Reg operation level classification in routing
Hi techies,
If I maintain classification for an operation in routing.
In production order can I see ,which are those operations classified under a particular class/charecteristic.
Thanks in advance.
Regards,
M.S.C.Kiran
Hi,
Check below link for more details about Task list classification...
http://help.sap.com/erp2005_ehp_04/helpdata/EN/ab/0b3caaa91611d189060000e8323492/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/ab/0b3caaa91611d189060000e8323492/content.htm
Regards
Edited by: Julfikar Ali on Apr 29, 2009 12:13 PM
Similar Messages
-
Mass change for QM at operation level in routing
Dear Experts,
I have to carry out mass change for Quality Management at operation level in routing. The steps that I am carrying out for an individual record are as follows.
1. CA02
2. Inspection point 100 is maintained at header level
3. Go to operation level
4. At operation level work center and control key have been maintained
5. Double click on operation
6. When I scroll down here I go to Quality Management: Inspection Points view.
7. There by default in Insp.pointCompletion system shows the option as u201CQuantity, valuation (production) and radio button selected default indicates u201CQty-relatedu201D
8. I want to change these options as only u201CValuationu201D and u201CNo relationu201D respectively
My queries are,
1. Is there any T-code available to carry out these changes in mass?
2. Is it possible to do this without any Z development?
I am doubtful about using LSMW here. I would be highly grateful to you if someone can help me step by step.
Thanking you,
Anand RaoHi Sujit,
Thanks for your reply!
I tried CWBQM. Unfortunately could not succeed. I think may not be feasible through CWBQM.
But I came across T-Code CEWB . There I opted "SAP_OPERATION" as working area and it worked. Its quite useful T-Code.
Thanks again for your input.
Regards,
Anand Rao -
Rework activities in operation level in routing
HI SAP GURUS,
As per blue print rework is to be treated as a additional operation in the routings, where ever required. In shop floor control activities client requires for a check for rework activity in each operation level , they have 21 operations. Please clarify is it really viable to go for a rework check in each operation level, how I can set the rework operation in routing.?
thanks,Hi
Yow can follow the below procedure to create a rework order and Assign it to the trigger point
1.) Create Reference Operation Set ( T.code ca11)
2.) Create Standard Trigger Point (T.Code co31)
Enter the Trigger Point usage /Group as FERT.
Tick the Trigger Point Functions.
3.) Enable the indicator creates order with Reference.
4.) Enter the system status as PCNF.
5.) Enter change as +.
6.) Enable the indicator once.
7.) Now place the cursor on the create order with reference.
8.) Goto Parameters.
9.) In the Parameter enter in the group the created Reference op set group no.
Reward points if usefull
Regards
Palaniappan -
In process inspection - Rejection Booking at operations level
Hi All,
Need some help regarding inporcess inspection.
As we aware about '03' insp type is not stock relevant
The requirement is , i having operations are like 0010 ,0020 ,0030 ,0040,0050 in Production order in Routing
Now while operation wise confirmation i want to book the rejection and that needs to get effect on further operation confirmation.
For example : Suppose I have confirmed 50 TON against operation 0020 , hence at the time of confirmation 0020 i want to book the rejection 2 TON
Hence while confirming 0030 system should not allow to cofirm 50 TON , system should allow to confirm only 48 TON through CO11N and Some where that rejection has to be display in report.
Is there any provision in standard to enter rejection at operations level.
Stock posting not required , Only qty tracking required like operation wise confirmation.
Please advise to make this scenario success.
Thanks,
AbhishekHi Abhishake,
As in inspection type 03 lot you dont have stock posting option, you can scrap the rejected material operation wise in CO11N at the time of confirmation (Mov Type 551).
As scraped material will no more in system, you can also look forward for bi-product assignment in bom if you don't want to go with first option.
Also you can check for early lot creation if can solve the purpose, as in this case you will get inspection lot of inspection type 04 at the time of release of production order and stock will be adde to quality inspection as you do confirmations operation wise.
Regards/Rohit -
Operation level Component Assignment
In MTO scenario with VC and Engineering, the sales order specific engineering BOM is
derived through VC and around 80% complete at the time of sales order creation.
Engineering activities are carried out and sales order specific production BOM is derived
very late in the process.
So, operation level component assignment is not at all possible in advance.
need to get different components assigned to different operations at at time of
production order creation/change automatically.
Is there any function module,exit or Bapi or some other method with help of which
operation level component assignment can be done automatically in the production order.Hi,
Just a quick thought:
If your order is having status CRTD or REL (but without any confirmations, goods issue, settlements) then you can use the Read PP Master Data (Order header - Functions - Read PP Master Data) & this will re-read your routing & BOM. But for this to work for you, the routing should be updated with the assignments.
So what you could do is start processing your order as late as possible, thereby you can re-read the BOM & Routing as the modifications take place.
But if this is not possible in your scenario, then i am not aware of a BAPI or a FM which adds components to different operations in production order, you might evaluate writing a BDC program for the same. Anyways will update you if i manage to find a BAPI or a FM for this.
Hope the above helps.
Regards,
Vivek -
Maintain different unit of measure at operation level
HI
I am working on a scenario where I have to maintain product in different units after each operation for a material. like i am working on SFG to get FG in 3 steps. my base unit of measure is lb. I maintain my product after 1st operation in lb, after 2nd operation in PC, and after 3rd operation again in PC. but weight of Piece after II & III operation are not same. how can i maintain relation between PC & lb at operation level. is it possible?
regards
RajeshHi,
1. Routing can be created for one header unit of measure only
2. But in the routing we can have different "Operation Unit"
3. In the routing in the operation details there is a unit of measure conversion details
1 header unit = 1 operation unit
4. In your case you need to maintain this which can solve your problem.
Kindly let me know if this is useful or if it doesnt work we can find alternate solution for the same.
thanks -
Standard Report for missing parts at production order operation level?
Hi PP Gurus,
We have standard report for missing parts at production orders level.
For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
Please help.
Thanks,
Reddy.Hi Arvind,
Thanks for for your response.
1. List: Components, Layout: Standard layout set the Missing part
It shows the component requirement/withdrawn quantity for each operation of production order. It is not showing the commit quantity.
2. List: Components, Layout: Pick list set the Missing part
It shows the component requirement/withdrawn quantity for each production order.
3. List: Components, Layout: Missing Parts List-Material View set the Missing part
It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
4. List: Components, Layout: Missing Parts List-Order View set the Missing part
It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
We are unable to get the solution from all these 1 to 4 reports from COOIS.
Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
If avilable, what is the procedure to be followed?
Thanks,
Reddy. -
PM: change all Orders from sub-operation to operation level
Hi Folks,
I've a requirement to change all PM-Orders from Operation-SubOperation to only Operation Level.
Example:
Op SubOp --> New Op (no subOp)
10__10__-->____10
10__11__-->____11
10__12__-->____12
10__13__-->____13
10__14__-->____14
20__10__-->____20
20__11__-->____21
Does someone here know, how I can make do this in an easy and save way?
The only way I see is to make an own report with calling BAPI BAPI_ALM_ORDER_MAINTAIN.
Have someone another solution
- SAP-Standard-Report?
- LSMW?
RegardsHi Raghu,
Many Thanks for your quick reply.
Okay ... no LSMW.
And also no Standard-Reports?
Do you think, making my own program is the best way?
Regards,
Daniel -
User status at operation level
Hi,
I have created one user status profile and attached in order type. In this profile I have included Operation and Order header as an "Allowed object type"
My problem is when I am changing user status at order level , it is not getting changed automatically at operation level.
Pls suggest me the solution.
ThanksHi,
I dont think it is possible .
A suggestion not sure if it works .
Assign user status profile operation wise and then have some development to check the operation status and
then update production order status with same user status you mentioned in operation.
FM: STATUS_CHANGE_EXTERN will help you to change the user status of order.
Regards,
Vishal -
BAPI to change data at operation level
Hi,
I have this requirement:
I need to change data at operation level, more particularly Person No (PERNR) by using a BAPI.
Is there any BAPI - in which I can pass the basic data (say Order data and Operation data) and change the PERNR for it.
The name of the BAPI and its usage will help.
AnkurHello,
Assuming you are talking about maintenance or service orders, you can use BAPI_ALM_ORDER_MAINTAIN. See function module documentation from SE37. The structure BAPI_ALM_ORDER_OPERATION contains PERS_NO field.
-Paul
Please use Enterprise Asset Management (EAM) forum for PM/CS specific topics
Enterprise Asset Management (SAP EAM) -
Error in operation level result recording
Hi,
I need held; result recording of inspection type =03 (operation level Quality inspection)
A product manufacture via three operations (10, 20, 30)
All operation quality inspection active let operation no-10, all products reject and confirm as rework.
Next operation level quality record is done but confirmation not allow Reason is operation -10, rework quantity, (Actual quantity is more than planned quantity)
How to add the quantity after reworks for next operation quality inspection?
Pl helps me finding the solution.Hi,
As per your more clearence , As per Example production order Quanity =1, passes 3 operation10,20,30
Operation=10 require rework as per quality ,
Operation =20 system raise the error message = Operation =10 rework .
If want to operation =10 ok Quantity =1 then system raise error messges =Actual quanity more than planned Quanitity
( 1 Rework + 1 Ok ) .
Supose rework order create and confirm then next 20 & 30 operation how complete .
Real scenerio :- Rework on operation =10 then again Quality check then goes to 20 operation Quality check pass / Rework if rework then again quality pass then goes to next operation level
I hope under stand my problem
Need help- please -
Cannot attach documents at order operation level in PM order.
Hi,
We have recently upgraded to EHP6 and I have activated the EAM business functions including LOG_EAM_CI_6. In my PM work order, on the Additional Data tab, I can see the "Document Assignment" section at the bottom. Here I attach an existing document and choose Assign to Order. Then I attach another existing document and choose Assign to Operation (0010). After saving the order if I go back into it (IW32/IW33). the document assigned to order header is still there but the document attached to the operation disappears.
I have defined the document type that I am assigning at header level and operation level in Customizing for Cross-Application Components under Document Management --> Control Data --> Define Document Types. I have also specified in Customizing that the assignment to objects PMAUFK (order) and/or PMAFVC (operation) is allowed for the document type of those documents.
Can someone please advise what's wrong here ? I have to attach/assign docs to operations.
Thanks,
SandyHi Sandy
Can you please make sure two things:
1) IMG --> DMS --> Control Data --> Define Document Types --> Select Doc Type ---> Define Object Links. It must be something similar to this one. Without entering CREATE DOCUMENT settings, you may not be allowed to attach a document. That might be causing the issue. If you do not want from within IW31, someone is creating documents then make sure this setting has value =2.
One more possible reason for this is 1:n field in this same setting. If 1:n is not selected, please read the help for that field and make sure the uniqueness of your document attachment to objects.
2) IMG --> DMS --> Control Data --> Maintain Screen for Object Link
For this one make sure that you have a screen entry for PMAUFK and PMAFVC.
Now if attachment does not work, try creating a document and let us know what is the error message.
And do you know that there is another way of attaching documents to the operation which is attaching them as PRT. Just select the operation, click on PRT button and select document and attach it.
I hope this will help.
Regards
Savas
Message was edited by: Savas Yazici -
Printing the Pick List at operation level
Hi all,
Is it possible to Print the Pick List at operation level.
Components are assigned to each operations and release of production order takes place at operational level. Once operation is released then only relavent component assigned to that particular operation should come in pick list.
Thanks in advance for your time and efforts.
Regards,
Siva
Edited by: Siva Kumar M on May 19, 2008 3:40 PMHi ,
System will not select the Opertaion which has status CRTD by default.
For further selection please try with below settings. ,
Profile = std profile
Production Order Number,
Selection at Operation level
System status = CRTD and Actiavte Excl .check box.
Now system will display the pick list for released operation and it`s component only
Please check, Reward if it is useful.
Pradeep
Edited by: Pradeep Kumar on May 19, 2008 3:45 PM -
Release of Production Order at operation level
Dear Experts,
Production order to be released at operation level automatically one by one, after confirmation of operation.
Let us suppose
Op 10 ...... 10 Confirmed
Op 20 ...... 10 Confirmed
then in the Op 30 ..... 4 Qunatity to be released automatically once Operation 20 is confirmaed.
Please give your valuble inputs
regards
Ram KumarDear Experts,
Production order to be released at operation level automatically one by one, after confirmation of operation.
Let us suppose
Op 10 ...... 10 Confirmed
Op 20 ...... 10 Confirmed
then in the Op 30 ..... 4 Quantity to be released automatically once Operation 20 is confirmed.
How to create trigger point for this?
Can anybody give clear idea, what all the fields I need to maintain ?
regards
Ram Kumar -
FM/BAPI to update Production Order at Operation Level
Hi Friends,
Can any one help me in this issue.
My rek is, needs to update Production Order Sequence Number(AFVC-CY_SEQNRV) at operation level.
There are some Production Orders under one Project.User is updating theSequence Numberfor the first order in that group (TCode CO02),at the time of save remaining Orders in that group needs to be updated with the same Sequence Number.
Please provide me with FM/BAPI(operation level not at header level)
Points Rewarded,
Thanks in advance,
PRBode.Prathap,
Have you tried using the Bapi : BAPI_PP_TIMETICKET
This would confirm at operation level..
Hope it is useful.
Regards
Ram
Maybe you are looking for
-
Hi i have a doubt if any one knows please let me know. in atg rest service(POST Request) i am sending request as xml and also i am expecting response as xml i have configured to get response as xml,but i want to delete xml prolog<?xml version="1.0" e
-
Locate an entry in SXMB_MONI for a particular value(IDoc numbe) in payload
Hi, We have an R/3 XI Third party scenario. R/3 is sending tones of IDocs. In some cases some IDcos are not going beyond XI. In BD64 we get a status code 40(from XI). We would like to locate the entry in SXMB_MONI for one particular IDoc. Th
-
GOS: create attachment sent by PI while creating Service Request Notificati
Hi Friends, I am developing a custom FM which creates Service Request Notification(QMEL). This FM will be called by PI with data using web services and gets back the results after execution of function module. PI receives the attachments also from t
-
Error 7 goopsup - source does not exist
The test sequence works fine on the development machine, but I get the error, mentioned above, when I try to assemble the test sequence VIs for run time distribution.
-
Imac Spinning Beach Ball after about 3 minutes of operation.
I get the spinning beach ball (SBBOD) after a few minutes of operation. The hard drive is indexing as well. I tried booting the computer in Safe Mode and I get NO beach ball and the computer seems to be perfectly fine. I recently upgraded my hard d