Refurbishment process - want to repair material from another plant

Hello All,
In a Refurbishment process, we can do repair either Internal resource(control key PM01) or with External resource(control key PM02) by sending out material to vendor with material outward slip. But in my case, i have to send material to my another plant(2222) for refurbishment & after repair want to take it back to my plant(1111).
Can you plz guide me over here, how i can achieve this? which are the things need to be taken care? whether any other process(SD-Shipment process) need to involve here?
Thanks to all in advance.

Hi,
you can use standard refurbishment orders and defining your plants and relevent storage locations at header level. just take care of following points:
- Valuation types are defined for the equipment/ material.
- movements of material from one plant/Sloc to other plant/ Sloc.
- operations defined correctly in terms of internal/ external.
- capture all labour costs in your plant (1111) cost centre related to carrying material from your plant to another plant and back  to your plant.
- cost centre distribution rules maintained correctly.
Ragards,
Lucky.

Similar Messages

  • Transfer the material from one plant(non valuated) to another plant valuat

    Hi All,
    How to transfer the material from one plant(non valuated) to another plant valuated.
    Which Goods Movement type we required to use.
    Regards,
    Amit Shah

    Hello,
    Please refer the link below. hope it could be a help.
    stock transfer plant to plant
    split valuation
    Regards,
    Jana

  • Extend material to another plant

    hi all,
    I want to extend materials to another plant using copy from...  Someone knows  which BAPI  Can I  use
    to do  this?
    thanks.
    marisol

    u can use "BAPI_MATERIAL_SAVEDATA".
    Suppose u have to Extend material from 1000 to 1100 plant.
    so ur template will be like this:
    Material Number,Current_Plant,extend_plant,valuation area ,Type
    Using Material Number,Current_Plant , valuation arear , Type and pass it to
    BAPI_MATERIAL_GET_DETAIL
    u will get all data 4 , BAPI_MATERIAL_SAVEDATA.

  • Withdrawal from another plant

    Dear Experts,
    there is an SAP standard process in ECC defiend as withdrawal from another plant, when for example creating a planned order in ECC, the dependant demand of the component product is placed on the plant assigned e.g the alternative plant.   We are using SCM7.0 and SNP as part of our supply chain solution.  Can someone advise how and if it is possible to replicate the standard process of withdrawal from another plant in APO SNP?, what settings are essential etc?
    Basics of withdrawal from another plant are as follows:-
    - create a special procuremnt key and populate the  flag withdrawal from another plant, assign to the material master in ECC.
    Cheers
    Paul Martens

    Nandha,
    thank you for the OSS note reference.  Very useful.  One more question, from this note it suggests that the functionality of withdrawing from another plant is only designed to work with PPDS, is this correct?
    Cheers
    Paul

  • MM01 -- Update Was terminated while copying the material from one plant

    Hi Experts,
    While I am trying to copy the material from one plant like ETPE to another plant ETPZ , its telling that material created.
    But when we try to display the created material in MM02 for plant ETPZ , it says that material does not exist.
    Note : After creating the material , if we try to move any transaction code it shows the error message box and  says that Update was terminated .
    Kindly help us to resolve this.
    Regards,
    Vijay

    Hi rob,
    we have put the debugging , if there is any badi , enhancement the debugger would have gone to exit or enhancement line but its not going to any where.
    and I have checked in sm13 ..
    its giving the error like update was terminated
    from funtion module : MATERIAL_UPDATE_DB
    Report name :      LGRAPU37
    row : 360.
    ABAP/4 processor: POSTING_ILLEGAL_STATEMENT
    but if we go and see in the row 360 ...
    CALL SCREEN 100 line only
    is there , even if we put the breakpoint in this line , while we are debugging , debugger is not going to that line .
    Note : if we see the screen 100 it shows the empty screen.

  • Selling Material From Multiple Plants

    Hi Experts,
    I have two questions.
    1. Is it possible to have more than one division for a material. If Yes, how we can do this.
    2. How to sell a material from multiple plants. What is the procedure,
    Thanks,
    Shan.

    hello, friend.
    1.  is it possible for a material to have 2 or more divisions?  yes and no.
    yes, if you leave the division in the material master blank.  the material, when processed in the sales order, then copies the division from the sales area of sales document.
    yes, if you configure cross-division, or if you configured the 'check division' options in the sales document type via VOV8.
    no, if you specified the division in the material master and you have made a sales transaction.  (it would still be a yes, if you made the right configurations using VOV8 described above).
    2.  how do you sell material from different plants?  by extending the material to the different sales org-distribution channel-plant using MM01.  be sure to maintain the Sales org 1 & 2, and Sales general/plant views for each combination.
    regards.

  • Movement of material from one plant to other within the same country

    Hello,
    I would like to move material from one plant to other via tran MB1B.
    The system generates the following error while trying to save document :
    Account determination for entry BAS1 BSX 9000 ___ C100 not possible
    The system did not find an account for this transaction. This means that the account determination for key BAS1 BSX 9000 ___ C100 is not maintained in MM Customizing (Valuation). The key is made up of:
    Chart of account
    Transaction key (= Posting transaction)
    Valuation grouping code
    Account grouping code
    Valuation class
    System Response
    The system cannot update a G/L account for this transaction. You cannot post the transaction.
    Can you please tell me where the necessary setting should be made.
    Thanks

    Hi
    Please check the confirguration in OBYC for this combination and assign GL account for this combination of Valuation class, Valuation area.
    Regards,
    Lakshmanan Krishnan

  • Copying Plant from another plant.

    Hi all,
    I am creating a new plant referencing another plant from the same company code.
    I completed that and found that the plant was not correctly coppied for some
    Now is it OK if I delete newly created plant and try to re-create it in the system again by copying it from the other plant.
    Or is it possible to get me the list of all the tables which are normally coppied when you copy plant from another plant.

    If there are few accounting documents existing for the plant
    Just copy the existing plant and rename it in ox10
    thanks
    G. Lakshmipathi

  • HT3497 Purchasing material from another countries' iTunes Store?

    There is a film I would like to rent, but it is only available in the United Kingdom store.  If I change countries on iTunes, will it allow me to rent or purchase material?  Thanks!

    No, to be able to buy (or rent) content from another country's store you need a valid billing address in that country and be in that country when buying (or renting) from it. You could try requesting that it be added to the US store, but ultimately it's the film studio that will have to grant Apple a license to have it for rent there : http://www.apple.com/feedback/itunes.html

  • Material planning from another plant

    Hi,
    Can anyone answer me
    I am planning for X in plant P1
    There is a material in Plant P2 and the same material added in BOM for X but the material is not maintained in plant P1
    How this can be managed
    shrish

    Hi,
    For that u have to create same material in both plants.
    If it is in BOM of X, you can use special peocurement key for component, i.e.production in alternate plant,purchasing from alternate plant, etc.
    So dependent requirement will be created in another plant for that material.
    Regards,
    Suhas

  • MM- Procurement of Material from Different plant

    Dear  SAP Gurus..,
    There is two plants   PLT1 and PLT2
    Plant  1 is procuring the materials for Plant 2.
    Requirements is generating in Plant 2 and  Goods Reciept and Invoice verification in plant2.
    But only finalisation of the purchase order with the vendor and releasing the Purchase order in plant1.
    How to map the same scenario in SAP..
    Please explain with details by step by step:
    Points wil be awarded.
    As per my Knowlege, I am thinking to do in the following  manner
    Is it can be acheived thorough  Special Procurement process  (Procurement in Another plant ) by MRP settings. or through stock transfer ..
    Please let me know any other ways to do the same.
    In case any thing is please help me , as it is required very urgently for me
    Thanks in Advance
    Rgds
    SAP123

    HI,
    Pl tell where is the actual purchase order generated(created)...
    As far as i could understand plant 1 is just acting like a purchasing organization for your plant 2...
    Where is the actual ownership of the material : plant 1 or plant 2....
    One possibility for you on which i am myself working...
    If plant 1 has the owner ship of the material and plant 2 physical receives the material for doing some services for plant 1
    Define plant 1 as a MM plant (Principal) do all the MM settings for plant 1 only.
    Define plant 2 in the enterprise structure. And treat this plant as a vendor for plant 1 giving some services (eg. manufacturing) to plant 1...
    Revert for further help.
    Regards,
    Prithviraj

  • Reservation to be created from another plant

    Dear All
    I have a scenario where stores person has created one plant as engineer stores ,which is different from maintenance plant, When executing the work order i can able to specify the plant which is corresponding to the engineer stores.from which i can issue the material .
    But if the plan for the material  using tasklist the reservation are getting generated in the maintenance plane, whereas the MRP run in done in engineer stores level .
    Is there any way we can create reservation in the engineer stores plant or any user exit available for transfer of reservation from one plant to another
    regards
    thyagarajan

    There is a field "Iss. Pl." available in the component overview section of task list. In standard configuration it is deactivated.
    Online help Document for the field is as under and it show that the purpose can be served.
    Issuing plant
    Area of validity of an item relevant to plant maintenance which is different from the validity area of the BOM (Plant).
    Use
    This entry is only taken into account for plant maintenance activities in the department responsible for plant maintenance.

  • Sending e-mail from another account while I want it to send from another

    Hello, my problem is kind of delicate. So first, in my Mail application on my iMac I have loaded the 3 of my accounts. And I usually use one for sending e-mails while the other 2 are for work and pleasure. I was in the settings for idk what reason once and since then everything went wrong. When I want to send e-mail(with the account i usually use for sending e-mails) it sends the e-mail with the 3rd account(thats for pleasure, and I've never used it for sending e-mails) I know that there is a bar where you select what e-mail you want to send from, but when i select the right e-mail another bar pops-up next to this one and there are some e-mails with strange names. What I want is to get my Mail app to factory settings, delete all 3 accounts from it, and then make a fresh start, I want to load all the e-mails from the 3 accounts and have it all working perfectly like before. So i need to get to the factory settings. How can I do that? I also tried deleting the e-mails but when I get them back same thing happens again.

    Hi Raptole,
    On your mail application open the preferences file and select Accounts. Delete the existing mail accounts and you have a fresh start to create the accounts. When you have set up your account select the Composing tab in the preferences and there you can select the account with which to send new messages default.
    Don't do anything untill you have a current backup though.

  • SAP MRP ConRel from another plant

    Hi there,
    I am thinking about setting up this process and need advise on few things.
    1. I have plant A creating Purchase Orders to ship from Plant B - For Eg - 100 Ltr.
    2. We auto convert PO to SO for Plant B
    3. MRP runs and creates Planned order into customer stock for 100 Ltr
    4. Planned order is converted into Production Order
    5. GR done against Production Order and inventory is received into Customer stock for that SO.
    6. Delivery done and inventory sent to Plant A.
    The problem with the above process is, when Plant A is creating Purchase Order for Plant B, ConRel entry is made into MD04 for Plant B. Now when I run MRP for Plant B. It creates another planned order for 100 Ltr along with SO referenced planned order for 100 Ltr.
    So I have two planned orders, what is it that I am missing ? Please advise. thank you

    Hello,
    Your ConRel should get deleted after creating the delivery.
    Check delivery table LIPS has Requirements class transfer of requirement set in OVZG for your requirement class.
    In SM30 table V_161V you can use the "ATP Conf. MRP" checkbox to define that the material requirements planning (MRP) is to refer to confirmation schedule lines only.
    The quantities that are available in the supplying plant, and that were confirmed by the ATP check are considered as receipt in the receiving plant at the confirmed date.
    Please refer KABA  1621912 - Transaction MD04: Requirements of stock transport orders are deleted after delivery is created
    and consulting note 207942 - MRP: Problems with requirements from sales order/delivery
    Best Regards,
    R.Brahmankar

  • Excise duty in Subconrtacting with components from another plant

    Dear SAP Gurus,
    I have a typical scenario in subcontracting. I have a company code 0001 which has 2 plants 1000 & 2000.
    Plant 2000 creates subcontracting PO against vendor XYZ for FG with Excise duty.
    However plant 1000 issues the component  which is excisable Material.
    Just to summarise the component issued from plant 1000 is excisable & FG to be received from Sub contractor in Plant 2000 is also excisable.
    Kindly guide.
    Regards

    Hi
    For plant 100
    1) Create a sub PO
    2) Issue the material th MB1B 541
    3) Create a excise invoice in J1IS reference document is step 2 doc.No need to create a Subcontracting challan as the excise Invoice would serve as a Legal document
    Account entries will be
    ED Suspense Dr
    ED Payable Cr
    ETT OTHR will be called
    4) Recieve the material in MIGO
    5) MIRO for processing charges only
    For plant 2000
    1) Create a sub PO with Excise duty
    2) Issue the material th MB1B 541 create a subcontracting challan in J1IF01 -No excise duty
    3) GR and J1IEX -For capturing and posting Excise duty
    Acc Entry
    ED Recievable Dr
    ED Clearing Cr
    4) MIRO for processing charged and Excise duties
    Regards
    Sandeep

Maybe you are looking for

  • After Effects quits unexpectedly on launch; GPU Manager Error

    Hello,      I've been searching the forums and haven't found an answer yet to my issue, although i have found some similar problems on older AE versions and older Mac versions.  Here's the symptom: AE crashes every time I launch it.  It used to work

  • Maximize on second monitor

    I wanted to maximize Safari on an external projector but I couldn't maximize on the second screen. So, I have the same problem with OSX Mail, Sparrow, etc. I've looked in teh options but couldn't find how to do that, anybody knows? Thanks in advance!

  • Do I have to install the updates to CS4 in order?

    Or does 6.0.5 contain all the updates in the previous 4 versions? Thanks, Harry

  • Trying to configure IStore in Jdeveloper

    HI All, I am trying to configure IStore in Jdeveloper. I followed 419887.1 to do it. But there is a step to zip all the class files, I am not able to understand it. Can anyone help me to configure istore ? Thanks a lot for your time. cd $COMMON_TOP/j

  • Concat String Values in an Update Statement

    Hi, i am having trouble with this SQL Statement. I do not understand why this is happening: Table1 (id int, text nvarchar(max)) Data: 1 , "xxx" 1, "www" 2, "yyy" 2, "uuu" Table2 (id int, text nvarchar(max)) 1, "aaa" 2, "bbb" The id field of table1 is