Regarding UWL  Backe end configuration

Hi ,
I have one dout. My task is to store the data in to  back end R/3 system i.e when a send a task to some person in portal  the task will be stored on work flow of inbox.So,  any idea about regarding this issue. plz help me .
I down loaded UWL.standard.XML  file . But i dont know where can i change the attribute.
Thanks,
Sumanth

Hi,
I think for this no need to do anything with XML.
U integrate the backend with UWL.
We can also raise the tasks from backend if we integrate the UWL system with the backend system.
Thanks and regards,
gopal.sattiraju

Similar Messages

  • Missig CN=EWS (Exchange Back End) in AD

    Hi @ all,
    I had some Problems with Exchange 2013. Now, on AD, where CN=EWS (Exchange Back End) configuration is missing, CN=EWS (Default Web Site) is there and correct...
    How can I register this back in AD?

    Hi,
    According to your description, it seems that you checked the configuration of a single CAS role in AD,
    If you check mailbox role, you will find CN=EWS (Default Web Site) is missing, and CN=EWS (Exchange Back End) is there.
    The screenshot below from my lab, for your reference:
    Hope this helps!
    Thanks.
    Niko Cheng
    TechNet Community Support

  • Regarding connection between front end HTML and back end SQL 7.0

    Hi!!
    I am working on the project 'ERM'. I have designed 12 forms using HTML. Can u please give me brief idea how to establish the connection between a back end and front end i.e. between HTML and SQL 7.0. If possible can u provide me the source code for the same.
    I will be very thankful to you.
    Thanks,
    Jigar.

    Read up about multi-tier applications.
    You need servlet and JSPs for the server-side presentation layer, some classes for the business logic, and some mor for the persistence layer either using JDBC or some framework like Hibernate.

  • Regarding Limit orders & backe-end contract

    Hi
    I have some questions on shopping cart $ back-end contract.
    Q1) In the standard srm solution,  In the case of material/service shopping cart , in source of supply , is it possible to access or use the backe-end contract in classic scenario?
    Q2)In the standard srm solution , In the case of limit shopping cart , in source of supply , is it possible to access or use the backe-end contract in classic scenario?
    Pleae give me the solution..
    Thanks
    Raj

    Hi Raj,
    Backend contracts can only be referred as SoS in classic scenario. So this should work for you. Infact you don't even need to replicate your backend contract from ECC to SRM.
    Cheers,
    Nikhil

  • Vendor Replication and Different Back-end Systems

    Hello,
    Currently, we have vendor replication were the vendor number from the back-end is used in SRM-EBP.  Now, we want add another back-end but there are vendor number conflicts.  Is there a way to configure it so that the new back-end replicaition generates new numbers in SRM-EBP? 
    Honestly, there should be a cleansing and alignment of vendor numbers between the two back-end systems. However, that is big task that the organization doea not want to take on at this time.
    Has anyone encounter this issue and how did you resolve it?
    Regards, Dean.
    Edited by: Dean Hinson on Feb 3, 2010 3:26 PM

    Hi,
    You can find option "If R/3 number assignment is not possible: Internal number assignment" in the bottom of BBPGETDV transaction screen.
    Regards,
    Masa

  • About back-end adapter and IDoc

    Hi everybody!
    I was watching in the FAQ of Mobile 7.1 about the possibility to use IDOC as a mechanism to push data to DOE, but this document only says: "IDocs are supported only for back-end-triggered scenarios" and provides a link to configure ALE between the backend and DOE, but the link doesn't work. (Somebody has this information on a link that works?)
    I'm trying to find any information, blog, article, how-to guide, however I cant found anything. Anybody has documentation about how to configurate and implement a backend-adapter to push data from the backend through IDOC? Any information will be welcome.
    Thanks in advance.
    Best regards,
    Simon.

    Hi San,
    You will have to look after this in Tansaction SE80. Open the BSP application cProjects, and find the appropriate view. (The naming convetion will help a little). Open the view tab: layout >> e.G. progAssignedPha.bsp Here you will find what BSP elements it consists of. You will find the
    <htmlb:tableView and <htmlb:inputField ... elements.
    Here you will find the information you are looking for.
    As easy as in SAPGui you can not find out this information.
    Regards.

  • Back-end communication error for r/3 parameter search

    Hello everyone,
    Have been facing this problem for sometime now.When i was clicking on <b>'binoculars/search'</b> find to check for account assignment on web gui,i was getting this error "display not possible...inconsistency in input help" error.
    I did configuration setting in 'define back-end' system(defined the last column of rfc destination), and the error disappeared and is working fine in sandbox.
    Now when i do the same in development system,'inconsistency' error no longer pops up but another one pops up saying <b>"error while communicating with the back-end system..inform system admin."</b>
    Just to let you all know,<u><i><b>i am able to create back-end documents</b></i></u>...it is just when i am trying to use "binoculars/find" in account assignment...the 'backend communication error pops up.
    I have tried everything possible..checked all attributes..everything is fine.
    Can someone assist me?I must be missing something very simple...plz suggest.
    Full points guaranteed:))!!!
    Priya

    Priya-
    Are you certain the RFC destination you have defined for search helps has proper authorizations?  See OSS note 656633 - <a href="https://websmp107.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=012003146900000120122003">OSS 656633</a>
    Regards-
    b

  • User,Role Sync with back end Error.

    Hello,
    I am connecting a new back end ECC system for an existing RAR system with 2 backend systems.
    I get the following error message. I have configured the Jco to the new system and it tests O.K.
    " Error while executing the Job:Interface Controller does not exist for Component Instance "
    Is it an configuration issue with the RTA at the back end ?
    Thanks
    Vidyar

    Hello ,
    Please check the following steps for the error.                                                                               
    1. Make sure that SLD is up and running.                               
    2. JCO's are properly configured and are successfully pinged and tested.
    3. After verifying the above steps, Restart the J2EE server.                                                                               
    TEST & PING the JCO in Web Dynpro =>Content Administrator =>Maintain JCOs. This JCO has to be the one which you are using for the connector for which you are running the SYNC job.
    Periodically the JCo destinations, as part of the Netweaver framework, sometimes fail.  Recreating them or restarting the system can make them work again.                                                      
    Regards
    -Ranjiv

  • Front-end/back-end cluster question

    [att1.html]
              

    Patrick Power wrote:
              > Thanx for your reply Prasad. I was surprised none of the Bea engineers
              > wished to touch this one. What do you suppose is up with that? Either
              > they are too busy, or possibly my question is too dumb.
              >
              I am from BEA so its not that we are not responding ;).
              >
              > Back to the issue: Yes, we will NES bridge/proxy into servlet front-end
              > cluster, potentially with Directors on the very front of the topology for
              > balancing. Your diagram as such:
              >
              > <Netscape/IIS/Apache/WLS FRONT END> ----- <CLUSTER OF WEBLOGIC SERVER
              > > SERVING SERVLETS> --- <CLUSTER OF WEBLOGIC SERVERS SERVING EJB>
              >
              > 1) Does <Netscape/IIS/Apache/WLS FRONT END> mean NES with proxy shared lib,
              > with a WLS service definition into cluster in obj.conf? I assume yes.
              Yes.
              >
              > 2) I would assume that <CLUSTER OF WEBLOGIC SERVERS SERVING SERVLETS> would
              > need the WLS HttpClusterServlet to the <CLUSTER OF WEBLOGIC SERVERS SERVING
              > EJB> all the way in the back.
              No. I was splitting presentation logic (namely servlets and jsp) and business
              logic (ejb) into two layers. Again you don't have to split it into two. You can
              colocate them both together. You could use NES or IIS or Apache or WLS. You
              don't need HttpClusterServlet.
              Lets get this straight.
              1. You need our proxy plugin for failover and to load balance the request that
              are going to presentation logic.
              2. From presentation logic layer, when you talk to backend business logic
              providers (like ejb cluster), if you use stateless session beans we provide
              failover and load balancing. In future we will support clustered stateful
              session beans as well. Therefore you don't need load balancer here.
              3. HttpClusterServlet should run only in front of presentation logic cluster and
              also it supports http only.
              Hope this helps.
              - Prasad
              > The NES proxy would only proxy into the f/e
              > cluster, right? You're not suggesting an external proxy of some type, are
              > you? The HttpClusterServlet is for WLS cluster-to-cluster proxies.
              > 3) A load balancer between the wls f/e and wls b/e clusters? That doesn't
              > seem applicable here. Once again, it should be HttpClusterServlet for WLS
              > cluster-to-cluster proxies.
              > 4) "use two or three proxy servers to avoid single point of failure."
              > Hmmm, once again - are we talking the WLS HttpClusterServlet proxy? Well,
              > that's the inital question: Can I have more than one HttpClusterServlet
              > proxy in the front-end cluster, proxying to the back-end cluster?
              > Otherwise, internally from this WLS architecture perspective, it is a single
              > point of failure.
              >
              > An example: 10 instances in f/e cluster. can more than one of these
              > instances have the WLS HttpClusterServlet proxy to the b/e cluster? Or, are
              > there instances of WLS HttpClusterServlet proxy in all 10 f/e cluster
              > instances?
              >
              > Cheers, Pat
              >
              > Prasad Peddada <[email protected]> wrote in message
              > news:[email protected]...
              > >
              > >
              > > Patrick Power wrote:
              > >
              > > > I know that this topic was addressed to some degree here in an earlier
              > > > posting, but I still have a question regarding the architecture
              > > > design:
              > > >
              > > > If configuring a front-end cluster for servlets/sessions and a
              > > > back-end cluster for remote services -- you route requests to the
              > > > back-end using the WLS proxy servlet. ok, got that part.
              > >
              > > Not quite. The typical scenario is
              > >
              > > <Netscape/IIS/Apache/WLS FRONT END> ----- <CLUSTER OF WEBLOGIC SERVER
              > > SERVING SERVLETS> --- <CLUSTER OF WEBLOGIC SERVERS SERVING EJB>
              > >
              > > You don't proxy and serve servlets from the same server.
              > >
              > > >
              > > > The question: Is there a single instance of the wls proxy servlet in
              > > > the front-end cluster? Or, is it on every instance in the front-end
              > > > cluster? What is the failover mechanism, in the case of a single
              > > > instance of proxy servlet in the f-e cluster failing?
              > >
              > > To prevent that you need to use some kind of h/w or software load
              > > balancer and then use two or three proxy servers to avoid single point
              > > of failure.
              > >
              > > > Is it a single point of failure between the 2 clusters?
              > > >
              > > > Thanx in advance for your help.
              > > >
              > > > BTW, I think Wei, Kumar and the other Bea folks cruising this group
              > > > have been doing a bang-up job of providing badly-needed detail on this
              > > > subject area - material this largely absent from the documentation.
              > > > Good job.
              > > >
              > > >
              > >
              > > --
              > > Cheers
              > >
              > > - Prasad
              > >
              > >
              

  • Not able to get a link to the fron-end portal(ess) with back-end sap R\3 AB

    Hi,
       In the back-end i.e sap abap-hr , the required data (leave types) are available.But on front-end Portal(ESS) ,the drop-down menu in personal LOA forms shows only two leave types(personal & self-funded leave).i got struck in how to make few in remaining also viewable in the drop-down list.Can anyone help me on this?

    Bottom line,
    to configure the Leaves on your portal you have to do.
    1. Configure the Leave Types and all the customizing on T554S.
        opc. If you want to have quota deduction, and everything else you should check V_T559L, T556C, T556A as well.
    2. Configure the Leaves on the Portal.  This is done on the IMG path colleague replied:
    >Personnel Management
    >Employee Self-Service
    >Service-Specific Settings
    >Working Time
    >Leave Request
    >Processing Processes
       a. Create the Rule Groups - this step you just create them.
       b. Adjust feature WEBMO - The feature WEBMO is used to select the rule group. Most of the times based on MOLGA and Ctrl. Center.
       c. Define Processing Processes for Each Rule Group - define the processes such as how to record partial day leaves, details on to check PTREQ_HEADER tables for unposted leaves, and how to determine workflow's next agent (more info press F1 on each of these fields)
       d. Specify Processing Processes for Types of Leave - Associate the Leaves from T554S that you want to show on the portal. This includes Absences and ATtendances. Here you define data such as if you are allowed to create leaves on the past, present and future; field customizing, and other details.
    Since Time Management is an old part of SAP the F1 documentation is very complete so I really advise you to check.
    Also, check http://wiki.sdn.sap.com/wiki/display/ERPHCM/LeaveRequestCustom+Messages
    for how to have custom warning messages to show on your leaves.
    I hope I have clarified.
    Kind Regards,
    Bentow.

  • Cost centre Budget Display in the shopping Cart ( back-end settings)

    Hi,
    I am working on Shopping cart budget (Back-end).
    I have maintained the budget for Internal order in the back-end, and while creating shopping cart for the Internal order able to get budget display as below
    Budget Overview Assigned to Budget of Value Budget Assigned Credit Limit Used Action
    Order R3xxxxx Order R3xxxxx 100.00 GBP 2,500.00 1,600.00 !!!!!!!!!!!!!!!!
    But my requirement is to maintain the budget for cost centre, I am going to create shopping cart with cost centre, I have carried out following steps but still not able to get budget display which i have maintained for cost centre.
    1) Cost centre created
    2) Budget maintained for this cost centre (KPZ3)
    3) Created statical order:
    a) Control data Tab: Statical order, Revenue Posting and Commitment update (all the check box licked)
    b) Assignments Tab: Responsible CCtr is assigned to this order
    3) As per the Note 68366 i have tried to maintain substitution in CO (transaction OKC9), but confusing about what to maintain and where
    Can you please suggest how and what to configure in OKC9, or any material or note which explains detail steps
    I am confusing about below fields
    1) Event
    2) Active
    When going inside after double click
    Under Cost accounting where i have maintain substitution, under line item or Order and process for pre-requisite and substitutions
    Regards,
    Jai

    Hi Jai,
    Could you please share how did you achieve this functionality?
    We are trying to implement similar functionality.
    Thank you
    Ritesh

  • Two SRM systems connected to One back end system

    Hi..
    Note: I have posted this message earlier ......but couldn't find that. I am just reposting the message:
    In our quality environment, we have two SRM and two backend systems. One for testing purpose and other for training purpose. We are planning to remove one back end system and connect both the SRM systems to one backend system.
    1. Is it possible to have this landscape?
    2. In SRM & R/3 we can define two RFC connnections but from R/3 side, I am not sure how the system will determine the respective RFC connection during GR or any other process.
    3. Are there any other difficulties?
    We are in SRM 4.0 using Extended classic scenario. We are using SRM for processing shopping cart, Po and confirmations.
    Please advise.
    Thanks.

    Hi Prashanth,
    is  very much possible.
    for this you need to configure the partner profiles.
    need to define port
    need to configure inbound paramters and outbound parameters.
    we20 - create partner profiles.
    define outbound parameters and inbound parameters of the message type.
    we21 - define port.
    under Transactional RFC.
    and create a distribution model and add message type.
    revert back to me if any problem still you find.
    regards
    sai

  • URL vs. document attached in back end EBP 4.0 Classic/4.7 E

    Based on documentation provided by SAP (Powerpoint) regarding new functionality available in SRM 4.0, we should have two choices regarding documents attached in shopping carts. One is the copy-to-DMS option well covered elsewhere, the second does NOT copy attachments to the back end but rather makes a URL available in R/3.
    We are attempting this URL approach:
    Instantiated BAdI BBP_CREATE_REQ_BACK (note to the reader, there is a different BAdI for SRM 5.0)
    == Start Code Change ===
    CV_ATTACH_USE_URL ='X'.
    CLEAR CV_ATTACH_TRANSFER_ACTIVE. "i.e. we are not transferring documents
    == End Code change ==
    Configured the badi, attached the method, configured SICF, etc.
    We have NOT configured DMS in R/3.
    Created new requisition/shopping cart
    Adopt the requisition
    Select attachments Icon in SAPGUI, no documents found.
    Has anyone tried this URL method? Did you get it to work? Is DMS still used? We are guessing a simple text file may be transferred with the attachment URL's, which would require DMS.
    Any suggestions on debugging the situation?

    HI Daemeon
    The attachment transfer from shopping cart is very simple just follow the steps below
    Following are the steps -
    In SRM - Activate BADI - ZBBP_CREATE_REQ_BACK
    method - FILL_REQ_INTERFACE
    parameter - cv_attach_transfer_active = 'X' set active.
    In R3 in DC10 create a new document type for SRM
    IN DC30 check all extensions are maintained properly.
    Logout and login and all the attachment gets transffered fully.
    check one process with attachment It will work.
    regard,
    Nimish Sheth
    pls reward points for helpful answers

  • Inconsistency between Bex and Back end

    Hello, I have a query about bex issue. I have few fields in my DSO/Cube which has data showing correctly in the back end but in Bex it shows partial of those values. like if i have something like this:
    ZField
    000000000000000000008
    It shows correct in DSO table but in Bex it only shows the zeros. do you know why and how to get this to show the whole field value?
    Thanks.
    By the way this is a characteristic and not keyfigure.

    Hi Vekant,
    If you have not did any speecific thing at query level then value should be shown correctly.
    Please try this once and check.
    Create new test query on your data target drag and droup your charecteristic.please execute your test query and see if you are able to see the correct value.
    try this.
    Regards,
    Ganesh Bothe

  • Front end and back end questions

    Hi,
    If I want to develop a web base SOA application by using Jcaps, I have several question want to ask.
    1.) In the front end, if i create the page by using eVision to create the page
    flow and the page layout, how can I match the fields of the page (such
    as the username, email, tel no... with the back end web services?
    2.) Does the flow of the front end web pages are control by the page flow in
    eVision? When will the eVision supported AJAX or JSF?
    3.) What is the use of the eInsight Business process manager, does it
    control all the back end flow, such as the flow of each web services?
    Does Jcaps has the Bpel engine to control the flow of web services?
    4.) I know that in JBoss, there is a jBPM server to control the flow of the front
    end pages, does JCAPS has this kind of server?
    5.) If i want to connect to the Database? I know that there is a eTL to extract
    the data from the database, it is true? Or do u recommend to connect the
    database directly through the web services by using JDBC or other
    framework as well?
    6.) If I have an existing application that is developed by .Net (With no web
    services). How can i integrate with other systems? What can I do in order
    to reuse the system? Or what Jcaps can do in this manner?
    Thanks for you reply! ^ ^

    Generally, back-end would consist of the taks associated with configuration of data targets (ODS, Cubes), working with extractors, mapping data to the data targets, writing transfer/start rtn/update rules, and creating Infopkgs/ Process Chains.
    Front-end deals with the use of the BW - writing queries, workbooks, web (although I think some of the infrastructure aspects of web reporting. e.g. javascript/templates might really could be considered backend).  Think of Front-end as all of the client/customer/user facing components.

Maybe you are looking for

  • What is the best home set up for a family to share/use apple products

    Hi, I am relatively new to apple (have an iPad) and having been a PC user for years I was pleasantly surprised with the apple experience and am now trying to work out the best set up for me, my husband and young son as I am buying them both of them a

  • PDF Fast Web View not working in Firefox

    I am using qpdf to convert PDF to linearized PDF files. The Byte requests are working on Chrome and Internet explorer but its not working on Firefox. Firefox 18.0.2 (On Windows) Adobe Acrobat reader - 10.1.4.38 Adobe Reader's (Edit > Preferences >) I

  • Configuring pickup groups

    We have a site that has a PagePac unit connected to a FXS port. CM is 4.1.3sr2. When the receptionist steps away / end of day, they forward the main number to the overhead night bell. The Night Bell is in a pickup group, as are all the phones, so tha

  • Determining whether form is valid or not

    Assuming I have a form with few input fields, I want to render a button only when the form is valid using ajax calls, Is it possible somehow to determine whether a form is valid or not? Thanks, Asaf.

  • Self Service Property Category missing for MSS

    I have just installed the latest MSS busines package on EP7 (NW04s) SP10. When I go to use the MSS report Launch Pad iview I find that the property category "Self Services" is missing. I have added the pre-requite BPs (Common Parts, Project Self Sevi