigned for Actual cost
Hi Dears,
Permit not assigned for actual cost in maint order
Actual cost in maintenance order is 3000
In IPMD, cost1 is assigned with class ACTUAL COST and value 3000 is defined.
In OIPG, Permit class ACTUALCOST is assigned.
Goods issue done to order for value 3000.
Again cost determination executed, but still cost1 is not assinged to the work order.
Am i missing anything ?
Regards,
Alagesan MHi
In charac CT04 i maintained one value 3000 and table maintained CSEVPERMIT and IKOSTEN
In class CL01, assigned the charac for 049 class type
In OIPG, permit class is maintained with class
In IPMD, new permit created and assigned class in classification and maintained 3000
Now order created and component assigned the planned value is 3000.
through MIGO goods issue done and found the actual value is 3000.
But still opened the permit found nothing assigned.
For Estimated cost and planned costs it is working good only for actual cost permit is not assigning.
Actual cost we need to anything more other than this ?
Alagesan -
How to sets the Reason for Rejection of the Open Sales Order Lines
Hello gurus,
I want to set the Reason for Rejection of the Open Sales Order Lines, Case is like :
If current date is exeed the Auto Void Confirmed Back Order Days(for item level) + date (last responding from customer), then reason for rejection should be set, So i want the logic to find out the date is exceed or not.
Thanks
AnjanaHello anjana,
Actually your question is some confusing, but if u want to get eldest change as active sales order then logic is as follows:
1. On base of OBJNR u have to get UDATE from JCDS table
2. then write logic as:
SORT i_jcds BY objnr stat chgnr DESCENDING.
LOOP AT i_jcds INTO wa_jcds1.
CLEAR lv_stat.
lv_stat = wa_jcds1-stat.
AT NEW objnr.
AT NEW stat.
CLEAR: wa_tab.
wa_tab-objnr = wa_jcds1-objnr.
wa_tab-stat = lv_stat.
ENDAT.
ENDAT.
IF wa_jcds1-inact = 'X'.
CLEAR lv_tabix.
IF sy-tabix > 1.
lv_tabix = sy-tabix - 1.
ELSE.
lv_tabix = 1.
ENDIF.
READ TABLE i_jcds INTO wa_jcds2 INDEX lv_tabix.
IF sy-subrc = 0.
wa_tab-chgnr = wa_jcds2-chgnr.
wa_tab-udate = wa_jcds2-udate.
wa_tab-utime = wa_jcds2-utime.
APPEND wa_tab TO i_tab.
ENDIF.
CONTINUE.
ELSE.
wa_tab-chgnr = wa_jcds1-chgnr.
wa_tab-udate = wa_jcds1-udate.
wa_tab-utime = wa_jcds1-utime.
ENDIF.
AT END OF objnr .
AT END OF stat.
APPEND wa_tab TO i_tab.
ENDAT.
ENDAT.
ENDLOOP.
DELETE ADJACENT DUPLICATES FROM i_tab COMPARING objnr stat.
SORT i_tab BY objnr stat udate utime.
DELETE ADJACENT DUPLICATES FROM i_tab COMPARING objnr.
3. now in i_tab table u'll get eldest UDATE
Hope its work for u.
Thanks & Regards,
Sumit Joshi -
Report painter/writer for actual cost component split
Hello Gurus,
Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
Thanks
RGHi Raghu,
After your reply, I am getting a doubt..
Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
You will be able to get the comparison...
Pls don't hesitate to call me for further assistance....
Srikanth Munnaluri -
Report to fetch Actual cost from a service order
Hi Gurus,
The requirement is to create a report to fecth the actual cost from the maintenance order. ie.. material cost , labor cost and some other costs which are directly posted to the order. Can anybody let me know from which tables I can pull the material cost , labor cost ..etc posted against maintenance order?
Regards,
JohnJohn,
Have a look in table PMCO
PeteA
Maybe you are looking for
-
Problem when saving form in web dynpro abap application in se80
Hi, I am trying to develop an adobe application. When I save the form which i have designed. I get the "error" unable to convert data and the transaction is terminated. I dont have any idea why. Help Thanks, Harish
-
Hi, E72: navigating with OVI-maps, the selected options hardly visible. I only see a small blue frame around the selected option. Maybe it is me, but at night i really cannot see which option is selected. Is there a way to change background for the s
-
DVD Playback Error Problems.
Hi, When I put in a DVD a initialation error pops up saying Player requires a newer version of DVD Playback frame work [-70103]. How do I fix this? Thanks.
-
I just order from best buy and it shows up in my recent orders but I have not yet received a confirmation email, I have checked spam folder and it's not there either. I placed a previous order today which I got the confirmation email for instantly. I
-
i have iphon 4 and al my software is updated but in settings on messagin tab there isnt a opition to turn group messaging on but i know people with same phone and same software and they have got it. can someone help please?