Hi,
I have Convert the planned order to Production order but error message coming "Actual Cost Error".
what procedure that error avoid.
plz, Advise me.
By,
Jeevan.S

Hi
1.problem could be with the activity type costing.
check KP26 data maintained or not (for activity and costcentre assigned to work cneter)
2.IF order having CSER status then do the cost caliculation in the order, so that the status will go.(do thsi after correcting the KP26 data)
if still facing check the error
-ashok

Similar Messages

  • Costing Error in Production Order

    Hi
    I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
    No itemization available for the corresponding material on the plant.
    Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
    Thanks in Advance.

    Hi
    If you are creating first time production order for the material  using standard price you have to do standard cost estimate  using ck11n
    In that screen you have to enter material no.. costing variant mostly PPC1, In the next tab page costing dates from and to  and execute..Here only system asks for Itemisation.. Just press enter.
    After that Update standard price using ck24
    mark and release your standard price  for the materail..
    Reward points if useful..
    Regards,
    MSH

  • Authorization for Cost Analysis in Production Order

    Hi,
    Can I maintain the authorization for displaying cost analysis in production order.
    I try to create transaction variant....into ZCO02 and ZCO03
    but in COOIS it is still branching to CO02 when changing and CO03 when displaying.
    I want to disable the cost analysis view in production order so PP people can not access it.
    is there any idea?
    Please help.
    Best regards,
    Freddy Ha

    Hi,
    as i know K_ORDER is authorization for internal order.
    We have activate the check in SU24,
    but when we tried to trace the authorization when CO02 -> GOTO -> COST _> ANALYSIS
    this auth K_ORDER is never check.
    Did I miss something here?
    Best regards,
    Freddy Ha

  • Selection of Costing Sheet in Production Order

    Hi friends,
    I have one query, details of which are as  follows.
    Costing sheet in Requirement Class - Blank
    This requirement class assigned to Requirement type which was derived in Sales order through Material master and hence Costing sheet in Sales order is blank.
    Costing Sheet in Valuation variant (Plan) is Z0010 which is assigned to Costing Variant (Plan). It was assigned to Order type.
    Costing sheet in Valuation variant (Actual) is Z0020 which is assigned to Costing variant (Actual). It was assigned to Order type.
    I have created a new Valuation variant T01 in which Costing sheet is blank. It was assigned to a Particular Plant.
    When i am creating the Production order with reference to the Sales order in that Particular plant, system is deriving the Costing sheet as per Valuation variant (Plan) which is common instead of picking from the plant specific valuation variant.
    So, its calculating overheads and is impacting our Goods receipt valuation (In this plant, GR Valuation is as per Plan cost of the Production order).
    I tried different combinations, and finally observed that it is picking the Costing sheet from the valuation variant (Plan) which is common and not Plant specific.
    Is this system behavior correct as per SAP Standard?
    Kindly advise on the same
    Regards
    Madhusekhar Gupta G

    Hi Madhu
    1. Production order gets coating sheet from the valuation variant assigned to order type
    2. The valuation variant that you assign to Plant is for standard cost estimate only
    3. For your case, create a new costing variant without costing sheet and assign the same to the order type for this plant
    You can assign different costing variant to the same order type per plant
    Br. Ajay M

  • Actual Cost Calculation in Process Order

    Hi All,
    I updated Standard cost of a raw material through a cost estimate and also ran cost estimate of the FIN that is using this raw material but when I am creating a Process order, it is taking the cost of this particular raw material from the previous estimate not the recent one to calculate the target cost. Can any body help me with this.
    Thanks
    MKR

    Hi Ashok,
    My Valuation variants for the Costing Variant of Cost Estimate and Production order (Actual/Plan) cost calculation are in Sync to get the prices according to the price indicator in material master. But when it calculates cost for a production order, it is picking up cost from the previous period for that particular raw material. I have updated the standard cost by running the cost estimate but still its not working.
    Any lead on this. This will be really appreciated.
    Thanks
    MKR

  • Costing issue in production order

    Dear all
    My problem I have 25 pc component quantity . first6 I have issue (261) 1 quantity against that  sys has generated one material doc and then issued(261) 24 quantity ,sys has generated second material doc. In production order cost analysis  is showing 25 quantity planned cost but in actual cost showing only one quantity .why?
    Means EX . material cost is 1 rs in material master .
    planned cost is 25
    actual cost is showing 1 rs for first issue material cost
    why system is not showing rs 25 actual cost in cost analysis in production order?

    Surendra,
    A silly question but worth asking, have you tired displaying the order after the 2nd goods Issue, so times database updation take time. Please check now.
    Regards,
    Prasobh

  • Product cost v/s Production Order cost

    Hi all Guru's,
                            Can any one help me in understanding difference between product cost and production order cost in SAP.
    Will give full marks for helpful answer.
    Thanks,
    Abhishek
    Edited by: ABHISHEK AGRAWAL on Jan 29, 2008 9:46 AM

    Dear Abhishek,
    Standard Cost Estimate or Material cost Estimate is nothing
    but the standard cost for the Inhouse Manufactured materials
    (FERT) = Raw Materials Cost + Activity(Operation Cost)
    Cost+Overhead Cost if maintained for the Company code.
    This cost will gets stamped in the material master in Costing2
    view,under Current Planned Price field.
    This cost will be the Planned Cost of the Production order and
    after confirmation of the order the actual cost and the variances
    for the production order can be viewed.
    So the Production order cost is for the order quantity say for
    Eg: for a quantity of 100.
    The cost(variance) will be settled against that production order
    after confirmation and TECO status.
    I hope this will be helping you.
    Regards
    Mangalraj.S

  • Cost center to production order

    hi friends
    i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
    sapians

    Hi,
    You have to check two things before executing this assessment cycle.
    1. Check the allocation structure whether you have assigned the assessment cost element and
       settlement of cost element to ORD (ticked in by cost element box).
    2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
       Have a check of the cycle before saving.
    Regards,
    Sadashivan

  • Error creating Production Orders in UNCONSTR version

    I am copying prodcution orders from version 000 to unconstr version through Report I am getting following error.
    Error creating Production Orders in UNCONSTR version and Message no. ZSXXPAPO140.
    when I am executed in background it is giving following error.
    PPM FG100203.01_19_FR04_P for product FG100203.01 is not valid at the required explosion date 14.01.2010  /SAPAPO/RRP      325          E
    Please suggest me any one it is a great help to me.

    Hi Venkat,
    It seems there is an inconsistent PPM FG100203.01 exists
    in your planning version from which you are copying.
    Check the possibilities of repairing that PPM and retry
    copying.  Orelse In the /SAPAPO/VERCOP transaction,
    under the product selection criteria, exclude that item and
    try copying the version.
    Regards
    R. Senthil Mareeswaran.

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Is there a process for moving costs from maintenance work orders to capital

    Is there a process for moving costs from maintenance work orders to capital projects?
    We have reversed the settlements on the work orders, and then trying to put the relevant NWA in , then receive error message :
    Rule for allocation of PM order to PS network is not maintained.

    hi
    check the allocation structure and the settlement related customization settings.

  • Permit not assigned for Actual cost

    Hi Dears,
    Permit not assigned for actual cost in maint order
    Actual cost in maintenance order is 3000
    In IPMD, cost1 is assigned with class ACTUAL COST and value 3000 is defined.
    In OIPG,  Permit class ACTUALCOST is assigned.
    Goods issue done to order for value 3000.
    Again cost determination executed, but still cost1 is not assinged to the work order.
    Am i missing anything ?
    Regards,
    Alagesan M

    Hi
    In charac CT04 i maintained one value 3000 and table maintained CSEVPERMIT and IKOSTEN
    In class CL01, assigned the charac for 049 class type
    In OIPG, permit class is maintained with class
    In IPMD, new permit created and assigned class in classification and maintained 3000
    Now order created and component assigned the planned value is 3000.
    through MIGO goods issue done and found the actual value is 3000.
    But still opened the permit found nothing assigned.
    For Estimated cost and planned costs it is working good only for actual cost permit is not assigning.
    Actual cost we need to anything more other than this ?
    Alagesan

  • How to sets the Reason for Rejection of the Open Sales Order Lines

    Hello gurus,
              I want to set the Reason for Rejection of the Open Sales Order Lines, Case is like :
    If current date is exeed the Auto Void Confirmed Back Order Days(for item level) +  date (last responding from customer), then reason for rejection should be set, So i want the logic to find out the date is exceed or not.
    Thanks
    Anjana

    Hello anjana,
       Actually your question is some confusing, but if u want to get eldest change as active sales order then logic is as follows:
    1.  On base of OBJNR u have to get UDATE from JCDS table
    2. then write logic as:
    SORT i_jcds BY objnr stat chgnr DESCENDING.
          LOOP AT i_jcds INTO wa_jcds1.
            CLEAR lv_stat.
            lv_stat = wa_jcds1-stat.
            AT NEW objnr.
              AT NEW stat.
                CLEAR: wa_tab.
                wa_tab-objnr = wa_jcds1-objnr.
                wa_tab-stat = lv_stat.
              ENDAT.
            ENDAT.
            IF wa_jcds1-inact = 'X'.
              CLEAR lv_tabix.
              IF sy-tabix > 1.
                lv_tabix = sy-tabix - 1.
              ELSE.
                lv_tabix = 1.
              ENDIF.
              READ TABLE i_jcds INTO wa_jcds2 INDEX lv_tabix.
              IF sy-subrc = 0.
                wa_tab-chgnr = wa_jcds2-chgnr.
                wa_tab-udate = wa_jcds2-udate.
                wa_tab-utime = wa_jcds2-utime.
                APPEND wa_tab TO i_tab.
              ENDIF.
              CONTINUE.
            ELSE.
              wa_tab-chgnr = wa_jcds1-chgnr.
              wa_tab-udate = wa_jcds1-udate.
              wa_tab-utime = wa_jcds1-utime.
            ENDIF.
            AT END OF objnr .
              AT END OF stat.
                APPEND wa_tab TO i_tab.
              ENDAT.
            ENDAT.
          ENDLOOP.
          DELETE ADJACENT DUPLICATES FROM i_tab COMPARING objnr stat.
          SORT i_tab BY objnr stat udate utime.
          DELETE ADJACENT DUPLICATES FROM i_tab COMPARING objnr.
    3. now in i_tab table u'll get eldest UDATE
    Hope its work for u.
    Thanks & Regards,
    Sumit Joshi

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • Report to fetch Actual cost from a service order

    Hi Gurus,
    The requirement is to create a report to fecth the actual cost from the maintenance order. ie.. material cost , labor cost and some other costs which are directly posted to the order. Can anybody let me know from which tables I can pull the material cost , labor cost ..etc posted against maintenance order?
    Regards,
    John

    John,
    Have a look in table PMCO
    PeteA