Regarding creation of bom and material in cfolder
dear gurus,
i want help from all of u.
can any one tell me , what is the benefit of creating BOM / material in cfolder instead of R3.???????
full reward points for useful answer
thanks
[email protected]
Hi,
cFolders is a collaboration tool (tool used for talking to 3rd parties outside your company.)
Usually you will not give access to your ERP system to others. In that case you use cFolders as medium of sharing information with others.
if the 3rd party colleague want to suggest some improvements or modify you design documents etc., he can do it in cFolders. This then can be verified by you in cFolders (once modification is done he can change the status in cFolders which will trigger a notification to you ) then import it to cFolders.
regards
Murugesh
Similar Messages
-
Mass creation of BOM and Master Recipe for Plants
My client wants to do Mass BOM creation and Mass Master Recipe Creation from a Generic BOM and Generic Master Recipe for all 10 Plants by just a click of button.
He does not want to use copy function using CSO1 or C201, and do for plants 'one by one'. He finds it very time-consuming. He wants to copy for all ten plants all at once. Please advice how this can be accomplished in the best possible manner, and if by standard SAP.
Thanks,
SacDear Sir ,
What is LSMW ?
I want to Copy some bill of material from another plant .I had used T code CS01 for it but only the header bill of material is copied .
The copy field in CS01 is only for first level boms the subsequent Boms are not copied .
so is there any other way to do it ? if possible please give the detail procedure .
Regards
Pankaj .
Edited by: pankaj.001 on Mar 9, 2011 10:55 AM -
BOM and Material Configuration and Sales order..
hi,
in my requirement, i am supposed to create a project automatically based on sales order..
additional requirement is that material components on the project are based on the the selections during the sales order creation
(for example if customer chooses tiles instead of vinyl flooring then materials for tiles will be selected automaticall)
i maintained reference points in my BOM and in the standard network activities.
i also maintained the class and characteristics of the material..
the missing part i believe lies in the dependency being set for the BOM. example:
=if floortype='vinyl' then get BOM_floortype..
how to configure/set up that scenario? i cant seem to find the link between characteristic selection and output of selected BOM.
Thanks in advance.Dear ramesh,
If it possible...can u explain...regarding
(i also maintained the class and characteristics of the material..
the missing part i believe lies in the dependency being set for the BOM. example:
=if floortype='vinyl' then get BOM_floortype..
how to configure/set up that scenario? i cant seem to find the link between characteristic selection and output of selected BOM.)
Regards
chandra -
Bapi For Bom and material Bom in cs71
Hi,
In CS71 we have 2 pushbuttons on the top ie create/copy BOM and create/copy Material BOM. for these 2 funtions i need Bapi or FM for the functionality of those 2 pushbuttons.
Duplicate thread Continue with this one - Re: How to search for BAPI or FM for some requirement
Edited by: kishan P on Aug 20, 2010 11:54 AMI tried to find BAPI for transaction CS71, but it seems that its no available.
Try using BDC method for the same.
Regards,
Lalit Mohan Gupta. -
SAP PM-BOM and Material/Spares planning
Hi dear all
can some one help me how to use equipment BOM for Material/Spare planning effectively in SAP PM
Vinod
Edited by: vnodpm on Sep 9, 2011 11:33 AMHi,
BOMs in PM define the structure of that Object :eqpt,material,F.loc
Eqpt BOM is used specfic for that eqpt
Material BOM can be used for multiple eqpts in IE02 -->Construction type u can assign material BOM
Similarly F.Loc BOM
You can use this BOMs for material planning in MO
Ex :- If a particular eqpt MOTOR has a BOM -> Then this BOM would be helpful for material planning in Maintenance Order -- Components ..
Spares mentioned in BOM can be directly used for selection into Component Tab .. this will serve u an easy material planning ..
More than this there is nothing .. to my knowledge ..
regards
pushpa -
Hi all,
I am facing a problem in following scenario.
Sales Order has many line items (100-500). For procurement, Material/WBS BOM is huge.Now the case is that after the procurement, delivery happens from project and invoicing is itemwise. By Itemwise I mean that for a SO line item there will be an advance payment and the following partial invoices based on delivery.I can map this case with the help of milestones in project. But the no. of line items is huge and hence will be milestones (advance payment and progress payments)
One more problems here is that when the SO is made it gives high level item. But there are cases when the SO line items itself is broken down into various subcomponents for invoicing purposes.
Can someplease throw some light on this issue.
ThanksHi Anjali,
Can you please provide the following details:
1. In terms of material requirement, the requirement is generated from the project or from the sales order?
2. What do the Sales order line items signify?
Regards,
Jibat -
Discontinuation data in BOM and MAterial master
Dear all
pl. tell how to maintain data for parallel discontinuation.
thanksHi Raj..,
1. When you want to replace a group of materials by material you will use this.
2. in the mrp4 view the materials which you want to replace put Discon ind "1" and the remaining materials in the group "3". and give the followup material name.
3. In the Bom select the material to replace and select (F7). in the basic data tab click "Discontin. Data". give the Dis cont grup and follo up grup.
regards. -
Hi,
is it possible to define a new BOM version for each new material version in 4.6c?
For example Matnr. 123456 Version 1 has BOM 1 and 123456 Version 2 has BOM 2?
If yes, how can I define it?
Kind regards,
JensHi,
You can have multiple BOMs for the same material (using the alternative BOM number). But I am not aware of any method of attaching the alternative BOMs to a version number.
In 4.6c, the version function is VERY limited and does not have this kind of link.
Have you thought of using the version number field to hold the BOM alternative number (or vice versa). This would establish a visual link but the link would not actually do anything.
Steve B -
Regarding creation of BOM through Master Recipe
Dear all,
I am trying to create a BOM but system is giving a message as BOM can be created through Master recipe only
Please guide me where do we set this and what is to be done to avoid this
Regards
venkatHi,
Refer the answers from thread mentioned below.
Re: BOM can only be extended via Master Recipe
Regards,
Lodhi.S -
Regarding Creation of Views and Multiple Datasources.
Dear All,
I hv a COreport(Cost Center Report).the data is coming from tables of CO,FI,SD,MM.
The Tables from CO are COEP,COSP,COSS,CSKS,CRHD,CSKU,CRCO,CSKB
The tables from SD are VBRK,KNA1
The Tables from MM are EKKO,LFA1.
The table from FI are SKAT,BKPF,BSIK,BSAK.
1)Can i create a view for these tables?Can a view be called a DS.
2)With these tables i hv Multiple DS's.So can i use Multiple DS's to extract data
3)Can i use FM to extract Data?If i use FM,vll i face errors during Support?
4)Please Guide me how to create Views for these tables and How to handle Multiple Datasources.
ThanksNoor,
Have you checked suitable business content datasources.
I think you have lot of options
FIrst You need to have a multiple data source
--> Check for suitable business content datasources
--> check whether these details are already available in BW through any means (through other standard datasources to ODS)
--> Create customized extractor finally as a last option
All these tables are atandard and nost probably you would find a standard datasource ( again multiple) I am sure for costing you have standard
Few or more standard datasources or already existing BW objexts with 1 or 2(rarely) customized extractor would do the purpose that you look for,....
Good Luck !!!
Regards
VJ -
Standard cost with material with alternate BOM and Routing
I have a set up where the same material can be manufactured in 2 different production lines and each production line has two different BOMs and Routings. If I want to have a blended standard cost for the material what are our options?
We do not want to do split valuation.
thanks a lotHi
You can different PCC (Product cost collector) for both lines of the same product (Product cost by period).
You can define a production process within a product cost collector for each line of production with a combination of BOM and Routing. TCode KKF6n. It would generate a order number for each production process.
You can use each order within the PCC for each production line to capture the costs for seperate lines.
Regards,
Suraj -
Material costing without BOM and routing
I have recd an order on sample basis. I want to cost the materia. I don't have BOM and routing. I want to cost that material manually. Is there any provision in SAP to do costing in such type of scenarios.
Dear BSR,
I guess you are meaning about cost estimate without quantity structure.
Check T Code KKPAN.
Regards
Mangalraj.S -
Distribution Procedure for Material BOM and Modifications
Hi Experts,
I'm using ALE to distribute Materials, Material-BOMs and Modifications. The user select the BOM and start the distribution.
What is the right procedure to distribute Materials, BOMs and Modifications (with the entire BOM-Modifications History).
I'm using following Functions:
- for Materials : MASTERIDOC_CREATE_REQ_MATMAS
- for Modifications : Transaction CC92
- for BOMs : MASTER_IDOC_CREATE_BOMMAT
Thanks for support.
Regards,
David.up
-
Hi PP Gurus,
How i can i define MRP for a final product(X) that have a dependent requirements BOM , and whose components are X,Y,Z. Let say X,Y are externally procured, Y is internal procurement.
Now my question is
1)How to run MRP for a final product and what are all the settings required in MRP1,2 ,3,4 in material master and spro
2) what are MRP settings required for the final product(X) and internal procured(Y), Externally procured (X,Y).
3)what is the MRP Procedure X Means.
Can any one please explain in detailVamsi,
The settings for the Finished goods are dependent on the Planning strategy you are going to adopt. For example for MTO strategy:
MRP Type = PD
Lot Size key = EX
MRP Controller = Mandatory entry
Procurement type = E (For inhouse production)
Strategy grou p = 20.
The above are the bare minimum settings required.
Now for the compoennets. The MRP type could be PD or VB based on whether it is bsed on requirements or consumption.
Procurement type X means both internal and external procurement is possible.
The MRP type X refers to only BoM explosion in the SAP system. The planning is done in an external system.
That is a planned order is created with prroc type X. Depending on the situation the MRp controller could either convert it to PR or Pro order.
Remember if the subassembly is always going to be proceured externally then it makes sense to set the proc type to F. Similarly for Inhouse as E. If it could be either way then it would be X.
The planning stragty for components would be as per higher level assembly unless otherwise it is specified.
Hope this helps you.
regards
Ram -
Production Order for a material without BOM and Routing
Is it possible to create a production order for a given material without routing and BOM, I know we can
create a production order for a material without a BOM (with a default routing) just wanted to check with
the above criteria
Thanks in Advance!!Members:
Thank you for your valuable replies and time
Santosh:
Tried what you have mentioned, but system still picks up a default routing
Kaushik:
Maintained Default values in OPJG for the given order type, but system still picks up
default routing
Mangalraj:
have no issue in creating a production order without a BOM, but I am trying to see
is there a way where I can create a production order without a BOM and routing (not
even default operation )
Any suggestions on how to create a production order for a material without a BOM
and routing (not even default one )
Maybe you are looking for
-
1. I have a basic MacBook. 2. I'm running Mac OS X Version 10.6.8. 3. Under Firefox, I have my preference settings set on "When Firefox starts 'show my windows and tabs from last time'." 4. I have privacy settings set to "Tell websites I do not want
-
8.1.7.4 upgrade to 9.2.0.5
Where can I find guides/documentation on this upgrade on a HP UNIX platform?
-
Muse is not publishing to my domain name, instead its publishing to business catalyst
I have several sites that are up and running a long time now with no trouble. Today i had to sign into muse and it said my trial had begun. I signed out and back in again and now it will only let me publish to a businesscatalyst temp site Eugene
-
When I try to download apps, a message appears saying that to move forward I have to agree to the new terms of the contract, but does not allow me to agree and not low Apps. Someone can explain what is happening?? thank you
-
Too many archived logs when trying a backup
Hello all, I'm having a bit of trouble running a backup script on an Oracle instance (10g1, on Solaris). As a normal DBA practice, I guess the backup should be scheduled and run from the very beginning of using a DB. Sometimes, from various reasons,