Regarding RFC creation

hi all,
after creation of RFC,we have to release the RFC or not.
regards,
subba reddy

Hi Subbareddy,
Yes you have to release the RFC after compeltion of creation.
After creation of RFC first import it into XI system and then test it once.If everything is working fine then you have to create a request for transporting this RFC from Dev system to QUALITY system.After creatiing the transport request then you can release the RFC with that transport request.With out releasing the RFC you can't move from Dev system to Quality system.
Plz close this post if you got the answer.
Regards,
Raju.

Similar Messages

  • Problem regarding the creation of Table using CSS.

    Hi ,
    Here I have a Problem regarding the creation of Table using CSS.
    In My Application i have a table with multiple rows(Rows are Dynamically added to the table).First i am setting the table with the following properties:
    width:900px;
    height : auto,
    Overflow : visible,
    Max-height: : 200px.
    If I use above properties,I'm getting a table with 5 or 6 rows(height upto 200px).After that i am getting the Vertical ScrollBar.
    The problem is when a table has many columns, Vertical and Horizontal Scrolls are coming at the time of setting the table. The table height is not Increasing dynamically.
    How can i use "height" property in CSS? (I want the table height to be increased when the columns are more.)
    Thanks & Regards
    Madhavi

    Hey humble user. Errr I'm trying to understand what ur trying to do. U want to create a section of a region destructively from an existing region right? If so select the option convert to new region (opt-comm-R or selecting it by right clicking). Check your audio bin to make sure. Whats the "merge" function? Are u refering to the glue tool?

  • Regarding RFC Communication from SAP R/3 to SAP J2EE Engine 6.40

    Hello,
         We have an application deployed in SAP J2EE engine 6.20. From SAP R3 (SAP R/3 version is 6.4C), We are communicating to the application deployed in SAP J2EE Engine 6.20 using RFC protocol. EJB module (Deployed in SAP J2EE Engine 6.20) which is being invoked from a Function Module using RFC protocol has the same name as the Function Module name. We were able to communicate to SAP J2EE Engine 6.20 this way.
         Currently, I have deployed the same application in SAP J2EE Engine 6.40.  I have followed the same procedure which i have used while depolying and working with SAP J2EE Engine 6.20. But, it is not working, and i was not able to communicate to SAP J2EE 6.40, the same way i did in SAP J2EE Engine 6.20. 
       Please let me know whether the procedure for communicating to SAP J2EE Engine 6.40 has changed in comparison with SAP J2EE Engine 6.20.
    Also,Any pointers regarding RFC and JCO implementation in SAP J2EE Engine 6.40 willl be helpful.
    Thank you.
    Regards,
    -Shabir Rahim.

    Hello ,
          The Connection in sm59 is established successfully> there were no Error thorwn in SAP when testing the connnection. But when i am making background call using a Function Module in SAP R3, the calls reaches Application deployed in SAP J2EE Engine 6.40, But it is failing with the error as,
    #1.5#005056A24413003C000000240000126000042853BD899290#1170240034258#/System/Server##com.sap.engine.services.dsr####sstra902_IPC_2629150#Guest#6813e650a93f11dba9f5005056a24413#Thread[JCO.ServerThread-1,10,SAPEngine_System_Thread[impl:5]_Group]##0#0#Error#1#/System/Server#Plain####
    #1.5#005056A244130042000000000000126000042853CFDB80F8#1170240341655#/System/Server##com.sap.engine.services.dsr#Guest#2####322aaa71b11811db85e1005056a24413#SAPEngine_Application_Thread[impl:3]_36##0#0#Error#1#com.sap.engine.services.dsr#Java#DSR_36#com.sap.engine.services.dsr.res.DSRResourceBundle#Error while taking over external passport null#1#null#
    #1.5#005056A244130042000000030000126000042853CFDB86BD#1170240341671#/System/Server##com.sap.engine.services.jndi#Guest#2####322aaa71b11811db85e1005056a24413#SAPEngine_Application_Thread[impl:3]_36##0#0#Info#1#com.sap.engine.services.jndi#Plain###Incorrect name parameter rfcaccessejb//DCEUR/Z_AIS_IPC_CFG_PRICE in naming operation.#
    #1.5#005056A244130042000000040000126000042853CFDB8745#1170240341671#/System/Server##com.sap.engine.services.jndi#Guest#2####322aaa71b11811db85e1005056a24413#SAPEngine_Application_Thread[impl:3]_36##0#0#Info#1#com.sap.engine.services.jndi#Plain###Incorrect name parameter java:rfcaccessejb//DCEUR/Z_AIS_IPC_CFG_PRICE in naming operation.#
    #1.5#005056A24413003C000000280000126000042853CFDBC4AA#1170240341686#/System/Server##com.sap.engine.services.dsr####sstra902_IPC_2629150#Guest#6813e650a93f11dba9f5005056a24413#Thread[JCO.ServerThread-1,10,SAPEngine_System_Thread[impl:5]_Group]##0#0#Error#1#/System/Server#Plain####
    Here, //DCEUR/Z_AIS_IPC_CFG_PRICE is the Funcrtion module name in SAP R/3 6.4C.
    Also Please let me know whether is there any Operating Differences between WAS 6.20 and WAS 6.40, for JCO/RFC based Communication( ie Comunicating with WAS 6.40 from SAP r/3 using RFC Protocol). Any materials and Information on how to work on SAP J2EE Engine 6.4 will also be very helpful.
    Thank you.

  • Regarding RFC to FIle

    Hi Everyone,
    Would anyone Please give me steps for  RFC to File Scenario.
    Thanks & Regards,
    Varun

    1) Create synch interfaces 4r source and target.
    For RFC while creation of interface
    input msgtype - Request msg
    output msgtype - Response msg
    2) Create 2 msg mappings.
    inputmsgtype(file)----> Requestmsgtype(RFC)
    Responsemsgtype(RFC)--->outputmsgtype(file)
    3) Create 1 interface mapping choosing synch interfaces on
    src and tgt side.
    -->you ll get two tabs here request and response.
    -->Click on request nd specify 1'st mapping
    --> Click on response nd specify the 2nd mapping.
    Refer this blog:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/xi/file-rfc-file%28without+bpm%29&

  • New RFC creation

    Hi,
    we have 2 RFC's.one is customer creation and the other is for Contract creation.the relation between those 2 RFC's is first we will create customer. Using the customer information contract will be created.
    now i need create a new RFC by combining with those 2 RFC's for Customer and Contract creation.
    how can i do that? 
    thanks in advance,
    fractal

    Hi,
    If i understood your problem correctly then you can write a report or FM which calls these 2 RFC's and call them like
    call function <customer_creation>
    destination <destination_id>
    parameters....
    call Function <contract_creation>
    destination  <destination_id>
    parameters....
    and now you can execute either this report or FM locally.
    i hope this helps
    regards,
    kinshuk

  • Regarding RFC connection in File to IDOC Scenario

    Hi everyone,
               I was configuring file to Idoc Scenario, i have made all the required configurations in SLD, IR and ID, in XI system and in R/3 System. i have created RFC connection from XI to R/3 system, and its working fine. i have created an Partner profile in WE20 with sender file system name with inbound parameters. <i>But still i am getting error as EDI Partner Profile not defined in WE05- iDOC ADDED WITH ERRORS. </i><b>Do we need to create an RFC connection from R/3 system to XI for file to Idoc Scenario</b>
         <b>!!! Note:  RFC connection from R/3 system to XI is not working, will this be a problem for file to idoc scenario. !!!</b>
    Regards,
    Varun Reddy.K

    Hi Varun
    Follow these steps
    First - Maintain the Sender R/3 System:
    SM59 : Create a RFC destination to XI
    WE21 : Create a TRFC Port ->Specify the RFC Destination Created
    BD54 : Create a Logical System for the Idoc Receiver
    WE20 : Create Partner Profile ->Maintain Outbound and the Inbound Parameters
    Second - Log on to XI System:
    SM59 : RFC Destination for Sender System
    IDX1 : Create the port to get Idoc Metadata from Sender System ( The Port Name must match the port name in the idoc header - Usually in format SAP<System ID>. eg. SAPID1 [Optional Step. Not mandatory]
    IDX2 : Maintain the Idoc Metadata. This is needed only by XI, and not by other SAP systems. IDX2 is needed because XI needs to construct IDoc-XML from the IDoc. No other SAP system needs to do that.
    Regards,
    Santosh

  • Regarding RFC Sender Communication Channel

    Hi All,
      I am working on RFC sender channel, need some important information.
    1). Can i use single RFC Sender Channel in Multiple Sender Agreements.
    2). Can i use Program ID in Multiple Sender RFC Channels. I am having one RFC to File interface and another  RFC to JDBC interface.
         Do i need to create 2 sender channels and 2 RFC destinations with 2 Program Ids????.
    Please give me clarifications.
    Regards,
    Balu

    If i will use single sender RFC channel and Single Program ID for my all sender agreements, how that Single RFC channel
    will identify the information like
    In our sender agreement we configure not only the channel but also the Sender Interface (in your case RFC)......this is the factor which defines what to accept......in broader term we use the same concept of channel re-use in other cases also and the same work fine because of this Sender Interface.
    I found Q28 interesting: https://service.sap.com/sap/support/notes/730870
    In first read it may sound confusing...but after some more rreads you will know what the answer means in the SAP note.
    Regards,
    Abhishek.

  • Query regarding RFC Call from R3 to BW

    Hi
    i have one scenario. during running the delta program in R3, and at the end of the code, send an RFC message to BW, which can trigger a job in BW which will start 1 meta chain.
    please let me know how this can be done and what ABAP code needs to be written there.
    Regards
    Atul

    Hi ,
    you can read  data related to  RFC connection  using sm59  with destination   for BW
    http://aq33.com/human-resources/Articles-006159.html
    http://it.toolbox.com/wiki/index.php/Re-Connect_R/3_and_BW
    we have done this   only  for .net  /BIZTALK  . so for BW you have to read ...
    regards
    Deepak.

  • Regarding RFC for SD n MM related to RFID

    hi all
    Will anybody give RFC for delivry of goods in Retail m using RFID technology
    Regards
    Abhijeet

    try to make use of Tcode BAPI
    or
    search in SE37 with search terms delivery.
    Regards
    Prabhu

  • Some PI questions regarding RFC and  receiver determination

    If we import the design objects in one customer system from another customer system , and in the original system there is an imported RFC ,
    This RFC has been created in the new SAP customer system.
    My question is do we have to import the RFC again , as it is already in the imported design objecs.
    My second question is , di we need to create a receiver determination for the answe in a synchronous send step of the BPM ,
    Thanks

    My question is do we have to import the RFC again , as it is already in the imported design objecs
    Yes....the RFC/ IDOC should be imported from the system to/ from which you will send/ receive the data.
    If the RFC was in system1 earlier and now in system2.....then you have to delete the RFC imported from system1 (if it is not used) and then import it from system2
    My second question is , di we need to create a receiver determination for the answe in a synchronous send step of the
    BPM ,
    Irrespective of sync/ async send step.....you should create Receiver Determination....which will have BPM as sender and the TO_SYSTEM as receiver.....not separately for response....just once
    Regards,
    Abhishek.

  • Regarding  RFC [ URGENT ]

    Hello Experts
    I am updating a table in SCM server with the data from R/3 tables. I am using RFC with destination.
    I created an FM[RFC] in R/3
    I created a program in SCM, in that i am calling that RFC.
    I created a dummy RFC in SCM with the same paramters.
    When i am executing the FM in R/3 i could able to fetch the data as output including some return value.
    But when i am executing the program which is calling the RFC i am not getting the data.
    But i am able to get the return value in R/3 FM[RFC]*
    So i am sure that logical destination name is working
    [ call  'FM' destination 'dest name' ].
    My problem is i am not getting the data to the SCM server eventhogh i could able to get data in R/3 and I could able to connect to remote server.
    *Guys Kindly let me know the solution for this it's a bit urgent
    thanks in advance
    Pramod

    Hi Pramod,
    In the RFC function place the code as infinate loop. like
    Data : x type c.
    do.
    if not x is initial.
    exit.
    endif.
    enddo.
    when you execute this the process will stop in this loop. Go to SM50 and select the process in debug mode. And in the debug mode you can change the value of x. then you can continue from that step in debug mode and you can trace.
    Regards
    Ganesh

  • Regarding Campaign creation

    while creating the campaign for marketing plan the following error is occured "cannot get RFC destination SEM." can anyone please clarify.

    Hi Srinivasa,
    Go to IMG:
    SAP Implementation Guide>Customer Relationship Management>Marketing
    >Marketing Planning and Campaign Management>System Landscape-->Define Target Systems (ERP, BI, SEM, CPRO)
    Here in you have to define an RFC connection to your SEM/BI system.
    In this step you define the connection of the CRM system to each of the
    external systems (ERP, BI, SEM, and cProjects). The following options  
    are available to you:                                                  
    Identification       Parameter type          RFC Destination           
    MKTPL BW             MKTPLBWRFC             (entry of your RFC         
    destination for BI )                                                   
    MKTPLCPRO            MKTPLCPRORFC           (entry of your RFC         
    destination for cProjects)                                             
    MKTPLR3              MKTPLR3RFC             (entry of your RFC         
    destination for ERP )                                                  
    MKTPLSEM             MKTPLSEMRFC            (entry of your RFC         
    destination for SEM)                                                   
    MKTPLMB              MKTPLMBRFC             (entry of your RFC         
    destination for Measure Builder)                                                                               
    You adopt the RFC destinations from the activity Define RFC Connections.
    Note                                                                               
    o   The entries MKTPL BW and MKTPLSEM are mandatory. With BI 3.51 and        
         higher, the entry originally conceived for the SEM must contain a        
         connection to BI, since the planning tool Business Planning and          
         Simulation (BPS), which is used in the Marketing Planner, no longer      
         belongs to SEM as of this release and has been integrated into SAP       
         NetWeaver BI.                                                            
    Best Regards,
    Pratik Patel
    <b>Reward with Points!</b>

  • Regarding Thread Creation

    Hello,
    To create a thread in java there are two methods.
    (1) by extending from thread class.
    (2) by implementing runnable interface.
    implementing runnable interface is the preferred method to create a thread because we still have the option to extend from any other class.
    But does anybody know why java provides 2 methods for thread creation, why doesn't it provide only option 2 (i.e. by implementing runnable interface) when it is the preferred option.
    Regards,
    Sandy.

    Though Runnable interface is preferred to create threads in Java,most programmers extends Thread class.As jschell would say, 'I am rather certain' that the opposite is true.
    The reason behind of this is that you can have a clear logic of your code by using ThreadThat's not even true and it certainly isn't a reason to extend Thread rather than implement Runnable.
    most of the system programming written in java used Thread class instead of Runnable interface .If you have some evidence on the point please produce it. The consensus of opinion on these forums has been the other way round for many years.

  • Regarding equipment creation..

    Hi Genius,
                  Now I want some details about Equipment creation in PM module, and what r all the table comes... please send some link to learn equipment creation.

    hi thanus,
                  This is vijay here, currently i m working with this epm module.
    for equipment creation you will use ie01 for change ie02 and for display ie03.
    some times you may be asked to create by regarding doccument no.
    then go to j3gi.
    well main fields are equipment no, recipient, sender, planning plant, maintenance plant, bussiness area, company code etc.
    there r lots of table.
    but usefull are
    equi,faglflaxa,j_3gbelp,j_3gbelk,iloa,ITOB,EQKTX,IMPTT,IMRG,CKBS,CKIS ETC
    REGARDS
    VIJAY DWIVEDI
    REWARDS IF USEFULL*
    FOR ANY FURTHER INFORMATION U CAN GET BACK TO ME

  • Regarding the creation of Webservice

    Hi,
    I have created a webservice and deployed sucessfully.
    I would like to modify it and I deleted the Virtual Interface and the webservice definition.
    After building the EJB module and EAR module, I cannot create the Webservice and the Virtual Interface.
    I need help in tracing the problem.
    Thanks and regards
    Vivek

    HI..
    Two roles are provided for creating Web services:
    &#9679; Web Service Developer
    The Web service developer defines the Web service at design time. He or she knows the application logic as well as the resulting conditions for the communication type (for example, stateless/stateful), and the required security level. He or she defines these properties at an abstract level. Specific details, such as the transport binding or security concept to be used, are defined only later during the Web service configuration.
    &#9679; Web Service Configurator
    The Web service configurator defines the behavior of the Web service at runtime. He or she knows the system landscape and the technical requirements of the application server where the Web service is to be called. On the basis of the abstract definition of the Web service, the configurator can decide during configuration which specific attributes should be assigned to the features defined at design time.
    Prerequisites
    To create or consume Web services, you need the authorizations associated with the role SAP_BC_WEBSERVICE_ADMIN. You must add the authorization S_ICF_ADMIN (authorization for the Internet Communication Framework) to your profile. You use the authorization S_SERVICE for starting external services.
    To create a Web service for a function module, function group, BAPI, or XI message interface with a predefined feature profile, use the Web Service Creation Wizard.
    To specify the features of the Web service yourself, follow the procedure described in Creating a Virtual Interface.
    You can also create Web services using the Web Service Creation Wizard, and then change the virtual interface and Web service definition in the Object Navigator (SE80), by choosing Enterprise Services ® Web Service Library.
    for more Information click on the following link
    http://help.sap.com/saphelp_nw04/helpdata/en/76/084e3ce0f9fe3fe10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/76/084e3ce0f9fe3fe10000000a114084/frameset.htm
    Regards,
    Arun

Maybe you are looking for

  • Some chinese character file name not uploading in SharePoint Document Library?

    Hi Some Chinese character pdf file name not uploading in SharePoint Document Library. I am getting following error. 1. File not found error if i would upload using file browse option in Doc Lib. 2. Can't read from the source file or disk. if i would

  • Migration from older mac to new

    I have an iMac running 10.6.8. I just purchased a new iMac  with Yosemite installed. I am trying to migrate my files from my old mac. On the new mac I am getting a yellow triangle ! that says my old mac is not running the newest version of OS X , and

  • Monthly EWA Report.

    Hi SolMan Mentors, Currently we are using SolMan7.0 SPS15. I would like to know whether we can reschedule the EWA report occurrence monthly rather than weekly(default). When I check DSWP --> Settings --> Solution Monitoring --> EarlyWatch Alert --> t

  • Scheduling Agreements and Purchase Contracts in SAP APO

    Hi We are currently working on a SCM 5.0 trialbox  and we  don't have access to any R/3 environment. Is it possible to create Scheduling Agreements/Purchase Contracts in APO ? If not then is there any way to upload the data using a flat file ? Best R

  • JavaScript popup code not working 4 me

    Hi, I am to trying to open pop windows in Flash through JavaScript. Now I found a number of ways to do this on the forums but none is working for me. When I click the swf button containing the pop code (embedded in html), nothing happens. I do not ha