Regarding Subcontacting scenario

Sapguru,
for my client where they have send 100 nos  of A material to subcontacting vendor for making 100 nos of B and along with that i have send the subcontactinng challan for 100 nos. but due to excise law, vendor side, he send back the 50 nos of A within 180 days to the plant in order to protect them any penalty from excise dept.
The process followed
ME21N(45000001)
MB1B(541) for 100 nos of A to subcontracting vendor(49000001)
J1IF01(40001) for 100 nos of A
MIGO( 101) for 50 nos of B with 50 nos(543) consumed
That means the remaining quantity(50 nos of A) is lying at the vendor side.
J1IFQ for 50 nos of A.
then i have done 542 movement type  for bringing the material back from the subcontracting vendor due to tcorssing of the time lenght (180days).
then once again i will send the goods to same vendor for remaining 50 nos of A (MB1B-541Mvt type)
J1IF01 I will create the another challan(40002) for 50 nos of A.
My question:-
is it possible in SAP where i could see the reduction of 50 nos wrt to challan no(40001) in report. that means if i open any report then i could see that for 40001 challan, the total quantity should be 50 nos.
Thanks praveer

Reconcile 542 material document against challan 40001 using J1IFQ.
Edited by: Jeyakanthan A on Jun 19, 2010 1:08 PM

Similar Messages

  • Regarding bpm scenarios

    hi
      Can any one provide me some scenarios related to bpm,coz
    i am trying to work out some in lab.i was unable to use all the step types with the
    scnarios i have.
    regards
    ramu

    Please see the below links.
    For Actions :
    An action represents a function within an application component that is not subdivided further. Actions subdivide the process flow of an integration scenario
    Internal Actions : Defined for a ‘separate’ software component version.
    You can use internal actions in application components (of type Product Version or Main Instance) that (by using the product version) contain the same software component version in which the action is implemented.
    External Actions : Defined for a software component version of a partner or for templates.You can use external actions in application components (of type Template or Product Version) that (by using the product version) contain the same software component version in which the integration scenario is implemented.
    Two XIu0092s in same scenario
    http://help.sap.com/saphelp_nw04/helpdata/en/68/88a440df800160e10000000a1550b0/frameset.htm
    For Integration Scenario :
    An integration scenario completely models the exchange of messages for a collaborative process and provides an overview of the process flow. The integration scenario provides you with a central point of access for all objects that you require for semantic and technical integration
    /people/venkat.donela/blog/2006/02/17/companion-guide-to-integration-scenario
    Regarding Business scenario's in XI
    XI scenarios
    See the below link
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/ee5bc490-0201-0010-e9b5-a258cf083bca
    ******Reward points,if found useful

  • Regarding subcontacting purchase order

    Dear cons
        I want to create a subcontacting p.o . In this p.o I entered 100 qt finished (final)product. & in component I entered 1 MT. & P.O i entered overdelivery tolerance as 10%. AT the time of goods receipt(migo) vendor sends 110 quantity.because 10% we have given as overdelivery. at the time of posting migo the system gives a message that stock deficit in vendor. but vendor sends 110 qty.
    note - we donot know how many finished product vendor will make within 1mt. It may be 100 or 110 also. due to this we give overdelivery tolerance. but system donot accecpt.pl.solve it.
    nirupama

    Hello Nirupama,
    When you create the Sub Contracting PO at that time you mention the relation between final product and components using BOM or Component functionality in the purchase order. So once you set the relation 100:1 and if you receve 110:1 the simply, system want accept it.
    so you need to change the purchase order quantity as 110 with component qty 1 or you need to provide extra coponent for additional 10 qty (as other expert's responded).
    System is not smart enough ()
    Regards
    Arif Mansuri

  • Regarding Integration Scenario and Communication Channel Template

    Dear All,
    1.What is the purpose of creating Integration Scenario in IR?Is it compulsary to create Integration Scenario in Every Case?(I mean Scenario not using BPM and Scenario using BPM).
    2.What is the purpose of creating Communication Channel Template in IR?
    3.If we create Communication Channel Template in IR?Do we need to utilize that Communication Channel Template for creating Communication Channel in ID?
    4.IF we have created Integration Scenario in IR,and we transfered that Scenario from IR to ID,then Do we need to create Sender Agreement,Receiver Agreement,Receiver Determination,Interface Determination?or will they automatically created?
    Please clarify my doubts.Thanks in Advance.
    Regards,
    Ramana.

    Hi Ramana,
    <i>1.What is the purpose of creating Integration Scenario in IR?Is it compulsary to create Integration Scenario in Every Case?(I mean Scenario not using BPM and Scenario using BPM).</i>
    >>> For graphical overview about the sceanrio.It is not compulsary to create Integration Sceanrio.
    <i>2.What is the purpose of creating Communication Channel Template in IR?</i>
    >>> In integration scenario while creating the connection between two actions u need to specify the communication channel templates for Sender and Receiver.
    <i>3.If we create Communication Channel Template in IR?Do we need to utilize that Communication Channel Template for creating Communication Channel in ID?</i>
    >>>You can utilize these templates in ID.After completion to creating the configuration sceanrio need to modify the parameters of the channels.
    <i>4.IF we have created Integration Scenario in IR,and we transfered that Scenario from IR to ID,then Do we need to create Sender Agreement,Receiver Agreement,Receiver Determination,Interface Determination?or will they automatically created?</i>
    >>> From Tools-->Transfer Integration sceanrio from Integration Repository, From input help choose the sceanrio,Continue and click on Finish ,with the same name the configuration scenaro will create in ID.You need to follow the Confiuration steps like <b>Assign services</b> , here need to choose u r source & target business systems and <b>Configure Connections</b> in this step you can cross check the interfaces,mapping,channel templates involved in this sceanrio and <b>Generate</b>. It would automatically generates Sender Agreement,Receiver Agreement,Receiver Determination,Interface Determination. It would shown to u Generation Log, here you can check what are the objects generated and if there are any errors it would shown Number of errors.
    By setting the appropriate channel parameters, activate all objects from change list.Now u can able to test the sceanrio.
    However in latest version it is not compulsoary to create Integration sceanrio in IR and to the above things.You can use Configuration Wizard to do all these things or you can do these mauvally.
    Hope it will helps to clear u r doubts.
    Cheers
    Veera
    >>>Reward points,if it is needful.

  • Regarding Idoc scenario....

    Hi Gurus,
    Could any one explain what are the configurations required for idoc to file scenario ?
    i have configured every thing, with defining a logical system, assigning a logical system, creating port and partner profile and i am getting confusing about how to trigger an idoc from r/3 system and how the data flow through these settings?
    could any one of u please explain me about how the message will be flown in the settings that done in between R/3 to XI..
    regards.,
    sai kumar

    Hi Sai,
    Hi
    These are the steps which u have to do
    STEPS IN DESIGN
    1. Import idoc from the SAP System (SAP02) through imported objects.
    2. Create Data Type, Message Type, Message Interface for the Outbound File.
    3. Create Message Mapping with file Message and idoc (Matmas04)
    5.Create Interface mapping between File Interface and the idoc.
    Steps to be followed in Creation of Technical and Business System
    Technical System
    In SLD, click on technical landscape->New Technical System->WebAS ABAP.
    Business System.
    1.Goto Business Landscape->New Business System->Name the business system.
    2. Choose the technical system that needs to be attached->WebAS ABAP->Technical System Name.
    Preconfiguration steps for transfer of data to IDOCS
    1.Create a RFC Destination in SM59 of XI Server of type.
    2.In transaction IDX1 ,create a port for the client of XI server.
    3. The port has to be displayed in the idx2 transaction and we should be able to view the idoc’s which we imported through integration repository.
    Steps in Configuration
    1. Goto service without party, right click->Assign a business system.
    2. Choose the business system to be added.
    3. Create a File Sender Service with communication channel for the same.
    4. Create an idoc receiver channel under the business system.
    7. The Idoc type( which data is to be written) is mentioned as inbound parameter.
    8. Mention the logical Name in the Service->Adapter Specific Parameters of both the File Sender Service as well as the business system.
    9. Make the Sender Agreement for theFile Sender with communication channel.
    10.Create the Receiver Determination and Interface Determination for the business system.
    11.Create the Receiver Agreement for the Business system.
    Step for Configuration fo IDOC in R/3
    SM59-rfc destination
    IDX1-port
    IDX2-load metadata
    we05-IDoc status records
    BD54-Create Partner Number
    We20-Create Partner Profile
    WE19-Testing IDoc Processing
    Do these configurations in R/3 and in XI...
    SAP XI
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (IDX1)
    a) Select create new button
    b) Enter the port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Load Meta Data for IDOC (IDX2)
    a) Create new
    b) IDOC Message Type
    c) Enter port created in IDX1.
    SAP R/3
    1) RFC Destination (SM59)
    a) Choose create.
    b) Specify the name of the RFC destination
    c) Select connection type as 3 and save
    d) In the technical settings tab enter the details SAP SID/URL and system number#.
    e) Enter the Gateway host as same details above SID/URL.
    f) Gateway service is 3300+system number#.
    g) In the Logon /Security tab, enter the client user & Password details of Destination system.
    h) Test the connection and remote logon.
    2) Create Port (We21)
    a) First Select Transactional RFC and then click create button
    b) Enter the destination port name as SAP+SID (The starting char should be SAP)
    c) Enter the destination client.
    d) Enter the RFC Destination created in SAP R/3 towards other system.
    e) Save
    3) Create Partner Profile (WE20)
    a) Create New
    b) Create the Partner no. name as same the logical system name of the destination system.
    c) Select Partner type LS
    d) Enter details for Type: US/USER, Agent, and Lang.
    e) Click on the + button to select the message type.
    f) Select Partner no. and LS which ever create above.
    g) Select Message type
    h) Select Process code related to the Message type.
    I) save.
    Idoc Testing...
    Testing:
    1.     Log in to Adaptor Monitor and check for the file adaptor. The status of the adaptor should be green and working.
    2.     Check the ftp connection, it should connect to destination folder without any error.
    3.     Log in to sender system, go to transaction WE19 (test tool to generate IDoc), generate Idoc of the required message type.
    4.     Log in to Xi system and execute transaction SXMB_MONI and check for the XML messages. Use your source and destination system to filter messages, it should have chequered flag.
    5.     Check the destination directory, it should have file with the name specified along with the time stamp. Check the file, it should have data for all segments. 
    Hope this information is useful to you..
    Reward points if it is useful to you..
    Thanks,
    Satya..

  • Help regarding BPS Scenario

    Hi,
        Iam doing one BPS scenario, in that i created planning area,planning level,adhocpackage,
        After this i tried to create planning layout from planning level but its giving message ' select a node in the related tree '.
      Please check the below flow how i created.
            costcenter demo  ( Planning area )
            activity planning   (planning level )
            adhocpackage    (planning package )
    after this i tried to create planning layout and planning function but iam unable to do that.
    Please help me ..

    Gobi,
    Please select the planning level you created by clicking over it. then you are able to create a function in the area below. remember that a function belongs to a planning level.
    regards,
    Alberto Sabate

  • Regarding RFC Scenario

    Hi All,
    iam doing SOAPXIRFC Scenario
    Here my SOAP Application dont want any Response message.
    But by default My RFC is having Request and Response structures.
    What i have to do here
    Regards
    Suman

    Lemme give u a very clear ans about this.
    The type of communciation (Sync or Async) depends upon the QOS of Sender (SOAP in ur case). If the sender has QOS EO (SOAP with only request in ur case), then RFC will not send any response. So no problem for u.
    But if ur sender side has QOS BE (SOAP with both request and response), then it will wait for response from RFC
    Conclusion: In ur case, with only SOAP request no RFC response wll be received in moni.
    Hope it clears everything
    Regards,
    Prateek

  • Regarding File scenario

    Hi Everyone,
    I want to read a message from a file with fixed file name and store it in another file Using PI .
           Is this the same scenario as file copy from a source path to the destination path or folder.
    How do i acheive fixed file name, i think the same source file name should replicate in the target also.
    Regards,
    Varun.

    Hi,
    You have to use the Adapter Specific Message Attribute and enable the option filename in both the sender and receiver file CC to have the same file name in both the receiver and sender.
    The specified item was not found. By Michal Krawczyk
    Thanks
    SaNv...

  • Regarding Sales Scenario

    Hi guys,
    I am preparing the sales scenario. I would like to know the hierarchies for sales representative and looking for fields in invoice
    Thanks & Regards
    Bhasin Naik

    Thanks

  • Issues regarding export scenario

    Hi,
    1.I have exported the material ARE1 is updated . But the material is returned from custom . In this scenario how can I receive the product in domestic  market.
    2.I am doing export but by mistake I have not exported the product after 180 days. What will I do in SAP system after 180 days. Whether I have to pay the interest or any thing else.
    3. Stock transfer from manufacturing plant to SEZ plant , How can I inventorize excise duty in this scenario.
    Regards
    Prashant

    First of all, please dont ask too many questions in one thread.  Secondly, on your first two questions, I dont think it is a real time scenario and hence, I refrain myself in giving suggestions to those.
    For third question, please search the forum or Google it so that you will get lot of inputs from there.  Take the inputs and try on your own.
    G. Lakshmipathi

  • Regarding Import Scenario for free goods

    Hi Sapgurus,
    the typical scenraio :-
    1) Suppose a vendor from china has send  material of A,(Quantity of 10 kg),
    For that scenario, I Have done ME21N(Import PO) and i paid the Custome duties through MIRO. i did GRN wrt to Commercial invoice number and the P.O. and then i paid the payement for import vendor.
    2) Now the vendor sends materials of A (Quantity of 2 kg as free goods). for these free goods we have to pay cutome duties and we have to take the existing p.o. for which we already paid MIRO (Custome Duties),MIGO(for P.O.) and MIRO(for which we have paid the payement).
    in SAP, when i amendment the P.O by adding the same material in other line item and flag as free of goods, then the condtion tab at item detail is dissappearing. hecne i could not give the percentage of Custome duties(CVD etc....). so that at the time of the MIRO, there is no item displaying.
    Hence Please help me with this issue.
    Thanking you
    Praveer

    Hi
    For the free item ..... dont tick free PO indicator ... put price as 0.01 or say just 1.0
    Then only u can do it ...... in MIRO enter exact custom duties .... and dont do MIRO for these free items
    Ask account people to clear it manually .... or may be even if u do MIRO for free items costing 1 RS ....still account people
    can knock off the amount

  • Help regarding a scenario

    i have a doubt.
    for example if my source data has a string of 20 characters length like
    <b>
    AMERICIANSTANDARDBANK
    </b>
    So while i transfer the source data to destination i have 2 criteria
       - after the 10th character that is the 11th letter should be replaced by letter 'O' and
       - the target string should contain only 15 characters, and all the characters after the 15th  letter that is from 16th letter on wards should be truncated.
    so target should be :   AMERICIANS<u>O</u>ANDA

    Satish,
    If you always have a string of 20 characters from the input then you take a substring from 1 to 10 and then concat with 'o' and then use the UDF to get the value from 11th position to the end and then once again take the substring.
    Use this UDF which gets the value from position 11 to the end:
    Create a Value UDF with two input parameters. First parameter ‘a’ is used to pass the length and the second parameter ‘b’ is used to send the actual value to the UDF. Now add this code:
    int i = Integer.parseInt(a);
    String c = b.substring(11,i);
    return c;
    In mapping you map this two fields to the UDF:
    Source>Length>UDF
    Source-->UDF
    It gets you the value from the 11th position to the end.
    Regards,
    ---Satish

  • Regarding HTTP scenario

    hi experts
    when i want to do Http tp RFC scenario is there any pre settings to be done r not required?If pre settings have to be done plz kindly suggest me what settings i have to do and how?
    Helpful answers will be appreciated.
    Thanks in advance.

    Hi farook shaik  ,
    Check these websites giving step-by-step solution to solve u'r problem:
    Connect XI with Sterling GIS Using SOAP HTTP Adapters
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/d53af8ca-0801-0010-08b0-dce9e02130a8
    Posting and Testing using XI/PI HTTP Adapter
    Posting and Testing using XI/PI HTTP Adapter
    Plain HTTP Adapter
    http://help.sap.com/saphelp_nw04/helpdata/en/44/79973cc73af456e10000000a114084/content.htm
    Configuring the Sender Plain HTTP Adapter
    http://help.sap.com/saphelp_nw04/helpdata/en/43/64db4daf9f30b4e10000000a11466f/content.htm
    Configuring the Receiver Plain HTTP Adapter
    http://help.sap.com/saphelp_nw04/helpdata/en/43/64dbb0af9f30b4e10000000a11466f/content.htm
    Posting and Testing using XI/PI HTTP Adapter
    Posting and Testing using XI/PI HTTP Adapter
    ABAP-Based HTTP Client for Messages to SAP XI
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/ae388f45-0901-0010-0f99-a76d785e3ccc
    cheers!
    gyanaraj

  • Regarding JMS scenario

    HI friends. i am doing file 2 jms scenario. in that during configuration part i need jms receiver details. i have IBM MQ in my system . can anybody help me hw to create  a queue queue name, channel name, port number etc.

    Hi,
    U need to create quque on MQ server. ask the administrator to create the queues. he will provide all the necessary details which is required for configuration.
    Please go through the following links.....
    /people/sudheer.babu2/blog/2007/01/18/asyncsync-communication-using-jms-adapter-without-bpm-sp-19
    /people/venkataramanan.parameswaran/blog/2007/01/18/syncasync-communication-in-jms-adapter-without-bpm-sp19
    First would be to deploy drivers for JMS scenarios - https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/3867a582-0401-0010-6cbf-9644e49f1a10
    Secondly, to configure JMS adapters;
    http://help.sap.com/saphelp_nw04/helpdata/en/cd/d85a9d6fab7d4dbb7ae421f710626c/content.htm
    In case JMS scenario that you have is a sync one, in that case if you are below SP19 you might have to build a BPM - ref: http://help.sap.com/saphelp_nw04/helpdata/en/83/d2a84028c9e469e10000000a1550b0/content.htm
    Else ref:
    /people/sudheer.babu2/blog/2007/01/18/asyncsync-communication-using-jms-adapter-without-bpm-sp-19
    /people/venkataramanan.parameswaran/blog/2007/01/18/syncasync-communication-in-jms-adapter-without-bpm-sp19
    How to correlate JMS messages - https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/5059f110-0d01-0010-7c8b-fdc983be70c0
    How to use conversion modules in JMS - https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/f02d12a7-0201-0010-5780-8bfc7d12f891
    thnx
    chirag

  • Regarding jdbc scenario

    hi friends plz find my error "Error while parsing or executing XML-SQL document: Error processing request in sax parser: No 'action' attribute found in XML document (attribute "action" missing or wrong XML structure)".

    HI this is my xslt mapping file please check if any errors r there.
    <?xml version="1.0" encoding="UTF-8"?>
    <!--
    This file was generated by Altova MapForce 2008sp1
    YOU SHOULD NOT MODIFY THIS FILE, BECAUSE IT WILL BE
    OVERWRITTEN WHEN YOU RE-RUN CODE GENERATION.
    Refer to the Altova MapForce Documentation for further details.
    http://www.altova.com/mapforce
    -->
    <xsl:stylesheet version="1.0" xmlns:xsl="http://www.w3.org/1999/XSL/Transform" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xs="http://www.w3.org/2001/XMLSchema" xmlns:n="http:file2jdbc_xslt" exclude-result-prefixes="xs xsi xsl" xmlns="http:file2jdbc_xslt">
         <xsl:namespace-alias stylesheet-prefix="n" result-prefix="#default"/>
         <xsl:output method="xml" encoding="UTF-8" indent="yes"/>
         <xsl:template match="/n:send_msg_typ">
              <n:receive_msg_typ>
                   <xsl:attribute name="xsi:schemaLocation">
                        <xsl:value-of select="'http:file2jdbc_xslt C:/DOCUME~1/miracle/Desktop/receive_msg_typ.xsd'"/>
                   </xsl:attribute>
                   <xsl:variable name="Vvar0_firstSource" select="."/>
                   <rowvalue xmlns="">
                        <statement>
                             <xsl:attribute name="action">
                                  <xsl:value-of select="'insert'"/>
                             </xsl:attribute>
                             <table>
                                  <xsl:value-of select="'emp'"/>
                             </table>
                             <access>
                                  <xsl:for-each select="empname">
                                       <xsl:variable name="Vmarkerloopempname" select="."/>
                                       <xsl:for-each select="$Vvar0_firstSource/empnum">
                                            <xsl:variable name="Vmarkerloopempnum" select="."/>
                                            <xsl:for-each select="$Vvar0_firstSource/empsal">
                                                 <xsl:variable name="Vmarkerloopempsal" select="."/>
                                                 <xsl:for-each select="$Vvar0_firstSource/dept">
                                                      <xsl:variable name="Vvar4_result" select="concat($Vmarkerloopempname, $Vmarkerloopempnum)"/>
                                                      <xsl:variable name="Vvar5_result" select="concat($Vvar4_result, $Vmarkerloopempsal)"/>
                                                      <xsl:variable name="Vvar6_result" select="concat($Vvar5_result, .)"/>
                                                      <empdetails>
                                                           <xsl:value-of select="$Vvar6_result"/>
                                                      </empdetails>
                                                 </xsl:for-each>
                                            </xsl:for-each>
                                       </xsl:for-each>
                                  </xsl:for-each>
                             </access>
                        </statement>
                   </rowvalue>
              </n:receive_msg_typ>
         </xsl:template>
    </xsl:stylesheet>
    and my error is "Error while parsing or executing XML-SQL document: ERROR occured parsing request:com.sap.engine.lib.xml.parser.NestedSAXParserException: Fatal Error: com.sap.engine.lib.xml.parser.ParserException: Name expected: 0x23(:main:, row:2, col:2)(:main:, row=2, col=2) -> com.sap.engine.lib.xml.parser.ParserException: Name expected: 0x23(:main:, row:2, col:2)"
    please rectify my error.

Maybe you are looking for

  • User property  from realm in ADF form or in BPM variables

    I want use the user property of realm to set BPM variable (for example set variable name with the corrisponding user property of the realm) or ADF component (for example insert e-mail in af:inputText) Someone can tell me where there is specific docum

  • What is the best method for multiple language interface?

    Hi, I need to adapt my CVI application to multiple languages.  But I have to be able to do this on the fly.  The Localizer is great for all the panel objects and this works great.  But I was wondering what the best method is for all the dialog box te

  • 2 Airport Expresses and a Time Capusule

    Hello, 3rd post so please be gentle. I have a Time Capsule getting its internet connection into the ethernet WAN socket. I have two ethernet points upstairs (one in each bedroom) which connect back downstairs to the Time Capusule's LAN ports. I want

  • Is it possible to use linux drivers to get a pluscom USB to ethernet adaptor to work.

    I'm grasping at straws here, the adaptor it seems has only linux and windows drivers and I'm avoiding having to return it, given the dramatic difference in price between these adaptors and the official apple onese for a device with the same functiona

  • Microsoft Ecosystem Metadata Exchange

    Installed Microsoft Ecosystem Metadata Exchange from here https://sysdev.microsoft.com/en-US/desktop/member/Telemetry/download/MetadataExchange.msi But it will not start.  From the Event log [Microsoft.Telemetry.MetadataExchange.Presentation.DialogSe