Refresh of DEV from PRD

Hi, SAP Gurus!
For our upgrade project, we need to refresh the DEV system from a recent copy of PRD. Our dev system must contain only configuration (i.e. no user data). This needs to be a new system with only ONE client in it. PRD and QAS are also single client systems.
We have not been able to find any official SAP document on this procedure.Seems like a standard procedure, so there should be a documented guide out there.
We are under a WIndows 2003 + Oracle 9i setup and running R3 Enterprise 4.7 ext. 2.00.
DEV is the domain controller for STMS.
Any ideas you can provide are wellcomed.
MC

Hi,
For your scenario it seems you need to go with client copy , but
This needs to be a new system with only ONE client in it
But this doesnot means it is new system either you can create new client in DEV or can overwrite any existing client.
For copying only configuration refer this link
https://cw.sdn.sap.com/cw/docs/DOC-33675
Other option is system copy but that will replicate your PRD data including master and transaction(I guess that is not required).
So you need to explore client copy option for your requirement.
Regards,

Similar Messages

  • BI Refresh of QAS from PRD for an MCOD Database

    Hi All,
    We are currently trying to refesh our BI QAS system with a copy from BI PRD.
    Our environment is as follows:
    BI DEV - BI 7, Windows 2003 x64, Oracle 10.2
    BI QAS - BI 7, Windows 2003 x64, Oracle RAC 10.2
    BI PRD - BI 7, Windows 2003 x64, Oracle RAC 10.2
    Our Oracle RAC databases are MCOD and also contain Solution Manager, ECC6 and SRM.
    We want to refresh the BI QAS with a copy of BI PRD, I have run a client Copy Export (scc8) with option sap_all and imported this into BI QAS (we have to use this mentod as the remote Client Copy will not work due to geopgraphical locations and network performance), the import works fine and the post processing via scc7 has all completed sucessfully, but the cubes etc and data do not change.
    I have seen in messages in Forums etc that the only alternative is to use a System Copy but this is not really an option as we do not want to re-fresh all of Solution Manager, SRM, ECC and BI by refreshing our MCOD database.
    Any options/ideas would be greatly appreciated.
    Thanks
    Simon.

    I've done the Export of the BI data out of the MCOD database (after alot of issues) but now when I try to run the Import using SAPINST following the following options:
    - SAP Netweaver 7.0 Support Release 3
    - Additional Software Life-Cycle Tasks
    - System Copy
    - Oracle
    - Target System
    - High-Availability System
    -Based on AS ABAP
    - Database Instance
    And go through the questions and point to the Exported Data I then get the option to re-create the Database, which I don't want to do as this is already has 4 other schemas in it for ECC, SRM, SM and Portal.
    Why is it prompting me to create a new DB and not allowing me to import the data into the existing datgabase?
    Thanks
    Simon.

  • QAS Refresh from PRD

    Dear Bhudev/Guest,
    I am Planning to refresh my Quality system from Production's Offline Database Backup. I have seen you a lot posts.
    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
    Refresh from Offline backup (AQC from APC)
    Let's say AQC is quality and APC is production.
    Pre-processing Activity:
    Verifications:
    1. Verify the last offline backup in the source system /oracle//sapbackup/back.log
    2. Verify that both the source and target systems are at the same Oracle level (which is already the case between APC and AQC)
    3. It is recommended that an off-line backup be taken of the target system before starting this process, in case of fall back.
    4. Confirm there is enough space in the target (AQC) file systems to contain the data from the source system this is required as we may have to copy the files from Production to quality. /oracle/SID/sapdata* folders should be having little more space as compared to the source filesystem.
    5. Check access to SAP* for APC (000 and 400) and also for AQC (000 and 400)
    6. Check other passwords such as adm and ora
    7. Server : User : ora > sqlplus u201C/ as sysdbau201D > alter database backup controlfile to trace > exit In /oracle/SID/saptrace/usertrace, the last trace (check the time) is the script for recreating the control file. You will need to edit it. Please rename the trace file to ld.sql and send the file to the target system /oracle/SID Edit the Script: vi ld.sql Delete or comment out all lines at the beginning of the file before STARTUP NOMOUNT which is kept. Change old controlfile creation statement at the beginnig of the controlfile: Old line: create controlfile reuse database NOresetlogs archivelog; change to New line: create controlfile set database resetlogs archivelog; replace all occurences of string by in each line where appears :g / / s / / /g example: :g/P10/s/P10/T21/g Delete the following lines a the end of the script: ; RECOVER DATABASE; ALTER SYSTEM ARCHIVE LOG ALL; ALTER DATABASE OPEN;
    8. Get from the Prod system (APC) the .aff and backDPR.log and copy them on AQC. (/oracle//sapbackup) Copy the files to /instkits/SID/. And after we can go on target source server and copy them from /instkits/SID to the /oracle/SID/sapbackup/. With the good owner and permission
    9. Lock all the users in client 400 except Basis and post system message. Target system data collection (On AQC -400):
    1. SM59 Expand all the trees, print by choosing: ->System ->List ->Print i) Compare list to R/3 connections on source system. Record details for any that will need to be recreated on target system.
    2. SCC4 Record all client settings. -> Tableview ->Print ->Standard List -> List -> Print Make sure you understand the columnsu2026
    3. SE06 Record system change options
    4. RZ10 Record the instance profile settings for: rdisp/wp-no-btc and rdisp/max_wprun_time
    5. STMS Record current transport routes. ->Overview -> Transport Routes -> manually expand all trees -> system ->list ->print
    6. Request customer to provide u201Ccatch-upu201D list of transports to be applied to system after refresh (QA and Sandbox systems).
    7. RZ04 Record current work process set-up. Highlight each operation mode and click instances/op modes button. i) Print with ->System ->List ->Print
    8. SAP License Ensure the SAP license information is available. If not on-hand, logon target system as adm and enter command: saplicense u2013show. This information is also available on OSS.
    9. TSM Nodename View /usr/tivoli/tsm/client/api/bin64/dsm.sys on source and target system. Record the nodename entries. These will be SAP or server names.
    11. Take printer Export through SPAD and save it locally to desktop->SPAD
    12. Take Export of User Master from the client 400 through SCC8 target system is AQC , so that it may be re-imported through STMS. Note the Transport number here also verify the transport exist in the queue. DB Restore from offline backup from APC:
    1. Stop SAP on AQC -> Login as aqcadm -> stopsap
    2. Change the TSM node on AQC-> cd /usr/tivoli/tsm/client/api/bin64 ls -lrt vi /usr/tivoli/tsm/client/api/bin64/dsm.sys Change it to point to APC, comment the AQC Node. Post Restore Acitivity:
    1. Stop Database Delete Old controlfile rm /oracle/AQC/sapdata1/system_1/cntrl/* rm /oracle/AQC/saparch/cntrl/* rm /oracle/AQC/origlogA/cntrl/*
    2. Re-create the controlfile and then after that start the database User : ora > cd > sqlplus u201C/ as sysdbau201D > @ld.sql > alter database open resetlogs;
    3. Change the sapr3 password Server : User : ora Temporarily, we have to change the sapr3 password to the default password. With SAPBA, change this user password to pass.
    4. Test the connection: Server : User : adm > R3trans u2013d It should have a return code of 0000
    5. Reasign tempfile alter tablespace psaptemp add tempfile '/oracle/AQC/sapdata1/temp_1/temp.data1' size 6020M reuse autoextend on next 20971520 maxsize 10000M; alter database rename global_name to AQC.WORLD; drop user OPS$APCADM cascade; drop user OPS$ORAAPC; create user OPS$ORAAQC identified externally default tablespace psapdnausr temporary tablespace psaptemp; grant connect, unlimited tablespace, SAPDBA to OPS$ORAAQC; grant connect, unlimited tablespace, SAPDBA to OPS$AQCADM;
    7. Change the instance profile to stop all the background processing To be sure that no production batch are executing, set rdisp/wp_no_btc to 0 posprocessing:
    8. Startsap
    9. Run Transaction SICK (as sap*)
    10. Installing license through the tcode: slicense While logged in as 000/sap/using password of APC system Get the License from service.sap.com and download it to local machine Log in 000 client using SAP and run the Tcode slicense import printers, run BDLS for logical system name conversions se06 posprocessing stms usermaster import import profiles for QAS
    thanks
    Bhudev
    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
    Hi Pranav
    why the SIDs of production and QAS are same, did you do refresh of QAS from PRD ?
    If yes, then you should have done control file creation and change of SIDs, after the datbase restore...
    however, if you want to create the new control file and change the SID then try to consider the following steps:
    1. Login as orasid
    2. connect to sqlplus
    3. run query: alter database PRD backup controlfile to trace;
    4. It will create a control file as a latest trace file (.trc) in the directory /oracle/PRD/saptrace/usertrace
    note: logout of sqlplus
    5. Rename that .trc file into ldQAS.sql
    6. copy this file into /oracle/SID ie. /oracle/QAS directory
    7. edit the .sql file as below
    8. CREATE CONTROLFILE SET DATABASE u201CQASu201D RESETLOGS ARCHIVELOGS;
    add above statement replacing the below:
    CREATE CONTROLFILE REUSE DATABASE u201CQASu201D NORESETLOGS ARCHIVELOGS;
    9. Replace all occurences of string <PRD_SAPsid> by <QAS_SAPsid> in each line where <source_SAPsid> appears
    :g/PRD/s/PRD/QAS/g
    10. login in sqlplus, stop database
    11. as oraqas, delete old control files:
    rm /oracle/SID/sapdata1/system_1/cntrl/*
    rm /oracle/sid/saparch/cntrl/*
    rm /oracle/SID/origlogA/cntrl/*
    12. again login into sqlplus (as sysdba always)
    13. run this .sql : @ldQAS.sql
    note: it should give a message that control file creaated.
    14. Open the database using: alter database open resetlogs;
    15. alter database rename global_name to QAS.WORLD;
    16. drop user OPS$PRDADM cascade;
    17. drop user OPS$ORAPRD;
    18. create user OPS$ORAQAS identified externally default tablespace <tablespacename>
    temporary tablespace psaptemp;
    19. grant connect, unlimited tablespace, SAPDBA to OPS$ORAQAS;
    grant connect, unlimited tablespace, SAPDBA to OPS$QASADM;
    at SAP level:
    1. you can run BDLS to convert logicalsystems from PRD to QAS SID
    Bhudev
    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
    In both post, There is some difference specially like User droping.
    Whether I have to run BDLS or Drop usr and create or both activity have to be done?????
    Regards
    Dharmendra

    Please explain step by step:-
    7. Server : User : ora > sqlplus u201C/ as sysdbau201D > alter database backup controlfile to trace > exit
    In /oracle/SID/saptrace/usertrace, the last trace (check the time) is the script for recreating the control file.
    You will need to edit it. Please rename the trace file to ld.sql and send the file to the target system /oracle/SID
    Edit the Script: vi ld.sql Delete or comment out all lines at the beginning of the file before STARTUP NOMOUNT which is kept.
    Change old controlfile creation statement at the beginnig of the controlfile: Old line: create controlfile reuse database NOresetlogs archivelog; change to New line: create controlfile set database resetlogs archivelog; replace all occurences of string by in each line where appears :g / / s / / /g example: :g/P10/s/P10/T21/g Delete the following lines a the end of the script: ; RECOVER DATABASE; ALTER SYSTEM ARCHIVE LOG ALL; ALTER DATABASE OPEN;
    8. Get from the Prod system (APC) the .aff and backDPR.log and copy them on AQC. (/oracle//sapbackup) Copy the files to /instkits/SID/. And after we can go on target source server and copy them from /instkits/SID to the /oracle/SID/sapbackup/. With the good owner and permission
    Break into steps and explain. It looks confusing to me because I am new to ECC with Oracle.
    Regards
    Dharmendra

  • Not able to recover QAS from PRD online backup

    Hi All,
    We are refreshing our QAS from PRD.
    We have restored the PRD database to QAS, using an online backup.
    After that, we created control file and brought the database in mount state.
    But, when we trying to recover the database, its giving follwoing error :
    ORA-00308: cannot open archived log
    '/saparch/RC4/PC4arch1_290393_614926552.dbf'
    ORA-27037: unable to obtain file status
    HP-UX Error: 2: No such file or directory
    Additional information: 3
    Its craving for some redolog file, which has nothing to do with the backup, used for restore.
    All the logs, generated during the online backup, have been placed in the respective folder i.e. /saparch/RC4/.
    Why is it asking for the someother log file?
    Thanks

    Hi All,
    i have duly placed all the redologs in the archive directory which were generated during the online backup.
    But whenever i start recovery, instantly it asks for some random file which is PC4arch1_290393_614926552.dbf
    The sequence of redologs generated during the backup is PC4arch1_29069[3-9]_614926552.dbf and they all are present in archiving directory, i have doble checked the backup log, we have the right files in our archiving directory.
    I hope the situation is clear now.
    Please suggest now.

  • BI CLIENT REFRESH FROM PRD TO DEV

    DEAR GURUS,
    I want to do client copy from production to development of BI server. I want to carry out the infocubes, queries, etcc. from prd to dev.
    for the above activity which profile i want to select for client copy.
    After client copy shall i get all the infocubes,queries of prd server.
    Because for system copy i don't have that much space in dev server.
    please guide me
    regards
    santhosh

    Hi,
    Pls chk this:
    How to System Copy in SAP Business Intelligence System Landscapes (NW2004)
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/bff13df2-0c01-0010-6ba7-bc50346a6fd8
    Strategies, Techniques, and Best Practices to Upgrade, Copy, and Migrate SAP BW Systems
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d163a7-0301-0010-d9b0-98f692ea3c60
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/bff13df2-0c01-0010-6ba7-bc50346a6fd8
    Note 184322 - Procedure after DB copy of BW source systems
    Note 886102 - System Landscape Copy for SAP BW 2.X, 3.X and NW2004s BI
    Note 771209 - NW04: System copy (supplementary note)
    Note 89188 - R/3 Source System Copy
    Regards
    CSM Reddy

  • Download and upload variants from PRD to DEV

    Hi,
    Unfortunately, most of the variants are being created directly in production system, but not in development. We would like to stop this process further more.
    In future, we would like to follow the process from DEV & transport to QAS and PRD.
    To match the variants of PRD and DEV, I would like to download the variants from PRD to DEV.
    How can I download the variants from one system and upload to the other system.
    Regards,
    Ravi

    Ravi,
    1. You can include the variants into a transport request in se38.
    SE38--> Variants --> Utilities --> Transport request
    2. When you create your program use can use TVARV table for variants, and parameters. You can maintain it with STVARV transaction also. So if you create your program using TVARV in your program, then you can include the changes of the variables into a transport request (there is an option to do it in transaction STVARV).
    If you use tvarv table, then you have to take care of when you saving a variant:
    http://help.sap.com/saphelp_nw04/helpdata/en/c0/9803aae58611d194cc00a0c94260a5/content.htm
    I think there is no other standard way to transport the variants from one system to another.

  • URGENT help needed:Address data missing after QA Refresh from PRD

    All,
    Address data for almost all user-ids are missing after QA Refresh from PRD.
    In QA, after importing the User-Master although its shows successful. The detailed log shows:
       Data inconsistency in USR21. Start RSADRCK2 (See Note 459763)
       Exit program AFTER_IMP_ADDRESS3 successfully executed
       SAP user has no address SAP*
       Error while deleting ADRVP for SAP*
       SAP user has no address SAPCPIC...
       ERROR: Type "F" user exit with SYS_ERROR:     SUSR_CLIENTCOPY_USERBUF_RESET
    We also do a Table export - import wherein the tables
    USR03
    USR07
    USR09
    USR20
    USR21
    USR30
    are included.
    The no. of entries exported and imported are same.
    Also FYI in the User-master Transport i can see the following Tables included in the object list
    USR01
    USR02
    USR04
    USR05
    USR06
    USR08
    USR14
    USR21S
    USR22
    USRACL
    USREXTID
    USREXTIDH
    Has anyone seen this before?
    Any body has any ideas?

    Hello Bidwan,
    I think it is an issue with company address. Just check if  company addresses are existing the source client ?After client copy company addreses of target client will only exist in source client. Then if you do impot of the transport containing USR* tables it will try to assign old company addresses to the users but probably they are not exisitng in target client any more.
    If this is the case then you need to create those company addresses again using SUCOMP and then once again import the transport for user master.
    Regards.
    Ruchit.

  • To revert back a transport request from prd to dev server

    hi experts
        how to revert back a transport request from prd server to
        dev server?
        a transport request has been wrongly transported
        and it has make major changes in production server,
       now  we want to revert back that request , we know the   request no.
    regards
    pankaj

    All you have to do is create an order of transport type "Transport of copies" in PRO.
    I give you the steps to follow:
    1. Go to SE01 and create a new order (remember the type "Transport of copies").
    2. Enter the data of the order of transport that is going to come back.
    3. Enter the target, here is where you asign the target system to carry the request.
    4. Now just add the number of request to the new request you just created.
    5. Finally released the request from this transaction.
    6. Check on the queue of transport in DES, the request must appear there.
    I hope you serve =)

  • Transporting active version of datasource from DEV to PRD

    Hi,
    When I transport a 3.x datasource from DEV to PRD, the version I am getting in PRD is 'modified'. In DEV we have both modified and active versions and there's no difference between them. When I try to activate the modified version, it says that I have to maintain the transfer rules associated with the datasource. Then it takes me to the transfer rules display but I am not sure what to do next...how to activate the datasource. How do I get the active version from DEV to PRD?
    Thanks

    Hi,
    Pls Refer this link for details about transporting BI Objects
    http://help.sap.com/saphelp_nw04s/helpdata/en/0b/5ee7377a98c17fe10000009b38f842/frameset.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/media/uuid/224381ad-0701-0010-dcb5-d74236082bff
    Hope this helps,
    Regards
    CSM Reddy

  • Transporting SQ01 Customer Query from DEV to PRD

    Hi All,
    I am not sure whether I am in the right forum, but maybe you still can help me.
    I created SQ01 for Customer Master query in our DEV environment, and i assigned t-code for the query.
    Can i transport it in our PRD? Or it is more advisable to create the t-code in PRD directly?
    Please note that the query is both existing in DEV and PRD.
    Hoping for your positive feedback.
    Thank you.

    Hai TINA,
    Hope you would have created T code using SE93 for your query program.
    and your SQ01 program may be like this, and in the program the bold letter differs from client to client.
    AQ    FU  SYSTQV000003XXXXXXX===
    AQ    IC   SYSTQV000003XXXXXXX===
    So while transporting it may give error that the program is not in the client, or while executing the T CODE it may give dump.
    Hence create the query in production client and create the T code for the program and assign to the users.
    Some tips may be helpful:
    1. Always Use T code : SQVI to create the ALV report, user friendly that SQ01.
    2. In case if you are making Customer master details report, if you are include all customer master tables, in case for some customer if some details were not maintained then the details will not displayed.
    In that case, in the joint between two respective tables, right click and change it to Left Outer join.
    3. If some data is replicated, then need to change the table path, like in case of billing always start from Biling item then to Billing header.
    Regards,
    Mani

  • DEV and QAS copy from PRD

    Hi,
    We have ERP 2004 on Windows 2003 with SQL 2005.
    Due to some corrections(config changes and abap corrections) were made directly made in our PRD System, we now need to completely refresh our DEV and QAS system with PRD.
    As we do not have enough space to make a system copy, please suggest me a way to do a complete refresh without PRD data getting into DEV and QAS servers.
    Thanks and Regards
    Dev

    Hi Mukund,
    In your scenario , better to go for client export / Import process in order to refresh .
    Select the appropriate profile :
    SAP_ALL    All Client-Specific Data w/o Change Documents
    SAP_CUST   Customizing
    SAP_CUSV   Customizing and User Variants
    SAP_CUSX   Customizing w/o Authorization Profiles and Roles
    SAP_EXBC   Customizing, Users and Cross-Client Customizing
    SAP_EXPA   SAP_ALL with Cross-Client Customizing
    SAP_EXPC   Customizing Including Cross-Client Customizing
    SAP_PROF   Only Authorization Profiles and Roles
    SAP_RECO   Recovery (Only if Source Client = Target Client)
    SAP_UCSV   Customizing, User Master Records and User Variants
    SAP_UCUS   Customizing and User Master Records
    SAP_UONL   User Without Authorization Profiles and Roles
    SAP_USER   User Master Records and Authorization Profiles
    I think you need   SAP_EXPC    " Customizing Including Cross-Client Customizing " .
    Do not go for  SAP_ALL as it contains all config and data .
    Regards,
    Nibu

  • Refresh QAS from PRD

    Hi,
    Can we refresh QAS from PRD backup ? and if so, suggest the steps to do that .
    REgards,

    Hi,
    this is normal business. One of the easiest ways is to use redirected restore  with the following steps:
    1) backup prd database offline or include logs
    2) create redirected restore script with "brdbbrt -bm retrieve" on prd
    3) copy outputfile to qas and chnage some entries like sid
    4) start the restore with command db2 -tvf <outputfile>
    5) do post restore activities you want to do
    Please make sure you have read the "backup and restore guide" and lot of other information in oss or sdn.
    Regards Olaf

  • Transports from PRD to QAS & DEV in SEM?

    Hi,
    I am in a strange situation. we are on BW 3.0B and SEM 3.1B. For some reasons, My predecessor who worked b4 me implemented SEM planning without DEV system and without transports.
    I've been told that they are not developing any thing in DEV system rather they are developing and testing in QAS. once it is done, they make the same changes manually in PRD without transports.
    they are doing this only for SEM planning. for BW, they are using DEV-QAS-PRD landscape and even transports.
    I'm not even sure what to ask. but, I need to start from here. any suggestions would be highly appreciated.
    Now, I need to start using DEV system for SEM planning as well just like for BW. but, PRD is already running.
    can we transport PRD objects back to DEV and QAS?
    once transported, can i start development in DEV and transport developed objects to QAS and then to PRD?
    if we can, what are the precautions we need to take b4 transporting from PRD to QAS & DEV?
    Is there a way, to find out the differences between "PRD and QAS" and "PRD and DEV" to make changes manually for small changes?
    if nothing is being done, atleast what i can start with to use "landscape DEV->QAS->PRD and transports" by keeping PRD objects alive and running.
    DEV is no where close in synchronous with QAS and PRD. there are quite a bit of differences between QAS and PRD but almost synchronous.
    I'm in a big need of help.
    any kinda ideas are welcome

    Hi,
    I am in a strange situation. we are on BW 3.0B and SEM 3.1B. For some reasons, My predecessor who worked b4 me implemented SEM planning without DEV system and without transports.
    I've been told that they are not developing any thing in DEV system rather they are developing and testing in QAS. once it is done, they make the same changes manually in PRD without transports.
    they are doing this only for SEM planning. for BW, they are using DEV-QAS-PRD landscape and even transports.
    I'm not even sure what to ask. but, I need to start from here. any suggestions would be highly appreciated.
    Now, I need to start using DEV system for SEM planning as well just like for BW. but, PRD is already running.
    can we transport PRD objects back to DEV and QAS?
    once transported, can i start development in DEV and transport developed objects to QAS and then to PRD?
    if we can, what are the precautions we need to take b4 transporting from PRD to QAS & DEV?
    Is there a way, to find out the differences between "PRD and QAS" and "PRD and DEV" to make changes manually for small changes?
    if nothing is being done, atleast what i can start with to use "landscape DEV->QAS->PRD and transports" by keeping PRD objects alive and running.
    DEV is no where close in synchronous with QAS and PRD. there are quite a bit of differences between QAS and PRD but almost synchronous.
    I'm in a big need of help.
    any kinda ideas are welcome

  • Please tell me the step by step process of Client Refresh from PRD to QAS

    Dear All,
      We need to Client refreshment form PRD to QAS. The client refresh used to Client export and import method, but our requirement for only last six month data from PRD to QAS. The any option is need only last six month data move from PRD to QAS. Please guide us this issue.
    Best Regards,
    Thiru

    Hi Thiru,
    There is no standard functionality that does this.  There are service offerings from SAP -- TDMS -- and other 3rd party tools that can, though.
    Best Regards,
    Matt

  • BPEL process Deployment from DEV to PRD

    Hi,
    I have a question on how to move deployment from one DEV to PRD. I have BPEL subprocess in my process and calling them WSDL. Every subprocess is exposed as webservice. When i move main process to PRD/QA, the main process points DEV WSDL. How to change the main process to point to subprocess.
    Could you advise me how to deploy BPEL process form DEV to QA/PRD ?
    Thanks,

    Asuming you are using 10.1.2.0.2
    When developing BPEL processes, make sure your partner-links to other BPEL processes are using the same host name. From JDeveloper it will use your workstation name. CHange this to "localhost". Furthermore JDeveloper is using 9700 as port number, whil ethe application server is using 7777. CHange the OC4J configuration of JDev that it will use port 7777 instead of 9700.
    Now you can basicly deploy your BPEL processes to other environments. If you are using adapters make sure that the JNDI naming is implemented on all the environments, (oc4-ra.xml file).

Maybe you are looking for