Reg:Material Ledger

Hi All,
Please any body Guide me the following Issue & Please give me any Cofig Doc for Commitment Management.
Valuation area 1101 not yet productive with material ledger
Message no. C+020
Diagnosis
The material ledger has been activated for the valuation area but material data has not yet been converted in this valuation area.
Procedure for System Administration
If you want to work with the material ledger, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Utilities -> Production Startup.
There you can convert the data for the material ledger by following the instructions in the online documentation.
Note
Setting the material ledger to productive cannot be undone.
See also:
Actual Costing/Material Ledger in the SAP Library.
The implementation guide for Actual Costing/Material Ledger.

Hi,
It seems you had not done costing activities on materials soon after its creation.
Remember one thing if *material Ledger* is active in your company code then you will have to perform some costing activities soon after the creation so that at the time of PUP (Periodic Unit Price) costing run all material s will be costed and if some variances are there will get settled.
I think u had not done CKMM soon after creation and u had done some postings thats why system is not selecting your material.
Thanks
Deepa

Similar Messages

  • Reg: Material Ledger Account posting

    Hello Everyone,
    We have Material Ledger active for a plant with transaction based price determination (Price Control V). I have posted a GR & its creating 2 Accounting docs. One with Transaction keys BSX, WRX & PRD.
    WRX is calculating correctly based on the PO price. But, I am not sure how BSX is calculated as its not picking the Periodic Price unit in the current period.
    Could you please guide how account posing (GR & IR) will happen for a material with Price control V & Material Ledger active.
    Thanks in Advance,
    Uswin

    Hi Uswin,
    if you look at the second FI document generated upon the GR, I'm pretty sure you will find that in this document, the price difference from the first document ist "reversed" and the amount added to inventory value, correct? So the end result is the same as it would be without material ledger (GR valued at PO price), it just happens in two steps. Therefore, what Frederick said is not 100% correct, as only the end result is the same with and without ML for V/2 materials, but not each single document.
    Secondly, as to why the PRD arises on GR.
    In my system I found the same case. A GR with a PRD posting for a material with price control V and price determination 2.
    In my case I found the PRD to be in fact a rounding difference, which arose in the following way:
    Price in PO was 57,78 u20AC/10 pieces. The price unit in material master, however, is 1 unit.
    Now what the system seems to have done is:
    (1) round the price in PO to the price unit from material master: result: 5,78 u20AC/piece
    (2) Post 5,78 u20AC * pieces received to stock value, the difference (5,778 - 5,78)*pieces received to PRD account
    (3) POst a second document reversing the PRD and addig it to stock value
    Perhaps, the reason for a "price difference" arising is similar in your case
    Regards
    Nikolas

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • MM closing period problem when material ledger is activated

    Hi!
    the MM period is opened for period 7,2010, now we want to close that period and open period 10,2010 ( this is sand box system only, so no one used from last 3 months), but when I am executing MMP to close period 8 ( as we have to close periods till 10th period) , system is giving erros saying key duplicate records are not allowed in table "ckmlkev" ( as material ledger is activated), in this table already periods are existed till 9,2010 for all valuation areas.
    Now how to close 7th period in MM ( MMPV)?
    can any one suggest alternative ways?
    regs,
    ramesh b

    Hi,
    As it's your sand box and you don't need to fix the root cause of the error, try to execute MMPV with option "Close period only".
    Regards,
    Szymon

  • Effect of Activating Cross company costing in Material Ledger

    Hi all,
    We are live with ML from seven years and now we want to activate cross company costing. I would like to know if there will be an impact of this in the material ledger side. If anyone has comeacross this situation please share your ideas about this.
    Thanks,
    Santosh

    thanq for reply.
    IF I can update standard price in 3 views, how can i see three standard prices in different views?
    I am facing another problem also here.
    we have 3 company codes and 3 plants like VN01,SG01,IN01.
    When I am doing standard cost estimation for IN01 with group costing variant for group valuation, I am getting error "Object was not costed", but where as If I use standard costing varaint ( PPC1), I am not getting any error, system is showing correct standard cost estimation?
    Where as If I use group costing variant for other company codes, I am not getting any error.
    Is there any customizing missed regarding standard cost estimation, when material ledger is activated?
    regs,
    ramesh

  • Material ledger is not active in valuation area C002

    Dear All,
    I have a Scheduling Agreement for a material 'A' with Vendor 'V' with diff prices with validity dates, I did the GR & when i am posting the invoice thro' miro, system is throwing error as above Material ledger is not active in valuation area C002 Why should I activate the material ledger here ? Pls suggest how can i solve this ?
    regds,
    Kallu

    Hi
    For a Particular material, Material Ledger is active or not? Can be checked in Accountig view of Material Master.
    Why we need Material Ledger?
    A fundamental task of the material ledger is carrying inventories in multiple currencies and/or
    valuations.
    Material inventory values are normally carried by the SAP system in one currency. The material
    ledger component enables the R/3 System to carry inventory values in two additional
    currencies/valuations. Therefore, all goods movements in the material ledger are performed in up
    to 3 currencies or valuations. Currency amounts are translated into foreign currencies at
    historical exchange rates directly at the time of posting. Businesses such as those in highinflation
    countries can therefore carry their inventories in a more stable currency (such as US
    dollars). This reveals inflationary effects on inventory values.
    If you use transfer prices to represent value flows in your company in different
    valuation views, you must use the material ledger. This allows you to carry your
    inventories in three different valuations (legal valuation, valuation for reporting
    purposes, and profit center valuation).
    Before activating the material ledger, make sure you know which currencies and valuations
    you want to use, because you cannot go back and change the setting.
    Activating the material ledger is a prerequisite for using multiple valuations.
    Thanks
    Raman

  • Material ledger is not active in valuation area S001

    Dear All,
    I have created a Scheduling Agreement & did the GR. When I am doing invoice posting system is throwing error as Material ledger is not active in valuation area S001
    What might be wrong here ? For same material if I create PO then everything is working fine. Problem is only with SA.
    regds,
    CB

    Hi,
    Please check your Material Ledger Activation  setting for the Valuation AreaC002 in T-code OMX1. The Check box for the ML activation against the Valuation Area-S001 may be ticked.  After activation/ticking this box, T-code CKMSTART was not executed to complete the ML activation.  If you want the activation of Material Ledger, you have to run T-code CKMSTART to complete this ML activation or Otherwise uncheck this box.  I hope this step will resolve your issue.
    Regards
    appalas

  • General  Ledger Special Ledger out of balance *URGENT* Material Ledger???

    We've activated Material Ledger in a company code in Jan'07.
    Accounting document created because of 102 Movement type FI document looks fine but in Special Ledger document dollars against Group currency are posted to Price Difference account? This is not happening for all 102movement type documents but i couldn't establish the pattern! Any help would be highly appreciated.
    Some background: 
    Company code and Controlling Area both got USD as main currency.
    This problem is sporadic and with 102 movement type only.
    Materials causing issue got Price control 'S' and Price determination '2"

    Hi Raghu,
    Probably I am mistaken; I was talking about SPL field movements and user exits used there. you can check that through transaction GCB2 where ledger is assigned to a company code and then u can drill down to activity and field movement assigned to the activity and can find if a user exit is used to post to a price difference account.
    Let me know if I am talking about relevant stuff here. If it is with SPL then I can help u more.
    Thanks,
    Kumar

  • GR/IR account problem with material ledger

    Hi,
    I just found an issue as effect of material ledger implementation.
    after the material ledger is active, when we post a transaction in foreign currency (invoice receipt), the LC 2 amount of GR/IR account is somehow different from the document amount, and the difference is transferred into Material price difference account that we maintain in OBYC - PRD transaction.
    because of this, the LC2 amount of  GR/IR account can't be cleared.
    any suggestion, please?
    thanks,
    Nasikhin

    hi,
    It will affect your valuation for the document, which are still open..
    You shd run this only after closing all documents and completing whole MM cycle..
    Once this is run, you can't go back and make settlements...
    So, beware...
    Regards
    Priyanka.P

  • Material Ledger Unit Of Measurement different from Material Master

    Dear Team,
    In my client, there is a difference between unit visible in CKM3N and MM03. The base unit of measurement in MM03 is MT. Other than that, there are some other units maintained (not M3) in additional data tab in material master. In CKM3N, the visible unit is M3. M3 is not present anywhere in MM03.
    Why would such unit flow in material ledger table? (CKMLPP has unit M3). Please advise.
    One more observation is that when there is some price change document in Material Ledger, the proper UoM (MT) is being captured. Only in the basic price determination structure visible unit for each head is M3. Please check the attached screen shot.
    Any help would be appreciated.
    Thanks.
    Jay Shah.

    Hi..
    Refer to Data Inconsistency of BUOM in Material Ledger Tables

  • Material Ledger - confirmation in different months

    Hi Gurus,
    I have a problem as follows:
    We are using material ledger for actual costing. When we post partial confirmation for a production order in period t, goods receipt and goods issue is posted for period t. However, in some cases, confirmation is posted although one material has not arrived at the factory yet and that material is not assembled on the finished product in period t, but it is assembled in period t+1. In this case, when we close material ledger, we receive an error as "there are nondistributed rows" in transaction CKM3. How can I solve this problem either in logistics side or financial side?
    Thanks and cheers,
    Fatih Zenginer

    Hi Faith,
    Are you familiar with transaction CKMVFM - Value Flow Monitor? You can analyze Not Distributed differences with this transaction. The price limiter is the key.
    Thanks,
    Greg

  • Valuation area not yet productive with material ledger

    While doing goods receipt at MB1C,i got the below error:
    The description of the error is given below
    Valuation area XXX2 not yet productive with material ledger
    Message no. C+020
    Diagnosis
    The material ledger has been activated for the valuation area but material data has not yet been converted in this valuation area.
    Procedure for System Administration
    If you want to work with the material ledger, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Utilities -> Production Startup.
    There you can convert the data for the material ledger by following the instructions in the online documentation.
    Note
    Setting the material ledger to productive cannot be undone.
    See also:
    Actual Costing/Material Ledger in the SAP Library.
    The implementation guide for Actual Costing/Material Ledger.
    Can you kindly suggest me how to fix this error.
    Regards
    Sabera

    Hi Sabera,
    The Valuation Area is not activated for your material ledger. Go to SAP Access>>Accounting>>Controlling>>product cost controlling>>Actual Costing>>environment>>Production Start up>>Set Valuation area as productive.
    If you already activated Valution area in to Productive Statge.
    Then go to T.Code OMX1 and for your valuation area XXX2 tick the ML activation box.
    the error wont come
    regards
    srikanth

  • Material ledger Tables

    Dear All,
    Issue: Not able to post Good receipt due to the error that material does not exit.
    Background:  we have activated user exit in material master for material type ZROH and assigned a internal number range to it in MMNR. this user exit will append the material group mentioned during master creation in the internal code generated by system.
    example PPMM is the material group and the internal code generated by system is 122222 so when we save the material in mm01 our material code is PPMM122222.
    we are trying to do GR by 501 and now the material ledger function module is truncating PPMM from the material code and its trying to post document with 1222222. which then goes into error that material does not exist.
    Analysis: I have checked in the MARA/MARC the material code is PPMM1222222.  but i guess in some table whcih is relevant for material ledger system has stored internal material number 1222222.
    So I am looking for tables or solution for this isssue

    Hi Expert,
    Please refer the SAP Standard Material Ledger Tables:
    The following tables contain data that can appear in the material ledger documents:
    Table - MLHD - Material Ledger Document: Header
    Table - MLIT- Material Ledger Document: Items
    Table - MLPP - Material Ledger Document: Posting Periods and Quantities
    Table - MLPPF - Material Ledger Document: Field Groups (Posting Periods and Quantities)
    Table - MLCR - Material Ledger Document: Currencies and Values
    Table - MLCRF - Material Ledger Document: Field Groups (Currencies and Values)
    Table - MLCRP - Material Ledger Document: Price Change (Currencies, Prices)
    Table - MLMST - Material Ledger Document: Costing Run Header Data
    Regards,
    GK
    SAP

  • Issue with Standard Cost estimates / Material Ledger

    Background:
    We have been using SAP for the last 5 years with Material Ledger active. Due to a number of reasons, we have not revised its standard cost estimates from 2001 till now. This means that at month end, we do not mark and release prices as recommended, nor do we mark prices and use dynamic release.
    What Happened:
    A new material called PFSW3 was made. This is a FERT. Before production
    could start my team released the standard cost estimate for this material. Production was now able to proceed without problem. Then, when the time came to sell the material (VF02), SAP again raised the error 'cost estimate not found'. On checking the standard price in MM03, we discovered that the future cost estimate was missing. So we created and marked a new cost estimate in the middle of February 2007.
    Problem:
    When the first sale took place, SAP released the marked cost estimate and posted a Price Change document to adjust for the new standard cost. I understand this was due to dynamic release. Now, when month end came, the system settled all the production orders of material PFSW3 but did not do multi level costing on it.
    Internal Investigation:
    My team has determined that the material PFSW3 has price determination 2 set by mistake. All our other production materials (HALB and FERT) are
    set to price determination 3 in the material master (accounting view).
    Questions:
    To sum this situation up,
    we need to know why the material PFSW3 was not marked closed in its period status (CKM3) at the time of closing through CKMLCP?
    What are the implications of not closing this material in Feb 2007 (current period status is showing 'Quantities and values entered')?
    How can we close this material this month?
    The future cost estimate is again missing for PFSW3 in March 2007 and I
    fear we are going to face more problems as this material is sold to customers.
    Please respond this is an urgent issue.

    Dear Shumyl,
    Please, have a look at Note 645083 - Material period status set to "Closing Entry Completed" that might help to closing your material in previous period.
    Hope it will be useful.
    Regards,
    Flaviano.

  • VPRS Cost in Material Ledger

    hi all,
    i have some problem here.
    we use 2 local currency. first local currency is IDR, and second local currency is USD.
    our client use material ledger, so in material master accounting 1, we maintain 2 value of inventory (in IDR and USD)
    let say we create material XXX (using standard price)  in 01 jan 2011 , with IDR value 1,000,000. the system will convert to USD with exchange rate in 01 jan 2011 (which is 10,000). so the USD value will be 1,000,000/10,000  = 100 USD.
    then in 10 january 2011, Sales order is created for material XXX with document currency USD .
    cond type VPRS get 1,000,000 IDR and covert to doc Curr (USD) with exchange rate in 10 jan 2011 (which is 9,000).
    so the VPRS value in USD will be 1,000,000/9,000 = 111,11 USD.
    by this case, the VPRS value in sales order is DIFFERENT with value in Material Master. it also become a problem when we want to see PROFIT MARGIN.
    can  cond type VPRS get the correct USD value according to Material Master?
    thanks.
    Best Regard,
    Hendry

    Please check the following notes which may help you
    a)  Note 547570 - FAQ: VPRS in pricing
    b)  Note 640692 - Currency conversion VPRS
    c)  Note 1365939 - VPRS logic and Customizing settings in SD
    thanks
    G. Lakshmipathi

Maybe you are looking for

  • Error while trying to access to the XI  tools

    Hi all, I am trying to access to the XI tools and i get the following error: 'Error 403 You are not authorized to view the requested source.' I am using a userid/pwd already created in su01 and i think it will be a issue related to roles or permissio

  • Physical disk not showing up in Disk Utility

    I'm in the process of selling my mac mini. I went to the disk utility and erased per the instructions here: http://support.apple.com/en-us/HT201065 The only thing I did differently was I adjusted the security settings to do a pass of writing zeroes. 

  • Java Uninstall Problem

    Java Uninstall Problem This all came about because of a failed uninstall, using Your Uninstaller. The {Java runtime which is all I want) is not listed now & I tried all the other fix bad uninstall type features, all to no avail.} ) When I DL & run th

  • Pre + Wish List: My first 6 suggestions

    I have been using my Verizon Pre +  for a couple of months and some things have moved up on my wish list. For starters: 1. keyboard control to delete moving forward as well as backward. For example [orange key (now gray)] + [<- ] 2. keyboard control

  • Using unlocked IPhone 4 from Canada in Russia

    I have bought IPhone 4 in Canada (MC603C/A) and I want to use it with a Russian (MTS) SIM card. When I insert this SIM card my IPhone writes "no SIM". I have cheked this SIM - it is working. Please help, What I need to do?