Regarding Production Resource Tools in Plant Maintenance Module

Dear All,
In our client group we have 3 maintenance companies PM1, PM2 and PM3. Presently we are implementing SAP PM in PM1.
My issue is like this...we have lubricants which is used for maintenance work in PM1.
This material is brought from PM2 at free of cost, so we(PM1) no need to pay any amount to PM2.
As if now we have created lubricants as material and getting the material with free of cost in PO. Now when I bring this material for free the price is zero.
when we use this material in our maintenance order, we need the cost of the lubricants used for maintenance.
After searching few forums, i came to know that lubricants can be used as PRT tools.
If anyone has any idea about this...please tell me how to solve this...
thanks in advance,
Nagesh

This is wrong. To fix the first wrong thing you should not do a second wrong thing. If a transaction happens between two company codes it should be seen from several angles. Please ensure that MM and FI have agreed for this. Also, using lubricants as PRTs is very odd. PRTs don't get consumed. Components do. The stock goes down when u issue them to the order. U don't return the lube oil cans after you complete the order!
My suggestion is that you sit with the MM and FI consultants and together come to a conclusion. This can't be done in isolation.
thanks
Bala

Similar Messages

  • Difference bet ween Fleet Object and Production Resource Tools

    Hi all,
    Please give me the difference between Fleet Object and Production Resource Tools in Plant Maintenance
    Thanks in Advance
    Thanks,
    shriraam

    Dear,
    Production Resources/Tools (PRT)
    Unlike machines and fixed assets, production resources and tools (PRTs) are movable (not stationary) operating resources that are required to perform an activity and can be used repeatedly. For example, PRTs include documents, engineering drawings, jigs and fixtures, and measurement instruments.
    Fleet Management
    Here can map the vehicles as equipment master records and enter vehicle-specific additional data, which is displayed in the system on two additional tab pages. This means that you can now specify important fleet data such as the license plate number, load volume, consumption data, fuel card number, engine data, or fuel type and so on directly in the equipment master record.
    You can also perform maintenance planning for a fleet object. You can make the date of the next scheduled service dependent on the distance
    Please refer this link,
    [Link|http://www.nd-solutions.com/pdfs/white_EAM/EAM_ConfiguringFleetMgt.pdf]
    Regards,
    R.Brahmankar

  • Production resources/tools

    Dear gurus,
    Could you please help me with the following issue.
    There is a neccessity to use production resources/tools, because we have materials, that
    Firstly, are produced,
    Secondly, are used in production, but should not add value to it,
    Thirdly, have some durability, which is diminished during the usage of PRT,
    Forthly, are being repaired, and the durability is being restored.
    Plant maintenance is not implemented.
    I know from help, that it is possible to create PRT as a material, machine or a document and maintain in the rooting.
    Tell please, is it possible to create a material type FHMI (PRT) in order to:
    1. Produce it (not procure).
    2. Maintain "ST" a basic UoM for it, but also to maintain some durability for it somewhere.
    3. Maintain it in the rooting.
    4. During the production order confirmation, diminish the durability without diminishing the quantity.
    5. To issue this material to CO-order for repairs (without plant maintenance), when the durability reaches 0, and somehow to restore the durability for it.

    Hi Nikolaj,
    It's very common requirement in many implimentations. But unfortunatley SAP does't support that process in PP module. Only from PM module we can support that process.
    But there are many ways to map process by using small development.
    Eg.1 Delcared PRT as material master and assign it in BOM. And update a Z field in BOM depending on the number of production order qty. when it reaches zero we can trigger message!!.
    Any way you need CO order only for settlement. So you can always book cost for restoring the PRT to relevant cost object.
    Eg.2.
    Create other or doc PRT and assign it to a routing for a specific operation. And then trace that operation in the production order by a development and manage the life of PRT.
    Reg
    Samson

  • IA07 : Key for Task List Group and Production resource tool number link

    HI abapers,
    In IA07 TCODE , i want to retrieve Key for Task List Group( PLNNR ) and Production resource tool  number ( FHMNR) .
    In technical settings for both the feilds, structure names are mentioned.
    Is there any function module or table link to retrieve both .
    thansk & regards
    Raghul

    Hi Raghul,
                    i am also facing the same issue. Kindly let me know if u get any solution for this.
    Thanks in advance.
    -AruN.

  • Status: Production resource/ tool

    Hi,
    I don't understand the function status for production resource/ tool.
    1. MM01. in the view Production resource/ tool and in the field Plant-Specific Material Status there are 2 choices. 01 blocked for procment/whse and 02 blocked for task list/ BOM.
    I would like to blocked the material for the routing. when I choice 02 It isn't been blocked for the routing. when I choice 01 It is blocked. I don't understand it because it is the opposite.
    2.The same in the PRT Master there are 3 status 01created on  02 release for PRT usage planning, 03 release for production. When I choice 02 I It is blocked for the Routing although 02 has to be release for the routing. with 03 function correctly
    Can you explain me how the status function in the 2 cases. Do I do it wrong?

    hi
    May be it has been customized in different way .kindly check in OMS4
    regards
    thyagarajan

  • Production resources/tools (PRT)

    hi,
    my client is doing gear mfg.they want to maintain machine tool (PRT) in sap. there want map prt for every operation.
    no plant maintenance module.
    and they want to maintain PRT in inventory
    we can create prt in material master and assign PRT in routings.
    How can issue prt for production order (but not a consumable item) and how can i trace it
    if tool(Equipment) gets repaired. we have to procure new tool .
    tool is transferable from plant to plant
    how can i map this???
    thx in advance

    Hi Brahmaji,
    Thanks for your response.
    1. I had set the PRT availability as you suggest.
    The thing is, PRT availability check still say that the PRT is available - while the stock of this PRT is 0
    2. CF11 only show the production order no & the order quantity that use this PRT.
    It didn't show the required quantity of the PRT (let say, if 1 pc of FG need 2 pcs of this particular PRT, it will only show 1 pc in this report)
    3. If it is not possible, then could you please advice, how the system could inform us when and how much to buy the PRT to ensure that the PRT quantity will not be in shortage?
    If the material PRT can't fulfill the requirement, then which PRT type would be the best sollution?
    Thank you.

  • Creation of Sub Job Order/ Maintenance Order in Plant Maintenance Module

    Dear SAP Expert and Gurus,
    I am new in SAP Plant Maintenance Module, and right now having problem to create sub Job Order/ Sub Maintenance Order. Kindly provide the step on it.
    Thank you
    Regards
    Leonard Tan

    hi
    check out this link
    http://help.sap.com/saphelp_40b/helpdata/EN/5b/ae2e484b8611d182ba0000e829fbfe/content.htm

  • Urgent Issue in Plant Maintenance Module

    Dear Experts,
    We have requirement as described below, please give us your solutions / comments on this.
    We have GTC company which is having around 800 trucks for transporting the products. I n this company we have implemented SAP Plant Maintenance Module, as we have the maintenance activities done for vehicles.
    Under the same group of companies, we have PM1,PM2,PM3 companies which provide maintenance to GTC. These companies are not external to the group.
    When I raise a maintenance order for a vehicle then I will mention hours of work and material that need to be used in the activity. This maintenance work / labour is provided by PM1/PM2/PM3 company.
    In plant maintenance we have external service management, but that is for external vendors who provide service to GTC.
    But how to handle the same with internal vendors like PM1/PM2/PM3.
    Please tell me how to handle this kind of scenario.
    Thanks in advance.
    Nagesh

    Hi,
    this is a major topic and cannot be covered in a blog. Even if it can it will take a lot of time to clarify. So, first do your checks within your module. Check if u really need to treat the services from the other company as external services. You might as well create workcenters in the plants of the other companies. And make a single maintenance planning plant for all the plants in these companies. This will make a better solution technically. But think also from the perspective of the cost of this solution. Meaning, is it worth doing all the jobs such as maintaining activity prices, work centers in the other plants etc..
    In general, my suggestion is include the FI and CO consultants at least in the discussion. It will b good if u can have the MM consultant also during the discussion.
    Bala

  • From Which table Production resource/tool number can be retried

    Hi Friends,
    In SAP Query I am Using MAPL,PLAS, PLPO, PLKO, I want to retrieve Production resource/tool number PLFHD-FHMNR, can any one tell in which table it is storing the value.. & what link condition I need to use to retrieve thisfield.. Transaction CA03.
    Thanks,
    Ravi.

    FHMNR is stored in table ADFSH_PRTHEAD. You may need to pass ORGEH - Org. Unit to get the Production resource/tool number.
    This may help you.
    Regards
    Karthik D
    P.S. May i know why you have mentioned FHMNR in all your answered questions today?

  • MATERIAL TYPE : Production resource/Tool...

    Hi...
    MATERIAL TYPE : PRODUCTION RESOURCE/TOOL.
    Friends..i want to know about the above material .and its uses..generally i heared that this type of materials mostly used in manufacturing industries...if i want to configure this in which way i can configure..and let me know brief about material (production resource/tool..)
    (or)
    plz share with me your experience about this type of material and its configurations..
    It will be verry helpfull to me..
    Regards,
    Sirish

    Hello,
    Please go through this documentation:
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/PSPRT/PSPRT.pdf
    Prase

  • Plant Maintenance Module

    Hi Expert,
       I am new to Plant Maintenance module, I want to know flow of this module, transaction codes involved, few objects if possible for better understanding. Thanks in advance.
    Regards ,
    nagaraju  Tankala

    hi ,
    look at  this...
    http://help.sap.com/saphelp_nw04/helpdata/en/66/158661547611d182cc0000e829fbfe/frameset.htm
    regards,
    venkat.

  • How to read the configuration for SAP GUI elements in Plant Maintenance module from SPRO and leverage the same in NWBC for HTML.

    Dear Members,
    Greetings for the day!
    I am working on NWBC for HTML in Plant Maintenance module.
    We have configured some changes in SPRO for customizing the UI elements( like visibility, mandatory ) like tabs and fields in transactions like IW21( Create Notification).
    As of now separate parallel configuration needs to be carried out in NWBC for HTML in PM module to achieve the same UI features for creating notifications and this is time consuming.
    Is there any way to read the configuration done in SPRO for the SAP GUI's and leverage the same in NWBC for HTML.
    Appreciate your time in responding to this.
    Thanks & Regards,
    Ram.

    >
    <IfModule mod_weblogic.c>
    WebLogicCluster 127.0.0.1:7005,127.0.0.1:7007,127.0.0.1:7003,127.0.0.1:7103,127.0.0.1:7104
    MatchExpression /app1
    </IfModule>
    <Location /weblogic>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007,127.0.0.1:7103,127.0.0.1:7104
    DebugConfigInfo ON
    PathTrim /weblogic
    </Location>
    <IfModule mod_weblogic.c>
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007
    MatchExpression /app2
    </IfModule>
    <Location /weblogic>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007
    DebugConfigInfo ON
    PathTrim /weblogic
    </Location>
    >
    This configuration is weird little bit. There is MatchExpression /app1 and MatchExpression /app2 and at the same time two <Location /weblogic> sections. Are you sure you understand what that configuration stands for?
    Try something like this ...
    <Location /app1>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007,127.0.0.1:7103,127.0.0.1:7104
    DebugConfigInfo ON
    </Location>
    <Location /app2>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007
    DebugConfigInfo ON
    </Location>
    where /app1 and /app2 are contexts of your weblogic applications.
    http://download.oracle.com/docs/cd/E11035_01/wls100/plugins/apache.html
    http://httpd.apache.org/docs/2.0/mod/core.html#location

  • Fund management in plant maintenance module

    Hi.
    can anyone explain how fund management works in plant maintenance module. Actually to say we have implemented FM. We make FM entries in orders in GOTO -> assignment -> Fund Management.
    The question is, when we make entries in PM orders, it creates auto reservation No. for the materials (components) which are added in component tab of order. though in PM order we have made FM entries it is not carried by the system in auto generated reservation no. Plz advice.
    Harish

    Hi,
    Plz find below te error occured in program.
    Program RFFMRP_MAT_RESERVATION does not exist
        Message no. DS017
    Diagnosis
        The program you specified does not exist.
    Procedure
        If are creating a new program, acknowledge the message and continue.
        If you are trying to access an existing program, check the spelling. For
        a list of existing programs, select Utilties -> Find program.
    Can You suggest the alternate answer for the problem.
    Regards,
    Harish.

  • Issue related to maintenance package in Plant maintenance module

    Hi ,
    Has anyone worked related to Task lists and Maintenance packages in Plant Maintenance module? i have a requirement where in i have to list all the Task lists whose maintenance packages have been changed.
    i need to get the current maintenance package assigned as well as last maintenance package used and the changed date.
    I need to know where can (i mean tables) we get all these info. 
    Thanks
    Raj

    Hi,
    Has anyone got any info regarding my query
    Regards
    Raj

  • PRT Production Resource Tools Counter

    Hi,
    I am trying to setup a production resource tool which is counted at time of production.
    I have setup the Material, Equipment, BOM, Counter, Routing.
    When executing a production order the Counter is not updated with the ammount produced.
    Does anyone have a manual on how to setup PRT Counters. I have looked on the SAP Library but this is not sufficient to solve the problem.
    Regards
    GIlbert

    Dear Gilbert
    You have to create the equipment as PRT Equipment category. In PRT data you have to assign the (counter) measuring point and maintain the usage formula. Assign the Equipment PRT in the production orders and Enter the usage value and UOM. Ensure the UOM of the usage value and the UOM of the characterestic value you have assigned in the measuring point are same.
    Now the confirmation will update the measuring point by creating a measuring document for the measuring poit to the count of the confirmation you are entering.
    Regards
    Soundararajan M.

Maybe you are looking for