Reg Triggering an o/p type when change scheduling agreement VA32

Hi Experts,
I have a requirement to trigger EDI processing o/p type when ever i change a scheduling agreement in VA32.
Please let me know how it can be configured.
Thanks

Issue Resolved .
The reason for this system behaviour is in fine-tuned control: We was
using ZMIN only for new message output and ZCHG only for change messagesNevertheless, you can maintain two entries in WE20 for ORDCHG:
EF ZCHG ME11 w/o Change message flag
EF ZCHG ME11 with Change message flag
Thanks

Similar Messages

  • Document type LPA in schedule agreement

    any one can explain me document type LPA in schedule agreement. I read books as that is document type with release documentation. And what is the diff between LP and LPA?

    Dear,
    Please find below, which I found by search and posted by fellow collegues earlier....
    Default quantity for goods receipt
    In the standard system, the quantity open to date from the last- transmitted SA release is used in the case of scheduling agreements with release documentation (document type LPA). In the case of scheduling agreements without release documentation (document type LP), the open quantity to date is used.
    Document Type of Scheduling Agreement
    As a rule, the APO scheduling agreement in the SAP R/3 system is a scheduling agreement with the document type LP or a scheduling agreement without release documentation.
    If you use scheduling agreements of the document type LPA without confirmation control key then no default quantities can be determined from the release upon goods receipt.
    If you use scheduling agreements of the document type LPA with confirmation control key then the default quantities from the confirmation (shipping notification) are used.
    As a rule, the OLTP scheduling agreement in the SAP R/3 System is a scheduling agreement with the document type LPA.
    A scheduling agreement is a longer trem agreement with a vendor covering the supply of materials subject to predefined conditions.The conditions are valid for a pre defined period and a pre defined total purchase order quantity.
    You can enter the Target value in the header data of the scheduling agreement.You can enter the Target quantity in the item overview for each item
    You can use scheduling agreement with or without release documentation.The advantage of working with scheduliing agreement release documentation is that you always have a record of when you sent which delivery schedule information to your vendor,which you can display at any time.
    Without release documentation(Document type LP)
    The delivery schedule lines have official character-that is to say,they are transmitted to the vendor as they are saved in the system.The system does not document in detail releases aganist the scheduling agreement that have been sent to the vendor.Therefore,in the case of the document type without release documentation,the message control facility should be set up in such a way that a message is immediately sent to vendor if any changes are made to the delivey schedule stored in the system.
    With release documnetation(Document type LPA)
    If you use scheduling agreement with release documentation,the delivery schedule lines are not transmitted directly to the vendor.Intially ,the lines of the delivery schedule stored in the system for an LPA scheduling agreement for an internal information only.A message informing the vendor of your material requirements cannot be transmitted to the vendor until you explicitly create an SA release,that is forecast (FRC) or Just in Time(JIT) delivey schedule.Through this process,you can change the way schedule lines are represented.With release documentation,you can disply the SA releases(delivery schedules) transmitted to a vendor over a certain period of any time.This enables you to trace precisely when you sent which information to vendor.
    Regards,
    Syed Hussain.

  • BAPI/FM to change scheduling agreement's delivery status.

    Hi All,
    I have to check  "Delivery completed" indicator of scheduling agreement.
    I tried using BAPI_PO_CHANGE but it returns the message below:
    "Not possible to process a scheduling agreement using this function"
    Is there any other BAPI or FM to change the agreement.
    I do not want to use batch-input. But if there is no other option I will.
    Note:  I am using system 4.6C
    Thanks
    Mandeep

    hii
    try using BAPI_AGREEMENT_MAINTAIN FM.
    one another FM BAPI_SCHEDULE_MAINTAIN is used to create or change scheduling agreement delivery schedule lines.i hope any FM can help you.
    regards
    twinkal

  • Change Scheduling Agreement and Info Record using Bapi

    Hi Experts,
    Can anybody say how to change the Scheduling agreement and Info Record using Bapi.
    I use BAPI_AGREEMENT_MAINTAIN to change Scheduling Agreement .
    But it does not changing Scheduling lines.

    Hi,
    Please find the below link check the setting are correct or not
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/a02cb00a-bfb4-2c10-98aa-e33e7f64ba28?quicklink=index&overridelayout=true
    Reagrds,
    Pramod

  • Error when trying to change scheduling agreement

    Hi gurus,
    I have created a scheduling agreement via me31l and all is ok.
    I'm finding an issue when trying to change the agreement via me32l.
    If i add a new item and save, all seems ok, but the new item is note created and the below error is raises (sm13):
    Function Module: RV_KONDITION_SICHERN_V13A
    Status: Update was terminated
    Report: LV13AU02
    Row: 209
    Error details: Class: VK - Number: 211
    VK 211: UPDATE error Table KONM. Return code 4
    The curious thing is that if we add an item with the same material, the error is not raised and the scheduling agreement is properly updated.
    Could you suggest me how to solve this issue?
    Thanks in advance,
    Valentino

    Hi RAVI,
    the issue was solved with the maintenance of material inforecord. There was only one price condition mainteined with the flag "scales"... We have removed the flag from the interested material, then it has been possible to change and create scheduling agreements.
    Thanks & Regards,
    Valentino

  • Changed Scheduling agreement category,when its transferred from R/3 to APO?

    Hi Experts,
    Basically, am ABAP developer, but, i got a statement as below, regarding the APO,
    BADI- /SAPAPO/DM_PO_CHANGE to change the scheduling agreement category when this is transferred from R/3 to APO via the CIF
    - What is the field for scheduling agreement category?
    - In which table, this field is existing?
    - What could be the business requiremnt behind this development?
    - Any other info?
    If my question is wake, sorry! Replies are gretaely appreciated.
    thanq
    Edited by: SAP ABAPer on Mar 29, 2009 7:09 PM

    closing, bcoz no answer

  • How to measure performance of supplier when using scheduling agreement ?

    Hello all,
    My client has an absolute need to be able to measure the performance of its suppliers based on delivery dates and delivered quantities. That is to say he needs to be able to compare what dates and quantities were asked to what has been really delivered.
    Most of the procurement processes used are based on scheduling agreements : schedule lines are generated by MRP and forecast is sent to supplier while firm requirements are sent through JIT calls.
    It seems that when doing GR in MIGO, it is done against the outline agreement number, and not against the call. Therefore, we have no way to compare dates and quantity with what was expected (in the JIT call).
    Do you know if SAP proposes a standard solution to this, and what could be a solution to this issue ?
    Thanks for your help
    E. Vallez

    Hi,
    My client faced the same problem and we ended up developing an own analysis in LIS. Since the GR is not linked to specific schedule line (SAP does some kind of apportioning, but it doesn't have to correlate to the correct match), one needs to do assumptions. Our assumption was the closest schedule line, i.e. each GR is related to the schedule line with the closest date. Then all GR the same day are totaled together before the quantity reliability is calculated, since the very same shipment can be reported through several GR transactions in SAP (one per pallet).
    If anybody has info about what SAP has to offer in this question (or is developing), please tell us!
    BR
    Raf

  • How to Change Scheduling Agreement Schedule line data thru BAPI ??

    Hii
           I want to change the shedule line data for a scheduling agreement .
    I used BAPI_PO_CHANGE but as this BAPI is used for PO only this gives a
    Error Message for Scheduling agreement .
    Please suggest me BAPI or FM to update the Scheduling agreement Schedule line.
    Regards
    Ajitabh Pradhhan

    as BAPI_AGREEMENT_MAINTAIN is not available in 4.6c
    Please help me out on hwo to maintain Scheduling Agreements .
    Regards
    Gaurav

  • Change partner defintion in scheduling agreement VA32

    Hello all,
    we have created a scheduling agreement in VA32 and assigned several partners in Goto - Header - Partner.
    One partner is the Ship to partner.
    Now, we want to change the partner definition which is empty now. We want to add a value, so we changed that in the customer master data. But of course SAP is not going to take that change in the scheduling agreement which was created before that change was made in the customer master.
    My question now, is there a way to change the partner defintion in the scheduling agreement? Right now the field is gray, so we cannot make any change. I have also tried to change the customer and then change it back to the original, but it didn't show the "new" partner definition.
    Thanks,
    Anne

    Hi Anne,
    I tried this and so would suggest you to rather close the scheduling agreement and create another new  agreement and go ahead with the acitiviities as if not this solution then u may have to change it using table entries, but that is not advisable.  Better go with the first option.
    regards,
    US

  • Movement Type 351 against scheduling agreement for future dates

    Dear Gurus,
    For stock transfer orders(Inter Plant Transfers), if the schedules in receiving plants are available only in future(say after 15 days), the sending plant is able to make 351 against such scheduling agreements today itself.
    Is there any way to control 351 movements against these scheduling agreements.
    Please reply.
    Points would be awarded.
    Regards
    Shankar

    Hi,
    we are taking multiple GR against Scheduling Agreement hence for Parking Invoice we are using "Delivery Note" as reference.
    but when we maintain delivery note system is not showing multiple GRs against Scheduling Agreement
    Invoice Parking is not done against these Invoice
    Please advce

  • Fast change option for changing scheduling agreements

    Dear Experts,
    We need to have more fields in fast change option for scheduling agreements. How can we get it. please suggest

    Hello Antony,
    I want to add more fields in SA fast change.. it is not possible. if we click on more fields. but in PO it is possible. is there any way to do it in SA.

  • IW41: automatic update of activity type when changing the work center?

    Hello colleagues,
    when doing a time confirmation with IW41, we have following problem:
    In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
    Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
    Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
    Thanks for your ideas!
    Regards,
    Patrick

    Hi Maheswaran,
    yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
    We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
    We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
    Thanks for your efforts so far!
    Patrick

  • How to not retriggered output type when changes are made in Purchase Order

    Hi All,
    Could you let me know how can I resolve this one?
    We have a custom output type. Now this output type should NOT be automatically retriggered if a change is made to the document/purchase order. Currently the system automatically repeating the output type for every change made to the document/purchase order. But there is still an option for the user to be able to manually repeat the output.
    TIA

    Hi,
    1.In order to restrict the output type to trigger you need to write the requirement routine in transaction
       VOFM> requirements>output control.
    2. create the requirement routine in application EF and write the required logic and pass the sy-subrc EQ 4 if you not require to trigger the output type and pass sy-subrc equal 0 to trigger the output type.
    3. assign this requirement routine to custom output type.

  • Bapi to change the sales schedule agreements VA32

    Hi Experts,
    is there any bapi or Function moduel availble to change the Sales schedule agrements in VA32 ?
    Please do the needful.

    Hi Gopi,
    Bapi which you had given, i believe is to update the billing data.
    see. i have one field called customer group (KDGRP) which is in KNVV table which is present in the sales view of a customer master (XD02). i have to change that field using a BAPI.
    Thanks for your warm input but still my requirement is the above, if i get the answer for the above req. it would be gr8.
    Thanks,
    -Rajesh.

  • When changing SAP source table causes drop trigger

    Hi folks,
    Recently we had an issue where a table stopped replicating with ERROR status in our development HANA environment due to a dropped trigger.  We were able to trace the drop trigger command to an abap user who had made a change to the source table directly in SAP.  Apparently they added a brand new field to the append structure of table MARC.  It seems somehow this automatically deleted the triggers.  Not such a big deal in development but once we move the change to production this is a big deal because all HANA reports using this table will experience downtime if we have to drop and reload this table.  My questions;
    1) Should adding a NEW field drop the triggers?
    2) What types of changes to a SAP source table would causes us to have to drop and reload a table?  Before this recent event I thought that only changes to existing fields would cause this issue (ie: changing a datatype of a field, or length etc) however I thought adding brand new fields to the append structure would not be an issue.
    We are on REV 82.  Thanks for any insight you can provide.
    -Patrick

    Hi Martin, I looked into that note and verified the following;
    Note 1875769 was successfully applied in source system
    Note 1749824 had status of 'cannot be implemented' for some reason
    So I have to dig into if that has anything to do with our issue.  But can you or anybody tell me if we should in theory be able to add new fields to a table via APPEND without having to drop triggers each time? 
    Thanks
    -Patrick