While doing deivery vl01n,getting an error
item000015:delivery split becoz of diff.shipping points.
I created an shipping point,assigned to my plant,while assigning there was already an existed shipp.point to my plant which i was unable to delete so cotinued wit the assignment,did shipp.point determination and carried out vl01n.I got the above mentioned error.The order was complete.There is no incompletion with th order.There is only one item carried for delivery still getting the error of delivery split becoz. of diff shipping points.
Message was edited by:
ramya rao
Hi Ramya,
To resolve issue temporarily, Follow below points,
Check Loading Group of your Line Item Material which gives error and make it same as other Material Codes. (This to avoid issue in future for material)
Try to change Shipping point, in Order at Item level for the same Line Item manually to make it same as other Line Item.
If system does not allow you to make changes manually, then Check Shipping Point determination configuration and update your Shipping Point there in Manual Shipping Point option. (Temporary solution)
To delete default shipping point entries,
Check in Logistic Execution section of configuration for Picking Location determination and remove all unnecessary line items with Default Shipping Point.
Remove Shipping Point determination line Items with default Shipping point
Remove assignment of Default shipping point to your Plant in Assignment section of Enterprise Structure.
Regards,
MJ.
Similar Messages
-
Regarding Delivery related problem
Hi All,
when i am creating outbound delivery ,i am getting error like this"16 Copying is not poss.because an entry is missing in Table TVCPL: ZOR"how can i solve this problem.
its very urgent.can u pls suggest me.
Thanks & Regards
Ramesh chandraHi sagar,
Thanks for u r reply.
i am maintained copy control and deliver document type in sales document definition but i am getting same error,
its displaying like this.
"16Copying is not poss.because an entry is missing in Table TVCPL: ZOR
"16 10 Copying is not poss.because an entry is missing in Table TVCPL: ZOR TAC"
how can i solve this problem.can u pls suggest me its very urgent. -
Regarding delivery block in sales order
Hi experts,
i have problem in user exits in which i hav 2 work
my requirement is if sales organization is ____ and order type is_____
and payment of terms is ______
then delivery block must be ' Needs Approval'..
please help me out for this
Thanks in advance.....
Anoop.
Moderator Message: I dont see any problem with the requirement. All you need to do is find the right EXIT/BADI and code your logic there.
Edited by: kishan P on Nov 16, 2010 6:21 PMDear Wolf,
I dont know whether it might help you but , we had a requirement to make the information message of CUSTOMER BLOCK (which we do in XD05) to ERROR message .
It was done in the include MV45AFZZ but i do not know much technical details.
What i know is, this include comes much before the SAVE comes.
Also if you can write the logic to check the BLOCK STATUS from customer master and if it has a value, then fill the same in the respective field in sales order, system might throw that blocking reason.
If there is no reason, system will put the the default blocking reason from the sales order.
Better you post the issue in ABAP forum.
You might get more inputs there.
Check and revert back.
Thanks & Regards
Hegal K Charles -
Report regarding delivery and sales order
anyone know of a report where i can see the quantity that is left from partially delivered orders. basically, if i place an order for 100 units and delivery only 50, i wanted a report that showed me the sales order that was partially delivery with the amount that is left to deliver. va05 tells me what order is partially delivered but it doesn't tell me how much of that order is left to deliver, need a report or list to do that.
Hi
In VA05 only you can check , by adding the feild in the drilldown option . and include the quantity feild also and then you can run the report VA05 and then you can check the quantity feild.
Secondly also run the following reports
MCTC -
Material Analysis
MC(A -
Customer Incoming Orders
MC+Q --- Material, Sales Volume
Regards
Srinath -
Regarding Delivery address In PO(Urgent)
Hi All,
Here, I have a purchase order,In this i want to make changes in delivery address.How can i do this?please let me know as soon as possible
Thanks & Regards
SureshHi,
In item level, select 'Delivery Address' tab. Click on 'Address Details' icons. Maintain your address here. After maintaining the address click on Continue. The address will be copied as Delivery Address. If you are using same address in number of POs, then you can maintain the address at T Code MEAN - Address Maintenance. This address can be referred in POs at 'Delivery Address' tab. At this tab, there is a window as 'Address' (below address details button). You may refer the address maintained at MEAN at this window. System will copy the address as Delivery Address.
Hope this fulfills the query.
Regards,
Prashant Kolhatkar
- Pl. reward points if answer is helpful. -
hi
if the stock is availabel for a material what will be the delivery date in sales order and if the stock is not available for that material then what will be the delivery date in order
regards
kiranHi
The system always tries to confirm the delivery dates for the Requested delivery date entered in the sales order. If it fails to confirm the delivery on that date, then gives a future date.
System considers various lead times while calculating the delivery dates. The lead times are, Transit time, Transportation lead time, Loading time, pick/pack time, Replenishment Lead Time(RLT) etc., These lead times are specified in Route, Shipping point and Material Master.
System initially carriesout backward scheduling to confirm the delivery on requested delivery date and if it fails to confirm, then carriesout forward scheduling.
Thanks,
Ravi -
Hi All,
Is there any possibility to get the delivery Document Number from Billing Document Number ?
Points will be rewarded for helpful answers.
Thanks & Regards,
Padmasri.hi,
check vbrk,vbrp for billing details.
likp,lips for delivery details.
check VBFA for sales document flow. -
Hello Gurus
I have a requriement that for a sales order quantity (MTO) say qty is 10 then the delivery date is confirmed as 26.11.2008 based on in house production days in Material Master now if i increase the quantity to say in another sales order or same sales order for qty 600 the delivery is poposed same as 26.11.2008 but i want that to change based on qty say like instead of 26.11.2008 atleast it should say 02.12.2008 or above or some date difference how it is possible
Thanks in advanceHi rajesh
In MTO , the delivery date will change when the PP and MM part is over . So once the PP confirms that the stock is ready then it will affect the delivery date , as at the time of manufacturing that material ,if the no. of days go up then the same delivery date will trigger in the sales order schedule line .
Say for example , In house production time is 1 day , GR time is 2 days, and you have created the sales order today then the delivery date wont come at all. in MTO .But say if it comes also then check that the delivery date could be 25/11/2008. And production time is more than 3 days then the delivery date will go up, say total no. of days they have taken is 5 days then the delivery date will go to 27/11/2008.
Regards
Srinath -
Regarding delivery quantity in schedule agreement
How to get the delivery quantity for schedule aggrement ? and which table it will store?
for the tcode va33 .
tahnks,
madan.Dear Madan,
I think, Delivery Qty --> VBAP-ABLFZ
Regards,
Abir
Please don't forget to award points * -
Regarding Delivery cost !!!!
Hi All,
I got challan from transporter at Good receive time. Now I want to post this and Invoice it. In MIGO, where is put callan and Transport vendor detail. So it can be invoiced separately???
Thanks in advance
Regards
Sanjayas for the chalan no. u can place it in the delivery note.
but appart from that here is no need to give the transport vendor details in the migo.
in practical case what happens is when the goods come to ur plant the transporter asks first to clear his bill,so here first u acn do the miro with the vendor code for transporter in the details tab and choose the layout as only for planned delivery cost.
then u can do the migo for the goods receipt and then u can do the miro for the goods vendor with the layout as goods/service item.
regards,
indranil -
Hi I want to do teh shipment and delivery which automaticaly creates the Purchase order please let me know the steps.as i want to test f.19 in which i made some changes.
Hi Revanth,
You can create Auto PO based on GR only.
Not possible with delivery.
Regards
Ramesh Ch -
UR: regarding delivery item details in dealer side
hi alll ...
the requirement is to get the delivery details for a particular sales doc no and item....
i fetched this details from likp table.
but there arises a performance issue ....
it's taking lot of time to fetch these details ...
is there any alternate table or any FM to get the Delivery details instead of from LIKP table ...
waiting for ur reply....
thanksThe transaction is VL10A (there are also other VL10s, e.g. VL10G, but they are almost the same). vl06o is for when the deliveries have already been created but good issue has not been done yet.
P.S. Please do not create multiple threads for essentially the same question. If your question has changed, you might want to edit the original post instead. -
Hi to all,
I got one issue which is peculiar to me.
One central distribution channel (Considered as plant) which is in malasia supllies finished goods to customer directly to india.When that particular product is repaired it is shipped directly to malasia from that customer in India . It is present scenario
Now it is changed. That customer has to sent that product to Regional Distribution centers in chennai, bangalore , delhi. which have multiple repair facilites. That Regional D.C's are considered as plant
Now how i have to assign the return delivery address of goods to that plants in India, That may be repaired, or scraped
Normally we define special procurement keys for repair
01 -with in the plant
02- another plant
now what are all the settings required in material master, inventory
can anyone please throw me lightHi kelly,
I am not asking the return delivery , How to map the central dc(malasia) to regional DC"s (india In configuration in terms of mastre data and inventory mgmt.
Look kelly once the stock from the malasia is reduced ,once it is supplied to customer in india., after that, the customer return the goods to India plants for repair. it can be replaced, repaired Or scrapped.
lets talk about Movement types , once the goods sold from that plant (Central DC"s Plant).It has one company code. But returning the goods from customer , the stock is not updating in Malasia plant. It i going to update on India plant.how to map these situations in master data and transactional data (mainly Inv mgmt)
Now u better understand, can u please throw some light in this scenario -
Regarding Delivery and document type
Hi Gurus,
I copied both the delivery type and document type from NL and UB and I also assigned delivery type and checking rule to the supplying plant in SPRO- LE - MM- PUR- PO - set up STO. and also assigned the Document type in SPRO- LE - MM- PUR- PO - set up STO assign doc type, one step....
But when I create the STO the system issues a warning message that
Doc. type YUB should be used for suppl. plant XXXX and receiving plant XXXX
Message no. 06674
can you please give me some suggestions
ShaneHi narayan,
I am working with INTRA company STO and I have checked with the config what i have did again and now I can get the shipping tab.............. only thing is before I have forgot to assign the Issuing storage location in the transaction process. So now i can create a STO.
Now I am not sure how and where we need to make changes so that the process doesnt ask for Issuing storage location information and still create the STO between two plants in a same company.
Thank you for your responses. They really helped me in figuring where exactly i am going wrong
Shane -
Regarding delivery address in pr item details
Hi,
My Client has 11 plants in India out of those 2 plants purchase is done by other plants.eg Mumbai plant purchase material for pune plant, now when i make pr i insert plant of Mumbai in item overview. but the delivery of the material should happen in pune plant, so what is the procedure,
if in item details in delivery tab i maintain pune address is it ok ?
regardsHi,
Ya what ever address yu mention in that delivery address the material goes to that address.
Thanks.
Maybe you are looking for
-
ITunes Won't Open; Get Option To Send Error Report
Whenever I try to open iTunes, I get the message, "iTunes has encountered a problem and needs to close. We are sorry for the inconvenience." I have the option to either Debug (which does nothing), Send Error Report, or Don't Send. I have tried restar
-
Problem with rotation and landscape mode in iOS 8
From start of iOS 8 I have got problem with rotation in my iPhone 5S 32GB as well as in my iPad mini retina 32GB. Automatical rotation to landscape mode is not working correctly. For example if you take the phone or tablet to landscape mode in base d
-
I have a mac mini with an intel core 2 duo 1.83 ghz and 1 gb of ram. Last night I was making a movie as I have done before using imovie 08. After I was done it has to render and all that stuff during this time the motherboard started beeping, so I ch
-
Hi guys, after installing the newest rme-audio driver (Version 1.6) for my hdsp 96/52 on my G5 2 Ghz dual I don´t get no sound anymore. I also installed the flash update. It seems to be a driver problem, cause on my backup-system, using the 1.5 versi
-
Is there a way to password protect individual pages in the site?
Is there a way to password protect individual pages in the site? I only want specific clients to view specific pages.