Ref. Operation Set for Trigger Point

Friends,
I m doing Trigger points in CO11N. Production Order quantity is 10. While confirmation yield qty. 7 & rework qty is 3. After saving trigger point function pop up but after pop up of ref. operation set, i m selecting Group and Task list type, system displayed *Ref. operation set ********** is not valid according to selection conditions.*
In CA02 change  routing I hav done all settings of trigger points and created Ref. op. set by CA11.
Pl. guide.......

Dear,
Kindly change order type dependent parameters(TCode OPL8), and check routing selection (3 Routing/ref. op. set optional (automatic selection))
and task list type S     Reference Operation Set.
check and revert back.
Thanks
Muhammad Ashfaq
Edited by: Muhammad Ashfaq on Sep 10, 2011 1:46 PM

Similar Messages

  • Regarding Rework (by inserting Ref oper set)

    hello sap gurus,
    i am confused regarding rework ,If we do the rework by inserting the ref oper set in the last in the operation overview of the production order itself than whole component qty reqd for producing the order header material will pass through that ref oper set but the fact is that for only rework qtys we require that ref oper set(but it will charge activity cost to all component qtys).So there would be improper costing(improper target cost) and scheduling.
       And while doing confirmation through co11n,for ref oper set which we have inserted in operation sequence at last there we have to confirm only rework qty and for the last oper you have to goods receipt for whole qyt.Am i correct?

    Hi
    1. Create a production order confirmation of original order with rework qty+yield qty = confirmation qty,Do GR  for only yield qty
    2. For the rework qty create  Rework order using reference operation set.
    3. In the Settlement rule for rework order , assigned with settlement receiver as original order.
    4.Carry out goods issue for components of rework order..
    5   Confirm rework order using  co11n
    6.   Do GR for original order with rework qty ., teco both orders.
    7. Settle first the rework order
    8 settle original order
    As settlement is doing for orginal order,  there is no problem in costs,, costs of the rework qty will also capture.
    Please come back still if you have any doubts..
    Otherwise close the thread by rewarding the points,
    Regards,
    MSH.

  • Insert Ref Operation Set when routing already in Prod Order

    Dear exeperts,
    Is is possible to insert a Ref Operation Set after a routing has been inserted in a prod order? I am getting the error Message no. CO892 which I can't resolve. I know for service orders there is not such constraint.
    Thanks in advance to share your wisdom!
    Francois P.
    Ref. operation set 50000148 is not valid according to the selection conditions
    Check why the reference operation set does not meet the selection conditions:
    1. Is it valid on 2010/07/16?                   OK
    2. Is lot size  within its validity area?     OK
    3. Is the selection ID for routing selection (Customizing: order type- dependent parameters) of a type that allows reference operation sets to be selected?              OK parameter routing selection = 5
    4. If the reference operation set has a change number, is it valid for production on 2010/07/16? OK

    All right, just found what I was missing: a record in config OPEB.
    BR,
    FP

  • Nokia E6 - Where is the Access point setting for Y...

    I have my Nokia E6 configured for my Corporate Email, MfE and it works fine.  In the settings for MfE, I see a setting for Access Point, where I choose Internet with Priority 1 as my Home WLAN and Priority 2 as my GPRS connection.
    Then, I started to configure my private Yahoo mail, evertyhing is done, it works fine, but I do not see any settings for Access Point for the Yahoo mail..
    Does this mean it picks up the settings from MfE??? 
    Can any other NOkia E6 users or experts comment on this??

    Hi Stuart,
    To answer your question:
    There is no shared secret for the ACS itself.
    If the ACS is going to communicate with another device, you have to define a AAA client and define a shared secret.
    ACS 4, used that shared secret to protect/secure the replication, in ACS 5, the replication secured with encryption and not shared secrets(hash).
    Rate if useful

  • Prod.Order Creation- Using Reference Operation set.

    Hi
    While creating a production order of particular order type,after entering the quantity and order finish date as today's date(05.06.2007),backward scehduling,it's showing no routing found for the material (as we are using REM-Repetitive manufacturing,we are having rate routing) ,and in the same mesaage box itself I choosed the Reference operation set(that I have created today) and entered the  group no,and after entering its showing me an error as <b>Ref. operation set 50000008 is not valid according to the selection conditions</b>,
    So I created a routing for the same material nd in MRP4 view of the same material under for selection method i kept blank(Selection by order qunatity) and tried to create Prod.order,and there was no problem,but if the same i'm trying to create using Reference operation set I'm not able to create the Production order.
    Kindly give me a solution for this,Is there anything to do with order type dependent parameters of the particular order type?
    Thanks & Regards
    Raj

    Hi,
    Is your problem solved ?
    One more solution to create a order with reference operation set,is to use a trigger point.
    Once you create a reference operation set.
    Use T.code co31 to create a trigger point, chosoe create order with reference & choose a system status eg: PCNF. & click the user parameter tab.
    The system will aks for the reference operation set no & group counter.
    Then assign this reference operation set to the routing operation.
    When you do partial confirmation of this operation, this will trigger the generation of a order.
    Regards,
    Senthilkumar SD

  • Selection problem of Ref op set while converting plnd to prod order

    Hi PP Professionals,
    Even though we have maintained 'manual slection (4)'  for Tast list type- S (ref operation set), we are getting error  'Ref Op set is not valid' and in error help 'error in reading PP master data'.
    Since the Routing is same for all the finished products, we want to assign Ref Op Set directly while creating production order.
    We have already maintained parameters in 'order-type dependant parameters' and in 'task list selections's default and automatic selection'
    Regards,

    Hi Senthilkumar,
    I really appreciate for your kind Hint of SEL ID.
    I created and assigned new 'Sel Priority' to the SEL ID same as for Routing.
    Now while converting Planned order to Production order system is asking for Reference operation set as there is no such need of Routing as I already mentioned in previous post.
    Regards,

  • Routing & Reference Operation Set

    Hi All,
           Could you guys please help me to understand the following will be grateful
    What is the difference between Routing & Reference Operation Set?
    When the Routing will be used?
    When Reference Operation Set will be used?
    What are all the advantages and disadvantages behind using Routing & Reference Operation Set in prodution?
    At which Scenario Reference Operation Set is must?
    Thanks in Advance

    Hi,
    Routing defines the sequence of operations that should be carried at a work center to make up a product.
    In the operation you define the values for setting the machine and the machine time to prodduce a finished product for a particular base qty.
    Routing is one of task list in PP module to carry out the production of finished and semi finished parts. it consists operation sequence which requires for manufacture finsihed and semi finished parts like operation 10. 20, 30...
    Ref operation sets is use as template to create routing , rework order.
    These are four types...
    1) Routing and Ref operation sets (used is discreate manufacturing).
    2) Rate routing and Ref rate routings (used in repetative manufacturing).
    3) Recipe (used in process manufacturing)
    Ref operation sets are repeated operations can be use for several products. you have use these always in rotuings.
    For documents and PDF files you can download from the below link
    http://mysapbi.blogspot.com/2007/01/sap-help-in-pdf-files.html
    CA01 = Standard Routings
    CA11 = Reference Operation Sets
    CA21 = Rate Routings (used in Repetitive manufacturing only)
    CA31 = Reference Rate Routing (used in Repetitive manufacturing)
    Regards,
    R.Brahmankar

  • Reference operation set

    Dear all,
    for one materail i am trying to creat PRD order
    order type XXXX is mainatined with refernce operation set slection in OPL8
    and refernce opration set is already created in CA11
    validity is ok
    system is throwing following Mssg
    while creating PRD order
    No default value mainatined for op.generation for order type XXXX (materail YYYYYY)
    Regards
    kumar

    Kumar,
    System is unable to find a valid Referance Operation set, for Production order. Various reasons can be
    1. Order quantity not within the Lot Size Validitiy of the Referance Operation set.
    2. Referance Operation set "Status" and "usage" problem, not valid or not relevant to production.
    3. Referance Operation set must have got created with valid from today, but the order may be exploding the PP-Master data for a past date based on the basic start and finish date of the order.
    Please check these parameters...there is no need to maintain OPJG. OPJG should be maintained if you want to allow order creation with default a single operation, in the event of system not able to find a valid routing.
    Regards,
    Prasobh

  • Trigger Point Table

    All,
    Does anybody know if or what the table is to view trigger points?
    I have assigned to operations in routings, so would like to view routings on mass to see if the operations all have trigger points, some have been missed.
    Thanks.

    Hi,
    You can check below Tables...
    MLG       Standard milestone group
    MLS       Standard milestone
    MLT        Standard milestone description
    Regards

  • Trigger points for the first operation

    Hi,
    We want to use triggerpoints on operations in PP. We want to set the status on the first operation to be released when we create an order. The problem is that systemstatus CRTD can not be used. Can someone help out how to get the first operation to be release automatically when the systemstatus is set to CRTD?   Thanks Marie Hillerbo

    Hi Marie,
    I dont know if this would meet your exact need.
    Based on my knowledge what you could do, is flag the order to release when it is created & saved. Assign a trigger point to the first operation, such that only on confirmation of the first operation you release the subsequent operations.
    Hope this is of some help to you.
    Rgrds,
    Vivek

  • Trigger point for the quantity

    hi all
    In routing i have maintained trigger point function . I assigned reference operation set( lot size 0 to  1) . for system status 'pcnf'. My question is with example-
    I have to produce 15 pieces .
    I assigned trigger point to 2nd operation.
    Now while iam 2nd operation( i have to  confirming piece by piece)
    while iam  confirming 1st  piece a pop has come for rework operation i said yes. rework operation is triggerd . but it is triggered for all 15 pieces where as it should be only for 1 piece.
    I want the operation should be only for 1 piece. how to proceed.
    please help me
    thanks in advance
    anitha

    Hi,
    I can explain how an rework order is created with
    reference op set.
    First check in Tcode OPJF for the selection id a
    Priority is defined for the Task list type S
    with usage 1 and status 4 and then Proceed as
    follows.
    1. First create a Reference op set in tcode Ca11.
    Enter the plant,Description , usage and status
    for the ref op set
    Enter lotsize and unit of measure.
    Enter the op as 0010 / workcenter/op control
    key/Description for the op
    Enter the standard values and save.
    2. Create a Standard trigger point in CO31.(Ex
    Production)
    Enter the Trigger Point usage /Group as FERT.
    3.Tick the Trigger Point Functions.
    4. Enable the indicator create order with Reference .
    5.Enter the system status as PCNF.
    6. Enter change as +.
    7. Enable the indicator once.
    8 . Now place the cursor on the create order with reference.
    9. Goto Parameters.
    10. In the Parameter enter in the group the created Reference op set group no.
    11. Order type as PP01 and group counter as 1 and save the Trigger Point.
    12. Now goto the Routing for your Material.
    13. Choose the last op to assign the Trigger point.
    14 .Select the OP -
    > Goto ---> Trigger Point overview.
    15. Enter the Trigger Point usage as FERT.
    16.Now choose that line ,select the Details---> Trigger Point
    17. The system will says standard trigger point exists from which you can
    select the created Trigger Point (EXx Production)and save.
    18. MD02/MD04.
    19. Convert the Planned Order into Production Order and Release the order.
    20 .Now confirm th ops.
    21. For the last op enter the yield and rework qty
    and set the status as PCNF.
    22. If the status of last op is PCNF then in the
    system a POP UP will appear as Activited by
    Trigger Point /Create order with reference/order
    number/sequence and op number which trigger point
    works and enter.
    22. Now a rework order will be created.
    23. In c003 enter the number which is next to the actual prodn order no.Rework
    order will be seen.
    Regards,
    nandha

  • Link for reference operation set

    Dear SAP Guru's
      Can anyone provide me the link for Reference Operation Set in SAP Library?
    Thanks in advance
    Regards
    Kalyan

    Dear kalyan,
    i think ur looking for Rework order, Reference operation set
    Plz refer my reply from this Thread
    [http://forumsa.sdn.sap.com/click.jspa?searchID=32188014&messageID=8172970]
    Regards
    kumar

  • Configuring shipping point as Trigger point for posting outbound idoc

    Hello All,
    I have a requirement that on saving an Outbound Delivery(VL02N), an Outbound Idoc should be posted...but the condtion for posting the idoc should be its shipping point. I am not sure how to configure shipping point as the trigger point for the idoc.
    Please suggest.
    Thanks for your co-operation.
    Regards
    Anand

    Hi Anand,
    1. Go to transaction: NACE & select application V2 and click on output types.
    2. change display <->Change mode.
    3. select LAVA and press F6 (to copy Standard output type LAVA to ZLAV).
    4. Give ur Z name for the new custom output type.
    5. change access sequence from 0005 to 0012(shipping point).
    6. Press ENTER and click copy all.
    7. Now goto trasaction VV21, give the created output type name. ENTER
    8. Maintain entries, shipping point, customer#, Medium as '6' ...etc
    Now try VL01N with the given shipping point and check the output ZLAV has been triggered or not?
    Let's see, if we miss any configs still!
    Keep this as reference:
    http://www.erpgenie.com/sapedi/messagecontrol.htm
    Reddy

  • Trigger point for no. of calls of a router

    Hello,
    we would like to limit the number of calls for a router.
    So the first three prototypes should use one router, the following work orders should use another one.
    We would like to inactivate this prototype router and activate the standard router after the prototype router has been called several times.
    It's not enough to reduce the validity period as we do not know befor when the third work order one will be started.
    Can we set a kind of trigger point depending on the no of calls of a router which starts a workflow (like sending a message or does anything else to inform us that a certian no of calls is reached)?
    Thank you!
    Anne Mielke
    Edited by: Anne-Kristin Mielke on Sep 23, 2008 3:38 PM

    Hi,
    A table may not have more than 249 fields. The sum of all field lengths is limited to 1962 (whereby fields with data type LRAW and LCHR are not counted).
    http://help.sap.com/saphelp_webas610/helpdata/en/cf/21eb6e446011d189700000e8322d00/content.htm
    Check the SAP Help Link
    Constraints
    All the key fields of a table must be stored together at the beginning of the table. A non-key field may not occur between two key fields.
    A maximum of 16 key fields per table is permitted. The maximum length of the table key is 255.
    If the key length is greater than 120, there are restrictions when transporting table entries. The key can only be specified up to a maximum of 120 places in a transport. If the key is larger than 120, table entries must be transported generically.
    A table may not have more than 249 fields. The sum of all field lengths is limited to 1962 (whereby fields with data type LRAW and LCHR are not counted).
    Fields of types LRAW or LCHR must be at the end of the table. Only one such field is allowed per table. There must also be a field of type INT2 directly in front of such a field. The actual length of the field can be entered there by the database interface.

  • How to set Busy Trigger for a large group of phones?

    Hello everybody!
    I need to set Busy Trigger parametar to 1 for all the phones in CUCM.
    I know how to do that for one phone in Line settings.
    But how to do that for all devices?

    Like Jaime said use BAT, see below screen shot to point you in the right direction. Just 'Find' all your lines, hit next and scroll to the 'Busy Trigger' check the box to say you want to update that field and enter your value in the box.
    At the bottom of the page, select the 'Run Immediately' option then hit 'Submit'
    Job done!
    You can then go back into 'Bulk Administration' and 'Job Scheduler' to check the status of your update.
    Hope that helps
    Matty

Maybe you are looking for

  • Bank statement Nr in journal entry and Payments

    In Notenumber 1374872 (SP 01/PL7) a change has been implemented that the number of the payment run is copied to the remarks of the payment and the journal entry. I think it will be good idea to do the same for the number of the bankstatement in bank

  • Deactivating Logging and Tracing

    Deactivating logging and tracing for single Interface in XI Box Could some one guide me on this. We have an Interface in which the log file generated due to XSLT Mapping+ Value Mapping is of huge size. So we want to deactivate the logging and tracing

  • White type showing as black on officejet 8600

    Here is a good one... Just purchased the new Officejet 8600 and everything appeared ok with the set up.  However, the first ID document I tried to print failed to print properly. In the document, I have an number of black areas with white type.  When

  • Control Columns in Radiobutton List

    Hi, I have a set of Radio buttons, and I want to display it such that there's only one radio button in a row/line. I think EA2 provides for that functionality, but don;t see a way to do this in JSC patch 8. Would appreciate help/advise. I come across

  • Cannot open pdf documents. used to work well. now not at all.

    Click on document and returns warning message to download software. I do that and warning says cannot download software as it is already on this computer.