These are the basic configuration settings you need to maintain. Apart from this, as per user's requirement you may need do configure more.
Factory Calendar     
               Configuring SAP calendar     
                Define Public Holidays
          Define Hoiliday Calendar
          Creation of Factory Calendar
Basic Data     
                Bill of Material     
                Define Modification Parameters
          Define BOM Usages
          Define Material Types For BOM Header
          Define Item Categories used for Item Data
          Define allowed Material Types for BOM Items
          Define Order of priority for alternative BOM usages
Work center     
                Define WorkCenter Category
          Define Field Selection for Work Center
          Define Task List Usage for Workcenters
          Define Parameters for Standard Value Key
          Define Standard Value Key
          Define Person Responsible for work Centers
          Define Move time Matrix
          Define Default Work Center
          Default Control Keys
          Define Capacity Categories
          Define Capacity Planners
          Define Shift Sequence
          Define Worcenter Formulas
          Define Work Center Formulas for Costing
     Routing
               Define Number Ranges for Routings
          Define Field Selection
          Define Material Type Assignments
          Select Automatically (Routing Selection)
          Define Task List Usage
          Configure Planner Group
          Configure Control Keys
          Define Reduction Strategy
          Define Relevancy to Costing
          Define (Standard) Trigger Point Usage
          Define Automatic Selection of Routings
Production Planning     
        Demand Management     
                Define number ranges for planned independent requirements
          Configuring Requirement Types and Requiremtent Classes
          Define Strategy
          Define Strategy Group
          Define version numbers
          Maintain consumption mode and period of adjustment
CRP          Define layout keys
          Define layout
          Define profile for capacity planning table
          Define Overall profile
Material Requirement Planning     Plant Parameters     
               Carry Out Overall Maintenance of Plant Parameters
          Scheduling Parameters for Purchasing
          Number Range for Planned orders
          Number Range for Puchase Requisitions
          Define MRP Controllers
          Define Missing Parts MRP Controller
          Define Special Procurement Type
          Maintain Planning Calendar
          Define MRP Areas
          Define Scope of Planning for Total Planning
          Define Planning Horizon
          Activate BOM Expllosion characteristics
          Define Planning Time Fence and Roll Forward Period
          Define Floats (Scheduling Margin Key)
          Define Parallel processing for MRP
          Define Receipt days Supply
          Parameters for Determining the Basic Dates
          Define scheduling parameters for planned orders
          Define availability stock in Transfer/Blocked stock/Restricted stock
          Define External Procurement
          Define BOM Explosion Control
          Define BOM Explosion for Sales Orders
          Define BOM and Routing Selection
          Activate MRP and Set Up Planning File
          Define Planning File Entries for Goods Movements
          Convert Planning File Entries for MRP Areas
Shop Floor Control     Master Data     
               Define Order Types
          Define order type-dependent parameters
          Production Status Profile
          Define number ranges for orders
          Define number ranges for confirmations
          Define number ranges for reservations
          Define production scheduler
          Define production scheduling profile
          Define Confirmation Parameters
          Define Time for Confirmation Processes
          Define Reasons for Variances
          Define single screen entry
          Define Field Selection for Confirmation
          Define Reduction Strategies
          Define Print Control
          Batch Status Mangement
          Batch Search Strategy to Production
          Activate Batch Management
     Availability Check     
               Define Checking Group
          Define Checking Rule
          Define Scope of Check
          Define Checking Control
          Checking Rule for Back order Processing
     Scheduling     
                Specify Scheduling Type
          Define Scheduling Parameters for Planned Orders
          Define Scheduling Parameters for Production Orders
Regards / US

Similar Messages

  • Configure manual bank statement ff67

    Hi!
    I am configuring manual bank statement in ff67 for my Indian customer (I am from Sweden and has not worked with it before).
    I have created three banks accounts:
    One main account
    One incoming account
    One outgoing account
    I have also created the house bank.
    How do I configure transaction code named ZBSR for outgoing payment with assignment reference and ZBSD for incoming payment.
    Thank you very much in advance!
    BR Åsa

    Hi.
    The customizing is difference according to your business requirement.
    For example you have a customer invoice document:
    01 customer 100 USD / 50 revenue 100 USD.
    Then you want to clearing Customer invoice direct with bank account in FF67
    then you have to define in your posting rule , posting area:2, as below:
    Posting Key         40                                    Posting Key
    Sp.G/L Indicator                                          Sp.G/L Indicator
    Acct symbol         Bank account                   Acct symbol
    Document Type       DZ
    Posting Type             8
    Posting on acct key
    Reversal Reason
    if you want to use a Interim bank account to clearing the inovice, then you should define
    then you have to define in your posting rule as below:
    Posting area 1
    Posting Key         40                 Posting Key         50
    Sp.G/L Indicator                       Sp.G/L Indicator
    Acct symbol         BANK            Acct symbol       bank clearing account
    Posting Key         40                                    Posting Key
    Sp.G/L Indicator                                          Sp.G/L Indicator
    Acct symbol        bank clearing account        Acct symbol
    Document Type       DZ
    Posting Type             8
    Posting on acct key
    Reversal Reason
    So it is necessary to do the customzing based on your business reqirements.
    and in your case->you want the account 198001 to be credited in ff67 and account 198000 to be debited
    Can you confirm whether the bank account defined in FI12 in your hourse bank/bank key is 198000, if yes, then you could define account symbol as below
    Acct symbol: Bank with **********
    Acct symbol:bank clearing account      with *********1
    then the following document will be posted after run FF67
    40 198000   100 USD/  50 198001      100 USD
    40 198001   100 USD/  15  customer  100 USD
    The vendor is the same senario.
    Hope above information are useful to you!
    Addition, you can use T-cd:OFTD, menu->business volumn->manually bank statement to find all customizng you should define.
    With Best Regards,
    Gladys Xing

  • Cisco Aironet Configuration Manual

    I am new to Cisco Wireless Configuration. Anyone know please is there any website I can surf for Cisco Wireless Configuration Manual. Thanks to anyone who drops me a response.

    Try this:
    http://www.cisco.com/univercd/cc/td/doc/product/wireless/airo_350/350cards/windows/legacy/scg/
    Shawn

  • COPA-Configuration manual

    Dear all,
    Can anyone send me COPA configuration manual?
    My email id is [email protected]
    will award good points,
    Thanks & Regards,
    ar

    Dear  Friends,
    A VERY HAPPY NEW YEAR 2008 and HAPPY SANKRANTI TO ALL.
    Can any one forward the Costing based COPA CONFIG and REPORT WRITING (form based) steps at the earliest to mail id : [email protected]
    Thanks&Regards,
    idr

  • Configuration Manual

    Hi Experts,
    I am in the finising stage of the implementation. I am supposed to prepare the configuration manual. Since this is my first implementation, i am not aware how this has to be done. Can some one help me with a sample/model Configuration manual for HR.
    Thank you in advance. Assure you points for the help.
    Cheers
    John
    Message was edited by:
            JOHN PETER. X

    Hi,
    I can just show u a sample based on that u can prepare as of....
    1.Maintain Plan Versions
       1.1Functional Component Definition
    Plan versions required in the enterprise are set up in this setting. Plan versions offer the possibility to administer several plans parallel in the system. As a rule, one plan version contains an overview of your enterprise's organizational plan.                                
    Evaluations (reports) are always concerned with one plan version. For this reason, it is not advisable to create own plan version for each component of Personnel Planning and Development (Organizational Management, Personnel Development, Personnel Cost Planning and Training and Event Management).                                       
    Only one plan version is ever active. This is the integrated plan version, which is considered in the case of integration with Personnel Administration.
    1.1.2.     Implementation Guide Menu Path & Transaction code
    Path: Tools  Business Engineer  Customising  Project IMG  Personnel Management  Global Settings for Personnel Management  Maintain Plan Versions Transaction Code: OOPV
    1.1.3.     How will SAP meet the business/process requirements
    Plan version 01 Current Plan will be used and will be active and current. Create new plan versions for copying the existing current and active plan into the new plan version. The new plan version will be used for carrying out the scenario modelling. Scenario modelling will not be carried out in active and current plan version.
    1.1.4.     Issues raised
    SI. No.     Description of issue     Owner     Resolution date
    Reward if helpful,
    Regards
    Asha

  • SLD configuring Manually

    Dear All,
    During Installation i did not selected SLD installation, can you please tell me how can i do installation and configuration manually without re installation.
    Regards,

    Hi Nikunj,
    It is possible to configure SLD after installation.
    Please check following link:
    /people/sugree.phatanapherom/blog/2005/08/14/configuring-sld-in-sneak-preview-sap-netweaver-04-sneak
    Regards,
    payal Patel

  • Pricing Configuration - Manual Flag

    Hello! I've done some searches but can't find specifically what I am looking for. My question is this - In the pricing procedure configuration when the manual copy flag is checked which copies the value from the source document, if there is a value in the CalType or BasTyp field does this override the copy from the source document?
    Thanks!

    Well I think your source document is the Condition Record saved at VK11. Only the manual check box in Pr.Procedure won't permit for manual entry in the documant, it will work along with the mannual entry priority in condition type, Hence it copies from your source doc. (Condition Record)
    And if there is any formula/routine mentained in CalTy then it will ignore the condition type (saved in Condition Record). Based on the formula it will calculate the value.
    Hope this will help you.
    Edited by: Sarat Orissa on Mar 1, 2010 4:11 PM

  • Reg.VAT configuration

    Dear All
    I configured VAT in our IDES system then the following error occured
    "No posting rules exist for account key
    Message no. FF714
    Diagnosis
    No posting rules have been defined for the account key in the tax table in table T007B.
    Procedure
    Change the tax table, enter an account key already defined for the transaction in question or define the posting rules for a new account key in table T007B."
    In OB40 what account I have to create,I case of I want to create new G/L account mean that should be Balace sheet or P&L account.
    Please advise few steps for me.
    Thanks
    Rajakumar

    Hi,
    Let me know where you configured VAT, is it in tax procedure or pricing procedure ?
    VAT condition types assigned to one Account keys. Find the account keys and for these keys you hve not assined credit n debit posting keys and you hve to assign GL accounts also.
    If you configured in pricing procedure go to OBYC transaction select the correct accounting/TE key and assign the rules and GL accounts.
    If you configured in Tax procedure, go to SPRO - Financial accounting (new) - Financial accounting global settings(new) - tax on sales/purchases - posting - define tax accounts.
    Hope its clear.
    reg
    Durga
    *assign points if the info is useful

  • Variant Configuration - Manual changes to BOM Items

    Hi All:
    We are implementing Sales ORder (SET) process. Need to have the ability to change BOM Items.
    According to SAP documentation referred in the link below, we have set the flag to allow the manual changes to BOM Items in the configuration profile. We have made sure that in the Material BOM configuration the fixed quantity flag is not set.
    But it is not working. Not sure if we are missing some other settings.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/92/58bfb9417011d189ec0000e81ddfac/content.htm
    Any help would be greatly appreciated.
    Thanks, Raja

    this would happen if you have edited the server.xml manually. if you do edit this file for valid reasons and want to keep the changes
    please run
    asadmin reconfig user admin password secret12 host host.domain.com  port 4848 --keepmanualchanges=true server1
    then deploy your applications, you should be ok

  • CIC0 configuration Manual

    Hi friends
    I have started configuring CIC0 and have the following question
    Where do u assign CIC0 profile to organisation unit (or) person?
    can u pl. tell the path
    Any config manual of CIC0 is highly appreciated
    rgds
    Madhusudhan

    Hi ,
    please follow thr path :
    Create an Organization Model 
    click on the person
    Choose Object Assigned.
    Then from Menu Settings-> Maintain Interface
    Then click on Staff Assignment
    After Choosing your required object (Orga unit or Person).
    From Menu click on Goto-> Object Description
    Now you have Maintain Object window.
    Then Click on Active Tab and choose Infotype ‘CIC Profile’
    After that for first time assignment we have to click on Create button   and next time we can choose Change button 
    Then we can choose the required CIC Profile ID by clicking F4
    that all....
    thanks and regards
    Deepak.

  • VMS configuration manual

    hi
    IS there any cookbook or config manual on VMS ?
    how is differ from DBM ? if all senarios are possibel by VMS then why cant VMS OVER DBM?
    kaustubh

    Hello Kaustubh,
    yes, there are some cookbooks for the configuration and extension of the VMS available. What do you want to know? Indeed, the easiest way is to start with the help.sap.com source, and dig also for some SAP notes (there are indeed cookbooks to find).
    Your question on how VMS differs from DBM is easy. DBM is an addon on top of ECC 6.0 and makes use of the VMS. The VMS is the Vehicle Management System and this name says it all: it manages vehicles. The DBM uses the vehicle object and some actions of the VMS. DBM adds order processing functionality (to express it in a very general way).
    What do you mean with "VMS over DBM"?
    You may can see VMS from a component or application perspective, than VMS provides an object, the vehicle, actions to manage the sale and purchase of vehicles (these actions can call ECC 6.0 function modules to create eg. an SD sales order), a comprehensive search functionaliyt, some personalization and other nice features.
    If you see VMS from a solution perspective, than this "module" is for the use by OEMs and importers to manage their vehicle supply chain.
    Dealers - who repair and sell vehicles - are interested in efficient order management - what comes with  the DBM order engine. The DBM makes use of the vehicle object and action concept as available in the module VMS.
    For the combination of both business scenarios - retail and wholesales/vehicle import - pls. see the SAP note 941633.
    Does this help?
    Best,
    Ute

  • Configuring Manually for PHP/CGI

    Is it possible to manually configure the Application Server HTTP Service to correctly handle PHP and Perl files? If so, further information would be greatly appreciated.

    i think this is a bug ... i dunno( if it's pacman of pkg related ), however .. you can get round it, ( or should ) by installing php as it was before .. then pacman -S php-cgi, this should prompt with a conflict warning, just issue Y, to replace it (note: don't remove it manually).
    if that's what you did, i unfortunately have no other solution.

  • Reg: work schedule manually

    Dear Experts
    i have an issue .i have create PWS for 5 working days and SAT&SUN is Day off.when
    i generate work schedule manually then the calendar shows Tuesday and Wednesday
    Day off.i checked all the configuration.but i couldn't find out the reason.
       so please assist me in this issue.
    Thanks&Regards
    Manoj Kumar

    In table V_T508A, Ref. date for PWS should be Monday, also V_T551A, 06 & 07 should be off.
    Regds,

  • How to Set/Configure Manual GPRS Setting with Asha...

    Can any one help me with to set manual GPRS setting for Nokia Asha 200.
    I want to change the GPRS setting, But there is no option for "Edit" or "New" (Configuration)
    Thanks
    Ricky

    Hi framor, 
    Welcome to Nokia discussions board! 
    In order to set up an internet access point for your Nokia Asha 200, please follow the steps below:
    Menu
    Settings
    Configuration
    Personal Settings
    Add (or add new)
    Internet
    Edit account name > input operator’s settings
    Select “No” in use “preferred access point”
    Access point settings
    Bearer settings
    Edit “packet data access point” > input operator’s settings
    Back 4 X
    Default config. Settings: select “personal configuration”, and click on “by default”
    By default in apps: select “yes”
    Please ask your operator to send you an SMS for automatic set up. If you have an issue connecting to the internet, you may set up the access point manually as described above.
    For further support on internet acces on your device, please contact your operator.
    Let us know how you get on and feel free to post any other questions you may have.
    Regards,
    Astra2025
    Press the 'Accept Solution' icon if I have solved your problem, Kudos my post if my advice has helped you!

  • Reg Standby Configuration method

    Hello All,
    I have two database servers DB1(as primary) and DB2(as standby)
    DB1 is currently online and DB2 is in mount state.
    I am using "Oracle Server-Standard Edition 11g R2", " version: 11.2.0.1"
    So it is not possible to perform switchover.
    I am generating the archive log from DB1 for every 1 hour and applying it to DB2 through batch program.
    If my DB1 fails. I am switching to DB2 just by changing(switching) the IP address.
    And I am not performing the actual database switchover.
    How good is this configuration?
    What are the problems that may occur in future?
    Also, customers are performing bank transactions. Will this configuration affect the transaction at any time?
    Do I need to migrate to oracle enterprise edition?
    Thanks,
    Madhu

    Standby databases are available with Oracle EE, SE, SE1 and XE.
    Most people do not realise that Data Guard is a process on top of the normal "standby database" architecture that has been around since Oracle 7.3. The standby database in EE (with DG) is slightly different in that there are standby redo logs which do not exist in SE/SE1/XE but the essence is the same.
    Only with Oracle EE do you get DG and so the whole standby database process has been automated. There are 2 other options with SE, SE1 and XE:
    1) Do it yourself. It sounds easy to do but to do it so that you create a fully robust system that is stress resistant under all circumstances is difficult. Why does Oracle otherwise charge a premium to upgrade to EE to use DG?
    2) Third party solutions such as Dbvisit Standby.
    To answer your questions:
    Is there any chance of losing certain logs from primary after failure?I think what you are referring to is "Is there a chance to loose data when the primary fails and the standby has to be activated?"
    The answer is yes, unless you use DG in maximum protection (in essence a 2-phase commit), there is always a potential to loose data as not all the redo may have been copied to the standby server. This is the case with EE, SE and SE1
    will the statement "SQL> alter database activate standby database;" make the standby database to primary without errors.Yes this is how you activate a standby database in SE, SE1 and XE. If you have created the standby database correctly (using standby controlfiles), all datafiles are online, no tablespaces in backup mode, then it will not error.
    Can I switch the standby database to primary in a short span of time, with the configuration I have?Yes switchover where you switch the roles between primary and standby for a short span of time is available in EE, SE, SE1 and XE. In EE with DG this has been automated, but with Dbvisit Standby switchover has been automated for SE, SE1, and XE.
    Switchover involves swapping the redo logs and controlfiles between primary and standby database. There is no dataloss in a switchover situation.

Maybe you are looking for