We have implemented the APO in our client & planning happening through APO only.  If we have stock at QUALITY INSPECTION STOCK in ECC, APO should consider this stock also while doing the planning.
Lets say example: I have stock of 50 in unrestricted & 100 in Quality inspection stock in ECC.  While planning APO should consider the stock as 150 and should calculate the proposal quantity for remaining amount.
Plz suggest how can i achieve this.
Thanks & Regards,
Arvind S

Hi Aravind,
I would agree with Debashis on this, you can control this from demand tab in product master in APO.
What you need to do is to CIF storage location stock to APO and have this "Stock in quality inspection" ticked, which is part of standard setting.
As per my knowledge this is applicable for CTM and PPDS only, not sure about Optimizer and Heuristics.
For Optimizer and Heuristics to consider QI stock, i think below thread can help you there.
How to consider 'Stock in quality inspection' in SNP
Rgds
Sourabh

Similar Messages

  • ATP check for delivery in ECC & Sales order ATP check in APO

    Hi All,
    Can we do an ATP check for delivery in ECC , but for the same set of Materials- Plant combination , the ATP check when a SO is created should happen in APO .
    We do not want to remove the Business event 'B'  which is meant for delivery in  APO . For some materials we need APO ATP check to happen for delivery   & for some it should be in ECC  & for SO  the ATP check should happen in APO .
    Even if we do not have check instructions pertaining to Business event 'B' & a particular check mode (for the materials where the ATP check for delivery should happen in ECC & SO check to happen in APO)  , when we are doing an ATP check for delivery , it is still pointing to APO ATP check rather than ECC check .
    Any pointers for this is highly appreciated.
    Regards
    Surendra

    Hi Surendra,
    For SO, business event is A and for delivery it's B. When integrated with ECC, the check rule in ECC points as biz event in APO.
    You can control ATP check by customized settings for check rule in ECC.
    Also, by setting requirement class and requirement type in ECC, you control check mode in APO. So, even if you dont define for check mode in APO, the system might refer from ECC for the ATP check settings. Look into your ECC customization for how requirement class is derived and settings for requirement type. (based on MRP type, strategy grp and Item cat).
    I'm not sure how you can control ATP to happen for some sales orders/deleveries in ECC and for some in APO, since check mode is mentioned in material master.
    However, there are ATP BADIs (business add-ins) available in both ECC and APO, whch can serve your purpose.
    Regards,
    Bipin

  • Plant stock to be consider in MRP MD51

    Hi all,
    My client want while running MRP for project MD51 that time plant stock and other project stock should be consider. MRP should not generated requirement for material available in Plant stock and other project stock i.e. special stock category Q.
    With Regards,
    Ashish

    Dear ,
    In SAP Stanrdar while running MRP on projects -MD51  , it does not  consider unrestricted use  stock .
    If you want to consider planr stock or speciall stock except project stock , you  have to transfer the stock to the WBS ( MB1B-412Q) so that it will consider it as a project stock during MRP and will not genrate any requirement.
    You can try with Cross Project Indicator as 1-All the segments on stock in various wbs  and keep availablity check key accrodingly  (01) in MRP3 view .
    Regards
    JH
    Edited by: Jiaul Haque on Oct 26, 2010 9:21 AM
    Edited by: Jiaul Haque on Oct 26, 2010 9:24 AM

  • Validity of exchange rates are not considered in APO DP planning books

    Dear SAP Gurus
    There are couple of posts on this topic without any conclusive reply and so I am posting this again.
    We plan and manage data in multiple currencies and wish to maintain the same in APO DP. We have defined an exchange rate type in the planning area  which is used for planning purposes. Please note that we have defined only one planning area  for all global products hence data is stored in one currency only.Exchange rates between different currencies for this exchange rate type are maintained in ECC and then transferred to APO via RSA1 using standard functionality. While exchange rates are maintained with validity (valid from date) in this table, APO DP planning books only consider latest exchange rates. This behaviour changes the data in the planning book every time there is a change in the exchange rates and is a complete nonsense.
    I believe there is a macro function CURR_CONV_FACTOR() which can be used to bring exchange rates as key figures in the planning book based on validity but given that this macro works only between 2 exchange rates and we use 10 different currencies, its not feasible to use this macro function for all combinations.
    Is there any other way to have exchange rates based on validity ? Does SAP has any guidelines / best practice on how to handle multiple currency scenarios in DP.
    We are on APO V5.1.
    Thanks
    Zorba

    Dear Nitish
    Thanks for the message.
    Unfortunately your observation is not correct. If you change an exchange rate with future validity,
    currency data in the entire horizon (past and future) adopts to that exchange rate.
    It doesn't matter whether KF is ready for input or not as data is stored in any one currency only in PA and conversion happen only when you change the currency in the planning book (column 0)
    Do some more testing and you will notice the above behaviour.
    btw, which version of SCM are you on ?
    Cheers
    Zorba, the Budha

  • Long term planning in ECC for materials planned in SAP APO

    Hi SAP PP and APO Experts,
    I would like to know whether it is possible to plan a material in SAP ECC with Long Term Planning to create Simulative Planned Orders in ECC, when the MRP Type for the material is set to X0 (Planning in SAP APO).
    Warm regards,
    Prem

    Hi Dhaivakumar,
    Appreciate your prompt response.
    My business is MTS. I have made all settings for LTP planning for the material. (M|RP Type is set to X0-Planning in APO). When I execute the transaction MS02, I get the error message "Material 5200000013 J310  is not planned automatically. Message no. 61008". The details of the error message is:
    The material 5200000013 in plant J310 or in MRP area  is not included in automatic MRP because
    either the MRP data for plant J310 or MRP area  has not been created
    or an MRP type has been entered for the material in plant J310 or MRP area  that does not allow automatic MRP.
    Warm regards,
    Prem

  • Use of ECC planningtime fence when planning with APO SNP

    I am using SAP ECC for execution, and SAP APO SNP heuristics for planning.
    So, for a product planned in APO, the MRP type in ECC is X0.
    So, as there is no MRP planning in ECC for such a product, what is the use of the ECC planning time fence? I think it becomes redundant in ECC - yes? In fact, I do not see it in the stock reqs list (MD04).
    So, in ECC, all that 'planners' can do is to manually reschedule planned/production orders - yes?
    Any shortage alerts will only be visible in APO - yes?
    Thanks for any advice on this...

    Hi
    Please find below the answers from my side.
    Two questions in my mind...
    So, if MRP type = X0 in ECC, the planning time fence is not seen in MD04.
    First of all, we should not have any planning time fence in ECC, as it is not adding any value for products with MRP type X0. Yes in MD04  we can not see it.
    2. How can ECC users easily distinguish between planned orders which are in the 'short term' from those which are beyond the SNP production horizon?
    I think they have to use APO alerts. I think that should be right approach as APO is leading planning tool.
    Thanks
    Amol

  • Raw material stock to be consider against sales order in md50(i.e mrp run)

    when i run MD50 against particular sales order, it is not considering stock of raw material. it is creating planned order for raw material which is already in stock. my problem is that when i run mrp it should consider my raw material stock.
    manish.

    Hi Manish,
    Correctly said by all our Experts (Mr.Brahmankar , Mr.Dharma)
    Now all you have to decide whether you want to go for this individual or Collective requirment type.Because on one hand
    - If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments.
    Also you will find PR and Plan order with account assignment of Sales order (in case of MD50)
    - If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03 / MD41 / MD42).
    Regards,
    Dhaval

  • Adding feild to CIF_MATLOC on ECC side which is available on APO side

    Hi All,
    In the structure CIF_MATLOC in the ECC side I need to add a field (RELDT- replenishment lead time) which is available in the /SAPAPO/MATLOC table in the APO side.
    Please tell me the procedure, how to proceed with this requirement.
    Thanks in Advance.
    Regards,
    SriLalitha.

    Hi Venu/Himadri,
    I receive the same issue "Error: Extension 'ZDELVRY01' is unknown" in XI while trying to send the ASN from SUS to MM.
    Can you please explian how you were able to over come this issue.
    I use process code - DELS. Message type - DESADV
    Thanks,
    -Devi Swain

  • Regarding MB5B(stock details) transaction

    Hi all,
        there is a standard report in SAP for Stock details on posting date in MB5B transaction. If you go in to this, there is a field 'layout'. what is meant by that layout and how can we add to any report?? after executing we will get a list. but i need to dispaly all field in ALV grid. i am copying standard prog to our prog and doing modifications. Is there anybody developed the same functionality, please send me that code. becuase this is some what urgent..
    Thanks in advance
    chandu

    Hello Chandu,
    For a moment forget about this <i>Layout</i> field on the initial screen of the transaction MB5B. Just give the other input parameters on the selection screen and execute.
    You will see the results in a list format. There's a Menu Option here called <i>Settings-->Layout.</i> Just try that option out and you'll discover that the layout of the list can be changed and also saved. When you have saved at least one such Layout, you would be able to enter the name of the layout in the initial screen of the transaction the next time you execute it.
    Unfortunately, there's no option here to see the list in an ALV Grid. There has been a similar post sometime back: MB5B IN ALV FORMAT
    And the Layout option in the case of this transaction has been impe=lemented manually, using the function modules from the Function Group SKBS.
    Hope that helps. If this solves your doubt, then please reward the points accordingly and mark the thread as answered. Else get back with further doubts.
    Regards,
    Anand Mandalika.

  • Regarding MD04, Stock requirement Report

    Hi SAP Guru,
                              Hi Sir I am running MRP for the 05 finished material. All the Finished material has some material common and and Semi-finsief  also.Lot SIze for the SFG and raw material are FZ and safety stock maintained,MRP type-PD.
    Now after running MRP in MD04  report.Some of the material which are common in BOM are being being display no of times in Order tree.Couls you please explain it did so
    Regard
    Bhupendra

    Dear Sir,
    I ahve sechduiling agrrement which is being generating daily. Some of the BOM componenet exploded multiples times. I dont know why this happening although it is not affecting the overall requiremment but still client deman
    In my case me of the Semi-finshed of the BOM component multiples times
    Regard
    Bhupendra Singh
    Edited by: Bhupendrasingh on Sep 7, 2011 11:25 AM

  • DOCUMENTS REGARDING ECC 6.0

    Hi all,
    Can anyone send me some gud documents ( preferably a pdf file ) regarding the features of ECC 6.0 version.
    I am new to these version and i need to know all about it..Plz send it as soon as u can..
    Thanks in advance..
      Mohit

    hi,
    chk these..
    https://forums.sdn.sap.com/click.jspa?searchID=2762568&messageID=3303793
    https://forums.sdn.sap.com/click.jspa?searchID=2762568&messageID=3424058
    regards,
    priya.

  • Regarding finding stock outs of material

    Dear All,
    I want to make a Z report of the number of days for which stock was Zero for a particular period.
    I dont want to use Standard report MC.9 as there required to count stock out days manually.
    Please guide me from which tables I can bring the required data.
    Thanks All,
    Rohan

    Hi,
    try report MB5B
    or used following table
    Stock tables: MARD, MSKA, MSPR, MSLB, MBEW /MBEWH
    Historical stock tables- MARDH, MSPRH, MSKAH, MSLBH
    MIGO TABLE: MKPF, MSEG
    Regards
    Kailas Ugale

  • Regarding required ABAP knowledge to understand the APO-BW developments

    Hi All,
    Could you pls let me know what kind of ABAP skills that an APO consultant must have to understand the development code in the  routines and user exits.
    Best regards,
    Ramya

    Hi Ramya,
    For ABAP consultant to work in APO, mainly you need to learn and
    focus on working with structures. 
    Other areas for focus will be Badi's, user exits, function modules,
    routines, enhancements which are more or less similar to other modules
    Regards
    R. Senthil Mareeswaran.

  • Regarding Constant Stock of a material

    Hi ,
    IF i want to maintain stock of a Material-"A" always as 1000. That means the stock of the material-"A" should never be less than 100. Please suggest what settings need to be maintained to make stock to be always as 1000.
    Thanks in advance

    Aditya,
    Put 1000 pieces into stock, and then block the material for any subsequent issues or receipts.  Since there are no issues or receipts, the stock will remain at 1000.
    You can block a material in MM02, MRP1 tab,  by entering the appropriate code in Plant-Specific Material Status.  You may have to configure a new code that blocks all movements.  OMS4
    Or, you could restate your question with the rest of your requirements.
    Best Regards,
    DB49

  • Need info regarding ECC 6.0

    Hi All,
    Can you please provide me some good links regarding the addtional functional feature added in ECC 6.0 terms of FI & CO when compared to 4.7 version.

    hi
    please check the SAP solution browser

Maybe you are looking for

  • Existing Calendar Entries not Syncing to iCloud

    I have an iPhone 5 running iOS 7 that has five calendars.  I attempted to sync it to my iCloud account today and it only syncs one of my calendars ("Work").  The other calendars ("School", "Home" etc), show up in iCloud in the Calendars sidebar, but

  • Events showing up many times in iCal on Mac and iPhone

    Certain events are showing up many times within my iCal and iPhone. These are clearly duplicate events and can show up as much as 50 times or more on the same day at the same time. Some additional background: 1. I use mobileme and have my iCal syched

  • Can't connect to work VPN

    Hi, I've read through some previous posts, but haven't had luck connecting to the corporate VPN at work.  I can sucessfully connect using a mobile wireless dongle (that uses the mobile telephony network) connected to my computer.  I tested this to ma

  • Pb to connecting to the demo database

    hi , i'm newbie :) i have just installed TimesTen with demo , i can't see how can i connect to the demo database in the command line (i'm on Linux) what's the name of the demo database ? thanks for help :)

  • Macbook wakes up when pulling out the USB mouse.

    When the lit is closed, the computer is asleep, the mouse is plugged in and I want to move it. If I disconnect the mouse the computer makes "that wake up sound" even if the lit is closed. Is this allright or could I do something? (Sorry for the bad e