Reg. Mass update of Planned order components

HI all,
I have a requirement wherein I will come to know the raw material consumption from storage location only at the time of production.
Now what I am doing is before doing confirmation I am updating the storage location for particular component in the planned order change mode - md12.I am doing this because the  production confirmation is happening at External system and transferred via IDOC to SAP.So I cant add the sloc at that time.
I am doing the changes to planned order one by one. On an average I am doing this for say 50 Planned orders which is time consuming
Is there any option available in SAP to do mass change to the planned order components.
Regards,
MBN.

Hi MBN,
You can use the LSMW, BDC program or FM MD_PLDORD_CHANGE_COMP_ITEMS to update the storage location in planned order components.
Regards,
R.Brahmankar

Similar Messages

  • Mass creation of planned order

    Hello,
    is there a way to mass creat a planned order for a finished product? having same FG mat, plant and prod version.
    Thanks

    Dear
    1.Goto MD61 with User parameters like Plant , Requirement type , Version and Planning Date .Then Select the Material Radio Buttion with FG item code .
    2.Enter the FG qty as required in each month as demand
    3.GotO MD02-Single Item ,Multi Level with indicator : NETCH , 2,1,3,3,2   and Execute the MRP to create the Planned order  for FG
    4.Check the result in MD04
    There is no SAP Standard Traction to Mass creation of  Planned Order .That is possible in Demand Creation and MRP run .
    Regards
    JH

  • Planned Order Components Table

    I have a question. Is there a table that holds the components of a Planned Order?
    When I see the technical data of a component field in MD13 it tells me they are in MDPM, but this is a structure, not a table.
    that made me think that perhaps this is being fed directly from the BOM. But when I make a change to the BOM, the components in the planned order are not automatically updated.
    So they must be stored somewhere. Anyone knows which table it is?
    Otherwise, what FM can I use to fetch them?

    Fernando,
    You can get the components list of a planned order in RESB table for field PLNUM = Planned order number and BDART = SB.
    Regards,
    Prasobh

  • Error while mass conversion of Planned order to production order

    Hi All,
    Thanks in Advance for help. We are facing one issue since Oct-2011.
    We have set up batch jobs for early morning to convert planned orders in to production orders. This is set up for transaction COHV.
    We have both MTO and MTS scenario.
    But problem occurs in Make to Order (MTO) scenario.
    Error comes in ST22 as   " SAPSQL_ARRAY_INSERT_DUPREC"
    *..Reservierungsköpfe inserten
      IF NOT rkpf_i[] IS INITIAL.
        INSERT rkpf FROM TABLE rkpf_i.
      ENDIF.
    Note : This error is not coming on consistent basis, it comes randomly. Secondly we are not aware of the reason/root cause of this error, hence not able to replicate error at all on Quality server.(Quality is backup of production till nov-2011)
    Writing to SAP, they debugged and provided note 504255. A part of that note says "Remember that this note describes a MODIFICATION which differs from
    the standard behavior of the system. Therefore, the customer assumes
    the responsibility for the implementation of this source code
    change. Due to this reason, SAP AG does not provide any support or
    maintenance for the changed source code."
    Hence client is reluctant to implement that note.
    Can any one help us out on
    1) What can be the cause of error as mentioned above?
    2) Resolution apart from SAP note?
    Best regards,
    Ravi Davda

    Hi Ravi,
    I am also facing same kind of issues from past couple of months.
    Sometimes this issue come up as sales order credit ststus is not approved and some times it happens due the following error INSERT rkpf FROM TABLE rkpf_i..
    I am also looking for some permanent solution.And today I have also faced same error and will be converting it manually.
    And can you tell for which client you are working?And if you find any solution for this please update me
    Regards
    Punjabi

  • Mass Processing of Planned orders

    Hi all,
    We can do mass availability check for the planned orders and we can firm the planned orders for which the materials are available through COHV but can we have a output log after the mass processing so that we can see the list of planned orders got firmed and for any other messages.
    Regards
    Kumar

    Dear,
    In COHV or COMAC.
    in mass processing gtab page
    select function = material availability check, execute it.
    In selection tab page
    Plant
    Order type
    System status - MSPT.
    Or
    Start the report PPCOXPR1 with the T.code SE38
    Then try with Tcode CO24..
    Regards,
    R.Brahmankar

  • Mass updates in sales order for Text note

    Hello,
    I have 1200 open sales orderswhich needs updates for
    Delivery Priority
    Delivery Blocks
    Billing Blocks
    Incoterms
    Shipping notes
    I can update first four items by MASS Tcode. Hoever, Shipping notes can not be found in MASS. While making Delivery of these pending order Shipping Notes is to be added which is different from standard. It can be achieved by CATT.
    I shall appreciate if you have any idea about some other easy/standard options available.

    Hi
    You Can update the sales order texts by the following methods
    BAPI --BAPI_SALESORDER_CHANGE
    LSMW
    BDC
    ECATT
    regards
    Prashanth

  • Reg : NO UPDATE OF SALES ORDER FROM PO erroer I0 114

    hi experts,
    while creation of PO with reference to PR,user gets error " NO UPDATE OF SALES ORDER FROM PO erroer I0 114 ".
    What could be the reason for this error?any idea...
    rgrds...

    Hello Jurgen,
    here the error message is " NO UPDATE OF SALES ORDER FROM PURCHASE ORDER  error I0 114 " .
    is there any solution for this issue.user looks frustrated because its working for one PO and the next PO its showing error.
    Rgrds.....

  • Change Planned order components

    When we change a component in a planned order that is different from the manufacturing BOM, is there a way to distinguish what component was changed.

    Hi Ramesh,
    There is no transaction available to compare Production Order component list to BOM Component list. You need to create a Z report for yourself.
    If it is just comparing 2 BOM's then you can use transaction CS14.
    Hope this helps...
    Regards,
    Prasobh

  • Mass Firming of planned order

    Dear gurus,
    I am looking for any tool by which i can make firming of collective planned order.
    Thanks,
    Das

    Hi Das,
    In SAPAPO itself, there are standard t-codes to carry out these options.
    1) /SAPAPO/RRP_SNP2PPDS - Conversion of Supply Network Planning -> Production Planning
    2) /SAPAPO/SNP2PPDS - Conversion of Supply Network Planning -> Production Planning in Background
    3) /SAPAPO/CDPSB0 - Production Planning Run  - To convert planned orders to production/process orders
    4) /SAPAPO/CDPSB1 - Production Planning Run in the Background - To convert planned orders to production/process orders in background.
    Regards
    R. Senthil Mareeswaran.

  • Wrong update of Planned order

    Hi,
    I have a requirement.I have created a ztable which has start date
    and end date.
    Sap standard flow.
    1) Create a sales order using transaction VA01.
    2) I execute  MD01 for MRP run.
    3) I go to MD04 with the material and plant agaist which
        i have created a sales order
    4) Planned order is created.
    5) I modify Start date or End date of Planned order using
        transaction MD12.
    6) Again i execute the MD01 transaction for MRP Run
        an Planned order gets modified.
    My Business requirement.
    1) Create a sales order using transaction VA01.
    2) I execute  MD01 for MRP run.
    3) I go to MD04 with the material and plant agaist which
        i have created a sales order
    4) Planned order is created.
    5) I execute a zprogram in which i call 
        BAPI_PLANNEDORDER_CHANGE to modify the
        Planned    order .Order start date and Finish date come
        from    the Ztable.
    6) Again i execute the MD01 transaction for MRP Run
        but instead of modifying the  Planned order new Planned
        order gets created.
    In Zprogarm i have done coding in Following way.
    1) Called transaction MD01.
    2) Called  BAPI_PLANNEDORDER_CHANGE to modify the
        Planned    order
    3) Again called transaction MD01.
    Kindly help me in why new planned order gets created instead of modiying existing planned order.
    Thanks & regards,
    Chetan

    Thanks

  • Mass Update for Purchase Order & Sales Order Text

    Hi,
    Can be change the Purchase Order & Sales Order Text using MASS.
    Regards,

    Hi,
    I am also surprised by the behaviour of the BDC.
    This is first time when I am facing the problem since I have been using SAP.
    I am able to update the PO Text manually , but BDC is giving the problem for only few Materials.
    It does sound stupid, but this is the fact here with me.
    Regards,
    Edited by: PK on Nov 5, 2009 12:58 PM

  • Improper set up group updation in planned order

    Hi,
    In Master recipe we assign set up group to the set up phase i.e. phase 20 (Superior operation 10). Same is transfered to APO PDS.
    In APO Planned orde normal strcture of order is operation 10- Setup group displayed. Operation 20 Set up group displayed.
    For one particular product we are unable to see any set up group for operation 10.
    Any help for this
    Regards,
    Santosh

    Besides Stick's suggestion, make sure that the plan is a "Production" plan.
    Also see the "Release Time Fence" section on http://download.oracle.com/docs/cd/A60725_05/html/comnls/us/inv/mrpattr.htm
    Also see http://download.oracle.com/docs/cd/A60725_05/html/comnls/us/mrp/planco03.htm
    Hope this helps,
    Sandeep Gandhi

  • Is there some way to mass update the planning calendar (MD25, MD26) ?

    I can find no standard mechanism to do this.  I would be willing to write a program, but still need some function or method or whatever.  Is there something to do this?

    dear friend,
    as far as i know there is no standard way.
    the best approach is to write a custom code.
    you would look at the the following includes:
    MM61IF90
    MM61IF50
    MM61IF40
    good luck!

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Planned order scheduling mass update

    Hello all,
    Is there a way I can change the scheduling dates for the planned orders collectively. (not MD16) ?
    Thankyou

    Hi,
    check the following
    Mass Changes of Planned Orders (Action Control)
    Use
    You can use this function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
    Features
    SAP supplies the function module MD_SET_ACTION_PLAF for action control.
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Confirm planned order (in repetitive manufacturing)
    Firm planned order data
    Firm planned order components
    Print component overview
    In connection with an action, you can always change planned order data, for example; order quantity, dates or production version.
    The function module also enables you to program further customer-specific actions.
    You can execute the actions for several planned orders simultaneously.
    You can create action chains, that means, have the system execute several actions in a single operation.
    Activities
    Define your own actions and program a report that includes these actions. As an example of this, the transaction MDAC Execute action for planned order (MRP ® Planned order ® Execute action) is available.
    In this example action, you can use actions only for individual planned orders. Nor can you form action chains, only simple action transitions are possible.
    Determine an action key and action controls in Customizing for MRP in the IMG activities Define action key and Define action control. An action key describes the actions that can be executed for a planned order. Action controls determine which actions are allowed and in which sequence they are to be executed.
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Regards,
    nandha

Maybe you are looking for

  • Using a TV

    I have a Mac Mini which I use for both home office and media center. When just working I use my Thunderbolt Display, works like a charm. I want to use the HDMI for connecting to my Samsung HD TV. Only thing is when I connect the display is always "on

  • Not able to see stack trace in JBoss IDE for eclipse2.0

    hello im using JBoss IDE for eclipse2.0 version for developing application. but the problem is im not able to see the errors/ error stack trace coming on console.i configured console but im not abloe to see any error. actualy earlier i was using ecli

  • Attachments with FI documents

    Hi Experts, Could you please give me some idea how to attach documents, with FI documents? My problem is, there are some FI docs with which some attachments exist, But for some others it's missing. No body (FI consultants in our project!!) could not

  • Java or C++ for desktop applications

    Help needed! We are a team of 5 programmers in a state agency who deal with federal contracts. About 70% of the applications we build are desktop applications. One of the team members strongly believes that learning C++ instead of Java would strength

  • One BR to copy data in two plan type

    Hi, I encountered this problem with the business rules. In order to run the what-if scenario analysis, I would like to be able to copy the data from one version to another version using a business rule. However, currently I have two plan type within