Regarding Change number - PP (CC02)

Hi,
  My issue is i have to pick up the change details along with the change number for the provided material number plant and BOM type can anyone help me to resolving this issue. 
Regards,
Beginner.

Hi,
I think i am some where wrong in explaining. My question is i have material number value  and i have plant value now for this material number and plant i have to fetch the change number and the change details.
I just tried debugging and found the table AEOI which has the material number and plant in the field OBJKEY but the problem is in many rows the values of the plant is empty and one more problem is apart from material and plant i find there is one more field getting displayed i am not very sure which field is that.
I hope i am clear please let me know in case i am not. For your reference my requirement in short.
   Input : Material Number , plant and BOM type
Output : change number and change details

Similar Messages

  • Delete link between a DMS document and a change number

    Hi. I've associated several DMS documents to a change number, using CC02 transaction. Now I'm trying to delete these links. I can neither delete them nor delete change number. I've marked "Deletion indicator", but I don't know how I have to continue.
    Best regards, Iván.

    Hi Iván,
    please use report MCDOKDEL: This report is used to delete the Documents which are marked for deletion.
    To delete the linkage between change number and object link, please go to CC02 and select button "Objects". Here you can see all linked objects to this change number. Select tab "Documents" and mark the document for which you want to delete the link. Afterwards please press the delete button. Then the linkage to this document should be deleted.
    Regarding object link problems please see also the following SAP notes:
    880077
    885977 and
    960202
    Hope this information will help you.
    Best regards,
    Christoph

  • Change number in material master required steps to use

    Hi All.
    Thanks in advance sap  mm dudes.
    Need steps in sap mm material master change number.
    creation of change number  and usage  of change number
    Display of list of changes.
    Regards.
    parameshwar

    Dear Parameshwar,
    1.I assume you have created a change number without release key in CC01.
    2.In CC02,for the same change number goto object types and include the check box against material for the first 3 check box and
    save the change number.
    3.Now check in MM02 for any material master changes or I would suggest you to create a new change number with valid from
    date as current date,include the settings for material under object types and then check in MM02.
    Check and revert.
    Regards
    Mangalraj.S

  • Change the validity date in change number

    hi team,
    I want to change the validity date of a change number from 01.01.09 to 01.03.09. I am getting an error "A BOM has already been changed using a change number with the same valid-from date as the selected date 03.01.2009".  I can change the date to before 01.01.09 but cannot after 01.01.09.
    Can you please help me.
    thank you,
    Satish

    Dear Mamiditi Satish Kumar,
    Is it a change number with release key or without release key?
    Do you want to assign a different validity date for the changes made using that change number?
    Try using alternative date field in CC02.and you have to select the object to assign the alternative date.
    Say if you want to assign an alternative date for a processed BOM,you have to select that object and
    enter the alternative date.
    Regards
    Mangalraj.S

  • Daily Change Number.

    Is anybody using this functionality in your SAP system ? This is different than regular change number.

    Dear Vinay,
    I will explain very clearly,
    1.If there are changes in material master which will become effective immediately,then ECN without release key will be created and the
    changes will be made with respect to that Change number.
    2.If the Changes are for a BOM ,then ECN will be created with Release key and the changes will be made.
    3.Once if the changes are to be made effective,then in CC02,by entering the Change number the same will be released and the
    changes made with respect to that ECN will become effective.
    4.IF the BOM changes are to be made effective immediately,then ECN without release key itself can be used and the changes can be
    made or create with release key ,but after making BOM Changes,the same has to be released.
    5.Daily an ECN will not created,if needed then it will be created on that particular day.
    6.Revert back if more clarifications are needed.
    Regards
    Mangalraj.S

  • Cancel ECN in BOM & remove change number in Routing

    Dear Gurus,
            I have 2 questions about ECN , pls. help .
    1> If we made a wrong ECN in BOM with change number, pls. advise how to cancel this ECN in BOM.I tried to delete the change record in CC02 but it's not allowed since BOM has been changed already.If I made a new change in BOM with new change number, in BOM it will show a new change number, but I don't want to show these change numbers because it should be no changes happen, pls. advise how to recall the change and remove the change number in BOM .
    2> We use change number when we change routing ( CA02) in the past, now due to some internal issue, we want to remove all change numbers in routing, I can't find any option in CC02 or CA02, pls. advise is it possible to remove existing change number?
    Thanks & best regards,
    Tina

    Dear Tina,
    In my understanding you may not be able to delete the change number assignment made in BOM or routing.
    But you can define an alternative date for the made changes and set the valid from date as say 31.12.5555.
    Check and revert.
    Regards
    Mangalraj.S

  • Change Number Creation

    Hi,
    Can anyone worked on CC01 transaction which will create Change Number. I have written BDC for this. Now i got a scenario like i will get the file and in that we have MatBom, Material and Alternate dates. I need to assign alternate date to the respective MatBom and Material according to the input file.
    I have created a BDC for this but i have problem with transaction while assigning the first alternate date to the corresponding MatBom and Material.
    I am looking a BAPI for this. In that BAPI we need this functionality assigning alternate dates to the corresponding MatBom and Material.
    or else can anyone knows how to handle this assigning each alternate date to the  corresponding MatBom and Material.
    Please do the needful.
    Thanks & Regards,
    Krishna chaitanya.

    Dear Madhukiran,
    As I have mentioned include the check boxes for Revision Level Active , Release active and then save the
    datas.then referehs the SAP menu or else logout and then login and then execute CC01 T code and check
    whether now in the input screen are you able to see the the options for without release key & with release
    key.
    Select the radio button for with release key and create the change number and then after saving and then
    creating the BOM,then you can come to CC02 T code enter the change number set the Release key
    values as 01.
    check & revert back.
    Regards
    Mangalraj.S

  • Enginering Change Number (ECN)&  alternative date

    Hi
    We have a scenario like this:
    We are having ECN effective in our system.
    Now we want to use the alternative date functionality for some objects.
    Ex:- we have a BOM with change number for which valid from date say" X".
    Already change is effective  from "X" date.
    If we  change valid from date of "X" to altrnate date say "Y"for this object, & if we  want to change this object with reference to this change number , the system is automatically changing the earlier changes also new valid from date "Y".
    I want to know is there any method to avoid this.
    Any suggestion advnce thnks.
    Regards
    Rao

    Hi Rao
      actually alternative date functionality is used like if you have BOM, task list created with reference to an ECn with a validity date and suppose you wish to activate the Bom to a different validity date with same ECN. then BOm will be active from the alternative date whereas the tasklist will be active from the validity data of the ECN.
    procedure
      in CC01 or CC02
      verify objects are assigned to the ECN ( BOM, TL etc) by selecting the object assginment button if not assigned then assign  the same.
      create the ECN with alternatedatekay and alternate dates by presssing the altrnate date button.
    after creating the altrnate dates
    from the same screen select the alternate date and then press the object assignement button
    Now select the appropriate object and then press assignobject. now press the details key you can see the alternate date assigned
    Just save it
    thats all everything is fine
    regards
    Sk
    Reward your points

  • Delete Configuration Profiles from Change Number.

    Hi Gurus,
    i want to delete Configuration Profiles from Change Number.
    while executing tcode cc02, i am not able to find configuration profile under  object tab.
    would you please tell me how to delete Configuration Profiles from Change Number?
    Thanks
    Amit dhar

    Hello Amit,
    I'm not sure I understand your requirement quite well. But let me share some stuff I know and make a humble attempt to address your question. Firstly by configuring the profiles we are only making certain data entry easier for the end user and also making the change data manageable. By Configuring Profiles we can default the values such as,
    Change number status
    Authorization groups
    Reasons for change
    Status Profile
    Object type profiles
    Most of the above objects / values are modifiable using CC02 till it becomes ECO and few like status till the change number is released.
    I'm hoping this helps, if not please be little more descriptive about your requirement.
    regards
    C

  • How to find Change number for a Material

    Hi,
    If we know the material number and Revision level then how can we find the Change Number of that material.
    Is there any table in which i can find Change number for a revision level or is there any Function module available.
    Regards,
    Vaibhav

    Hi Vaibhav,
    Is there any table to find the change number and revision level of a material. I have change number and material and revision level coming from external system. But i need to check that with SAP whether it exists or not.
    Is there any table link to find whether a material has change number.

  • Error while changing BOM with change number

    Hi ALL, Please help me with followed error message, I am using ECM. I created ECR and converted to ECO and then released.
    Object management record cannot be generated
    Message no. 29046
    Diagnosis
    You want to change the BOM with the entered change number.
    One of the following situations triggered this error message:
    1. The indicator that allows automatic generation is not set for object type BOM in the change master.
    2. The indicator generation only on initial creation is set for object type BOM
    3. You are processing a change request.
    System response
    The system checks whether the indicator object management record will be generated is set in the change master.
    If the indicator generation only on initial creation is set, the system checks whether the BOM exists in the system.
    Procedure
    If you are authorized to change the change master, execute the following steps:
    For 1.)
    Set this indicator for object type BOM or create the control record in the change master.
    For 2.)
    If the BOM already exists in the system and the generation only on initial creation indicator is set, the system can no longer generate the control record automatically.
    In this case you have to add the object control record to the change master first, then you can change the BOM in relation to the change number.
    For 3.)
    You cannot generate any object control records for a change request.

    Hi
    With your question regarding changing BOM with change number  it looks lke there may be problem in defining the Object types,objects.Moreover whenever converted to ECO you need to enter into cs02 tcode for changing the bom with relevant change number and valid from date.
    Hope this gives you a clear idea.let me know if you need anyfurther inputs.
    Regards
    Praveen

  • Need to fetch  change number for tcode IA06

    Can anyone please tell me how do I fetch the change number (Aennr) in case of tasklist chage? Tcode IA06?
    I am using FM CP_EX_PLAN_READ which returs me change number..but it is not populated....
    Plz help.

    hi check this..
    check the table AENR for the aennr values...
    here is an example for this fm..
      call function 'CP_EX_PLAN_READ'
         exporting
              plnty_imp        = i_plnty
              plnnr_imp        = i_plnnr
              plnal_imp        = i_plnal
              sttag_imp        = i_sttag
              cuobj_imp        = i_cuobj
              parnt_imp        = i_parnt
              i_plant          = i_werks
              tca11_imp        = ls_tca11
         tables
              plmz_exp         = lt_plmz
              plpo_exp         = lt_plpo
         exceptions
              not_found        = 1
              plnal_initial    = 2
              others           = 3.
    regards,
    venkat

  • In iPhoto  how do I open Photo Grid to change number of caption lines?

    In iPhoto  how do I open Photo Grid to change number of caption lines?

    In iPhoto '11 you can only display two lines below the thumbnails of your photos when you browse an event or an album, the titles and the ratings. The title will be truncated, if it does not fit into the single line. From the iPhoto help:
    To show title and rating information below photos:
    Click to select Photos in the Source list.
    Choose View, and then choose the information you want to view:
    Titles
    Rating
    The information field you chose appears below your photos.
    To hide this information, choose View, and then choose the information you want to hide.
    Regards
    Léonie

  • PI 7.31 (single stack) posting RFC gives this error: RFC_ERROR_SYSTEM_FAILURE: Processing of change number CO-01234 cancelled (raised by system ECCHostXYZ)

    I'm trying to determine if I am dealing with an RFC connection issue or just an error resulting from the RFC itself.
    The error says "Processing of change number...cancelled (raised by...ECCHostXYZ)".
    I thought this was a problem with my RFC config because it is labeled as "RFC_ERROR_SYSTEM_FAILURE".
    However, when I google that specific message, it appears to be an error specific to change order creation.
    Here’s my google search: http://goo.gl/ZhKsm3
    Here is the error again:
    RFC_ERROR_SYSTEM_FAILURE: Processing of change number CO-01234 cancelled (raised by system ED1|ecc-host-xyz)
    When I check ST22, I see no RFC errors.

    Hi Jody,
    No st22 exception is needed to be throwed in order to raise a controlled exception in the RFC.
    You would need to check the RFC in the ECC system with the data that you are sending from PI, if the data is the same, you would need to check PI user RFC roles with the ECC roles user that you used to check the data integrity in the ECC test.
    To avoid this error you can do a Z RFC to wrap the standard RFC and to control the exceptions errors with a BAPIRET2 strucutre to return to PI.
    Hope this helps.
    Regards.

  • MM02 - Enable options change number, change overview and change documents

    I am with the following problem: I enter the transaction MM02, I enter the material 1000765, I select the view "Classification". Later I access the environment option from the menu bar and options for change number, change overwiew and change documents are disabled.
    How do I enable these options change number, change overview and change documents?
    Regards,
    Sérgio Salomã

    Hi Sergio,
    If we activate the change documents for classification data, then we will be able to see the CHANGE DOCUMENTS for characteristic values through CL20N transaction (CL20N via menu ENVIRONMENT --> Change Documents) or MM02.
    For reference please check SAP Note 65124.
    For enabling change documents for classification data in SPRO --> Cross-Application Components --> Classification System --> Classes --> Maintain Object Types and Class Types.
    In this enter into MARA table entry. Inside that corresponding to the respective CLASS TYPE (say 001) enable the CHANGE DOCS check box in Classifications part (For enabling this please check SAP Note 65124). Then for this CLASS TYPE (say 001) inside the OBJECTS folder, enable the CHANGE DOCS CLASS checkbox also.
    Now in MM02 and in CL20N under menu Environment --> Change Documents you can view all the changes done to that characteristic values.
    Once the change documents is activated, then we can get the change documents details in CDHDR and CDPOS tables. The OBJECTCLAS may be "CLASSIFY". We can also use the "CLLA_CHANGE_DOC_CLASSIFICATION" function module to fetch the data from these tables.
    Hope this helps in solving your issue.
    Thanks and Regards,
    Harish kumar.

Maybe you are looking for

  • Where can I download usbsecure.pl and learn about how it works?

    Via Google I was able to locate a dead link on http://www.oracle.com/technetwork/server-storage/solaris10/training/index-jsp-139370.html# which references the usbsecure.pl. (Solaris is spelled Solars on that page btw). Is there somewhere I can downlo

  • Saving to file. Help needed

    I'm designing an electrionic organiser, it only does one year and for each month the user can enter appiontments (which is just a simple text area the user enters text to). I have prity much everything finshed but I don't know how I should store the

  • Facing a problem in writing textfile, badly need help.

    I am already close to finishing this. Just that the problem i'm facing is that i can't seem to log the data into the textfile. It says that the concatenate has an error or something. That's the problem because i can't seem to find it. Do i have to us

  • Create a new schema from existing schema

    Hi, I'm wondering whether there is a way of create a schema from existing one? Could it done through SQL statement or have to go through some sort of tools? Please drop me a few words if you know the answer. Thanks.

  • Restrict the items while adding to cart based on zipcode.

    Hi All, I have a requirement of restricting the items while adding to cart based on the zipcode . For ex . If I enter zipcode of 10014 ,then I shld able to only add 2 items .If i enter some other zipcode like 55344 then I shld able to only add 5 item