Recommandations for upgrading from 46C to ECC 6.0

Hello
Our SAP system landscape is actually in 46c and is only composed of 3 servers with almost 40 users declared (25 actives) on production system. Modules FI/CO HR MM are actually implemented.
We plan to upgrade the system to ECC 6.0 between March and August of 2009. The evaluation of the upgrade should begin as soon as possible. Do you think it can be possible to realise the upgrade alone, without the help and expertise of a SAP consultant? Do you think the delay for preparing the upgrade is suffisant?
Thank you.

As suggested earlier, refer to Master and technological guides for reference.
also for information, the upgrade can fall under any below scenarios.
1. Strategic Business Improvement
Focus on functionality extension and improvement
Enablement of new and optimized business processes and scenarios based on new ERP core functionality
2. Functional/Retrofit Upgrade
New functionality to be implemented as part of the upgrade, modification clearing
Focus on reduction of system complexity
3. Technical Upgrade
Focus on pure technology upgrade
Retain functionality used
Review Usage of custom developments
As per the requirement.  knowledge and experience the decision can be made.

Similar Messages

  • Error in upgrade from 46c to ecc 6.0

    hi experts,
    we are facing an error at the time of upgrade from 46c to ecc 6.0 in the phase JOB_RSUPGAIMEXE.
    did anyone face this error anytime during upgrade on windows plotform?
    Please let us know your comments..
    regards
    raghu

    Hello,
    Can you please look in the /put/log directory and copy the error from the appropriate log file. You should find a log file with a name similar the to upgrade phase that is causing the error.
    Thanks
    N.P.C

  • Upgrade from 46C to ECC 6

    Hello:
    We are planning to begin technical upgrade in SAP, from 46C to ECC 6.0.
    I have the next landscape:
    -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    We want to install SAP ECC 6.0 in NS and get the data from CS.
    Which is the best and easy way to do this? SAP manuals are quite generic. I have two ideas but I would like your comments:
    1st way
    1. Homogeneous copy of CS
    2. I install ECC 6.0 in NS with the option to import data generated in 1. (is this possible??)
    3. Finish installation and aditional configurations. I begin to test.
    2nd way
    1. Homogeneous copy of CS
    2. I install 4.6C in NS with the option to import data generated in step 1. (Not sure if 4.6C will accept Solaris 10 and Oracle 10.2).
    3. I suppose I don't need to reconfigure after installation and import.
    4. I do necessary tests. At this point I would have 46C on the new versions of Solaris and Oracle.
    5. I begin the SAP upgrade to ECC 6.0 in NS
    6. .... The remaining processes indicated by SAP
    Thanks for your attention.

    > -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    > -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    The database software is usually installed during the run of sapinst/R3setup, not before. You may run into problems if you pre-install Oracle (environment, necessary database options not set etc.)
    The easiest way would be do to a system copy.
    I would then
    - install the latest Oracle instantclient
    - install the latest kernel 46D_EX2 kernel
    Markus

  • Upgrade from 46c to ECC 6.0 new components support package

    dear experts,
    we have upgraded our test system from 46C to ECC 6.0
    before upgrade in 46C we have support packages components
    SAP_BASIS 46C
    SAP_ABAP 46C
    SAP_APPL 46C
    SAP_HR
    PI 2003_1_46C
    SAP_NOTES 46C
    ST-A/PI 01B_R3_46C
    ST-PI 2005_1_46C
    after upgrade to ECC 6.0 we found
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_BW 700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    EA-IPPE 400 0003
    EA-HR 600 0003
    EA-GLTRADE 600 0003
    EA-PS 600 0003
    EA-RETAIL 600 0003
    EA-FINSERV 600 0003
    EA-DFPS 600 0003
    EA-APPL 600 0003
    FINBASIS 600 0003
    ECC-DIMP 600 0003
    ERECRUIT 600 0003
    FI-CA 600 0003
    FI-CAX 600 0003
    INSURANCE 600 0003
    IS-CWM 600 0003
    IS-H 600 0003
    IS-M 600 0003
    IS-OIL 600 0003
    IS-PS-CA 600 0003
    IS-UT 600 0003
    LSOFE 600 0003
    SEM-BW 600 0003
    we are planning to apply SPS 06. Is it mandatory we have to apply
    all the support packages in SPS 06.
    we are confused as we dont use IS-OIL,EA-,ERECUIT,INSURANCE,FI-
    please suggest which support packages we have apply relating to the
    functionality we have in 46C
    regards
    Raghu

    Hi,
    you have to apply the same type of packages as before.
    All other are included in ECC, but if you don't use the special services and applications (for example IS Oil or stuff like this), there is no need to apply all these packages.
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    should be enough
    Regards
    Timm

  • Upgrading from 46C to ECC 7.0

    Guys,
    My company is going to upgrade R/3 46C to ECC 7.0 later this year.  From the development (ABAP programs, any ABAP objects) standpoint, any suggestions on preparation, or what can be done in our current 46C environment to ensure a smooth transition from 46C to ECC (unicode, obsolete ABAP syntax, etc)?  Also any idea and recommendation on planning the upgrade, as well as things to watch out for are welcome.
    Thanks,
    Yan.

    First ECC 7.0 does not exist, so you will be upgrading to ECC 6.0.  And yes, you can start by doing a start for any calls to WS_UPLOAD and WS_DOWNLOAD.  You will need to change these calls to call the GUI_UPLOAD or GUI_DOWLOAD function modules.
    Other syntax issues will need to be handled after the upgrade, like using the ECODING extension on all OPEN DATASET statements.
    Regards,
    Rich Heilman

  • Short dump in MIGO and VL02N when upgrading from 46C to ECC 6.0

    Hello,
    We are doing an upgrade from R/3 46C to ECC 6.0 and we face a shortdump in trx MIGO (upon saving the document).
    DBIF_RSQL_INVALID_REQUEST
    a BKPF_INSERT in program SAPLF005
    The same shortdump happens when doing a Goods Issue on the SD side.
    Looking at the program, this is not modyfied so I guess it is a standard SAP error.
    OSS however, up to know did not respond to my message and there does not seem to be a SAP Note on this issue!
    Anyone had this problem before. How did they solve it.
    Thanks for any reply,
    Aart

    Posted in another forum

  • Upgrade from 46c to ECC

    Hi,
    Can you please explain me the complete procedure to be followed and precautions to be taken for upgrading SPAU(program,func groups,data elements,tables,structures, etc) objects, SPDD objects and custom objects(programs,func grps etc..) from 4.6c to ECC version.
    Thanks,
    Laks.

    Hi ,
            The Precautions are .
    1 .SPDD transaction should be executed 14 days before the upgrade .
    2 .SPAU transcation should be executed after the Upgrade.
    3 .Maximum error in SPAU can be resolved using Basis and Function Consultant support .
    4 Maximum errors are in BDC,Sapscript ,Userexits which deal with standrad transaction .
    5 .Also take care about The Unicode errors.
    6 .For Unicode Use Transaction UCCHECK and SCOV.
    Please reward if useful .

  • Upgrade from 46C to ECC 6.0

    Hi All,
    We are upgrading from 4.6C to ECC 6.0.I have downloaded all the SOFTWARE from Service market place except ORACLE 10.2 which I am not able to locate it.
    Do I need to order ORALCE UPGRADE CDS from SAP? or is there any way to find out on the service market place...
    Would appreciate If any of you can throw some light in this regard...
    Thanks in Advance,
    Johnny.

    Of course the DVDs are available for download.
    I do not know your OS, but you can follow this path:
    http://service.sap.com/installations
    Entry by Application Group ( you should also have it available in "My Company's Application Components" )
    From here there are several ways. For example:
    SAP NetWeaver
    SAP NETWEAVER
    SAP NETWEAVER 2004S
    Installation and Upgrade
    Your OS
    ORACLE
    You get a list including oracle 10g

  • Error in Zreport while upgrading from 46C to ECC 6

    Hello Experts,
    I am facing problems in 1 Zreport while i have upgraded that report from 4.6C to ECC 6. Dump is reported while running the program.
    Error is : "Access non-existent storage area."
    error is coming @ line :  ADD <f1> THEN <f2> UNTIL <f3> GIVING v_totval.
    FIELD-SYMBOLS: <f1> TYPE ANY,
                   <f2> TYPE ANY,
                   <f3> TYPE ANY.
    DATA: v_totval LIKE lfc1-um01h.
    IF <f1> IS ASSIGNED  AND
         <f2> IS ASSIGNED  AND
         <f3> IS ASSIGNED.
        ADD <f1> THEN <f2> UNTIL <f3> GIVING v_totval.
    ENDIF.
    can you ppl please tell me any solution as its urgent !
    thanks in advance.

    this is fine for me.
      DATA: BEGIN OF numbers,
              one   TYPE p VALUE 10,
              two   TYPE p VALUE 20,
              three TYPE p VALUE 30,
              four  TYPE p VALUE 40,
              five  TYPE p VALUE 50,
            END OF numbers,
            sum     TYPE i.
      SELECT-OPTIONS position FOR sum.
      ADD numbers-one THEN numbers-two
                      UNTIL numbers-five
                      ACCORDING TO position
                      GIVING sum.
    A

  • Batch Jobs Running during upgrade from 46C to ECC 6!

    Hi All
    We are currently due to run our upgrade in the next two weeks and I have one final concern. The only testing we have not done relates to batch jobs.
    Our upgrade stratergy is downtime minimised.
    Does anyone know any best practices or issues that could effect our upgrade?
    Cheers
    Phil

    Hi Phil,
    If I remember correctly all background jobs in SAP R/3 are de-scheduled by the upgrade process. You have to manually reschedule them after the upgrade so make sure you have good scheduling documentation (or consider the central job scheduling provided by SAP NetWeaver for the future).
    One tip is that you need to make sure that jobs started from other systems are postponed until after the upgrade too (e.g. data extractions to BI). The upgrade process cannot determine job schedules and dependencies in other systems/scheduling tools.
    Cheers,
    Mike.

  • OSS notes relevant for FI/CO for upgrade from 4.7 to ECC 6.0

    Hello,
    I need the list of the applicable OSS notes relevant for the FI/CO module for upgrade from 4.7 to ECC 6.0
    Thanks
    Sid

    Hi,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Please assign points if it useful.
    Regards
    Ravinagh Boni

  • Does for upgrade from ecc 5.0 to ecc 6.0 we have to pay money  for that

    Hi All
         Does for upgrade from ecc 5.0 to ecc 6.0 we have to pay money to SAP for that.

    hi,
    asking or teling ?
    I think you need not as long as you are with official support . However please contact sap official support in you region

  • Requirements for upgradation from 4.7 to ECC 6.0

    Hi Guru's,
                      Can anybody explain what are the steps required for upgradation from 4.7 to ECC 6.0, technically and functionally. If any body have documents regarding the same, please share.Full marks will be awarded.thanx in advance....

    Hi
    You have to aware of all related program like BDC's , Screens related errors and all dictionary related problems.
    Some function modules may become obsolete, and some screens will change
    abnd some new fields will be added in the new versions etc.
    Also take care of SPAU and SPDD tcodes.
    You should be able to know about Unicode concept in sap.
    chk this
    http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
    also chk these 2 notes in service.sap.com
    Technical Upgrade is only a version upgrade without any functionality changes.
    The objects that are needed to be upgraded are:
    Includes
    Function Groups / Function Modules
    Programs / Reports
    OSS Notes
    SAP Repository Objects
    SAP Data Dictionary Objects
    Domains, Data Elements
    Tables, Structures and Views
    Module Pools, Sub Routine pools
    BDC Programs
    Print Programs
    SAP Scripts, Screens
    User Exits
    You can refer to the below links for more information on technical upgrade:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
    https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/2e/6d66647d9011d396b60000e82de14a/content.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
    Reward points if useful
    Regards
    Anji

  • Features and Functionalities of ECC 6.0 for upgrade from 4.7 to ECC 6.0

    Hi All,
    Can you let me know the features and functionalities of ECC 6.0 as we are planning to go for upgrade from 4.7 to ECC 6.0...
    Cheers
    Prasanna

    And you can see the PAM for your architecture.....
    Do you want to use the JAVA instance?
    Change from no-unicode to unicode?
    Do you have MDMP?
    Regards,
    Alfredo.

  • Open dataset for input don't work after upgrade from 46C to 47

    We did an upgrade from 46C to 47, after that all the Z programs that have the sentence "open dataset for input" alwas send a sy-subrc = 8, the curios things is that the sentece "open dataset for output" works ok.
    Please I need help to solve this?
    En example of code.
    PARAMETERS: P_ARCHF(60) OBLIGATORY DEFAULT
                'C:\20050900.txt' LOWER CASE.
    OPEN DATASET P_ARCHF FOR INPUT IN TEXT MODE.
    IF SY-SUBRC <> 0. MESSAGE i001 WITH ARCHIVO. stop. endif.

    Well, it's telling you that the datset doesn't exist. From the help in 4.7:
    OPEN DATASET
    Addition 1a
    ... FOR INPUT
    Effect
    OPEN ... FOR INPUT opens the file in read mode.
    If the file does not exist, OPEN ... FOR INPUT fails with Return Code SY-SUBRC = 8.
    Note
    If OPEN DATASET is not executed in a Unicode program and if the user has write authorization for the file, the file is opened in read and write mode. Otherwise, it is only opened in read mode.
    Rob

Maybe you are looking for

  • Cisco SSL-VPN / webvpn with Cisco 2901 IOS 15.3.3M

    Dear Community, I have a strange issue that I am hoping some of you will be able to assist with. I am running an environment with the following specifications Cisco ISR G2 2901 with IOS 15.3.3M Security Licence enabled Data Licence enabled VPN Licenc

  • How do I find and delete invisible files?

    Mac Hard Drive info window says 157.58 GB used and 159.56 GB capacity, leaving 1.99 available.  Total for all folders in Mac HD is 133.344 GB. 14.13 GB  Library 04.81 GB System 114.4 GB Users 16.58  GB Applications .004   GB  User Guides and Info I a

  • How to batch print multiple PDFs in Mac OS X?

    Does anyone know of any new software that allows one to batch print multiple PDF files with a print dialogue for the first file, followed by dialogue-less printing for the rest? I work for an architect's firm and we often find ourselves printing doze

  • IDOC Sales process

    Hi ABAPers     I am new to IDOC i want to send sales order to IDOC i created Sales order how we can able to send that to IDOC and tell me the config process also step-by-step with screen shots Regards Ravi

  • Although I have an Adobe subscription, and Adobe export PDF (from 12/12), I cannot open my Adobe PDF

    Although I have been Adobe subscription, and export PDF from December 12 of 2012, I cannot open my PDF documents. When I attempt to do so, and Adobe screen pops up stating that I have to subscribe, even though Adobe recognizes by subscription from 12