Reg: measuring point creation and measuring point counter creation

how to create measuring point and measuring point counter.
what is the difference between these two.
what is measuring point category,
what is measuring point
what is measuring point object
what is measuring position.
can anyone explain me in an easy for better understanding.

Firstly a Measuring point is nothing but, a factor which you measure on an equipment/FL. (Temperature, Vibration etc)
Then, a measuring point is created either on a Functional location or on an Equipment.
IK01 is the T-code for creating it.
If it is for F/L you have to use IFL as measuring point object, when it is an equipment you use IEQ
Generally these two will be in use.
In the IK01 screen if you tick the counter checkbox, the MP becomes a counter.
Example for simple MP is temperature.
And example for a Counter MP is 'Litres of petrol consumed'
In the first case you don't need to add the temperature measurements, whereas in the petrol consumption you may wish to have the cumulative value of readings taken for a period of time.
The measuring position: Example : If you are measuring the temperature of a Motor on the Drive side, you may put 'Drive End' in this field, or similar many applications.
Category would group these MPs.
In case of need you may define in customisation a sep[arate MP category.
Then each time you read a MP through IK11 or other methods a Measuring Document is created.
Regards
Jogeswara Rao

Similar Messages

  • How do I switch to "Add Anchor Point Tool" and "Convert Point Tool" with shortcuts? (CS6)(Windows 7)

    I would like to know if there’re shortcuts to switch to" Add Anchor Point Tool" and "Convert Point Tool" on Photoshop CS6 while using a Windows 7 PC.
    Thank you for your time!!

    What I usually do is use the pen tool. Clicking anywhere on the path adds points, clicking on a point removes it and holding down the alt key while over a point is the convert point tool. Ctrl key is the direct selection tool and ctrl+alt key while dragging the object duplicates it.

  • Changing the measuring tool units and measurements

    Hi,
    When reading the PDF in Acrobat 9 Pro, how can I change the measurement units  from inches to metric when using the measuring tool?
    I have already been  to Preferences and changed in Units and Guides the Page and Rules Units  to millimeters but then, although the rulers do change to mm, the  measuring tool (the red lines) still read in inches...I have also made sure the Measuring (2D) preferences show the 'Use Scale and Units from Documents' is checked.
    Does anyone kow how I could get the measuring tool to give me the dimensions in metrics?
    It would be truly great if anyone could clarify this. Thank you so much!

    I am sorry if I have wasted anyone's time. I have actually now found a solution.
    Right clicked the page when the measuring tool was selected and chose 'change scale ratio'. However, I would have never thought that it was a ratio issue...
    Thanks a lot, anyway.

  • Automatic Service Order creation and OBD line item creation - Repair Order

    Hi ALL,
    I tried to run the Repair process based on the help document of SAP:
    Configs Followed:
    1) In Material master MRP3 view, strategy group is assigned as 84 (service orders). By default this str.grp is linked with Requirement type SERA and Requirement class 203.
    2 ) Requirement class is assigned with appropriate Service order type.
    SPRO>Sales and Distribution>Basic Functions>Availability Check and Transfer of Requirements>Transfer of Requirements-->Define Requirements Classes (OVZG)
    Actual Assignment:
    Reqt. Class Service Order Type
    039 SM01
    203 SM01
    3) Task list is assigned to your Service material - Service product - OISD
    Actual Assignment:
    Service Pdt Work Centre Plant B Area Gen TL Group Counter Task List Type
    R-1001 PC-SERV 1200 8000 62 1 A
    4) Check the Requirement class setting indicator for configuration (cnfg)
    Actual Assignment:
    = mandatory
    5) SPRO>Sales and Distribution>Basic Functions>Availability Check and Transfer of Requirements>Transfer of Requirements-->Define Requirements Classes --> Determination Of Requirement Types Using Transaction
    Actual Assignment:
    Item Category Reqt class Reqt. Type
    IRRS 039 SE
    IRRE 203 SERP
    IRRP 203 SERP
    IRAL 040 KE
    6) Sales and Distribution>Sales>Sales Document Item-->Assign Item Categories for determining the item category based on usage
    Actual Assignment:
    Sal. Doc. Type Item Cat. Group Item Usage H. L . Item Cat Item Category
    RAS NORM IRRS
    RAS NORM R101 IRRS IRRE
    RAS NORM R102 IRRS IRRP
    RAS NORM R103 IRRS IRAL
    Errors Faced:
    1. Service Order is not getting created automatically.
    Error in SAP - IDES :"A service order has not been found for action 'Repairs'"
    2. Also im not getting the automatic creation of the 4th line item(Item Category - IRAL) in the repair order, which in turn stops me from creating the Outbound delivery.
    Please HELP !
    Regards

    Hi PeteA,
    Sorry, here it is...
    Let me explain the process that has been followed:
    1) Initially to start with Service Notification was created with IW51 T-code.
        In that, Sold to party and material # were entered. Then from there directly i go for Create Repair Order from the Action Box.
        Order type for repair order - RAS, and when i save both Service Notification and the Repair gets saved.
        Now, in the repair order, two line items were getting created automatically and the requirement Types for those line items are:
        Line Item I : SE
        Line Item II: SERP
    2) After that i take the material in with the help of t-code VRRE.
    3) Then, i do the acceptance of the stock ( Technical Check) with t-code QA11.
        Once i do that, i get the Third line item in the Repair Order and the requirement Type for that line item is:
        Line Item III: SERP
    Now my query is, Once i do the QA11 transaction i need to get a Service Order automatically but thats not happening.
    Also if i create a Service Order manually, and do the repair and do the technically completion of the service order, then i need to get a third line item (IRAL) in the repair order automatically and thats also not happening.
    Regards

  • Tracking and parasite point

    Hi everybody,
    I`m trying to realize one tracking with LabVIEW Vision, It works not so bad, but sometime I have one problem.
    I have to draw the deplacement of my objectand sometimes I have one parasite point, and unforthunately because of that the draw is not good. It happens not often, maybe twice with one video of 2 minutes (20FPS).
    It is very important to avoid that.
    So as you can see, I should not have this straight line.
    Labview send my each coordinate of my object for each frame of the video.... I have two ideas to delete this parasite point, but I don`t know which one is the best and how to do.
    1) I could compare the point before and the point after, and if the point between both of them is to different, LabVIEW delete it.
    2) I could put one threshold, I mean if the value is more or less than the point before more or less 20 pixel, so this point is delete.....
    I would like to know what you`re thinking about that. Maybe there isa simpl solution. 
    I`m searching but at this moment I found nothing ^^
    Thansk a lot
    Maxime

    Well I found something not to bad in my opinion.
    This software resolve this kind of errors (0, NaN or number to far). The software replace the bad number bythe average between the number before and after
    1            1
    2            2
    0    =>   3
    4            4
    or
    1               1
    2               2
    NaN =>   3
    4               4
    or 
    1                1 
    2                2
    20    =>     3
    4                4 
    But I still have one problem, If there is one repetition about the wrong number..... For exemple
    1
    2
    0     or     20       or        NaN
    0     or     20       or        NaN
    5
    6
    With this graphique, I obtain the wrong result.
    I could put one loop if, and if the number before is not good take, the number before again.
    But it will work only till the number before before.
    There is something to resolve this kind of thing?
    Attachments:
    delete average exclude point.vi ‏21 KB

  • Function Modules for creation of characteristics and Measurement Points

    Hello everybody
    I'm new in ABAP (trainee) and especially the use of characteristics. I'd be very happy if somebody could help me :).
    Can anybody out there with some experience in creating characteristics and measurement points tell me how to create them with function-modules or by changing database tables?
    I'm happy about every hint and ready to give some reward points.
    Best Regards,
    Steffen

    FM and TABLES
    http://72.14.235.104/search?q=cache:71IXBMWcX_8J:reflexcontracts.co.uk/SAP_R3_QUICK_REF.xlsupdatetable+tse05&hl=en&ct=clnk&cd=1&gl=in
    FUNCTION MODULES
    http://www.erpgenie.com/abap/functions.htm
    http://www.sapdevelopment.co.uk/fmodules/fmssap.htm
    http://www.erpgenie.com/abap/index.htm
    http://www.geocities.com/victorav15/sapr3/abapfun.html
    Rewards if useful..........................
    Minal

  • Screen enhancement in display measuring point (ik07) and ik02

    Hi experts,
    Can anybody please help in determining userexits for screen enhancement of ik02 transaction. I need to add block to measuring point details.
    and also i need selection screen input parameters to display at the bottom of ik07 tcode.i had inserted the selection screen parameters at the top of screen in ik07 but i need it at last. how can it be inserted there.
    PLZ HELP!!
    screen shot of ie02 for referenece....

    Hello Jared,
    Have a look to this :
    http://help.sap.com/saphelp_crm50/helpdata/en/20/a4ffee7e0fcc4ebb7e5466d3903d38/frameset.htm.
    Regards,
    Frédéric

  • Making system settings for measurement documents and measuring point

    What is the significance of making system settings for measurement documents and measuring point in spro?
    Edited by: Pallavi Kakoti on Jul 14, 2011 1:23 PM

    Hi,
    << Moderator message - Cut and paste response from http://www.consolut.com/en/s/sap-ides-access/d/s/doc/YY-OLI0IMRCCUST removed. Plagiarism is not allowed in SCN >>
    Regrds
    Jitender
    Edited by: Rob Burbank on Jun 6, 2011 10:53 AM

  • Relation between notification no and measuring point no or document

    Dear Expert's
    I want to link between notification no (qmnum) and measuring point no or measuring point document.
    I want to search measuring point number thorough notification no.
    plz suggest me ABAP purpose.
    thanks.
    regards:
    Neelesh Sonkar

    Hi,
    1. Get the EQUNR from the table "QMIH" using QMNUM.
    2. Get the MOVING_OBJECT from the table "IEQT_WL_MP" using EQUNR.
    3. Get the MDOCM (Measurement Document) POINT (Measuring Point) from the table "IMRG"
        using MOVING_OBJECT ( which is MDOCM ).
    Hope this will help you.
    Regards,
    Smart Varghese

  • Set reference point in objects and measure distance

    1) How can I set the reference point in objects?
      for example:  
            a) exactly in the center of a pad or a via
            b) exactly in any corner of the board outline
    2) How can I measure the distance of two points with the maximum accuracy?
      for example:
            a) measure the distance between two pads or via
            b) measure the lenght of a line

    dear Semaphore, thanx for your response.
    I already use the ways that you refer me, but like this I can't measure with accuracy, or setting the zero reference is not guarantee that I set it exactly in the center of via or pad.
    With grid seted in smallest option is difficult to target the center of a pad, and also is difficult to target the point in the edje of a line with accuracy. With ruler I also have the same problem, I cant be sure that the ruler is pointing exactly to the center of a via or pad.
    That I need is a kind of a snap option to attach the mouse-cursor exactly in the center of an object, that can help me to target exactly in the center and have an accurate measurement or accurate set the zero reference without mistake.
    Any other suggestion for accurate measurements?

  • Unable to Inport Measurement points and Measure documents from R/3 to clien

    Hi,
    I am not able to import measuring points and measuring documents into the client device even after assigning the measurement point varaint in the back-end config.
    Please help!
    Thanks & Regards,
    Kanwar

    Hello Kanwar,
    I am thinking of two reasons at the moment.
    1. The equipments/Functional location which you had downloaded to your device were not having measurement points. If this is the case, you need to make sure that corresponding Equip/FL's are there on client (provided case 2 is not valid)
    2. The measurement points were not replicated. Hope you had checked MEREP_207 table for the required measurement points.
    Hope this helps.
    Best Regards,
    Subhakanth

  • Unable to Build VC++ application it showing error 1 LINK : fatal error LNK1104: cannot open file 'NiFieldPoint71D.lib' but I am Using Measurement Studio 2009 ,NI DAQ 7.01 and Field Point 6.05.

    I am having a application in Visual Studio 2003 on Windows XP  , Now I am Migrating the application in Visual Studio 2005 on Windows-7 .
    In my Development PC , I was install Measurement Studio 2009 ,  NI DAQ 7.01 and Field Point 6.05.
    my application is Showing following error:
    Linking...
    LINK : fatal error LNK1104: cannot open file 'NiFieldPoint71D.lib'
    Build log was saved at "file://c:\EdacsNt\Source\SaftyServices\NICfpDAQDl?l\Debug\BuildLog.htm"
    NICfpDAQDll - 1 error(s), 0 warning(s)
    When I copy from NiFieldPoint71D.lib library from Measurement Studio 7.1 and put in :\Program Files\National Instruments\MeasurementStudioVS2005\VCNET\Lib.
    my application is Showing following error:
    1>Linking...
    1>atlsd.lib(atltrace.obj) : error LNK2005: "unsigned int (__stdcall* ATL::g_pfnGetThreadACP)(void)" (?g_pfnGetThreadACP@ATL@@3P6GIXZA) already defined in NiFieldPoint71D.lib(StdAfx.obj)
    1>atlsd.lib(atlbase.obj) : error LNK2005: "class ATL::CAtlWinModule ATL::_AtlWinModule" (?_AtlWinModule@ATL@@3VCAtlWinModule@1@A) already defined in NiFieldPoint71D.lib(StdAfx.obj)
    1>   Creating library ..\..\lib\debug\NICfpDAQDll.lib and object ..\..\lib\debug\NICfpDAQDll.exp
    1>..\..\bin\debug\NICfpDAQDll.dll : fatal error LNK1169: one or more multiply defined symbols found
    I want to ignore NiFieldPoint71D.lib from using project setting(Linker->Input->ignore Specific Library ) but still it is showing same error.
    In the project Setting I am done following setting:
    "C:\Program Files\National Instruments\MeasurementStudioVS2005\VCNET\Lib";"
    C:\Program Files\National Instruments\NI-DAQ\Lib"
    Linker->Input->ignore Specific Library: mfcs71d.lib;libc.lib;'NiFieldPoint71D.lib
    Please provide some solution.
    Thanks
    Nityanand

    You posted this in the LabVIEW forum.
    Are you programming in LabVIEW?
    There is a separate Measurement Studio for VC++ forum. http://forums.ni.com/t5/Measurement-Studio-for-VC/bd-p/231

  • PM - Functional location and measuring points

    Dear all,
    is there any table that stores the link between a functional location and measuring points?
    Thanks in advance for any help.
    Regards,
    sb.

    Hi
    you can go for
    EQUI                             Equipment master data
    Arunima

  • Measurement Doc creation and Transfer: Difference field is the basis for measurement reading, why?

    Hello All
    I have  transfer supported measuring points. Whenever I create a measurement document for a measuring point, the measurement values are transferred to all its subsequest measuring points havin transfer supported check. The target measurement points gets readings from source measuing point and source document and creats a new document for this measuring point, . The measurement reading is calculated by adding the difference (as per the difference in the source document) to the last counter reading and creates the new Total reading. Can some one xplain why the system adds the difference value and calculate a total reading.
    This approach leads to discrepancy between Source and Target measurment document reading as the reading of both the source and target can be different on same time stamp and also I observed that the Target reading can be greater than the Source reading which can never be true or logically exceptable.
    How can we solve this? Is this right and standard approach.Please provide your views and solutions.
    Regards
    Murad.

    Hi Murad Ahmed,
    Examine these 2 cases.
    Case1
    A Measuring point (Counter) created for recording  Distance Traveled by a Car.
    Case2
    A measuring point (again a Counter), used to record the Fuel consumption in the Car.
    In Case1, you have a meter fitted in the Car itself, which gives the Total Distance traveled. This reading you record in the Counter Reading in IK12. The Difference field is automatically updated.
    In Case2, you read the amount of Fuel filled in the Car, from the Meter at the Gas Station, This reading you should record in the Difference Reading in IK12. Then the Counter Reading is automatically updated.
    I hope you understand, in Case1, you can not know the Difference and in Case2 You can not have the Total readings.
    About other doubts regarding Transfer of Measuring points, hope all the Measuring point invovled in the process have the same characteristics used.
    The following document might be able to help you further.
    Measurement Reading Transfer – A useful functionality
    Jogeswara Rao K

  • Measuring power at two different point (single phase)

    Hi all,
    I am new user of LabVIEW 2013 with electrical power suite.
    May i know how to measure two different point of single phase system using the same VI such as in DAQ power and energy example?
    As I notice that there are several type of wiring available. Is only one voltage and one current availabe during 1 ph voltage and 1 current selection. Thus, when I select 3ph voltage and 2 current, the value I obtain is not seem to be true.
    From the figure attached, I want to measure the voltage at current at the solar/PV  to obtain the power value. Other than that, I also need to measure the voltage and current at the load such as water heater. This is a single phase configuration network.
    (2 voltage and 2 current measurement at single phase)
    Hope for guidance.

    Hi Lewis,
    Here attached the file.
    Actually I wanted to measure power two different point in a single phase system as shown in the first attachement.
    Since, there is example in power quality measurement(DAQ) as shown in the second attachment.
    since there is two measuring point in my measurement. May i know how to obtain two measurement voltage at the same time in DAQ?
    Hope for guidance.
    Attachments:
    Two measuremernt point (single phase).png ‏7 KB
    power & energy measurement.jpg ‏172 KB

Maybe you are looking for

  • Using 2 monitor on my G5

    Can anyone on this planet tell me exactly want I have to do to run two (apple, plastic) monitors on my G5. I found out there is a adapter I need but what else?

  • Convert web pages to PDF in Acrobat

    This question was posted in response to the following article: http://help.adobe.com/en_US/acrobat/pro/using/WS58a04a822e3e50102bd615109794195ff-7f67.w.h tml

  • Does anybody know of a product that caches files in IIS?

    We currently have the bulk of the static support files for our portal (.js, .gif, .jpg, .css, .html, etc) in the application .ear file. We'd like to move these files into IIS, since we frontend our cluster with IIS with the BEA WL Proxy plug-in, but

  • Online Number doesn't include unlimited country mi...

    I used to be a subscriber of online number which includes unlimited minutes of that country. This year, when I tried to renew, it doesn't include the minutes!! I didn't know it until I noticed my credit in my account is dropping!! Now, I had to go ba

  • Custom Access Level

    Hi All, I am stuck in access control mechanism in BO. Can anyone forward me any documents related or brief on the custom access level & how to apply it in real, because I am failing to apply it accordingly. Thanks.