Recognizing external production costs for production order

Hi Experts,
Our company is new to SAP and one issue we have not resolved is whether it is possible to attach costs to an Inspection Plan, and ultimately have these costs flow with the production order to Cost of Goods Sold (COGS).
The objective is to enable us to analyze which specific customers/products require us to incur these additional costs.  Any advice you have to accomplice our objective would be appreciated.
We are a Process Industry, and many materials are sent out for external testing. These costs are significant and some customers and/or products require more testing. We currently have Inspection Plans set up for each Material that requires testing, but have not found a way to burden the material with the appropriate COGS for the external testing.
For example, if a product must be tested for the following characteristics, and each test cost is known, how do we get the test costs attached to the production order for the total of $200?
Product 1 Inspection Plan
Salmonella $70
EColi $59
Coliform $25
Yeast/Mold $46
Thank you!

Richard,
Are you able to advise which forum is the proper one for this question?
Thank you,
Esther

Similar Messages

  • Production cost for product preference dermination

    Hi Gurus,
    I have a question about preference determination for a finished product. As you can see from below screen shot, there is a value for production costs, which is used to calculate RVC.  Could you shed lights where this production costs value is from?
    Thanks,
    Ryan

    Hi Dave,
    Thanks for your reply.
    Actually I checked related tables mentioned by you. However, the logic does not explain well in my case. Value from table /SAPSLL/PRVAL for value type PROD_PRICE is not equal to productions costs showed during performing material preference determination.
    One more thing, I got an odd case which has production costs as minus value( -3095.21 CAD). while doing preference determination.  Any idea why prodduction costs is minus?  (see attached screen shot)
    Regards,
    Ryan

  • ADDDITIVE COST FOR PRODUCT COST BY SALES ORDER SCENARIO.

    Dear friends,
    We are using costing for sales order & we have maintained the costing variant under the path IMG> Controlling> Product Cost Controlling> cost object controlling> Product cost by sales order >premliminary costing & order based costing>product costing for sales order costing>Costing variant for Product costing >Check costing variant for product costing.
    Under this we have maintained the Costing variant, Now we need to have Additive cost. But didnt found the tab in the costing variant where as when we check in T.code OKKN which is a part of Product cost planning we can find the Additive cost tab.
    How to run addtive costing run for Product cost by sales order scenario & please guide me with one example.
    Or else is there any configuration where we can assign standard costing variant PPC1 instead of Costing variant SOC1 ( which is a costing variant of Product cost by sales order.
    Please guide me
    regards,
    Sandeep

    Hi Sandeep,
    You may please try using Unit Costing for Sale Order.
    It is over an above the sale order costing you have done. So in case you want to post any additional known cost, you may do the unit costing for the sale order after the sale order costing.
    Trust this helps

  • Product costing valuated sales order stock

    Hi all,
    We are in complex mfg & currently re-vamping all the ERP SAP instances ( totalling 13 company codes into one single)
    All 13 units( who use NON Valuated scenarios for cost object controlling) wil use valuated sales orders & projects. The old 13 companies will be trated as profit centers with transfer pricing functionality ( Multiple valuations)
    My issue is to get a product cost for sales order in <b>profit center view</b> ( plan cost) exactly same as to the marked standard cost itemisation of the FERT material.
    We mark & release the std cost in Jan & the client wants to have the same itemisation of the cost ( with same values) even if they create a sales order in 2nd or 3rd or last quarter. ( As you might be knowing that the sales order wil always cal;culate the values as per the current qty structure date. In Std SAP date control, there is nothing which allows us to cost exactly the same cost estimate as marked & released in JAn)
    Could somebody pls give pointers as how to get this sales order plan cost itemisation exactly equal to prevously marked & released itemisation ?
    We use the Std costing variant ( Costing Type = Profit center valuation) with Std date control.
    Thanks in advance to all of you,
    Warm Regards
    Dhiraj

    Hi,
    If the sales order stock is valuated, you have immediate access to its value in Financial Accounting. The assigned accounts are debited and credited as a result of the valuated goods movements. From the viewpoint of MRP, the sales order stock is available for the sales order only.
    If the sales order stock is not valuated, it is managed via a cost collector. The system does not carry out invoice verification postings for goods movements, and you cannot obtain an overview of how the stock is valuated until the end of the settlement period in Controlling.
    Valuated sales order stocks have the following advantages:
    The full costs are available at each manufacturing level.
    All goods movements are immediately reflected in Financial Accounting
    Assign points if helpful
    Regards,
    Saurabh

  • Business Content for Product Cost by Sales Order

    Hi,
    We need to do reporting on costs associated to Sales Orders. The corresponding R/3 Area is "Product Cost by Sales Order" in Cost Object Controlling. We have looked at the standard cube for Cost Object Controlling (0PC_C01) but this cube only contain costs related to manufacturing orders, whereas we need to look at costs associated with sales orders after Result Analysis.
    Have you guys any ideas which content that might support this, if any?
    Many thanks!
    / David

    Hi Christian,
    please refer to SAP Note 584791: <a href="https://websmp208.sap-ag.de/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=0000584791&nlang=E">BW-BCT-CO: Costs not extracted on sales orders</a>.
    Unfortunately there's no DataSource providing the data you need for your analysis scenario. A custom development is needed (<i>awful!!</i>)
    <b>Note 584791 - BW-BCT-CO: Costs not extracted on sales orders</b>
    <b>Symptom</b>
    In R/3, costs are posted directly to sales orders. The costs have to be analyzed in the BW system. In the standard system, however, this data is not extracted into the BW system.
    <b>Other terms</b>
    0CO_OM_OPA_1; 0CO_OM_OPA_6
    <b>Solution</b>
    1. There are currently no DataSources for costs on sales orders in the standard BW Business Content. Unfortunately, there are currently no resources scheduled for a new development in this area either.
    2. Therefore, the DataSources and the Business Content must be created in the customer project within the framework of consulting as a customer solution concerning the generic extraction options of the BW Service APIs or function modules you have programmed yourself for extracting data.
    3. Technical background information about costs on sales orders:
    The transaction data is available in the following R/3 tables
    COSS and COSP - Totals records or COEP - Line items.
    This concerns records for the VB* object numbers.
    The master data of the sales orders is contained in the VBAK and VBAP tables.
    The 0CO_OM_OPA_1 and 0CO_OM_OPA_6 DataSources only extract costs for orders with master data in the AUFK table. These types of requests always have OR* object numbers. Therefore, these DataSources cannot be used for sales orders.
    However, you may be able to assign requests from the AUFK table (for example, maintenance orders or production orders) to a sales order through the AUFK-KDAUF table field.

  • Product costing by sales order configuration steps

    hi
    plz send me product costing by sales order configuration steps.
    sir, i know manufacturing order configuration step but i do not sales order configuration.
    in the sales order also is same as manufacturing order like first we have to make planning cost , the planning cost should be updated to material master and next configure the actual cost.
    for first step- costing variant -okkn
    next -costing variant -opl1
    for sales order also same we need to update planning price first- what is costing variant
    for actual cost - what is costing variant
    plz tell me detail
    regards,
    sowmya
    Moderator: Please, read forum rules before posting

    Hi Sashikanth,
       Please send me the Configuration document for make to sales order.We are at Blue print stage need some docment for make to sales order.Plese send me the document it will will be very help full for me.
    My id is [email protected]
    Thanks in advance
    Regards,
    Nagaraju
    Edited by: nagaraju sami on Mar 9, 2008 11:58 AM

  • Production cost for MTO in Sales Pricing

    Hi All,
    For Make-To-Stock items the material standard cost comes from Accounting view of material master as VPRS in Sales Pricing (provided we include that condition type). Now how do I get the production cost for Make-To-Order items in Sales Pricing. Please elaborate the process.
    Thanks in advance.

    In the first Accessof the Access sequence 0016 for Additionals (specified for the condition type KAD0) , under the fields - there is a field called Doc. Field. When I changes this field through a ADDNR to MATNR - then the condition record is properly picked and KAD0 condition is filled with the cost and then used accordingly in the calculation schema.
    However this looks only like a workaround.

  • Product valuation for Sales order with itemizations

    Hi experts,
       I'm trying to find a data source which extracts Product valuation for sales order, and which is important, with itemizations. This is for the KMAT material. I tried 0CO_ACT_* and 0CO_PC_PCP_* but found no proper one.
       The closest one is 0CO_PC_PCP_03 but which only extracts normal material instead of KMAT.
       Points will awarded.
    B'R
    Aaron

    I found it.
    0CO_PC_01
    Cost Object Controlling: Plan/Actual Data

  • Product Costs by Sales Order - Settlement Options?

    Hello All -
    I am trying to understand if I need to settle to a sales order (SDI) or directly to material (MAT) or to COPA (PSG).
    If i look at my sales order, it has item category ZPSF, which product costs by sales order configuration shows a requirement class ZKE.  ZkE has a valuation of M, which means separate valuation of reference to sales document/project.
    Does this mean I need to settle to sales order first?
    Then i run vA88 to settle sales order to copa?
    if ZKE valuation is blank, does that mean its not valuated?  I have read on other sap help pages that means it is valuated.  Please clarify.
    also, when does one directly settle to MAT? what scenarios?  this confuses me.
    Thanks!
    Emmas

    I'll give this a try. When working in a make-to-order environment there are 2 settings in the requirments class that you must consider in determining how to settle the costs (and maybe the revenue as well).  The first setting is the account assignment category.  In the standard system "E" is used to designate the sales order as a cost collector.  "M" is used to if you don't want the sales order to be a cost collector.  Whether the sales order is a cost collector or not will determine your settlement options. 
    The second critical field is the valuation setting.  If you set it to "M" then the stock assigned to the sales order will be valuated (by valuated I mean that once the goods are produced they will be held in inventory as sales order stock with a value).  If you leave the valuation field blank then the stock assigned to the sales order will be held in inventory without a valuation. 
    If the sales order is not a cost collector then the cost to manufacture the order will be collected in your production order and the settlement rule for the production order will be to the material you are producing.  Since the material has a valuation, the costs collected in the production will be reduced by the material's valuation once it is received into finished goods inventory.  Any remaining costs are settled to wip or variance based on the production order's status and the RA key and variance key settings.
    If you have set the sales order as a cost collector then the production order costs can either settle to the finished material or to the sales order.  If you are using valuated sales order stock you would normal have the costs settle to the material and the production order would behave very much like the previous example.  If you are not using valuated stock then you would need to settle the costs to the sales order and all the production costs would accumalte in the sales order.
    If you are using the sales order as a cost collector than you will probably want to settle the sales order as well.  During the sales order settlement you have the option of settling the cost and revenue assigned to the sales order to COPA.  The settlement profile along with the RA key assigned to the sales order controls how these are settled.

  • MTO-Product cost by Sales Order

    Hi Guys,
    My client is manufacturing Energy Meters, they want Sales order based Production Planning and costing etc.,
    in MTO scenario, Product cost by Sales Order
    1. Sales Order will be created
    2. BOM is created
    3. some of raw material in the BOM list are available in the stores
    My question is that
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order.
    Correct me if am wrong,
    if the system is not checking the available qty, then there is no Planned Order, everything will be new PR for the whole sales order Qty.
    Expecting your valuable reply
    Thanks for your help in advance.
    Regards
    Elan

    Dear ,
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order
    Answer is Yes .In Sales Order Based Production Order -MTO  , you will be having pre-determined BOM and Routing , before creation of FG Sales Order .
    Based on Planning Strategy 20 : If you are using 20 planning startegy , then you will frist roll the cost in Sales Order Level  by going to VA02-High Lisght Line item -Extras-Cost -based on BOM and Routing  , Sales order will be costed and flagged with green .Then Sales Order will be credit relased in VKM3 for MRP run in MD02.
    Now , in MD02 , you need to select NETCH , 2,1,1,3,2  while executing MRP on FG item .Here , MRP system will explode the BOM till the lowest level and does net requirement calcuation for BOM Component (as depedent to FG) .If the stock alwardy available , then it will  show up as Stcok in Order Report (MD4C/MD04-Planned Order -Order Report ) under Reseravtion number or else it will generate PR for componenet where as planned Order for FG.
    Creation of PR or Plnned Order depends on Procurment Type -E/F as well as selection of indicator Create PR in MD02.Basically , for MTO Sales Order item , it will FG  with procurement type E and compoenet will be F if there there is no farther sub-assblmy .So it should generate Planned Order for FG and PR for shortage qty of component .
    Hope this is clear
    Regards
    JH

  • Product cost by sales order - conceptual clarity required

    Hi,
    We are a manufacturing company with both Make to Stock and Make to Order Scenarios. In cost object controlling, we have made the settings for product cost by order. Now, the question is whether product cost by sales order is a mandatory setting in MTO scenario. I understand this is a conceptual question but i never got the clarity after reading help files, threads and blogs.
    I'll put down my understanding - pls correct me.
    If i do the product cost by sales order, there will be a statistical cost object ie sales order. Now every cost incurred (with a component split) will be recorded stastically in the sales order in case of production orders created from S.O.s
    If I don't do the setting i cannot get a component wise split for the cost of sales order to do any analyses. but still I'll have the COGS which i'll capture to COPA and take the profitability.
    Can you please give me some more clarity on this scenario? Are there any other factors/ advantages/mandates in product cost by sales order?
    Best Regards
    Vimal

    Hi  Vimal
    Prod Cost by SO is done in the case of MTO.. Here, you have 3 possible scenarios
    A. Only Qty i.e. GR from Prod order is tagged to Sales Order.. Sales order is not a CO Object....
    This scenario is as good as MTS... Only that GR is tagged to SO....
    Your costs are collected on Prod order....
    PGI uses GBB-VAX i.e. does not post to sales order... Billing updates revenue and COGS to costing based COPA
    B. SO is cost obj with non valuated stock (SAP recommends this)
    C. SO is cost obj with valuated stock...
    B -
    Prod Order is settled upon sales order.. GR from prod order does not update any acc doc
    Sales order is settled to COPA.. Here you can use a PA Trf Str where in you have replicated your Cost Comp Str... i.e. You can create as many assignment lines in KEI1 as your CCS in OKTZ and assign each one of them to a separtae value field
    No question of variances in this case
    C
    Prod order is not settled upon sales order.... GR from Prod order updates acc doc.... However, variance from prod order can be settled to the sales order if you create variance account as a cost element... Else, it is settled to COPA
    Upon PGI, the COGS is posted to Sales Order as a single line item
    Here, in your PA Trf Str, you would create an Assignment line and tick "Qty Billed/Delivered".... This would update the Billing Qty to COPA upon settlement of Sales order
    This Qty update will trigger KE4R.... i.e. You need to assign CCS to VF in KE4R for PV=01 and Rec Type = C.... This would update the CCS in COPA as per the Sales Order cost estimate
    The Costing Key in KE40 should refer to "Sales order cost estimate" and not "Std Cost estimate"
    br, Ajay M

  • Product costing by sale order

    Dear all,
    Please tell me the process in product costing by sales order.
    In my client place, i have done the configuration but i dont know the process.
    Please guide me.
    Thanks & Regards,
    AR

    Hi,
    Product cost by sales order is useful when  a finished product is manufactured  for a specific customer rather than for the normal make-to-stock inventory. You can use the Product Cost by Sales Order component in the following situations:
    When you are manufacturing in-house with reference to a sales order in complex make-to-order production
    When you are purchasing customer-specific trading goods with reference to a sales order and reselling them to your customers
    When you are providing services whose costs are assigned to a sales order
    When you want to collect the sum of the actual costs incurred for the sales order item on the sales order item (standard cost of goods manufactured of sales plus variances) For detailed information, refer to the sections Valuated Sales Order Stock and Settlement in Product Cost by Order or Period.

  • Product costing by sale order(urgent)

    Dear all,
    1. Please tell me all the configuration steps to do product costing by sale order.
    2. Also please tell me how to test it after configuring.
    3. Please explain me the end user part also.
    I will award full points.
    Thanks & Regards,
    A.Anandarajan.

    Hi,
    Product cost by sales order is useful when  a finished product is manufactured  for a specific customer rather than for the normal make-to-stock inventory. You can use the Product Cost by Sales Order component in the following situations:
    When you are manufacturing in-house with reference to a sales order in complex make-to-order production
    When you are purchasing customer-specific trading goods with reference to a sales order and reselling them to your customers
    When you are providing services whose costs are assigned to a sales order
    When you want to collect the sum of the actual costs incurred for the sales order item on the sales order item (standard cost of goods manufactured of sales plus variances) For detailed information, refer to the sections Valuated Sales Order Stock and Settlement in Product Cost by Order or Period.

  • Product Costs by Sales Orders

    HI,
    Is there any extractor that pulls the Product Costs by Sales Orders?
    The 0CO_PC_02 extractor extracts Product Cost by Order and Product Cost by Period. It extracts just the
    OR* entries from the COSB, COSS tables but not the
    VB* and PR* entries from the tables. Values of Transaction KABG
    Regards
    Vijay

    HI,
    Is there any extractor that pulls the Product Costs by Sales Orders?
    The 0CO_PC_02 extractor extracts Product Cost by Order and Product Cost by Period. It extracts just the
    OR* entries from the COSB, COSS tables but not the
    VB* and PR* entries from the tables. Values of Transaction KABG
    Regards
    Vijay

  • Product Costing and Production Planning

    Hi,
    Is Product Costing absolutely required before implementing Production Planning, specifically PP orders? My client does not want to plan costs or need any cost estimates. They want to use a PP order to check availability for a BOM, and then issue it out to an external vendor for services. After this material is processed by the external vendor, he would ship it back and we would be doing a goods receipt at the parent level of the BOM. The whole purpose of this is to get the accurate price of the BOM parent which would include all service costs. This parent would finally be sold via the regular SD sales order process. Our Logisitics consultant suggested that the only way this could be accomplished is a PP order. All this looks okay, but he also mentioned that a PP order cannot work without Product Costing and the process cant be accomplished CO-PC. I am unable to grasp why SAP would force us to have costing when the client doesnt need any cost estimates, planning etc. Could any one please tell me if we need CO-PC for this scenario?

    Dear SAPFicon,
    Technically, to run PP without using product cost planning would cause a lot of problems during business process of production order. Because, once a production order is created then the data structured is freezed in the PO and if there is any missing data it will cause errors. Any errors in production order would stop the following transactions. We never know what would be the error level of the production order. The worst case, the production or should be cancel and start it all over again.
    But by using product costing or product cost planning, this is a preliminary step to prevent and eliminate any error of the products tobe produced.
    So, ideally, there is one person in charge to ensure that the products which be produced in the production orders are free of error.
    So, the product costing is an integrated module that take data from variouse module such as PP, MM, CO, HR.
    The product costing use the Logistic master data such as folllowing;
    1. Bill of material
    2. Routing
    3. Work center
    4. Material master
    How you can say, that running PP without PC will run, while the to run the smooth production order, you need to mandatory parameter in Material Master that belong to Costing area.
    Without having product costing, I can assure that your client will trap in a lot of troubles with their business process.
    Please see the online documentation for product costing for a better overview or you are welcome to ask again
    Regards,
    Irhasni

Maybe you are looking for

  • Key mapping Generator Tool

    Scenario One customer has two systems: System A and System B in his landscape. System A serves as the central server for item master data management. He maintains the same set of item master data in System B as that of System B manually. Now, the cus

  • Pdf form text field

    Hello there, if text  contain "(" or ")" brakets are not displaying in PDF textfiled,if i convert "(" to "[" then the text is displaying in the pdf textfield.how do I allow "(" inside text.and i'm creating pdf programatically in java. thanks in advan

  • How to disassemble the Camileo S10?

    I would like to hack the S10 to solve 2 problems: 1) Put a wide angle adaptor Actually it is almost impossible, but removing the plastic part in front of objective allow to access to cylindrical part of it and fix a wide angle adaptor 2)I need to fit

  • Set up of payment methods per company code

    Hi frens, my requirement is if Type 'C'    then - Cheque payments for USD from USD account,              Cheque payments for EGP from EGP account, if type 'F' then -Foreign payments for USD from USD account,          Foreign payments for USD from USD

  • How to give F4 help

    Hi all,          Please solve this query of mine . I am displaying an ALV report . I want to give F4 help on a field . Please tell me how to give the F4 help without using OO concept. Kindly reply as fast as possible. Regards, Vijay