Regarding Cost Estimation

Dear All,
While doing the Cost estimation for a Product i am getting the below mentioned error..
Cost estimate for material W275271299NEW / plant LEP1 is incorrect
Message no. CK168
Diagnosis
The system found errors in the cost estimate of material component W275271299NEW from plant LEP1.
System Response
The results of raw material cost estimates that have errors are not used in the product just costed. Only cost estimates that do not have errors or that were released are used in cost rollup.
All assemblies that contain material W275271299NEW from plant LEP1 in their structure are indicated as incorrect.
The message sets the costing status of the assembly to 'costed with errors'.
Procedure
Eliminate the error at the highest low-level code.
The Material W275271299NEW is Scrap material. That is generated at the time of Production. this material i have mentioned Negative in BOM.
Regds,
Janardhan.

Check with your Practice for Matrices,Technical refererence models, Governance policies, standard templates for requirement gathering etc.

Similar Messages

  • Shipment Cost Estimation Report

    Hi Experts,
    There is an existing report which is very helpful regarding most transportation details. You can pull information at the delivery or item level of all types of shipments in one place. We use this to review what shipments we need to process to cost documents and transport POs.
    Another report shows all of the information except information on what the actual cost calculations have been. A report is available which details the cost calculations but this report is not available until after the cost document has been created which is too late to assist in the shipment costing process. This T code is VI12  and it shows each cost type separated out based on the calculated rate.
    Using  T code VT02N from the shipment cost estimation button, this is the information we need to merge it in the existing report.
    Please can anyone advise on this situation how to do this enhancement.
    Do we need any other information from the client for this issue.
    Thanks for your help.
    With Regards,
    Ruby.

    Hello,
    Would VI11 answer your question, there are also additional fields in the ALV catalogue that can be added to the layout?
    Regards
    Waza

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • Price for Cost Estimation - Info Records

    Hi All,
    We need a clarification on how  system picks the price for COST ESTIMATION with following setting in Valuation Variant.
    1.Valuation Price from USER EXIT
    2.Price from Purchasing Info Records
    3.M A P
    4. Planned Price 1
    Sub Stratergy.
    1.Effective Price from Purchase Order
    2. Net Quotation Price
    3. Gross Quotation Price.
    If we have 3 info records  with the same validity date  and different price in each for three vendor, what price will  system pick for calculating the stand cost estimation.
    We have activated Material Ledger and we in ECC 6.0.
    Do suggest.
    Regards,

    Hi ajai,
    I agree with your point,we have 3 info record for a material and 2 are valid as such. The price maintained in  two info records are as 7.5 & 1.0 respectively(valid info records).
    The last price in the purchase order (of the info those records) are 0.41(dated on 09.04.2010)  & 0.2(dated on 19.04.2010) respectively, but when we execute the cost estimation the system picks the price of 7.5  not the least price of 0.2(as its the latest purchased price).
    Do let us know why and of what logic the system picks the highest price.
    Do revert.
    Regard,

  • Changing Cost Estimation ( ML activated)

    Hi All,
    We have ML activated  and we have Price Control as "S" for all  ROH, HALB & FERT Materials.
    The intention was to have one Cost Estimation per year and  difference to be posted to variance.
    The Material Valuation Strategy is
    1. Valuation Price from User Exit
    2. Price from Info Record
    3.MAP
    4.Planned Price 1
    Now our issue, in June 2011 we have executed cost estimation for some new materials(say one Material ABC - Cost estimation must be $12000 but it is updated as $19000 due to wrong price maintenance)  with wrong price and made  goods movement.
    Now when we want to correct the cost estimation by executing a new cost estimation( i.e. we want to overwrite the $19000 by $12000 for the ABC material) by this month( July 2011), but the system is picking the same old cost estimation price (old cost estimation price as $ 19000).
    Can you suggest, how we can overwrite the existing cost estimation.
    Do suggest.
    Regards,
    Rex

    Hi All
    Costing valuation follows the priority you have define. If this is taking 19000 maybe this value is coming from the first option (user exit).
    I suggest you to change the priority to take price from  planned price 1. Go to OKKN and change the priority for Valuation variant.
    ...or you have to assure there is no prices from priority from 1 to 3.
    Regards.

  • Difference in the Material variant  BOM Qty during Standard Cost estimation

    Hi SAP Experts,
    We are trying to estimate the cost for the material variant, but the BOM exploded
    during the cost estimation, the quantity differs slightly with the BOM exploded
    during CU50.
    What might be the reasons for difference.
    Please give your valuable Inputs.
    Thanks
    Best Regards
    Siva

    Dear Mr.Kumar,
    <b>For any material in the material master , for Price
    Control indicator in Accounting 1 View we can either
    maintain S or V.</b>
    <i>For In House Manufactured materials we maintain S
    (Standard price) & for Sub contracted or bought out
    items we maintain V(Moving Average price).</i>
    <b>During cost roll up & release as far I know we cant
    split like 70 & 30% and we can do the costing.</b>
    So either you have to use the moving average price for
    both inhouse & bought out.
    <b>Because 1 material cant have both standard price &
    Moving Average price.
    Because bought out item's doesnot have standard price.</b>
    If your vendor is ready to give the material(Finished
    product) using the same amount which you spend for
    producing inhouse,then no issue,you can use
    standard price.But Practically it doesn't occur.
    I hope this will help to clear your doubt.
    <b>If useful reward points.</b>
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • Table for Valuation Price from USER EXIT - Cost Estimation

    Hi All,
    Can you let us know from where the system picks the price for VALUATION PRICE from USER EXIT when we have following setting in valuation variant
    1.Valuation Price from USER EXIT
    2.Price from Purchasing Info Records
    3. Planned Price 1
    Sub Stratergy.
    1.Effective Price from Purchase Order
    2. Net Quotation Price
    3. Gross Quotation Price.
    Now when we execute CK11N for a material, the system displays a cost price as 316 Euro/ unit.
    But Standard price is 290 euros, info record price is 294 euros & planned price 304 euros.
    Our previous cost estimation ( period 1, current period is 5) was 316 euro/unit (which was not correct), so deleted the cost estimation with CKR1 and try to rerun the cost estimation to update the value (new price), but still the system is picking the old price.
    Can you let us know from where does(transaction code & table) the system is picking the old values.
    In CK11N Material valuation (Valuation tab) its showing as Valuation Price from USER EXIT.
    We have activated Material Ledger with price control "s"and we in ECC 6.0.
    Do suggest.

    Hi,
    Where & how can i find the exit.
    Do suggest.
    Regards,

  • How to create Quotation from Ad hoc cost estimation of cProjects?

    Hi Guruu2019s
    Please help me in resolving the issue given below. I am able to get ad hoc cost estimation results in accounting screen, but not able to create a Quotation from Ad hoc cost estimation of cProjects.
    I am here with providing necessary steps to be followed. But these buttons are not available in my accounting screen.
    Prerequisites
    A reference quotation has been linked to the project under Structure  Object Links. An ad hoc cost estimate has been created for the project.
    Procedure
    1.     Choose the Accounting tab.
    2.     Choose link Ad Hoc Cost Estimate.
    3.     Enter client, user and password to log on to SAP ECC.
    The client, user and password must be entered if Single Sign On is not activated
    4.     On the Ad Hoc Cost Estimate screen, choose  .
    5.     On the Easy Cost Planning screen, choose  .
    6.     Choose  .
    7.     Choose Yes when you are prompted with u201CDo you really want to create the quotation?u201D
    8.     Write down the Quotation number :_______________
    9.     Choose  .
    Result
    Quotation in SAP ERP has been created.
    Please respond to this at the earliest. Points are given for your reply. I would be great if any one provides step by step procedure for IMG activities.  Thanks in advance.
    Thanks & Regards
    Suresh. J

    Hi Suresh,
    maybe you find the following link also useful:
    [http://help.sap.com/saphelp_ppm400/helpdata/en/index.htm]
    Navigation: Collaboration Projects -> Accounting Integration -> Preliminary Costing and Quotation Creation -> Ad Hoc Cost Estimate for cProjects  or Sales Pricing for cProjects
    From the page:
    The cost planning function is executed by Easy Cost Planning (ECP). The cost estimate is always created at project level and is always single-level. The organizational data relevant to costing (controlling area, company code, and master cost center for the derivation of the activity type under which the allocation is reported) is derived from the HR organizational unit specified in the project definition. The costs are calculated based on the rates for the resource, project role, or task. For more information, see Costing Logic.
    The revenues are calculated automatically if you have selected the option Use Cost/Revenue Rates from cProjects or Use Sales Pricing in SAP ERP as the revenue calculation type for the project type that you are using for the project. You make this selection in Customizing for Collaboration Projects, by choosing Connection to External Systems -> Accounting Integration -> Make General Settings. With the last option, the revenues are calculated with the dynamic item processor (DIP). For more information, see Sales Pricing for cProjects. Then you can also call up sales pricing from within the ad hoc cost estimate.
    You can archive the ad hoc cost estimate in SAP ECC (archiving object CO_ECP) if the project has the status To Be Archived.
    Technically, the ad hoc cost estimate is saved in SAP ECC with reference to the cProjects project number. When the project is transferred, it is recosted and the cost estimate stored for the account assignment object.
    Hoping this helps...
    Best regards,
    Thomas

  • Difference in the BOM Qty during Standard Cost estimation

    Hi SAP Experts,
    We are trying to estimate the cost for the material variant, but the BOM exploded during the cost estimation, the quantity differs slightly with the BOM exploded during CU50.
    What might be the reasons for difference.
    Please give your valuable Inputs.
    Thanks
    Best Regards
    Siva

    Dear Mr.Kumar,
    <b>For any material in the material master , for Price
    Control indicator in Accounting 1 View we can either
    maintain S or V.</b>
    <i>For In House Manufactured materials we maintain S
    (Standard price) & for Sub contracted or bought out
    items we maintain V(Moving Average price).</i>
    <b>During cost roll up & release as far I know we cant
    split like 70 & 30% and we can do the costing.</b>
    So either you have to use the moving average price for
    both inhouse & bought out.
    <b>Because 1 material cant have both standard price &
    Moving Average price.
    Because bought out item's doesnot have standard price.</b>
    If your vendor is ready to give the material(Finished
    product) using the same amount which you spend for
    producing inhouse,then no issue,you can use
    standard price.But Practically it doesn't occur.
    I hope this will help to clear your doubt.
    <b>If useful reward points.</b>
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • Ad Hoc Cost Estimation

    Hello Experts
       My organization is planning to use Ad Hoc Cost Estimation feature for new finish goods items. Can any one share if you have any explanation document with screen shot of whole process? I have already gone through SAP help.
    Thnaks
    Ankit

    Hi Suresh,
    maybe you find the following link also useful:
    [http://help.sap.com/saphelp_ppm400/helpdata/en/index.htm]
    Navigation: Collaboration Projects -> Accounting Integration -> Preliminary Costing and Quotation Creation -> Ad Hoc Cost Estimate for cProjects  or Sales Pricing for cProjects
    From the page:
    The cost planning function is executed by Easy Cost Planning (ECP). The cost estimate is always created at project level and is always single-level. The organizational data relevant to costing (controlling area, company code, and master cost center for the derivation of the activity type under which the allocation is reported) is derived from the HR organizational unit specified in the project definition. The costs are calculated based on the rates for the resource, project role, or task. For more information, see Costing Logic.
    The revenues are calculated automatically if you have selected the option Use Cost/Revenue Rates from cProjects or Use Sales Pricing in SAP ERP as the revenue calculation type for the project type that you are using for the project. You make this selection in Customizing for Collaboration Projects, by choosing Connection to External Systems -> Accounting Integration -> Make General Settings. With the last option, the revenues are calculated with the dynamic item processor (DIP). For more information, see Sales Pricing for cProjects. Then you can also call up sales pricing from within the ad hoc cost estimate.
    You can archive the ad hoc cost estimate in SAP ECC (archiving object CO_ECP) if the project has the status To Be Archived.
    Technically, the ad hoc cost estimate is saved in SAP ECC with reference to the cProjects project number. When the project is transferred, it is recosted and the cost estimate stored for the account assignment object.
    Hoping this helps...
    Best regards,
    Thomas

  • The split (i.e., 70% & 30%)during standard cost estimation (CK11)

    Dear All,
    A component(Y) in the BOM of X is manufactured in house (70%) & procured directly from vendor (30%).
    Can we have the split (i.e., 70% & 30%)during standard cost estimation (CK11)
    Based on the cost we deside to make or buy.
    Please explain the procedural steps in arriving at this solution.
    Regards,
    Kumar

    Dear Mr.Kumar,
    <b>For any material in the material master , for Price
    Control indicator in Accounting 1 View we can either
    maintain S or V.</b>
    <i>For In House Manufactured materials we maintain S
    (Standard price) & for Sub contracted or bought out
    items we maintain V(Moving Average price).</i>
    <b>During cost roll up & release as far I know we cant
    split like 70 & 30% and we can do the costing.</b>
    So either you have to use the moving average price for
    both inhouse & bought out.
    <b>Because 1 material cant have both standard price &
    Moving Average price.
    Because bought out item's doesnot have standard price.</b>
    If your vendor is ready to give the material(Finished
    product) using the same amount which you spend for
    producing inhouse,then no issue,you can use
    standard price.But Practically it doesn't occur.
    I hope this will help to clear your doubt.
    <b>If useful reward points.</b>
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • System is not converting unit of measure ment while doing cost estimation.

    Hi All,
    System is not converting unit of measure ment while doing cost estimation.
    Now i am explaining system setting. based on this kindly help me.
    Our Base Unit of Measure Measuremnt in Material Master is M2 (meter square) and We have maintained Unit conversion in Master as  1 PC is <=>2.5 M2.
    We are running costing for 1 M2.
    Producion we are doing in Peaces (PC) .  and i maintained Std Value for for Machin and Labour for PC only. and we maintained charge quantity in phases also.
    While running cost estimation system is not converting std value of machin & labour into M2.instead it is showing full machin and labour time and value.
    System showing PC value for M2 Cost estimate.
    Can any one let me know where i am missing.
    Thanks in Advance.
    Regards,
    Sahil

    Hi,
    as per your explanation: 1 PC (piece) = 2,5 sqm (m2), standard values for "labour / machine" maintained per PC.
    I guess within T-code CUNI, the unit PC does not allow any decimal places (means there can be only 1 piece, 2 pieces, 2 pieces but not 1 and a half pieces, 2,63 pieces,...)
    Now if you are running plan cost estimate for quantity 1 sqm (m2) SAP picks the "labour / machine" values for 1 PC (and not for 1 / 2,5 = 0,4 pieces) as decimal places for unit pieces are not allowed so its up-rounding.
    Run cost estimate for 10 sqm (m2) which should be 4 PC and the result should be fine.
    Best regards, Christian

  • Routing during Standard Cost Estimation

    Dear all,
    We are executing the Standard Costing using t_code CK11N for a finished product,,,for the same we have maintained BOM, but no routing has been created,,
    so, during execution of Standard Costing system is prompting a msg: No routing could be determined for material AUBF0018 (green indicator not an error msg), so if we try save the costing a success msg: "The cost estimate is being save" is being prompted,, but the standard cost did not get updated in material master.
    what would be the cause? Is routing essential prior to standard cost execution,,, as our Client says that without routing also they could excute/update the standard cost earlier,,, why this problem is occuring? is there any thing need to be defined in customization for routing not to consider during standard cost estimation,
    Please help us in this regard,
    thanks
    Kumar

    Dear Urendra,
    1.After executing the costing run with quantity structure in CK11N and saving the datas,it only saves the cost estimate.
    2.Marking and release should be done using CK24.First the same has to be marked and then using the same T Code you have to
    release it,only after this steps it get's updated in the material master.
    3.In your case you have done only CK11N and not CK24.
    4.Moreover the routing get's picked automatically by the costing variant that you use,in your case even though there is no
    routing,the systems throws the message before saving,but the status will be saved with errors.
    Check with this and revert back.
    Regards
    Mangalraj.S

  • Error while doing Std.cost estimation.

    Hallo gurus,
    I am facing one problem while doing Std.Cost estimation.
    Let me explain in detailed..
    I am doing costing estimation for a Product. This product contains both Bought out Material and Customer Supplied Products.But both are coming as Material class as Raw material.
    But Overheads to be calculated differently for those means for Bought out product - 1.5% and for Customer supplied Products-5%.
    So i have created one Overhead Key and the same is attached to Overhead
    Group and this overhead group is attached to a respective material.
    In Costing sheet for overhead i have selected Dependency D010 and maintained the same along with Overhead key..
    But while executing CK11N, system is not calculating the same.
    Pls through some light on this....
    Advance Thanks..
    Regds,
    Janardhan.

    Did you attached the costing sheet in costing variant?

  • Error: no product cost estimation possible, at the releasing for accounting

    Hi Guru,
    while releasing for account in billing document for the finished product.Shows Error as:"no product cost estimation not allowed". Thou I cheked configuration checking of costing key in COPA and costing variant of relevant one looks fine. Plz guide me further more configuration and basic settings needed in to solve this task.
    Thanking u in advance
    Murali.

    Pawan,
    Thanks for your quick reply.
    I have done those change also, still it is coming same as " No Product cost estimate was found". check  you costing key 100 in COPA configuration. i have checked costing key configuration , in that costing varinat PPC1, Costing Version 1, Period/Indicator as "Current Standard cost estimate Acc. to entry in Material Master" .
    How to fix this, guide me
    Sateesh