Hi all,
In CS11, CS12 and CS13, why the system does not display prices of the materials (both standard or moving).
It is there in layout.  But it is showing blank. Is some setting is required ?
Regards,
YR

hi ,
The standard functionality of SAP itself is in CS11 or CS12 ,you can not get these
values.
I mean either the Standard price or Moving average price can not be checked here
along with the BOM items.
you can get only either from the material master or else in MBEW table
i  have found three OSS notes that relate to this problem and look like they will resolve the problem.
177006, 101262 and 361677
regards
muthraman.d
Edited by: muthuraman d on Dec 9, 2009 11:10 AM

Similar Messages

  • BOM Explosion for MRP Area

    Dear Expert,
    I have doubt regarding BOM explosion for MRP Area. This doubt is triggered when performing MD01, as result I do not find the dependent requirement in MD04 for my FG. I have maintained the BOM through CS61 and MRP area for all component, I understand that only component level system is taking into account MRP area (storage location). FYI before maintaining all components to MRP area, the BOM explosion was successful exploded. Your advice is appreciated.
    Best regards,
    Mahnansa

    Dear,
    Please check the Explosion control in Customizing, Transaction OMIW.
    Try to explode the BOM in CS11 , CS12 or CS13 if it is working there in curret date then chack the planning file entry in MD21.
    You need to convert the planning file entery at MRP area in OM0F.
    Also note the dependent requirement is not generated in the corresponding MRP area to which the production storage location in the material master has been not assigned for the data of the MRP area.
    Regards,
    R.Brahmankar

  • BOM Explosion for Multiple Process Orders

    Hi,
    I hope someone can assist me with the following: Is there a report I can run or transaction I can do to have BOM explosion for multiple Process Orders? I would like to input process orders for a week and see the BOM details per PO.
    Thanks

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • BOM explosion in subcontracting PR

    Hi...
    I have one issue of BOM explosion in subcontracting PR.
    I have created BOM, routing & PV. Production version maintained in info record.
    While creating manaul subcontracting PR , BOM is not exploded giving error message as "Not possible to determine any components".
    I have checked validity of BOM, PV found ok.
    Also Proc. type X & Spl. proc type 30 maintained.
    Any suggestion to the problem appreciated
    Regards
    Tushar

    Dear Tushar,
    Check this link
    [Sub contracting PO - BOM components are not seen;
    Regards
    Madhu

  • How to restrict BOM explosion in Quotation and Sales  Order

    Dear all,
    How can we restrict BOM main item explosion in Sales Order.
    this BOM main item is having special order items which have to generate purchase requisition (item category - BANC),
    with out exploding bom main item, can we generate a  purchase requisition for BOM subitems, can any body explain me that how can we do that.
    your suggestions will be highly appreciated.
    thank you
    Raghu Ram

    Hi Raghu Ram,
    The BOM explosion is controlled by item category.
    In the item category configuration screen, under "Bills of Material/ Configuration", you can see "Structure Scope" field.
    Select the one which is applicable to your case:-
    "blank" - Do not explode material structure
    A - Explode single-level BOM
    B - Explode multi-level BOM
    C - Configuration, no BOM explosion
    D - Configuration, poss. with BOM explosion
    E - Structure from Customer_Function (product selection)
    Hope this helps
    Regards,
    Nicole

  • BOM explosion in sales order

    Hi Experts,
    I have met a problem in BOM explosion in sales order.
    I have maintained the BOM with usage 5 and the conversion between header material and component of the BOM. But in the sales order entry, no matter how many qty I entered for the header material, after the BOM explosion, the qty of component is 1.
    Can anyone help?
    Regards,
    Emily

    Hi,
    Go to CS02 and select ur bom and go to components give 1 that means 1;1
    hope u get it
    regards,
    sadanandam kasarla

  • Bom explosion in sales order mrp(MD50)

    Hi Experts,
    In sales order MRP i.e. MD50 Getting the planned orders for header material(Finished goods) generated but for raw materials (BOM items) Purchase requisitions are not getting generated.
    Details:
    Header material A and raw materials B and C.
    In material B in MRP 4 coll/ind indicator is 2 And same indicator for C is blank.
    Now when we are running the MRP sales order based it will generate the purchase requisition for C only but not for B.
    In OPPQ we have done the setting for sales order BOM explosion.
    Can anyone please throw some light what is the setting missing in customization or in front end?
    Thanks in advance.
    Regards
    Vilas

    Dear,
    If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments. Check in MRP4 view Individual / Collective .
    Also you will find PR and Plan order with account assignment of Sales order (in case of MD50).
    - If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03)
    Please try and come back.
    Regards,
    R.Brahmankar

  • BOM explosion in Sales order with material variants

    Dear all,
    we would like to work with Variant Matching in the Sales Order. Additionaly we would like to explode the BOM....according to the SAP help this is not possible....
    http://help.sap.com/erp2005_ehp_06/helpdata/en/bd/05a7d69d3211d190380000e8a49aad/frameset.htm
    Does anybody of you has any ideas how and where to make this happen?
    Thanks for your help and kind regards
    Jan

    Hi,
    I have gonethrough the SAP link referred by you but never come across with any problem in type matching during Sales order even if the BOM explosion is set for Multilevel in Configuration Profile provided the other pre requisite set up was perfect.
    Regards
    Brahmaji D

  • MRP RUN- KIT BOM explosion not working

    We setup one layer BOM’s for our maintenance KITs as parent material and components as child material.  For  example KIT is TS10000-K1 and components are TS10001, TS10002 etc setup as next layer with in the BOM. Both KITS and components are defined as material types ERSA (Spare parts). These one layers BOMs are setup as production BOMs and expected to create purchase requisitions for KITS and components by exploding BOMs during MRP runs. We use purchase requisitions and convert them into POs to procure both KITS and components. We DO NOT USE Panned orders and Production orders. 
    The safety stocks / reorder point are considered as demand for KITS and components as we do not have any external demand for KITS and components.  
    MRP run is creating purchase requisitions automatically for both KITS and components as per safety stocks and reorder point defined in MRP Views of Material Master. This is working as expected.  
    The issue is: KIT BOM’s are not exploding to generate purchase requisitions for the dependent components of KIT BOM. Please suggest the way to resolve this issue. 
    Split valuation: Also we plan to use split valued KITS with both new and refurbished. So we need BOM explosion for split valued KITS
    also (after the 1st issue is resolved).   
    I verified the following items to make sure the required configuration and data setup is defined correctly.
    1) Planning file activated Plant - OMDU 
    2) Executed MRP run with Total Planning - MDBT and MD02 (single item, multiple levels)
    3) BOM explosion for MRP activated- OS23 
    4) MRP type in MRP1 view- PD and VB (I tried both separately but BOM is not exploding).
    5) Procurement type “F” (MRP 2 view) and lot size “EX”  
    6) Planning strategy in MRP 3 view (tested w/o planning strategy and with strategies 10 and 40. But BOM is not exploded)
    7) BOM status and usage (status is active and usage is for production-CS02 and OS20)  
    8) BOM Validity date (Valid) 
    9) BOM structure in CS12 (BOM is exploding in CS11) 
    10) Availability check  
    11) Selection of BON ID to have BOM usage indicator assign (OS31).
    12) No alternate BOMs or production versions or work scheduling view are used.
    Please review the above 2 issues and suggest any workable solution. Thanks in advance!
    NOTE: I extensively used MRP with multi-level BOM explosion in my earlier projects without any issue. However the above issue is a  bit strange  why one layer BOM is not exploded in this case. 
    Regards
    Srini  

    Hi
    Thanks for your response. I reviewed all SAP notes and none of them are applicable to my scenario.
    1808396 - BOM changes not considered by MRP: I have not changed BOMs.
    1781324 - MD11: Valid BOM alternative is not found. We do not have alternative BOMs.
    1791009 - No BOM explosion after changing production version: We am not using production versions.
    Our Material KITS are PM spare assemblies set up as BOMs and consists of individual spare parts as components. We are creating purchase requisitions and not planned orders. We are not using PP functionality/Production orders.
    MRP is generating purchase requisitions for KITS and components as per ROP and safety stocks. In other words it is working as expected.  The issue is BOMs which are parent assemblies are not exploding to the next lower level components.
    Please note that I am not getting any error messages when MRP is executed.
    Regards
    Srini.

  • Routing details with bom explosion

    hi friends
    i have developend the report for pp,in routing details
    how to get the details of bom explosion with workcenter and routing operations
    If procurement type is E or X, system has to check the routing through CA03.
    If procurement type if F, leave this field as blank and then fetch the relevant vendor
    CS_BOM_EXPL_MAT_V2 - using this fm to get the bom explosion
    after that how to relate between workcenter and routing details.
    input is material number
    plant
    1.operator
    2.material - i got through fm
    3.material description i got through fm
    4.workcenter
    5.vendor
    6.operation description
    7.uom -i got through fm
    8.qty - i got through fm
    9.uom
    10.setuptime
    11.processingtime
    12.deliverytime
    code for review.
    TABLES : MAST
    DATA: BEGIN OF ISTPO OCCURS 1000.
    INCLUDE STRUCTURE STPOX.
    DATA: END OF ISTPO.
    DATA: BEGIN OF MATCAT OCCURS 1000.
    INCLUDE STRUCTURE CSCMAT.
    DATA: END OF MATCAT.
    DATA: W_TOPMAT LIKE CSTMAT.
    SELECT-OPTIONS : P_MATNR FOR MAST-MATNR.
    PARAMETERS : P_WERKS TYPE MAST-WERKS.
    DATA : BEGIN OF ITAB OCCURS 0,
    MATNR LIKE MAST-MATNR,
    WERKS LIKE MAST-WERKS,
    END OF ITAB.
    DATA: IT_STB LIKE ISTPO OCCURS 0 WITH HEADER LINE.
    data : istpotemp like stpox occurs 0 with header line.
    data : istpofinal like stpox occurs 0 with header line.
    START-OF-SELECTION.
    CLEAR ISTPO. REFRESH ISTPO.
    SELECT MATNR WERKS FROM MAST INTO TABLE ITAB
    WHERE MATNR IN P_MATNR AND WERKS = P_WERKS.
    LOOP AT ITAB.
    CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
    EXPORTING
    CAPID = 'PP01'
    MEHRS = 'X'
    MMAPS = ' '
    MDMPS = ' '
    BREMS = 'X'
    DISMM = ' '
    LIFNR = ' '
    WEBAZ = ' '
    DATUV = SY-DATUM
    MTNRV = ITAB-MATNR
    WERKS = P_WERKS
    EMENG = '1'
    STKKZ = ' '
    FBSTP = ' '
    FTREL = ' '
    IMPORTING
    TOPMAT = W_TOPMAT
    TABLES
    STB = ISTPO
    MATCAT = MATCAT
    EXCEPTIONS
    ALT_NOT_FOUND = 1
    CALL_INVALID = 2
    MATERIAL_NOT_FOUND = 3
    MISSING_AUTHORIZATION = 4
    NO_BOM_FOUND = 5
    NO_PLANT_DATA = 6
    NO_SUITABLE_BOM_FOUND = 7
    OTHERS = 8.
    WRITE: / W_TOPMAT-MATNR UNDER TEXT-H00 COLOR COL_HEADING,
    W_TOPMAT-MAKTX UNDER TEXT-H01 COLOR COL_HEADING.
    sort istpo by index descending.
    loop at istpo.
    WRITE :/ ISTPO-POSNR,
    ISTPO-IDNRK,
    ISTPO-OJTXP,
    ISTPO-MENGE,
    ISTPO-MEINS,
    endloop.
    refresh istpo.
    endloop.

    HI,
            i got the workcenter also,but i need to classify
    if the material procurment type is E OR X CHECK FOR routing details
    or else if its F THEN pick the vendor and uom -PLPO-VGE01,PLPO-PLIFZ.
    how shall i implement this
    Regards
    ds

  • BOM explosion in BOMBOS transfer

    Hello,
          can any one tell me how BOM explosion happens in BOMBOS transfer? Thanks!!
    Regards,
    Saravana

    Dear Saravana
    I believe if you use "standard" configuration the is no BOM explosion done. This is not needed. The reason is "simple". Any BOM item must be as well a specification. Thsi specification will have it self a composition. The BOMBOS transfer "end" normally on REAL_SUB level. Therefore the "leaflet" REAL_SUB must be maintained by youe (composition) either using PURE_SUB or LIST_SUB. But if needed: there is some user exit available (more than one) which you could try to use so that the "BOS" which is generated on EHS side is the "exploded" 
    The reason why this is all "customer" specific developmet is "quite"  easy. You have a "main" BOM per plant; and you have alternative ones. How should the "explosion" be done? The system can not know thos. Do you always would liek to use the "Standard BOM"? Don'T know. But oplease check paralell thread:BOMBOS transfer SPRO settings and technical details
    C.B.

  • BOM Explosion in CRM & ECC

    Does anyone know of a way to control Sales BOM explosion at the item category level in the middleware?  We have boms created in our ECC system for both standard and configurable materials.  For our standard materials I need the sales BOMs to explode on the CRM order (for ISA shopping basket purposes) and to prevent a duplicate explosion in the ECC backend I have parameter NOSTRUCTURE set to X in SMOFPARSFA.
    CRM does not support using configurable products as the header or component of sales boms so for these materials I do want the bom explosion to happen in ECC as the order flows from CRM to ECC.
    I've tried adding order types and item categories to the parameter names for NOSTRUCTURE but it didn't work.  OSS confirmed my findings that it would not work.

    Hi,
    I did work on single level BOM explosion in a couple of projects. As per SAP note 549341 - FAQ: BOMs in the sales order, it is very much possible to explode multi-level BOMs.
    Check this note and item category BOM explosion options.
    <b>Do not forget to reward if it helps,</b>
    Regards,
    Paul Kondaveeti

  • BOM explosion in CRM Service Contract

    Hello
    We want have a BOM explosion working in CRM for service contracts
    Here are the details :
    We have replicated the materials from ECC to CRM. We are not maintaining any BOMu2019s in ECC.
    The idea is that we maintain the BOM Structure in CRM only, as we donu2019t want to have the Items as a billable item in a position, only for information purposes (or later on for metering)
    We have maintained the product category for the header product in CRM so we are able to maintain depended components
    (Relationship type SCDEC S Dependent Components (DC) )
    Not we are able to assign dependent component to the header material
    Item category groups:
    We understand that the standard item category groups that should be used are ERLA for the header product and LUMF for the Item product.
    In order to support the same functionality for the given item category group , maintained at the product level in ECC we copied the same setting for the item category group from the standard to
    our settings.
    Standart
    Tx type Item Cat Group item category structure scope
    TA ERLA TAQ A single level Explosion of Structured Product
    TA LUMF TAP A single level Explosion of Structured Product
    So we have copied TAQ to ZTAQ and TAP to ZTAP.
    ZS01 is a copy of SC (service contract)
    Tx type Item Cat Group item category structure scope
    ZS01 ZLEI ZTAQ A single level Explosion of Structured Product
    ZS01 LEIS ZTAP A single level Explosion of Structured Product
    But when we use a header product in the service contract, we cannot see the BOM is exploding.
    We have also created some products in CRM with exactly the same Item Category groups as the standard and when we create a standard order (TA) in CRM, the BOM is NOT exploding.
    Questions:
    Is it possible to have the BOM setup only in CRM, like we try to do it?
    Is it possible to use our own item category groups in CRM more is the functionality only working with ERLA and LUMF?
    Is it possible to use the BOM Explosion in Service contracts as well ?
    What steps are we missing to get the BOM explosion in CRM ?
    Thank you for your help
    Frank

    Hi,
    I did work on single level BOM explosion in a couple of projects. As per SAP note 549341 - FAQ: BOMs in the sales order, it is very much possible to explode multi-level BOMs.
    Check this note and item category BOM explosion options.
    <b>Do not forget to reward if it helps,</b>
    Regards,
    Paul Kondaveeti

  • BOM Explosion in PO for Subcontract.

    Hello Gurus,
    I have Created the BOM using CS01 for subcontract order. i could not able to explode it during my PO. I wantend to know weather there is any prerequsit to be made for the BOM Explosion in the PO..?
    regards,
    Mahesh.

    Dear Mahesh,
    1.Create the BOM for the sub-contract material(header material) in T code CS01 for BOM usage 1.
    2.Mention the procurement type as F and special procurement type as 30 in the  material master of the header material(which you
    recieve from sub-contractor) in MRP2 view.
    3.Maintain the sub-contracting Purchase info record in ME11.
    Check and revert
    Regards
    Mangalraj.S

  • BOM Explosion in Quotations

    Hi All
    please can you advise ifa BOM explosion in a  Sales Quotation is this standard SAP?
    Kind Regards
    KC

    Please check the configuration in Menupath:
    SPRO> Production planning > Material Requirements Planning > Carry Out Overall Maintenance of Plant Parameters
    or T.code: OPPQ
    If you have not maintained the plant parameters, please copy the same from any SAP std plant.
    If you have already maintained, lcik on MAINTAIN button.
    Then go to BOM Explosion button and Check the Sord/WBS option
    Hope it works,
    Regards,
    Anbu

Maybe you are looking for

  • Lack of customer service at BT!

    Order placed in November with switch on date given for 19th December,it's now 29th and still have no service. BT seem totally uninterested in the fact that they ruined Christmas for two little boys who Christmas presents relied upon them having Inter

  • Backing up iPhoto library located on external hard drive

    I recently moved my iPhoto 09 library to a 500gb WD portable hard drive in order to free up space on my MacBook Pro hard drive.  What I would like to know is can I back up this external library to another external hard drive so that I have two copies

  • Edit custom genre problem[Java]

    I am trying to edit the custom genre of mp3 files like "Welcome" using mp3agic library but it is not working. https://github.com/mpatric/mp3agic Mp3Filemp3file=newMp3File("SomeMp3File.mp3"); if (mp3file.hasId3v2Tag()) {   ID3v2 id3v2Tag = mp3file.get

  • How I solved my installation error

    Whew, I never thought I'd be saying that CS4 is installed on my Vista 64 bit system! Here's what I did: 1.  After the set up error, ran event viewer to get specifics. 2.  Used "regedit" to grant permission to specific keys.  The Adobe tech bulletin w

  • How to unregister an unavailable control center in the design repository?

    We are using OWB 11.1. and we have 8 control centers which are registered in the design repository but these control centers have become unavailable. Is there any way to unregister control centers which are inaccessible?