Regarding post installation job's

Hi,
could you all please help me in knowing the jobs that are to be scheduled after installation of an ECC server. I want to know the common jobs that are scheduled after the installation. The jobs may also include background jobs.
I hope some of the jobs are like checkDB, verifyDB...could you help me with more..
vineeth

Hi Vineeth,
You must configure all the SAP standart REORG jobs, see Note 16083 - Standard jobs, reorganization jobs.
You also can schedule CheckDB & CleanupLogs through DB13
Hope this help
Juan
Please reward with points if helpful

Similar Messages

  • Regarding post installation jobs

    Hi,
    could you all please help me in knowing the jobs that are to be scheduled after installation of an ECC server. I want to know the common jobs that are scheduled after the installation. The jobs may also include background jobs.
    I hope some of the jobs are like checkDB, verifyDB...could you help me with more..
    vineeth

    Hi vineeth,
    with transaction SM36, you have the button "Standard job" that you can use to schedule all necessary job in your system. This function allow to schedule job in the right client, so is better to launch it after client copy. Not all job are mandatory, for example if you haven't a livecache you can not schedule the job regarding it.
    The job for database are to be scheduled from transaction DB13, usually I schedule from DB13 the check DB, update statistic and clean up log
    Best Regards
    Giuseppe
    Message was edited by:
            Giuseppe Tagliente

  • Regarding post installation

    Hi,
    could you all please help me in knowing the jobs that are to be scheduled after installation of an ECC server. I want to know the common jobs that are scheduled after the installation. The jobs may also include background jobs.
    I hope some of the jobs are like checkDB, verifyDB...could you help me with more..
    vineeth

    Hello Vineeth,
    Generally after the installation as a part of post installation we schedule standard background jobs which can be done through SM36, you may find a standard note on the Standard background jobs.
    Best Regards,
    Sachin.

  • Post installations in PI7.0

    Hi all,
    Can anyone explain me regarding post installations in PI7.0
    Step by step.
    Thanks,
    Kalyan.

    hi,
    Post-Configuration Guide
    http://help.sap.com/bp_bpmv130/Documentation/Installation/Configuration_Guide_FP.pdf
    Post-Installation Steps of the NWDI in the SAP NetWeaveru2122 2004 SPS15 Sneak-Preview
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/419b479b-0801-0010-f8a1-c26208b4b209
    /people/sravya.talanki2/blog/2006/11/15/post-installation-steps-for-activating-adobe-document-services-in-sap-xi-nw-2004s
    Post installation Steps.
    SLD configuaration..
    http://help.sap.com/bp_epv170/EP_US/Documentation/How-to/Configuration/Post_Install_SLD_NW_2004s.pdf
    http://help.sap.com/saphelp_nw2004s/helpdata/en/14/39084136b5f423e10000000a155106/frameset.htm
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/xi/workingwithSystemLandscapeDirectory+%28SLD%29&
    http://help.sap.com/saphelp_nw04/helpdata/en/78/20244134a56532e10000000a1550b0/content.htm
    http://help.sap.com/bp_bpmv130/html/Specific_Info.htm
    Exchange Infrastructure How-to Guides for SAP NetWeaver 2004 [original link is broken]
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/ac6de690-0201-0010-54ac-8923089dcc97
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/a5550de0-0701-0010-a8b4-9fd433a080f3
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/ac6de690-0201-0010-54ac-8923089dcc97
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2498bf90-0201-0010-4884-83568752a857
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/a5550de0-0701-0010-a8b4-9fd433a080f3
    Tuning guide -
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/70ada5ef-0201-0010-1f8b-c935e444b0ad
    Thanks,
    Vijaya.
    Edited by: Vijaya Lakshmi Palla on Jun 18, 2008 8:32 AM

  • Regarding the Post Installation and SP Level

    Hi All,
    We have installed NWDI on our existing EP Dev Server.Installation was successful but regarding the post installation we are in a thinking as how best we could patch the newly installed NWDI system.
    As our EP system is on SP 11and NWDI system on sp 9,Do we need get EP and NWDI Patch level in Sync? as there would be developers working from EP and BW as well on this NWDI server.
    Here My doubt is:-
    Do the Nwdi System needs to be in the same patch level as our EP system (as it is installed on EP itself.)
    Do we need to run the Template for the Newly installed NWDI only after the Patch Upgradation?
    Kindly Advice
    Regards
    Santosh.N.G

    the patch level of EP and NWDI should be same

  • Post - Installation SAP R/3 4.7 - Urgent !!

    Hi All,
    I have installed SAP R/3 4.7. I would like to know what are the post-installation steps involved in it. I went through the installation guide. But, I am not able to understand the details provided in that. Can somebody tell me what are all the steps involved as a part of the post installation.
    Kindly Help !!! Its urgent !!
    Regards,
    Rose.

    Hi,
    Initial Consistency Check
    SM28
    Edit Batch Jobs
    Workbench Organizer Reconfiguration
    TMS Configuration
    Import Printers
    Client Configuration
    SCC4
    Set System Change Option
    SE06
    STMS
    SCC7
    SM37
    Deleting Source System Profiles
    RZ10
    Reconfigure Operation Modes
    RZ04
    Delete Update Failures
    SM13
    Delete Batch Input Sessions
    SM35
    Reorganize Spool
    SPAD
    SP12
    Delete Invalid Background Control Objects
    Restrict Outgoing Email and Faxes
    SCOT
    Adjust RFC connections.
    SM59
    Adjust Logical Systems names
    SALE
    Hope this helps.
    Cheeers
    Deepanshu

  • Post Installation Steps after installation of sap sol 7.1

    Dear all
    Can you pls share me what are the post installation steps required after the installation of Solution Manager 7.1
    I know some of them as same in ECC
    1 ) SICK
    2) STMS
    3) RZ10 - Profile parmeters
    4) SGen
    5) Back ground Jobs scheduling
    Also tell me which parameters need to be set in solman
    regards
    Shakshi

    Hi,
    You can refer below guide for setup:
    https://websmp103.sap-ag.de/~sapidb/011000358700000872072011E
    Regards
    Vivek

  • Post installation error

    Hi folks ,
    job cancelled while  doing post installation (SGEN ) and 89% job completed....
    it show following error
    ZDATE_ILLEGAL_LOCTIME     
    how can i solve this error .....
    give me suggestion
    regards
    sathish

    Hi,
    please check with ABAP dump error
    How to correct error line what it says
    some times it can be time of Db server is not in sync with Application server or difference in O/s and application server.
    Also can you look at this thread
    [ZDATE_ILLEGAL_LOCTIME error]
    and follow the notes
    SAP Note 447839 - ZDATE_ILLEGAL_LOCTIME
    Note 481835 - Analyzing the time zone settings

  • IDES POST INSTALLATION

    Dear Gurus ,
    SAP ECC 6.0 , Windows 2003 Server 64 bit , DB2 , 4GB RAM , 320 GB HDD
    While Post installation of ECC 6.0 , i take too time to complete SGEN Transaction, still not completed
    it shows
    Data for Current Job:
    Job Name : RSPARAGENER8               Start time : 17:21:25
    Job Status: Active                               Start Date : 29\04\09
    Progress:                  19% Complete Edited Objects     47658   from 251408
    Complete in Approx    : 99 Hours    16 Minutes...
    when I Check SM50 STATUS -
    > ON HOLD   and SM37 -
    > Active
    Give Me suggestion to Complete the Post Installation......and   Whether the post installation is Correctly Going or Any issues .........
    regards
    SATHISH.N

    Hi
    Complete in Approx : 99 Hours 16 Minutes
    This will change accordingly
    Being ECC6 ideas system you have lot of objects to be regenerated it will take time.
    As korva said you should have configured STMS/Upgrade kernel/Import profiles/update your patches then you would have run SGEN.
    Regards
    Uday

  • Compliance Calibrator Post Installation checks.

    Dear all, i'm trying to find some documentation regarding the CC post installation checks to ensure the system is installed fine. This is important because the installation is done by the customer themselves and I need to verify them before they should proceed to create or mitigate any rules in the system. Is there a checklist which i can refer to ?

    Peter,
    You'll find this to be quite a task - if i have understood you correctly. That is if you want to verify that installation has suceeded and that it is actually working correctly.
    Once you have gone through the post installation steps. That is, setting up the JCo Connections, SLD, Uploading the rules, usobt etc etc (This maybe creating the rules), Running the Full Sync for users/roles/profiles, analysis and management report background jobs and have not run into problems it is probably safe to say that everything has gone ok.
    What i would do after this is select a couple of sample users and execute some user analysis reports and use data in the backend R/3 to verify the reports.
    There isn't as far as i know a document which is able to <i>verify</i> the installation.
    Hope this helps,
    Cuneyt

  • SCM Dialog instance installation, post installation activity for livecache

    Hi All,
    We have installed SCM 7.0 Central instance with Livecache server. Now we have successfully installed additional application server (i.e. Dialog instance) for this SCM 7.0 system.
    We need to know
    After installation of SCM 7.0 Dialog instance what are the post installation activities?
    How we should integrate the livecache server with the Dialog instance which is installed on different hardware.
    We need to know how livecache server understand that the additonal application server ? Is there anything to do in LC10?
    Please reply
    Thanks

    Hi Ashley,
    Thanks for your time.
    Since i am installing app server, the SAP<SID> group will have to be online on this node. There is another group containing shared drives for components for livecache. This is also required to be online on node 2 for app server installation.
    The only cluster resource I can move back to node 1 is ORACLE<SID>. Tried doing that, but no luck.
    Any one here facing similar issue during SCM dialog instance installation in MSCS environment?
    Regards,
    Kiran

  • Post-Installation Process Error (Template Base)

    Hi Experts,
    I try to run template base post-installation process in client 100, we never run post installation process in client 001 (Which is recommended before making the client copy), while doing template base post-installation process failed (got error) at PIPostInstallProcess step 7 u201CAdd Installed Product2u201D I move further and then it failed at step 19 (u201CConfigure the Role of the Integration Serviceu201D) and 20 (Register Queues) same process. It failed at number of process, so what I did I move to manual post-installation process but I stuck in the step were we need to import exchange_profile.xml because I can not see this file at sap\BX0\SYS\global, is this file being deleted by template base post-installation if yes then how to recover it?
    Without this file i can not complete the manual post installation process...:-(
    With Regards
    Sunil

    i think we do not need exchange_profile.xml file in 7.0 post-installation. ok i skip that step in post-installation now when i created LCRSAPRFC_BX0 in Visual Admin services->JCo RFCProvider and try to start it, it is throwing an Error.
    I am using user "PI_JCO_RFC" has respective role assign to it.
    I am not sure whether i am providing correct value to these filed or not
    Gateway Host
    Gateway Service
    Application server host
    System Number
    Client
    can somebody send me detail about these fields
    With Regards
    Sunil

  • Post installation error "Local logical system is not defined"

    Hello everyone,
    I freshly installed the latest SAP NetWeaver 7.01 ABAP Trial from scratch and like to configure ALE.
    I followed thew steps of http://help.sap.com/printdocu/core/Print46c/EN/data/pdf/CABFAALEQS/CABFAALEQS.pdf
    (ALE Quick Start) but cannot get through the following step on page 12:
    From the R/3 Implementation Guide screen in TA SALE
      choose Basis
        Application Link Enabling (ALE)
          Modeling and Implementing Business Processes
            Maintain Distribution Model and Distribute Views
    Clicking on Maintain Distribution Model or using TA BD87, I immedeately get the following error:
    The initialization of the logical system has failed.
    With TA BD64 the error: Local logical system is not defined arises. I also looked at
    /people/swaroopa.vishwanath/blog/2007/01/22/ale-configuration-for-pushing-idocs-from-sap-to-xi,
    /people/vikash.krishna/blog/2006/10/15/replicating-hr-master-data-part-1 and
    /people/kevin.wilson2/blog/2006/11/13/ale-scenario-development-guide describing the same actions
    to find an explanation, but without success
    I assume, the error does not occur because the trial version does not support it, but
    because of other post installation activities that must be done.
    I already created two logical systems and assigned them to newly created clients 100 and 200,
    but this did not have any impact on BD87 and BD64 as i was hoping.
    Does somebody know what to do here?
    Thanks in advance and kind regards,
    Andreas

    Hi Naveed,
    i made the following settings:
    SCC4: new entries created
    100     Sending System
    200     Receiving System
    SM59: new ABAP type 3 connections:
    RFC_DEST_LS_100
    RFC_DEST_LS_200
    - Tab Logon & Security Logon user: current user (bcuser client 001)
    Connection test is successful
    - Technical Settings: target host: localhost
    SALE: new logical systems created
    LS_100
    LS_200
    SCC4:
    double click on 100 Sending System   configured with logical system LS_100
    double click on 200 Receiving System configured with logical system LS_200
    kind regards
    Andreas

  • Error in PI 7.0 not connect to go.bat & Post installation errors

    im completed installation of PI 7.0
    SYSTEM NAME : BIW7
    System ID   : BI7
    DB ID       : BIW
    Instance No : 04
    for post installation unable tp connect  go.bat
    im giving right password
    http://biw7:50400/ExchangeProfile   = it gives error 404 not found
    http://biw7:50400/sld   gives following error
    503   Service Unavailable
    Application cannot be started.
      Details:   com.sap.engine.services.deploy.container.ExceptionInfo: Naming error.

    For exchange profile, ur URL is incorrect. Try this
    http://biw7:50400/exchangeProfile
    Regards,
    Prateek

  • SLD port problem in Netweaver XI post installation configuration steps

    Hi All,
        Recently we changed the port number of the SAP server to 80.Every thing working fine.
    When ever we are configuring the XI that mean the post installation steps for Exchange Infrastructure it giving the errors in machine_technical_configuration  step.
    Error Message is:
    Element 'SAPConfigLib.NW5.Unclassified.addInstalledProduct':!BrokerImport.import_of_element_failed!!BrokerImport.Fehler!com.sap.tc.lm.ctc.cul.cpi.exceptions.CPIBaseException: <Localization failed: ResourceBundle='com.sap.tc.lm.ctc.cul.cpi.CPIResourceBundle', ID='com.sap.tc.lm.ctc.cul.cpi.BaseException_BASE_EXCEPTION', Arguments: []> : Can't find resource for bundle java.util.PropertyResourceBundle, key com.sap.tc.lm.ctc.cul.cpi.BaseException_BASE_EXCEPTION:com.sap.tc.lm.ctc.provider.javaServiceProvider.JavaServiceWriter.writeElement!BrokerImport.LINE!157-:com.sap.tc.lm.ctc.cul.broker.BrokerImport.importElement.86
    -:com.sap.tc.lm.ctc.cul.broker.BrokerImport.importElement.128
    -:com.sap.tc.lm.ctc.cul.broker.BrokerImport.importElement.128
    -:com.sap.tc.lm.ctc.cul.serviceimpl.importservice.CULConfigurationImport.importConfiguration.96
    -:com.sap.tc.lm.ctc.ccl.templateinstaller.StepExecuter.run.41
    Element 'SAPConfigLib.NW5.Unclassified.addInstalledProduct':Error during executing Java Reflection:IO error: Unable to open connection to host "mmsr18:50000". The host is down or unavailable..
    Is there any solution to solve this....
    Thanks & Regards,
    Vivek.

    hi
    check if the new port(80) is maintained in tcode- sldapicust
    Thx
    jonu

Maybe you are looking for

  • Warranty Counters Not Displaying in Customer Warranty Check

    Dear All More then two Characterstics for service in warranty master  are not displaying in my warranty check when i try to check the warranty for serial numbers.what i have done is 1.Create Characterstics as numeric value. 2.Define warranty counter

  • 890GXM-G65 Bios Update Render Unlocked Phenom Locked

    I have an "unlocked Phenom II X2 560", it was unlocked (Phenom II X4 B60) and running well for 3 month, but today after I update the bios to version 1.D, I missed my unlocked cores. Why this is happening? What I have to do to recover my unlocked core

  • Display of values in sapscript output

    Hi, I am working on a sap script in which i am displaying the data coming from the program.but in 1 column there is a problem that it is not able to display the data properly i.e. it is a text which is not able to display properly. Same type of text

  • I am having trouble burning a disk of my project what should I do?

    I am having trouble burning a disk of my project what should I do?

  • User Exit EXIT_SAPLCOIH_009 (ZXWOCU07)

    Folks, I've learned that EXIT_SAPLCOIH_009 (ZXWOCU07) should trigger on the "SAVE" event in IW31/32 but I just couldn't get it to work. I've added a simple code(perform xxxx) in ZXWOCU07, activated, set the breakpoint and then saved a few changes via