Regarding Rework in production order

Hi Everybody,
I am having an issue regarding re-work concept in prod.order.
Following is the scenario: The total prod. order quantity is 100 pcs, but 80 pcs are done correctly and 20 are bad quality. Our requirement is, client don't want to scrap the 20 pcs, instead they want to do Re work for it.
Is it possible to confirm the order with total 100 pcs but put 20 into re-work quantity (or) blocked stock.
Is it possible to do like this? if so, plz give me some steps to follow.
Thank you very much,
kanth

Hi Chandra,
Client don't want to do the confirmation for the whole 100 pcs at once and move the 20 pcs (which are of bad quality)  into blocked stock. If i we do like this, we can't run the Prod.ord report and track the scrap quantities for that particular prod.order becoz in our case each prod.order represents a sub.contractor. ( external processing scenario)
is there a way to put the 20 pcs in scrap and while doing confirmation for the prod.order and receive the 20 pcs into stock?
It's for reporting purposes, to track the scrap % based on prod. order (sub.con)
Thanks in advance,
kanth

Similar Messages

  • Rework of Production order through Q notification

    Hi,
    I want to insert an reowrk operation / create new production order through Q Notifcation. Could some one provide me Config for the same. I am mainly interested in how to choose right function module
    Thanks in Advance

    Function module"
    CO_ZF_PRODUCTIONORDER_CREATE
    MD_ORDERTYPE_PRODUCTION_ORDER
    BAPI:-
    BAPI_PRODORD_CREATE

  • Production order-rework

    Hi friends,
        My strategy is Make to stock production. I have created my production order of quantity 100. Then i have deliverd the same quantity of 100 to store in t.code MB31 (against my order). Then i closed my order
    My order status is:
    CLSD CNF DLV PRC MACM GMPS SETC.
    I have stocked my quantity in my store. Afrer 3 months, our people wants to sell the product through sale order. Now they find some damages in that final product. Now sales is returning the final product to production for rework.
    How to reprocess the closed order again? How to go about with this scenario?
    please guide me
    Thanks
    kumar

    Hi Senthil,
    Good afternoon and greetings,
    Made to stock in production term is called as Repetitive Manufacturing and the cost object for the same would be Product Cost Collector.  The Product Cost Collector doesnt have the concept of closing fully basically because the product cost collector would be a replica of the material itself.
    In your case, a rework for production order is applied through by adding an additional work centre in the routing called REWORK.  Re-opening a production in a different period may lead to confusion basically because the planned cost at the time of creating the order say before 3 months would have been £100 per PC.  Now the standard cost estimate is £125 per PC and reopening the order will redetermine the planned cost again and when it is settled it will hit your profitability very badly because the variance would be £25 + rework cost.  Thereby it is advisable to use the concept of standard REM.
    Alternatively, if you want to use the Production Order only, then follow the sequence as below
    1. Move the material from one code to another rework code
    2. Create a new routing with REWORK work centre for the rework material code.
    3. Create a production order for the rework material code
    4. Transfer the material from rework code to main material code.
    5. Settle the production order for the rework material code and thereby your P&L would be intact for the additional cost involved on the Rework.
    Please reward points if found useful.
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • Error in Conversion of Planned order to Production Order

    Hi,
    I am getting error while converting the planned order to Production order.
    Error is " Scheduling parameters not defined for the production orders"
    I have maintained the parameters in Prod-> Shop Floor Control -> Operations -> Scheduling....but after that also the same error is coming.
    And also I have maintained in the Capacity Req Planning
    Kindly assist me where I can define the scheduling parameters for the production orders in MTO cycle.
    Regards
    Toshi

    Hi ,
    My production order has been created ....but now m getting error while releasing it.
    Its saying that "No checking rule maintained for operation"
    I have maintained the checking rule in OPJK. But still m getting the same error.
    Kindly assist me for the above error.
    Regards
    Toshi

  • How Production Order to be Closed?

    Hi
    Experts
    I want to do the closing of orders that are finished.(From COOIS)
    Our system works manually no MRP
    We have order type
    PP01 Production order for Semi finish
    PP02 Production Order for Finish
    We create manually Production order CO01 of Finish Product say Mat u201CAu201D qty 100
    This finish Product consist of different 3 types of process
    X Cutting
    Y Heat Treatment
    Z Pre turning
    We also create Production order of Semi finish 100 each with order type PP01 
    Order 200000 Order for Finish Product 100 ea
    Order 100000 Orders for Cutting 100 ea  
    Order 100001 Orders for HT 100 ea
    Order 100002 Order for Pre turning 100 ea
    We manufacture above product now I want to close the order
    How do I close the order? Is it necessary to close all orders? How? Because our finish product stock is not updated is it because of this?
    Please suggest.
    We donu2019t have CO Module I just want to close the order
    Explain me in details I am end user. Whether go for technically complete or DLV or Close
    Thanks & Regards
    Pert

    Dear Pert
    Production order Balance should set to ZERO for  closing the order
    Plz refer this links for better undersatnding
    [ Closing a Production Order;
    [Production order closing;
    [Order closing;
    [Order Closing;
    Regards
    Madhu Kumar

  • How to create Disassembly production order type.

    Dear All,
    I've been reading threads regarding disassemblyi type production order usage, but in my system (SAP ECC 6.0) i don't have an option to select this type of order.
    So the question is how to create this disassembly type for production order, what other settiings are needed for disassembly processing. And could you pls shortly describe best practise for disassembly processing.
    Thanks in advance,
    Regards, Andrey
    Edited by: Andrey Kruglov on Jul 15, 2010 3:45 PM

    Hello
    Such functionality does not exist on the standard system, however, there is a functionality called Order Combination for the industry solution DIMP.
    Please take a look on the following document, which describes the order combination scenario:
    https://help.sap.com/bp_fm603/BBLibrary/HTML/372_EN_FR.htm
    BR
    Caetano

  • Creating Production Order with wrong production version

    Hello Expert,
    please provide me answer and solution to resolve our problem regarding creation of production order (CO01 and CO41), because SAP provide and propose production version which have alternative BOM which is status 02 (inactive) already it is not picking the production version which has active alternative bom for our finished material. it is allowing the production to be created even the bom was inactive.
    please help us to this it still bugging our system
    tenx

    Hi Ryan,
    Production version will be selected based on the field Selection Method field in Material Matser MRP 4 view.
    1  Selection by explosion date
    2  Selection by production version
    3  Selection only by production version
    If the selected field value is 1 , then system selects the version based on the validity dates i.e whichever production version is active on that day that will be considered in MRP.
    If the selected field value is 2 by production version. Then system will select the First Prodution version mentioned in the Material Master MRP 4 View (production version Tab).
    If the selected field value is 3 always only by production version. Then system will select the First Prodution version mentioned in the Material Master MRP 4 View (production version Tab).
    So to address you query I suggest you to delete the production version PV1 with BOM 01 and Make production version PV2 will be available and active in seen as the first production version in teh screen.
    Then for your inof purpose you want have the PV1 then re-create it as second version in the Version tab screen.
    Regards
    radhak mk

  • Production order with sequence   table names requested

    Hi
    We have production order with sequence.  Each sequence has several operations.  How do i get the list the operations for each sequence.
    Tables AFKO , AFVC are good but when production orders are created with out reference to  Routing the field seq no is empty in AFVC. 
    Any ideas are welcome.
    Regards
    Anvi

    if the production order not created then for routing you have to chaeck PLKO and PLPO table.
    if you got the material no check MAPL and get MAPL-PLNNR
    match that PLNNR with PLKO and PLPO table you will get the routing data.
    regards
    shiba dutta

  • Equipment as PRT's during Production Order Confirmation

    Hi Gurus,
    During Production Order confirmation I cannot see whether I have consumed equipments as PRT which are attached to operation.
    The operation is showing CNF status as well the Order.
    How can I see whether which Equipment was used for each operation since there can be more than one equipment as a PRT's for a single operation.
    Regards
    Nilesh

    I use Production Order confirmation hence saw it in CO14 and checked that PRT's are in PRT REL status..I guess this is what you mean to say right??
    Thank you so much for your response.
    Regards
    Nilesh

  • User exit for Production Order status

    Hi all ,
    Pl tell me about the : user exit for Production Order status
    ( i want CLSD status after settlement of the Production order .)
    regards,

    Hi,
    for production order you have exits PPCO0001 - PPCO0023. In transaction SMOD you can see the documentation for all this exits. Actually I think exit PPCO0007 could be a possiblity for you. This exit is called by saving the order.
    But maybe it would be better for you to use a special status profile? A user status is set if settlement status is set.
    Also BADI WORKORDER_UPDATE could be interessting for you.
    Regards,
    Sabine

  • User exit for production order settlement

    Hi Experts,
    Can anybody tell me if there is any user exit which will make GR and settlement of Production Orders at the same time i. e. as soon as production order is confirmed ( movement type 101 happens) the same production order will be settlelled immediately.............
    Thanks on advance for your answer.
    Regards,
    Bijay

    Hi,
    for production order you have exits PPCO0001 - PPCO0023. In transaction SMOD you can see the documentation for all this exits. Actually I think exit PPCO0007 could be a possiblity for you. This exit is called by saving the order.
    But maybe it would be better for you to use a special status profile? A user status is set if settlement status is set.
    Also BADI WORKORDER_UPDATE could be interessting for you.
    Regards,
    Sabine

  • How to find the total value of the Production order

    HI ,
    I am developing one report in which , custumer have a req. to show the total value (in Dollar) of all  open production order as well as the past production order ( not DELEvered & teco ) for  the selected plant . for that i need  BAPI or table name .
    Regards
    Satish

    Hi,
    For production order nos. - AUFK or AFKO
    For production order status - JEST & to know the status eg REL etc, refer TJ02
    For costs - COSS & COEP (Pass order nos. to the field OBJNR as OR followed by 12 digit order number)
    Hope the above helps.
    Regards,
    Vivek

  • Generating a production order through projects, without MRP run?

    Hi to all
    Is it possible to generate planned orders and further proceed to production order through projects  WITHOUT MRP run?
    Regards
    surya

    create the production order in CO01 and assign WBS element in the assignment tab of the order.
    whether it ll solve ur purpose....
    ashis

  • Create a Production order for rework

    Hi,
    I would like to create a Production order for rework.
    But I don't want to do it in the master PO with trigger point.
    I would like to create a new PO for rework and asign to account to the old or master PO.
    I've tried to do it but I want to know if it's correct.
    CO07, maintained the qty, in the settlement rule maintained (category= order,settlement reciever= master PO number) released the order and by confirmation where can I maintain the qty? (as Yield or as rework qty)
    Thanks

    Hi,
    Use T code CO07- creation of PO w/o material, settelment rule as u mentioned and the quantity has to be maintained in rework.
    When u confirmed the order and settel it, it will be settel againts the main order.
    Regards
    JDB

  • Create Rework Operation in Production Order

    Hi,
    I am looking for a function module that will create/insert an operation in a Production Order when a rework is done.
    Do you know any? Please help. Thanks.
    Regards
    Ryan

    Hello Frank,
    Please inform us the follwing details:
    Whether you are getting the Status: PRT after Shop papers printing?
    Immediately after the operation insertion (Because of Trigger Points) what is the Print Status?
    Please refer the OSS Note for fuether details: 755992, 568883
    Regards,
    Siva

Maybe you are looking for

  • Best Practice for Enterprise Repository Layout

    We recently moved to 6i R2 non-versioned from 2.1.2. We have several projects that use the repository for development in various business areas of the agency. We have 100+ application containers and only 5 active projects at this time. Many of the co

  • Using page parameter causes "form" layout report to become "tabular"

    I did a diff on the HTML generated for the page and found this: Page Parameter Used: <TH ALIGN="Left" SCOPE="col"><FONT CLASS="PortletHeading1">Employer Auth Treatment</FONT></TH> Page Parameter Not Used: <TH SCOPE="col" ALIGN="LEFT" VALIGN="TOP"><FO

  • AP reports

    HI gurus, are there any AP reports that could give us the following fields. If we could run this for a plant would be great. AP Report: Report ATP only open AP(key off of profit center?) Fields: Vendor name, vendor #, invoice #, invoice date, PO#, PO

  • NB200 - How to find 3G module for it?

    Hi Pls how I finding 3G module in my NB200 - PLL20E ? Thank You

  • Calculation of estimated to transfer a file

    Does anyone of you here have any tips or code on how to do a estimation of a file transfer timing needed before the actual transfer start. kindly email me at [email protected]