Reg: inspection lot in MIGO

Dear all ,
can anyone have idea,
I have done GR against PO , My inspection lot has been created , But there is no stock Posted in the recieving plant.
so can anybody help me in resolving this issue

Dear Sunil,
Now you have to Tcode-QA32
In that input the following
Lot created on-Input the date on which inspection lot was created
In the field "Insp.lot origin"- select- 01
Under List Setting header
click the Radio Button on -Select only inspection lots without a usage decision
Now press F8 or execute
In the subsequent screen You will get the inspection lots created for that day,select the respective inspection lot & do result recording & usage decision,consult your QM consultant for more details on the same
While doing usage decision if you accept the goods then it will be moved from quality stock to unrestricted stock
After that you can check in MD04/MMBE -you can find the stock under unrestricted/blocked(based on the decision you gave in QA32)
Hope this is useful
Revert back if you have any further queries
Reward points if useful
Regards,
SVP
Edited by: SVP on Dec 17, 2007 12:54 PM

Similar Messages

  • Reg inspection lot cancellation

    Dear all,
    When I am cancelling material document of  GR (101) for a purchase order with account assignment-P
    (projects) and item category-S (third party) with insp type-01 , inspection lot is not getting cancelled.
    Where shall I make setting to cancel the lot.

    HI,
            GO to QA12 transaction code enter inspection lot -
    >Usage Decision----
    >Function -
    >Cancel lot

  • Avoid creation of Inspection Lot by MIGO

    Hi All,
    In some cases I want to avoid the creation of an Inspection Lot, It can be done by configuration.
    How can I do that?.
    I was thinking to change the "Status GR Doc." but In the badi MB_MIGO_BADI that field can by changed.
    Please any help??

    Hi,
    Check tcode OMJJ. Set a movement, and go to 'deactivete QM inspection..' and change the flag 'QM not active'. Read the documentation and the help on F1.
    I hope this helps you
    Regards,
    Eduardo

  • Reg inspection lot in Multiple specs

    Dear all,
    I am trying out Multiple specs scenario. and I have done all the steps  while I got a insp lot generated it is in CRTD stage,I want to know although created insp plan why I got the lot in CRTD and how to proceed the lot processing, For IP spec is 10-20 and for BP it is 21-30, insp plan created first then I have done a process order
    please give me step by step
    Thanks in advance
    Regards
    Madhav

    Dear Gajesh,
    Thanks for the response, Yes I am doing Multiple Specifications, although I created insp plan prior to the cycle, insp plan is not getting assigned to insp lot,is it a prerequisite that compulsorily we need to activate check box of material specification in QM view.
    please advice step by step
    Thanks in advance
    Regards
    Madhav

  • Create inspection lot move data from mseg to qals

    hello.
    When SAP create inspection lot from MIGO,  I need to move mseg-ablad ( uploading point) to qals-yyfield.
    In Migo we can have more than one pos, then system create differents inspection lot.
    Is it possible ??? are there any user exit to do that ??? i see user migo's exist  and inspecion lot's create, but in both cases i don't see all data to read an and move it.
    Regards.
    Antonio

    Namastey
    In my case i have Migo with more than one position, and for each position the system will create a new inspecion lot.
    Do you mean there are more than one Items in PO and for each Item there will be different inspection lot?
    Then,
    You need to get Material document number for inspection lot number and get MSEG-ABLAD which will be QALS-YYFIELD (YYABLAD).
    I hope, I have understood your question!!
    Amol.

  • Inspection Lot not generated, with MIGO 561

    Hello All,
    Please help me with this issue.
    WHen i do MIGO with 561, inspection lot is not generated.
    So there is a setting in spro, if we check that, inspection lot wont be generated.
    So now in my IDES, i tried to uncheck that box.
    When i save this setting, I get the following error.
    "Fill table key for table T156Q only up to position 010".
    Please help with this issue.
    Regards,
    Piyush

    To load initial inventory in Quality stock and release it using Inspection lot  UD,   use movement type 563 instead of 561.
    With 561 movement stock is directly posted to un-restricted status. So there is nothing to be released from Quality stock.

  • Inspection lot Error while executing MIGO

    Dear SAP Gurus,
    I have executed MIGO once for a particular material and vendor, for which i have activated inspection setup in material master. So I have successfully executed MIGO and also lot quantity for required qty in MIGO was listed in stock overview.
    Again, when i wanted to do MIGO for same material and vendor, I am get the following error msg: QA228
    " No inspection lot can be opened for this material and vendor"
    Please help.
    Regards,
    Prashanth Pai

    Dear Prashanth
    Please cancel the GR, now check the following
    1. material master qm view, did you add the 01 insp type, check , check the post to inpsection lot chk box is activated or not.
    2. check whether movemnent type 101 is activated for Insp lot creation during GR or not eithr inside QM for logistics or IN Txn OMJJ
    3. Ensure You already have the quality plans with Task assigned. Your inspection types should have the characteristcis assigend to it
    chk out all once ok then you do the GR
    regards

  • How to prevent MIGO when source inspection lot is either open or rejected.

    Hi
    How to prevent doiMIGO when source inspection lot for the vendor/material is open or the source inspection lot is rejected.

    Hi Sudhar,
    Please find the process steps for your question : 
    How to prevent MIGO when source inspection lot is rejected
    Go to Q-info record (QI02) for that particular material, vendor and Plant combination.
    1.Use Inspection Type 0130 for source inspection.
    2.Number of days ahead of lot to be created.
    3.Through transaction code QI07 run the manual program to create a lot.This source Inspection may be rejected as in your case.
    4.Control key contains the control on GR in the QM view of MM.
    In the spro>QM>QM in Procurement-->Define Control Key and assign it to MM.
    We can define here under Source Inspection Control that in case of GR for rejection-->GR not allowed.
    This will prevent MIGO if in case Source Inspection Lot is rejected.
    Thanks,
    Ravi.

  • Userexit for MIGO or COR6N  to update inspection lot ?

    Sub : I am looking for User exit or Badi for MIGO tcode.
    Who have good idea on this, please help me .
    I have to update the inspection plan ( in qa33, select one of the record --> "inspection lot" button on application tool -->  Insp. Specifications --> Usage field to be updated )
    Do I have any userexit which can do update this "Usage" field .
    Through "COR6N" tcode, I am trying for the user exit.
    Could you please help me.

    Hi Check below exits/BADIs
    Exit
    MGA00001                                Material Master (Industry): Checks and Enhancements
    MGA00002                                Material Master (Industry): Number Assignment
    MGA00003                                Material Master (Industry and Retail): Number Display
    Business Add-in
    WRF_DISCONT_PARAMS_I                    BAdI: Parameters in Fashion Discontinuation
    WRF_DISCONT_FACT_E                      BAdI: Follow-Up Actions in Discontinuation
    WRF_DISCONT_CHECKS_I                    BAdI: Scope of Check in Material Reorganization
    MG_MASS_NEWSEG                          User-Specific Fields & Segments in Mass Maintenance
    MATGRP_SKU_UPD                          BAdI for Article Hierarchy Connection
    CDT_CHECK_MATERIAL                      Checks for Existence of a Material in a CDT
    BADI_MM_MATNR                           Modification-Free Archiving Enhancement of MM_MATNR
    BADI_MATNR_CHECK_PVS                    Check Material for Use in iPPE
    BADI_MATERIAL_REF                       Addition of customer-defined default data for material
    BADI_MATERIAL_OD                        Integration of New Objects in Material or Article Master
    BADI_MATERIAL_CHECK                     Enhanced Checks for Material Master Tables
    BADI_GTIN_VARIANT                       User Exit for Customer-Specific GTIN Variant Check
    BADI_EAN_SYSTEMATIC                     BAdI for Internal Control of EAN Logic

  • User Exit for MIGO during inspection lot creation

    Hi Everyone,
    I want to change the vendor number in the  inspection lot while doing goods receipt for an outbound delivery in MIGO. Is there any user exit available to do this or can we do this in standard transaction?
    Please guide me how this has to be done.
    Regards,
    Sugopa

    i am working on 4.6c.
    This BADI is not present there.
    Any other solutions suggested.

  • No inspection lot can be opened for this material and vendor -QA228

    Hi every one !
    Iam  getting  Error while doing Migo -"No inspection lot can be opened for this material and vendor-QA228"
    we analyze the issue asfollow -
    1.checked Quality Lot-Available
    2.Quality info record- Availble
    3. Quality plan is exist.
    But stil throwing  above Error.

    Hi,
    Check the below threads,
    [No inspection lot can be opened for this material and vendor;
    [No inspection lot can be opened for this material and vendor;

  • Quality Management During Goods Receipt (Inspection Lot)

    Hi all,
    >>>>>>>>>>>>
    REQUIREMENT
    <<<<<<<<<<<<
    I have a requirement that i need to write an interface program which will receive a file from external agency (manufacturer) and process goods receipt until inspection results. The following steps need to be taken care of;
    1) Create a equipment (Utilities - It is an unique identifier for each unit of the material).
    2) Do Goods Receipt for the PO with the equipment numbers created.
    3) Create Inspection Lot for the material document created during the GR for each equipment number.
    4) Execute Inspection Result.
    >>>>>>>>>>>>
    INFO NOW
    <<<<<<<<<<<<
    Inspection lot can be created from MIGO directly by SPRO config and MM master data maintenance.
    >>>>>>>>>>>>
    DONE
    <<<<<<<<<<<<
    Called BAPI to create Equipment.
    Called BAPI to create Goods Receipt.
    Inspection Lot Settings to create lots during MIGO
    1) New Inspection Type Created as SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection types. The maintenance is a copy of type 01.
    2) Assign Inspection Type to Lot Origin at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection Lot Origins and Assign Inspection Types. SG1 is maintained against lot origin 01 with variant 01.
    3) Set Default values for SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Define Default Values for Inspection Type with parameters same as for 01.
    4) In Material master for the record set the inspection setup in the quality management tab. put SG1 as active and preferred. Also set Post to insp Stock, Insp with task list, Auto Assign, Skips allowed, Serial Numbers poss, Control Insp lot as For each Material Doc Item.
    I have to kow how to select the Inspection Plan for the lot and thus set the status of lot to released and get it ready for results.
    I also have BAPI ready for Inspection Result.
    >>>>>>>>>>>>
    TESTING
    <<<<<<<<<<<<
    I have tested it and was working fine till last thursday. I have the above mentioned settings even now in the system. Can there be anything else which the functional consultants would have change that affected the process. Anyways now the inspection lot is not getting created for the Inspection during MIGO and I am really struggling to find the exact reason.
    For your info, I am working mostly on Utilities and so do not have much idea about the quality management stuff.
    >>>>>>>>>>>>
    QUESTION
    <<<<<<<<<<<<
    Why the inspection lot is not getting created during MIGO for my scenarion?
    How to select the inspection plan in the program?

    deleted

  • Inspection Lot creation for the 103 movement type

    <<Don't ask for or offer points>>
    Dear Experts,
    we have the requirement of Creating the Inspection lot for the 103 movement type. we have done all the necessary settings for 103 movement type (in OMJJ and under the node   Quality Management --> Quality Inspection -->Inspection Lot Creation -->Inspection for Goods Movements) but still I am unable to achieve the results. Same is happening for 105 movements.
    Kindly let us know what settings need to be done in order to achieve the same.
    Full points will be awarded for the reply
    Regards.
    Edited by: Matt on Sep 18, 2011 4:44 PM

    Hi,
    If you have activated two inspection types (eg 01, 0101) of same inspection lot origin (01), in material master you should  have a preferred indicator set for the inspection type for which you want to be selected when you perform goods receipt.
    This check box is available in the inspection type set up in the Material master.
    Also check whether the post to inspection stock indicator is set for the material (in the inspection type), then only material will be posted to inspection stock.
    Please confirm, what happens to the stock after making MIGO. check in MMBE and confirm
    Go through the link and maintain the necessary settings. I think default settings for 01 type should work.
    http://help.sap.com/saphelp_470/helpdata/en/2d/350e4d448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Inspection lot creation during STO return

    Hello Gurus,
    is there a trick to trigger inspection lot creation during STO return ?
    Scenario is the following:
    1 - Creation of STO
    2 - Supplying plant ships materials... stock in transit
    3 - Receiving plant receives materials
    4 - Materials with defects -> Receiving plant add new line with return tick on the same material
    5 - GI from Receiving plant... stock in transit
    6 - Supplying plant receives materials -> Inspection lot has to be created
    I used inspection type 08 on Receiving plant w/o success.
    Many thanks.
    Stéphane

    No inspection lot is created when we return Materials to Vendor (Plant A) even if we maintain Inspection type 02.
    Before STO customizing, Plant B creates a subcontracting purchase order. Next Materials are sending to Vendor (Plant A) and put in "Stock provided to vendor" (Transaction ME2O).
    Vendor (Plant B) creates a Repair request (Sales document / Transaction VA01). Next run VRRE to reveice Materials to repair. Inspection lot is automatically created. The usage decision triggers the creation of Service order to manage all the repairing flow. Last step is to deliver Materials to Plant A and create Repair invoice.
    Repair request supports all repairing flow (inspection lot, service oder...), especialy status (out of warranty or not).
    After STO customizing, I expected the following result:
    1° - Return STO to Vendor (Plant A) / ME21N with return tick
    2° - Plant B ships Materials / MIGO wih 101 (SAP converts in 161)
    3° - Stock in Transit
    4° - Materials receive to Vendor (Plant B) / VL10B
    5° - Creation Inspection lot
    6° - UD triggered Service order creation
    7° - ...Repairing flow with Service order...
    8° - Materials ship to Plant B
    9° - Repair invoice
    10° - Stock in Transit
    11° - Plant B receives Materials
    As I said, there are 2 blocking points:
    - Inspection lot not created when Vendor receives Materials
    - Service order not created automatically (because no Repair request to support inspection lot, service order...)
    Thanks a lot for your help.
    Tell me if you have any questions.
    Stéphane

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

Maybe you are looking for

  • How to set-up BO Xcelsius Enterprise in a layered SAP BW landscape

    Dear all, We are implementing BO Xcelsius Enterprise next to an existing SAP Netweaver BW landscape (including SAP BW 7.0). We want to use the direct Xcelsius-SAP BW connection using the BI Consumers Services from EHP 1. Currently we're using a 3 sys

  • Help in sql query

    Hi all, I am trying to fetch a value from table 1 if there is no record on that table , then i need to select from table 2 Can we do this in a single query without using exception or cursors thanks

  • When to use IN Queue and When to use OUT Queue

    The architecture that we have is Client publishes the EDI 272 data to FTPS Server. We have ESB configured to pick the EDI data from FTP location, construct the B2B Header message and send to B2B. The B2B translates the EDI raw data to EDI XML. BPEL r

  • What is happening about fixing the bug that prevents me from downloading the updated version of Muse CC 2014

    I managed to upload to an external host server (Vidahost.com) but it only only showed an older unmodified version of my site. I used the FTP upload and selected ALL files then tried to upload modified files only. Here is what I received: 'This site w

  • No response from server error when transferring files

    Hi, I just changed my website over from a windows based server to a linux one. I wasn't having any problems and now I can't get my files to load onto the server. I contacted the server provider who has tested things on their end and say the problem i