Dear Madhu Kiran,
Reference Operation sets are used to create Routing which are used in Discrete scenario.
Reference Rate routing are used to create Rate routing which are used in REM scenario.
Also check this,
Reference Operation Set  
Definition
A type of routing that comprises of a series of operations that recur frequently. It is used to create a
routing.
Use
A reference operation set cannot be used directly in production.
To reduce the effort needed to create a routing, you can
reference the reference operation set
All the changes you make in the reference operation set are automatically implemented in the referenced operations of the routing.
If you have referenced a reference operation set in a routing, you can unlock this reference. In this case the operations of the reference operation set are copied into the routing and can be changed there. The connection to the reference operation set no longer exists, which means that any changes in the reference operation set are not transferred to the routing.
use the reference operation set as a source to copy from
Operations are copied from the reference operation set to the new routing and can also be changed there. Changes you make in the reference operation set have no effect on the routing.
Structure
A reference operation set has the same structure as a routing. You cannot assign a material to be
produced to a reference operation set. It can have neither parallel nor alternative sequences.
Regards
Mangalraj.S

Similar Messages

  • Help me,Mass Changes to Reference Rate Routing

    Hi,
    I need to mass changes to reference rate routing.
    but i don't know how to do it.
    by using CA85N i was able to make changes to Normal routing but not reference rate routing.
    so.so.so. i need your helps.
    best regards.
    thanks.

    Hi
    While entering the selection criteria make sure that you are entering the correct selection parameters. Since the routing exist in CA32, it will be come in CA95N also. Please try with correct selection parameters.
    Thanks
    S.Murali

  • Differences between rate routing and reference rate routings?

    Hello PP members:
    I would like to differences between rate routing and reference rate routings
    Thanks for your time,
    Thanks Again,
    Suren R

    Hi Mr.Suren,
    As explained by other friends Routing is used in Discrete manufacturing and Rate routing is used for REM-Repetitive manufacturing.
    In addional to these types SAP has given 2 more types
    1.Reference operation set -Used in Discrete manufacturing.
    2.Reference rate routing - Used in REM.
    If similar rate routing is been used for producing many materials,then instead of entering(these steps) in rate routing of each  material you create a refrence rate routing and you enter the work centres used and the other details.After saving you get a group counter number showing reference rate routing is saved with group XXXXXXXXX.
    When you are creating rate routing for a material say A ,after giving the name and plant details in the top you will be able to see an icon "copy from" and you can select the radio button for reference rate routing and give the group counter number. or else without giving it here you have got an option to select the reference rate routing after entering into the operation screen also.
    In that particular page in operation overview screen,there will be an icon copy,there you can click that icon and you can give the reference rate routing group counter number and very easily you can create rate routing for N number of material.
    Likewise you can use reference operation set while creating routing for a material in Discrete manufacturing.This basically reduces the time in creating routing or rate routing for materials in Discrete & REM respectively
    CA01,CA02,CA03-Create,Change,display (routing)  respectively.
    CA11,CA12,CA13-Create,Change,Display reference operation set Respectively.
    CA21,CA22,CA23-Create,Change,Display rate routing respectively.
    CA31,CA32,CA33-create,change,display reference rate routing resp.
    I hope this will help you.
    If useful reward your points.
    Thanks & regards
    Karthik.

  • Difference between Routing & Rate Routing

    Hi All,
    can anyone tell me difference between Routing & Rate Routing? can we use routing for REM? if no, then what will be the effect?
    Thanks,
    Rinky

    Hi Rinky ,
                   Routing and rate routing are task list in broad manner .
    standard task list: Describes the worksteps necessary to produce a material or perform an activity without reference to an order.( that means they are created without reference to order )
    Essential objects of a task list are header, operations, material component allocations, production resources/tools and inspection characteristics.
    Together with specific dates and quantities, task list data forms an important part of the order.
    The following task list types exist in the R/3 System:
    routing
    reference operation set
    rate routing
    reference rate routing
    inspection plan
    maintenance task list
    standard network
    master recipe
    Routing is created with ca01 and rate routing by ca21 .
    Routing is used in discrete manufacuting and rate routing in repetitive .
    Rate routing generally has only one operation  and prod line instead of work centers and operations in routings .
    Both routings can be used for scheduling , cosing and capacity planning .
    Hope this was helpful answer !
    Neal
    Edited by: Neal Gibson on Jun 30, 2008 11:46 AM

  • CEWB for Rate Routing

    Hi..
    I have one query reference to CEWB ,is there any selection criteria for selecting task list type R(Rate Routing) in CEWB.
    I have checked the same in CEWB found only Routing,Reference operation set,Inspection plan.
    I have checked also op77 but it is bydefault Routings for production & not the rate routing one.
    Any suggestions to above issue pl.
    Tushar

    Hi Anupam,
    Thanx for reply...
    I have checked the settings which you have mentioned & tried with the selection criteria as you said but not possible  with desired result as there are only three task list type selection as mentioned above .
    I have also checked OP77 ,I tried to create new work area with usage area "R-Repetitive manufacturing" but it is bydefault comes with Routings for production.
    Is there any setting  which I couldn't incorporate?
    Pl. suggest
    Tushar

  • Pro & cons for Routings vs Ref Rate Routing

    One of our plants uses Reference Rate Routings (CA31, 32, 33). Many colors of vinyls are processed the same way producing many individual material numbers. So one Ref Rate Routing has many Materials assigned to it.
    Recently an engineer in other plant found that he can do the same material assignment on Routings (CA01, 02, 03)
    What are the pro & cons for Routings vs Ref Rate Routing when doing Material assignments
    thank you for any information you can provide
    Althea

    Dear,
    Reference routing is usually used for calling the set of operation can be used manr routings so it is reusage.
    Suppose a cleaning  operation is having 5 operations. This is used in may places. Then create a routing and call this operation set wherever required. Hence you need not repeate defining the operations in each time.
    For more details...see below link
    http://help.sap.com/saphelp_47x200/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm

  • Problem in automatic rate routing selection

    Dear all,
    I am using REM and according to that I have maintained REM profile in Material Master, rate routing, line hierarchy, production version, but the time of scheduling of planned order, system is saying " The automatic selection of routing is not possible".
    I suppose I am missing some configuration.
    As also, I have already done the same scenario in other server.
    If u have any suggestion then pl. forward me.
    Thanx,
    Das

    Dear SAP PP,
    1.Check whether have you included the check box for REM allowed indicator in the production version.
    2.Also ensure you have assigned the rate routing option for detailed planning and the correct group and
    group counter in the production version.
    3.Check the valdiity dates of the rate routing,try to create a planned order in some advanced future date
    so that your rate routing is valid for the planned order start date.
    4.Check the status and the usage of the rate routing.
    Regards
    Mangalraj.S

  • Problem during Rate Routing Upload using BDC.

    Dear Sir/Madam,
    I am uploading Rate Routings using a BDC program which is working perfectly but having a single problem.
    In the initial screen of the transaction CA21(Create Rate Routing), I need to enter only the Material Number and its Plant and all the other fields should be left blank.
    But, here the group number field is automatically getting filled with the previous value and it is incrementing the group counter number. 
    I want the system to allocate different group number for  each Routing. I want the group number to be unique.
    Thanks,
    Ranjan.

    Dear Ranjan,
    While doing recording CA21. you would pass only the material number and plant (i mean you did recording of CA21 based on material number as well as plant not for routing number (group counter))
    Routing number (group counter) dynamic (In your case Internal number rage has assigned).
    So the Problem is:
    1st record of you internal table update smoothly because you program will pass only material and plant
    group counter (RC271-PLNNR) field is blank, after update 1st record system will regenerates the
    group counter number.
    ones the system updates the data it will generates Group counter number and assign to filed :(RC271-PLNNR).
    after saving the record system will go loop statement of you program. again program will call the call transaction statement with 2nd record of the internal table. call transaction statement pass the material number and plant field at ca21. but group counter number automatically poulated in the screen field because that time system can't be refresh the initial screen of CA21,
    so system will shows previous updated screen ( 1st routing record will show)
    Remove your bdc perform and add this code in your BDC perform.
    *        Start new screen                                              *
    FORM BDC_DYNPRO USING PROGRAM DYNPRO.
       CLEAR BDCDATA.
       BDCDATA-PROGRAM  = PROGRAM.
       BDCDATA-DYNPRO   = DYNPRO.
       BDCDATA-DYNBEGIN = 'X'.
       APPEND BDCDATA.
    ENDFORM.
    *        Insert field                                                  *
    FORM BDC_FIELD USING FNAM FVAL.
       IF FVAL <> SPACE.
         CLEAR BDCDATA.
         BDCDATA-FNAM = FNAM.
         BDCDATA-FVAL = FVAL.
         APPEND BDCDATA.
       ENDIF.
    *                Clearing the Group Counter                                *
       IF FVAL = SPACE.
         CLEAR BDCDATA.
         BDCDATA-FNAM = FNAM.
         BDCDATA-FVAL = FVAL.
         APPEND BDCDATA.
       ENDIF.
    above code: 1st time of call transaction FVAL = space means ( group counter field is blank)
    2nd and rest of the time FVAL <> space. means (previous record group number exists for new call transaction ) so system will be by pass with new record.
    Check with debugging mode. you will come to whats going in you code.
    Even i have go same problem while uploading routing data. i have find out solution after doing my RND.
    Regards,
    Akshath

  • Mass Changes to Rate Routing

    Dear All,
    We were trying to carry out mass changes to Rate Routing,
    by using CA85N we were able to make changes to Normal routing but not rate routing, in CA85N we were able to select only three types of task lists ie N, S & Q. Also checked in CWEB here also only the three types of task lists were provided for selection. Is there any other way for carrying out mass changes to rate rouitng, or settings in the above transactions.
    Regards
    Mithun

    Dear Mithun,
    In my understanding only CEWB can help you to some extent,otherwise you may have to develop some
    BDC's or LSMW's.
    Regards
    Mangalraj.S

  • Rate Routing Changes

    Hi All,
    Is there a possibilty to find out the changes made in the Rate Routing of a BOM regarding to Component Allocation over a period of time.
    Regards,
    R. Vijayakumar

    Dear Rajavelu,
    Try the standard report CA60,for task list type R - Rate Routing,include the check box for for all the options under Detailed Change
    documentation for and execute the report for some date range for any material and plant combination,this will satisfy your
    requirement.
    Regards
    S Mangalraj

  • Rate  Routing

    Dear Sir ,
                   i need sample program of Rate Routing Tcode CA21..Using BAPI or BDC CALL transcation ...........or tell me the BAPI Function module ....
    Pls Help to me ....
    With Regards ,
    Meena ...

    Hi,
    You can check the BAPI: BAPI_ROUTING_CREATE.
    Also you could check the following DI/BI steps in LSMW ( Not sure whether these objects work for Rate Routing Creation):
    Object               0170   Routing   
    Method               0001   Batch input
    Program name         RCPTRA01         
    Program type         B   Batch input  
    Object               0170   Routing     
    Method               0002   Direct input
    Program name         RCPTRA02           
    Program type         D   Direct input  
    But following IDOC could be used for loading Rate Routings:
    LOIROU02
    You can check the documentation in WE60.
    Hope thsi helps.
    Best Regards, Murugesh

  • Sequence selection in Rate Routing

    hi,
    In Normal Routing in sequence overview  - extras - new entries we can find the option of creating a Parallel or Alt sequence, but in Rate routing there is no way to select the type of Sequence. It by default shows Parallel sequence.
    Pl. let me know the step by step proceduer to create a Alternate sequence in Rate routing.
    regards

    Dear Rishi,
    We cant create any alternative sequence for a rate routing.This is one of the difference between routing and rate routing.
    Rate routing supports only standard and parallel sequence.
    If alternative sequence is present in a routing,then at the time of order creation the system gives a pop to select for alternative
    sequence or to skip it and proceed.
    For this under OPL8,for plant order type combination the field sequence exchange should be having value 2 - manual selection.
    Creating production version or sequence in my understanding depends on the business requirement.
    Check and revert
    Regards
    S Mangalraj

  • Rate routing std values not appearing during backflush

    Hi ,
    Rate routing is defined from REM product. The REM profile has check to post activities.
    In MFBF when I try to do assembly backflush the activities are not proposed from rate routing when "Post with correction ".
    What could be the reason for this ?
    Regards
    ShankarR

    Dear Shankar,
    Once after selecting the radio button for assembly backflush>post with correction->click on actual activities and check the rate
    routing details along with the work center,timings etc.
    If you are unable to find the same means,goto KKF6N--->mention the product and plant and click on change mode and click on
    cost calculator button for preliminary cost estimate and save the data,then check in MFBF.
    Regards
    Mangalraj.S

  • Sequences in routing -reg

    Hi,
    what is the purpose of sequences in routing ?
    normally all the operations list we can put and create routing ?
    if we use sequences will the operations of all the sequences taken in to account while doing standard cost ?
    are these sequences are of reporting purpose or any thing else
    can any one clarify ?
    regards,
    Madhu Kiran

    Hi,
    we use REM , no order reference
    our routing have sequence 0 to sequence 11 etc.. based on operations , these are not parallel sequences
    sequenec 0 is mainline operations
    sequenec 1 is some sub assembly operations etc...
    my doubt is when cost is run whether it will take these other sequences other than 0 also in to consideration ?
    with out giving the sequences if all operations are put in to routing what will be the issue ?
    one doubt with this is
    sequence 2 is handling time 2 min  and when we assign return operation to this sequence as operation 30 of main line where in that operation we give time as 1 min suppose
    whether system takes 2+1 = 3 mins time ? or 1min only from mail line sequence ?
    pl clarify
    regards,
    madhu kiran

  • Defect Recording for operations in rate routing

    Dear Masters,
    How to record the defects for the operations defined in rate routing of a material once the inspection lot in generated using TCode MFPR in repetative manufacturing?
    Thanks & Regards,
    Ram Kulkarni

    You mean to say tan is available in rate routing itself ?