Hi friends ,
Can anyone tell me how to create capacity requirement..
When execute cm01 for a work center it is displaying the " No capacity requirements have been found for
selected periods" how to generate the requirement??
how to create capacity requirement
CM01 is a report where you can see capacity requirment of a perticullar work center.
As said by our other expert you need to create capacity during work center creation.
Now based on your usage of workcenter in routing sytem creates capacity req during mrp run (scheduling = 2 lead time scheduling),plan order creation and production order creation.
regards,
Dhaval
Similar Messages
-
CM02 Transaction is showing Capacity requirements in Hours
HI Guys,
I have a question in regards to CM02 transaction, Plz help me finding out what is wrong with it let me walk you through the step which I take
CM02 > Workcenter name> Plant
Click on Planning (Upper Left Corner) => Profiles > Option Profile and select SAPB023 which is Weeks (78)
Click on Standard Overview Tab (upper left Corner)
Select any one the week and hit Cap. details/Period
My problem begins here
IN Rem.proc column(Remaining capacity rqmts.for operation segment "Processing) it is showing as Minutes, however in Reqmnts (Capacity requirements) it is showing the same value as in Hour Unit with the same number for instance if the number is 30 min and Reqmnts column it shows as in hour.
Why it is showing Unit of Measure in Hours rather then Minutes and secondly, where this value is coming from.
Thanks In Advance.CM02 > Workcenter name> Plant
Click on Planning (Upper Left Corner) => Profiles > Option Profile and select SAPB023 which is Weeks (78)
Click on Standard Overview Tab (upper left Corner)
Now before you do the below step ,Go to Setting > General > Here you will geta Screen POP up for Settings: VAlue display
And here there is check box for the unit of measure for capacity
activate the check box.- and then follow the below stept. F1 details of this check box is self explanatory
and now you do the below step
Select any one the week and hit Cap. details/Period
Kinldy let me know the feedback'
reg
dsk -
How to calculate the Remaining capacity requirement in SAP Production Planning?
Hi SAP Guru's,
I would like to make report on Work center capacity with Remaining capacity requirement, available Capacity and Remaining available capacity requirements.
Can please let me know the Transparent tables for below Fields?
BEDAKT: Capacity Consumption Rest
OUTPUTLEN: Capacity Consumption Offer
SLIBELAS: Capacity load and
SLIDELTA: Capacity Unused.
Could you please help me accordingly
Regards
BhupalWrong space. Please move this to BW area.
-
Function Module to get a work center's capacity requirements (load) within a given period
Hi all experts,
Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
Selection Parameters: Work center range from and to, Period from and to
List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
Please help to provide some leads for a FM or the logic.
Best Regards
PhilipHello Philip
The following function modules should be useful:
- CY_PRIMARY_SELECTION - Function module for selection of orders for the work center
- CY_SECONDARY_SELECTION - Check for additional criteria
- CR_CAPACITY_AVAILABLE_PERIODS - Reads the available capacity from work center
- HR_PERSON_READ_TIME_INFO - Reads the available capacity from person (modification)
- CY_GET_PART_CAPACITY - used only for the first period to read backlog
- CY_LOAD_DISTRIBUTION - Distribution key
Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
BR
Caetano -
Function module to calculate capacity requirements of production order
HI
Hav a requirement to calculate capacity requirement for production orders like we see in cm50... does anyone know a function module to calculate capacity requirement?Hi All,
Just to reopen this issue, even I am looking for a similar functionality.
To reinstate the requirement:
I want to find shifts and corresponding capacities for a work center. These details are obtained from CR03 and CR13 transaction.
If possible do let me know Function module or tables for the same.
Debs -
Tables for PDS modes and capacity requirements
Does anyone know which tables store the Mode and Capacity Requirement data for SNP PDSs? In particular I am looking for the Mode Duration and Capacity Requirement Bucket Resource Consumption fields.
Thanks,
Laurence.Thanks Nanda,
I am unable to find this BAPI on our system (we are on SCM 4.1). Do you know the tables that store SNP PDS Mode and Capacity Requirement data?
Regards,
Laurence. -
Error in SAP APO Inbound: capacity requirement is invalid
Hi Experts
I am getting an error in APO Inbound in APO queue manager. The error text reads " Capacity requirement is invalid".
I checked for all the resources whether they have validity and also checked for mismatching control key. But these fields are allright in both ECC and APO system.
I checked note # 924562, but i am still not able to solve this issue.
Can you please suggest how should i debug this error?
Many Thanks!!
Regards
MansiHi Mansi,
Were you able to replicate the issue on which activity triggers this CIF error?
I remember a similar error which happened when converting planned order to production order where it was giving error"“Bucket capacity requirement has an invalid value” .
SAP had suggested to implement note 1381483 to fix this.
Thanks
Ajay -
Remaining capacity requirements scheduled for operation in Planned Order
Hi all,
I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
You can see the info in the "Detail Scheduling" of the planned order in MD13.
Anyone knows how to get the info? Any table or any FM to get it?
Points will be given for helping
Thanks in advance!Did you ever find out where the planned order capacity information lives? I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
Thanks,
Matthew Bruckner -
Repetitive manufacturing - CM01 Capacity Requirement
Hi All,
I configured repetitive manufacturing process with lead time scheduling.
Conf. at OPU5 is set as below
Rate.plng horzn - 999
SelID:rate plng - 02
Scheduling u2013 X (selected)
Generate Capacity reqs. u2013 X (selected)
Scheduling level - Via Rate based scheduling
Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates
For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates
I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
RegardsHi,
Select the correct profile in CM01. Menu->Planning->Profiles
Thanks -
Putting a production order on hold, removing capacity requirement
Hi,
I have a need to temporarily remove capacity requirements from production order because there is situation on the shop floor that caused the particular order unable to move ahead.
Capacity requirement shall be re-instated when the order specific production issue is cleared.
Is there a way to update a production order to release capacity requirement yet allowing changes to production order routing? I tried "LOCK" production orders but that will not allow me to change anything in the order.
Can I set up a user status + user exit to remove the capacity requirement? If so, how to?
Thanks all in advance!!!
Regards.Hi
Capacity requirement can be deleted when the following functions are carried out.
1.The production order is set to Technically Complete.
2. The deletion flag is set for the production order
3.The production order is locked
4.The indicator capacity requirement in the procdution order is reset and order is rescheduled
5.The capacity requirement is reset with fucntions -----Availability check---reset cap stock
Regards,
Sadan -
Hi
After creating Production order. In Control data tab what is the setting so that the calculate capacity requirement tick will come automatically.
Regards,
AnandHi All,
Nice to see the response for this post. All 4 replies are posted at the same time. Though the solution was the same, I like the attitude of the Forum members for their prompt reply for the posts & sharing their knowledge & experience.
Keep it up dear members. Special thanks to Rajesha vittal, Prasobh Karunakaran,YM Reddy,Krishna Mohan,Pradeep,Mangal,Nandakumar,Jaganathan Saravanan & Dharma for their active contributions.
Dear New members please close the threads if you are satisfied by the replies & reward the posts suitably, which will help all members to post prompt replies for our queries.
Have a nice day!
Regards,
Senthilkumar -
Capacity requirement and scheduling process
Hi Experts,
please explain me how capacity requirement and scheduling (please explain with configuration settings) will help in SAP PP.
Regards,
Bhaskar.
Edited by: basi123 on Nov 7, 2011 1:12 PMDear
Capacity Requirement Are those Which is used For Operation And Calculate the Time with help of Dervied Formulas
for instance i take an Example To Describe so that u get clear Picture
Ex: Suppose i have machine Drilling u assume that Drilling machine as a one capacity under capacity catergory
here to operate this i need to make my machine set up first then machine time i need to arrange a labour
so total i required Setup Machine Labour so Here in sap we define a standard value key with all these combination and there we will assign formula for HOW Much to Produce so on...... and in turn it is assigned to control key to perform all the Actions.....
Scheduling : Scheduling is Nothing but to sechedule Right time at Right job This helps in shop floor to over come overload on machines.scheduling used in
scheduling for Production orders
scheduling for Planned Orders
scheduling for Plant maintainence Order
Configuration :
1. Capacity Requirenemnt ;
SPRO>>>production >>> capacity requirement >>>> Define capacity catergory
2.Capcity planner
3.Define parameters OP7B
4.Assign this to OPCM
Scehduling
1. go to OPU3
With regards
Pushpalas -
Capacity requirement showing up in previous month in RCCP
Hi Experts,
I am doing RCCP through MC88. But when i am giving the sales quantity in January and generating a synchronous production quantity, the capacity requirement and load are shown in the month of December instead of in January.
How can i get the requirement and load in January, please suggest.
Regards
Sm.Hi Jiaul,
I cannot find a provision to change the profile dynamically from MC88 screen. This is possible in my understanding in capacity levelling/planning screens like CM38/CM01, etc.
But even in such screens the same problem remains. For example when i did LTP for this material with PIRs in Feb 2011, the capacity requirements in CM38 appeared from current period that is from 09.12.10, though my planning scenario was valid from 01.01.2011. I changed the period and evaluation period dynamically from the CM 38 screen, but that did not solve the problem as the requirement and load which was wronly showing up in Jan instead of Feb 2011 ( just as it happened in RCCP) merely vanished from the output and now i have the available capacity in Feb 2011 showing up but without any capacity requirement or load in the month.
Regards
Sm.
Edited by: Sm on Dec 9, 2010 1:02 PM -
Capacity requirement in workcenter.
Hi all
Please explain about setting for determining actual capacity requirements in workcenter.
Also explain how it is useful?Hi,
Capacity planning is divided into two components in SAP
1. capacity leveling
2.capacity Evaluation
Capacity Leveling
Following elements will create Capacity requirements,
1. Planned order with Lead time scheduling
2. production orders
Following elements will be used to calculate required capacity and Capacity Percentage:( Actual capacity calculation)
1. Work center formula
2. Routing Base qty.,activity times
3. Number of Individual capacity
4. production order/ Planned order Order Qty
Capacity Evaluation
Capacity evaluation is fully controlled by setting maintained in IMG 'Overall profile'
This is Just an overview about CRP.
Regards,
Velmurugan S -
Table For Capacity requirements
Hello Every one,
Does any body know the table which contains details for capacity requirements raised for a planned order and production order raised for a specific tme period for multiple capacity categories.
The table should contain or a logic should exist to link the following fields:
1. Planned order, production order
2. Capacity requirements
3. Capacity category.
4. Period
This is because my current uses capacities of 2 capacity categories (machine and labor) to plan production.
Sincerely,
AjiHello Aji,
Please find the tables:
KBKO Header record for capacity requirements
KAKO Capacity Header Segment
KAKT Capacity Description
KAZY Intervals of Capacity
KBKO Header record for capacity requirements
KBED Capacity requirements records
KBKO Header record for capacity requirements
KBED Capacity requirements records
KBEZ Add. data for table KBED (for indiv. capacities/splits)
TC26 Capacity category
Regards,
Alok Tiwari
Maybe you are looking for
-
Mail won't open after software update
I just did a software update (I think it was itunes update) and now mail won't open. Mail is still located in the apps folder. Message says to reinstall mail. Any ideas? Thx!
-
SolMan 4.0: error occured in persistence
Hi, We just finished the upgrade of solution manager 4.0 from solution manager 3.2 with WAS Java add-in 6.40. This system was a fresh clean install of solution manager 3.2. Thus, no customising or developments yet exist on this system. We are getting
-
Remediation problems in Captiveate version 6.1.0.319
The remediation does not work in the project I am workin on. Failure level: 1 Last attempt: Jump to slide Slide: 8 slide 8 If I answer the question correctly it works fine. If answered incorrectly I get the "incorrect: click anywhere.." and when
-
Hi I have a Dell 8200 desktop with pentium 4 1.8 ghz 256mb ram and 64mb nvidia gforce2 80gb drive. When I start up itunes 7.0 I get a message box that tells me that my itunesexe is set up on a slower version of windows. Turn off the compatibility mod
-
Constant problems with HP DeskJet 952C
This printer prints well, but somewhere along the line under OSX it became intermittent. I would try to print from Word, Safari, Photoshop Elements, or pretty much any program- and, after seeing the dialog box with "Opening printer connection," the j