Regarding Upgrade To EP7.0
Hi all,
I need to know, if suppose we are upgrading SAP ERP 2004 to SAP ERP 2005 as well as EP 6.0 to EP 7.0.
Also,If SAP ESS/MSS 100(for SAP ERP 2004) had been deployed in EP6.0.
Now is it neccesary to again deploy SAP ESS/MSS 600 (For SAP ERP 2005) in EP7.0?
Also, will the customized iviews be overwritten after upgrade? What are the precautions which have to be taken with respect to the before/above during upgrade?
Thanks in advance,
Akshay
Helpful answers would be rewarded.
Hi Akshay
Refer to Note number 1007341 for supported landscape on the upgrade scenario mentioned by you.
You will require to upgrade ESS business package when you are upgrading to ERP2005 and EP7.0.
Hope this helps.
Regards
Prabhakar Lal
Similar Messages
-
Hi Guru's,
I have two doubts regarding upgrade work.
1. when we are doing unicode remediation for the obslelute function modules, if in older system if they handling any exceptions how we can handle those in ECC new system. I mean to say if they are displaying some messages according to the exception how we can handle??.
2.Describe field statement with addition in CHARACTER MODE or BYTE MODE?..When to use CHARACTER MODE and when to use BYTE MODE??
Please clarify..
Thanks & Regards,
SASTRY R.Hello,
1. When replacing a obsolete function module, if any exceptions are handled, you will have to manually map those exceptions in the newer function module and handle accordingly.
2. The type of the field on which the DESCRIBE statement is used will determine if it should be a CHARACTER or BYTE mode. If the type is C,N,D,T,S go for character mode else BYTE mode.
Vikranth -
This is regarding upgrading problem
Hi,
This is regarding upgrading problem.
I am Upgrading 4.7EE IDES to ECC 6.0 but I got the problem with Solman key
When I given the Solmman key it shows illegal solman key. what is the problem ?
system Id -
> F06
nstance number ---> 30
Hostname is -
> saibaba
Thanks,
Narshiha raoHi,
You genereate new solman key according to your system name and put that. This will work very well. Because when we create solman key then we have to define what is server name etc.
Anil -
EP6 NW04 on 32 bit upgrade to EP7 on 64 bit
Hi,
We want to move from EP6 NW04 on 32-bit Windows/Oracle to EP7 on 64 bit Windows/Oracle. Our choices are:
- system copy to new 64 bit hardware and then upgrade.
- upgrade on 32 bit then system copy to new 64 bit hardware.
- install EP7 on the new 64 bit hardware and transport the content from EP6.
What is considered best practice? What would be the main reasons for choosing fresh installs over the copy/upgrade? Any comments welcome...
Also, is a system copy from 32-bit to 64-bit considered heterogeneous?
And lastly.. is it possible to use the "XML Content & Actions" method for copying transport from EP6 to EP7?
Many thanks in advance.
Regards
Jane>
Rishi Narayanan S wrote:
> We did a fresh install of EP7 on new 64bit hardware and then did a system copy from the old portal. I presume since the OS and DB change from 32 bit to 64 bit, this falls under heterogenous system copy.
Is there an advantage to doing a system copy rather a simple export/import of the PCD? -
Regarding upgrade of web report\web templates functionalites BW 3.5-BI 7.0
hi all,
I m working on a Upgrade study from BW 3.5 to BI 7.0 for Web Templates,web items and java scripts.
Below is the scenario of the client system:
New web templates are created from the 6 master web templates available for publishing to a custom Portal (created using BSP and hosted on the WAS). TOOLBAR and FOOTER are custom web templates used in all Master Templates and contain various JavaScript functions and footer code respectively.
TOOLBAR provides the Toolbar, header and buttons functionalities in the Master Templates via the contained Javascript functions. FOOTER displays the date and time of issue as well the logged in user.
FOOTER1 and FOOTER2 are web items derived from FOOTER web template. They have different set of web item properties and are used to create web templates used through the custom Portal.
It is observed from BW Tables that out of 100 unique Web Templates available in the system, 90 are using TOOLBAR template and 95 are using FOOTER template.
No external Javascript .js files are used in the Web templates. Most of the Javascript functionality is contained in TOOLBAR and no other custom javascript in master templates. However, there are some derived web templates where custom javascript is contained.
Following is the process to create custom Web Templates in development server that are eventually transported to QA and Production:
1) The appropriate master template is identified and saved with new name in developer role.
2) Dataprovider is added to corresponding web items.
3) From the library, properties are transferred from master template to the custom template.
4) Report title is added in HTML tab.
5) No changes are needed in the Web Templates Properties except change of value in Show Jump Target in field to the portal Frame ConPortal or _self in case RRI is to be used.
6) Some properties like Title, Width in Pixel, Affected Data Provider, etc. needs to be adjusted. Changes can be done to web items seen in Overview tab except the FOOTER and TOOLBAR web items. These web items are saved as reusable components in Library.
7) After all the changes the web template created is transported from development server.
To summarize, all master data for creation of web templates like reusable master templates, web items in library, web templates containing Javascript code are stored in dev. server. Custom web templates created from these are transported.
I want to validate the sequence of migration as below:
Following sequence has to be followed for the Web Templates and Queries Migration in development BI 7.0 Server:
1) Migrate the Individual BEx Queries first and perform functional testing.
2) Migrate the TOOLBAR template manually (create as new in BI 7.0 Toolset) and FOOTER template automatically (using Migration Tool).
3) Manually migrate the JavaScript code in TOOLBAR. Please refer to section ..for more details.
4) Migrate the library of reusable web items, if any.
(What to do if web item is custom or is not supported in BI 7.0)
5) Migrate the Master Web Templates manually (create as new in BI 7.0 Toolset) and automatically (wherever possible) and perform functional testing.
6) Migrate the custom web templates automatically (wherever possible) and manually, if automatic migration is not possible. Perform functional testing and data provider binding.
7) Perform jump target binding wherever applicable.
8) Transport custom templates, TOOLBAR and FOOTER to QA and Production subsequently.
Also i have the following questions:
1. How to migrate functionalities accessed thru web templates like jump queries, general navigation blocks with filter, table interface, and are data providers automatically linked to web items or have to be done manually post migration.
2. Do we need to migrate the library of reusable web items also.
3. After migrating the master web templates and javascript containing templates to BI 7.0, can we migrate automatically the custom webtemplates derived from master templates and containing the custom javascript that is now avaialbe in BI 7.0, will they pick up the custom code automatically.
thanks in advance
Regards
praveenNo resolution found
-
Need help regarding upgrading Oracle 10g Forms to Oracle 11g Fusion Middlew
Hi All,
I am trying to create a workshop on a VM for showing the migration / upgrading of Oracle Forms 10g to Oracle 11g FMW using the Upgrade Assistant tool available in <ORACLE_HOME>/bin/ua.bat.
As per my understanding of pre-requisites:
1) I need to install Oracle SOA Suite 10g on my VM.
2) I also need to install Oracle SOA Suite 11g on my VM.
3) I need to install Oracle Forms/Reports Services 10g on my Oracle SOA Suite 10g installation.
4) I need to run Oracle Forms/reports installer on my Oracle SOA Suite 11g installation.
5) I need to run upgrade assistant tool on my VM to upgrade my form from source(Oracle SOA Suite 10g) to destination(Oracle SOA Suite 11g). Is it mandatory for this migration that I should have Oracle SOA Suite 10g and Oracle SOA Suite 11g on the same system ?
Having all these software installed on one VM would be difficult. So just wanted to check can I avoid any software to install on VM ?
If there is any alternative suggestion then please let me know.
Regards,What do you want to do with the SOA-suite? At least for Froms10G is is not necessary.
-
Query regarding UPGRADE SAP NW BI 7.0 to BW 7.3
Hi,
What are the prerequests needed to upgrade from NW7.0(EHP1) BI system to new SAP BW 7.3 ? is it possible?
if YES, what are things need to taken care. if NO what are the prerequest need to be done in existing NW 7.0 (EHP1) BI system?
Your response is highly appreciated.Hello,
If you mean the BI Content then you can check the pre-requisites from the Info file from the download path
Regards,
Anand -
Regarding upgradation from 4.6C to ECC6.0
Hi Friends,
We want to upgrade from 4.6C to ECC6.0 .
Pls can any one suggest me which tool i have to use .
Possible pls send me some docs on this one.
Thanks & Regards,
Ramnaresh.PYou have to refer Upgrade documentation at https://service.sap.com/instguides
Regards,
Nikunj Thaker. -
Documents regarding upgradation of 4.6 to ecc 6.0
can help me regarding this???
HI
Check this for the upgrade related Information..
http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
Thanks
Praveen -
Regarding Upgradation of Project
Hi
Can you please guide me what exactly is the role of an BW consultant.. For ex: One XYZ company is Using BW3.1 c now they want to upgrade the systems to BW 3.5 . In this scenario what is the role of an BW consultant and what exactly we are going to do...
Please send any kind of documentation to my mail id <removed> regarding Upgadation of project.
Thanks & Regards
AjayHi Ajay,
Please go through this document: How to SAP BW 3.5 Upgrade Prep and Post- Upgrade Checklist
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/472443f2-0c01-0010-20ab-fbd380d45881
Hope this helps... -
Regarding Upgrad ! (Urgent plzzz)
Hi Guys,
currently i am using BW 3.5 and have created various InfoObjects like InfoCubes, Infosets, Master Data, ODS.
Now the client is planning to upgrad the system from BW 3.5 to BW 7.0. And i am assigned the task to upgrades these InfoObjects after the upgrade of system is done.
Could some one tell me how to upgrade these Objects so that they will be compatible with the new system BW 7.
The clien does not want to create all these objects from scrach once the system is upgraded to BW7.
ur help will be awarded in terms of point.
Thanks,
manmithi,
Yes u need not create these objects from scarch again!!
please check the official upgrade guides.
https://service.sap.com/instguides --> SAP NetWeaver --> Release 2004s --> Upgrade
u will find plenty of stuff there.
check this pdf too...gives u full guide on upgradtion.
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7
Assign points if it helps!!
Regards,
Dhanya. -
Hi I want to know about upgrade project from 4.7 to ECC 6.0.
The points to be known is........
1. What are the steps to be followed during upgradation?
2. Any phases are there in an upgradation?
3. In an ABAP program run what are the statements giving the problem (Few examples)?
Help would be appreciated.
Thanks in advance
RameshHi Ramesh,
When we go for upgradation, first we read upgrade guide thoroughly and implement accordingly then we will do very fast and with out problem. Please ready carefully and implement.
Regards,
Anil -
Regarding Upgrade differences.
hi Experts,
we are planning for Upgrade from 46C to ECC. and do Delta Customizing/Transaction report for old and new system.
Could you please suggest us what are all the factors to be considered for Delta Report(either with respect to transaction/System).
Appreciate your reply in advance.
Thanks
Ambichan.Hi,
You have to consider All the dictionary object, Programing objects for the delta report. First fetch the data from the Source and using RFC fetch the data from Target system and compare the data for the following objects
Tables
Views
Domains
Data Elements
Match Codes
Search Helps
Lock Objects
Message Class/
Function Groups
Programs
Logical Databases
Transactions
Menus
Script/Smartfo
Styles
Business Objects
Queries
Infosets
User Groups
Idocs
eCATTs
sCATTs
reward points if useful
regards,
ANJI -
Info regarding upgrade project
Hi Experts,
am going to join to do upgrade project (ECC6.0) till now i ve worked on up to 4.7 only, so what is required knowledge for upgrade project.
and what is unicode is it required for this?
Thanks in advance.
sudha.Hi,
ECC 6.0 does not support MDMP installations. For those systems, a Unicode
conversion needs to be done before the upgrade to ECC 6.0. A combined Unicode
conversion / release upgrade is another possibility. In such a project, the system is
upgraded to ECC 6.0 and migrated to Unicode in one step.
All this does not apply to your environment. Non-Unicode, single code pages systems
are still supported in ECC 6.0. You have to option to an upgrade to ECC 6.0 and migrate
to Unicode at a later stage. If you want, you can also do a combined Unicode
conversion / release upgrade project which does both in one step.
I cannot predict the expected downtime as it depends on many different factors such as
the database size, size of the biggest table, number of CPUs and amount of memory in your system.
OR Check these links....
http://searchsap.techtarget.com/expert/KnowledgebaseAnswer/0,289625,sid21_gci1242699,00.html
http://www.saptechies.com/upgrade-from-sap-47-x110-to-ecc6/
for upgradation project guide.....
http://www.sappressbooks.com/product.cfm?account=&product=H2903
Reward points if useful....
Regards
AK -
Regarding upgrade OCMJEA 5 to OCMJEA 6
Hi team,
I recently complete the path for OCMJEA 5. However, I already took the first exam of OCMJEA 6 (1Z0-807), because I thought it was sufficient for upgrading to the OCMJEA 6, but it does seem to be true.
How can I achieve the upgrade to OCMJEA 6?
Regards,
Raphael RodriguesIf you already hold the Java EE 5 Enterprise Architect certification, the 807 exam should upgrade you to EE 6. This issue is likely your testing ID. You probably took the 807 exam under a different testing ID. If you were assigned a new Oracle Testing ID when you registered for your 807 exam, then you have multiple IDs. You'll need to contact Pearson VUE at pearsonvue.com/oracle/idmerge to request to have your IDs merged. The Oracle Certification database is recognizing those records as two different candidates. Merging the IDs should take care of the issue.
Regards,
Brandye Barrington
Maybe you are looking for
-
I have been using the same HDMI cord connecting to my same MacBook for a year now. I have enjoyed watching movies without a single problem. Two software updates later and my HDMI cord says it is no longer supported. I have read just about everythi
-
How much White is too much White?
Hi guys, We're in the process of finalizing our site (See Who Sells - http://www.seewhosells.com) and have been trying to stick to the "minimalist" approach in terms of color scheme for the duration of design. However upon discussing recently with so
-
hii,,, i am using iphone 3g, i am trying to install apps from apple store,, installation stop in middle,and say,, u have to do install through itunes from your laptop. when i am trying to install it from my laptop,, its failed again n again,, help me
-
HTTP Connection to ABAP System - Query String Not Allowed message
Hi All, We are trying to create HTTP Connection to ABAP System on a SAP ECC system. Following entries are added 1 Connection Type: H 2 Target Host: Host name 3 Service Number: HTTP Port name 4 Path Prefix: /sap/XI/engine/?type=entry It is not allowin
-
Full signal strength but unable to connect to the internet
I just got my ibook G4 about a month ago and have only been able to access the internet for about 2 weeks on and off. After I set up my wireless linksys router I was able to connect right away and it was fine. Then about a week or so after using it w