Regarding Validation on Charactersticites of given Configurable Material.

Hi All,
           I am working on BDC in whcih I am getting the charactersticites of the configurable materials in Flat File. Now the Problem I am facing is that when a particular characterstic is not associated with that configurable material the program is not updating any of the charactersticites associated with that configurable material.
How can we check the validity of the given charactersticites for that configurable material ? Or is there any other logic how I can update the charactersticites for that configurable material.
Points would be rewarded....
Thanks in Advance.
With Regards
Jitendra Gujarathi.

no clues

Similar Messages

  • Stock of configurable material

    Hi,
    Is it possible to have stock of configurable material....?
    If yes how ,...?
    Regards
    SK

    Hi SK,
    You cant keep configurable material in stock.
    But you can create material varient of configurable material and can stock them.
    Go to SAP help , you will find lots of information about it.
    and come with a specific question if you need further help on that.
    also check below links ,
    Re: How to put configurable material in finished stock???
    Re: Variant configuration u2013 availability check for Configurable material
    Hope it helps you.
    Regards
    Ritesh

  • Make to Order for Configurable Material & Error in Confirmation

    Hello, PP Gurus,
                       I am doing one MTO for Fabric business but during the confirmation I am getting error that
    SALES order Stock does not Exist as well Please inform me Costing procedure in this scenario.
    *is it necessary to run MRP in this scenario?*
    Please see the all Details of Business so that U can give answer properly.
    One is raw fabric (Raw material) which has to passed different process to convert Colored fabric as my Finish product as well I can sale Raw fabric also.
    is it possible to maintain raw fabric and Colored fabric with same mat.code?
    I have configured the material as well all pricing BOM, Recipe its working properly.
    How can I assign the material to Operation? I am getting GRAY field in New Assignment in change recipe mode ..
    Is it possible to use Material type other than KMAT? I want to use Finish material type. If yes How?
    Right now I can create Process order from the Sales order but I am facing error in confirmation that Sales Order stock does not exist than I have to transfered stock to Sales order and error get solved temporarily but  I want to avoid this manual transaction to remove this error. Any configuration is required please inform.
    My configuration is given below.
    MRP Type : PD
    BOM item Category:  L Stock Item.
    In dependency & Profile I have set radio Button as Single level Bom explosion.
    Order Bom selection in profile.
    Strategy : 25 make to order for configure material.
    How can I do ? please suggest any changes
    I have only 9 months of SAP experience within short time I have gain lot knowledge from this site and other reading material as well my learning Learning thirst.
    thanks to all SAP gurus..
    THANKS IN ADVANCE .... Definitely I will reward points even if my some questions get solved...
    Regards,
    Bhavik dangi.

    Hi,
    You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
    Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
    In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
    Then the stocks will be reserved to the specific sales orders.
    Thanks and regards
    Murugesan

  • Configurable material - Error converting plan order to production order CO6

    While I am coverting planned order to production order with configurable material, I am getting the follwoing error:
    You cannot make an assignment to make-to-order stock
    Message no. CO684
    As read in previous forum messages I am check settlement profile assigned for  new order type (ZSD01) with standard sett profile (SD1) at OKO7 and set "Valid receivers" with value "1" in Order, Material, Profit.segment, Sales order and Order item.
    Configurable material have item category group "0002", MRP type "PD", Lot size "EX", Strategy group "25" and "Individual requirements".
    Sales order with configurable materiale have item category "TAC".
    Where is the problem?
    Thank you in advance
    Oscar

    Hi,
    There are some OSS Notes to address this problem..(OSS Note: 311651, 432109 etc..)
    But all ae for older versions of SAP.
    Regards,
    Siva

  • GATP allocation check for configurable material with characteristic

    Hi APO Gurus,
    We are using configurable products and wanted to go for GATP  allocation check based on Characteristics.
    The scenario is goiven below,
    All our products are configurable materials. At the entry of sales order , the characteristic values are updated and then the sales order is checked for GATP.
    When the order come to APO-GATP for allocation check , here I want to check the allocation for configurable material.
    But the allocation quantities are given for a combination of Configurable material and its characteristics.
    How can we map such scenario?
    Do I  to create the CVC at family level that is configurable material level ?
    How the characteristic values are considered in allocation.
    Waiting for your reply.
    regards,
    Ravi

    answered.

  • Costing Of Configurable Material

    We have a scenario here.
    We create the sales order in the sales Plant
    We do a STO  to Production Plant  where explode the  BOM  which has an configurable  sub-assembly
    When we run an  MRP this creates a another  STO  for  the configurable material  to be produced in the supplying plant.
    Now, the questions are
    1) How do I create the cost estimate  for the configurable material
    2) How do I get it to reflect in my parent order.
    Thanks
    Siva

    Dear Siva,
    In the case of configurable material,they will be having a super BOM and super Routing defined with object dependencies.
    To do the costing for configurable material you can use T code - CU50 (configuration simulation)
    Here in CU50 you can select the characteristics values which ultimately selects the valid BOM and Routing required for variant
    production and do the costing and check.
    Also check this SAP link to explore more on this topic,
    http://help.sap.com/saphelperp60_sp/helpdata/EN/7e/cb857b43a311d189ee0000e81ddfac/content.htm_
    Also check this thread
    CK11N:Costing  done for Configurable material is throwing error
    Re: Material xxxxx in plant xxxx is configurable and will not be costed
    Regards
    Mangalraj.S

  • Problem while creating PO from SO for a Variant configurable material

    Hi
    i am facing a problem when i am creating a Purchse order from a Sales order.
    the material is a variant configurable material and we are creating a Sales order in Future date say in june.
    For one of the materials in the SO the configuration is different today and the configuration is different in June.
    Today the BOM contains different materials and in june there is a different bom for the material.
    and according to my understanding the BOM gets exploded on the basis on the delivery date in SO.
    here on the basis of the config which is valid in june materials are getting picked and that is correct.
    when i try to creat a PO out of that SO i could see that the BOM gets exploded and   correct materials are picked but i get the error message that inforecord for one of the componentes is not there.
    but that component is not getting selected in the config..and it is not there in BOM in june.
    It is there in the BOM today but not in JUNE.
    I dont understand why the system is refering to that componeent and throwing this error
    please help
    Thanks & Regards
    sarika

    You may try creating two BOMs  -- one speicfic to the date of order.
    Sanjeev

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Error message while creating configurable material for variant configuration.

    Dear All,
    I want to create configurable material for the purpose of variant configuration. When trying to create configurable material using mm 01 or mm k1, it is displaying an error message that internal number assignment is not possible for the material type configurable materials as well in using external number also. Can anyone specify the steps to be done in creating the configurable material. Thank you all.
    Regards
    Akula Sivaji Kumar Madhu Kiran

    If you want to set these material type to another group (Which has a internal number and external number range), then you can do it.
    In MMNR, Click on the Edit Group.
    Then select the material type and click select element.
    Then mark a tick option in another group and then press Element/Group.
    Then you can see the material type will come under this group.
    Now save your entry, and create a material with this material type.

  • Configurable material in scheduling agreement

    When I use DS scheduling agreement with LPN as item category with configurable material, I cannot input value for configuration. But if I use normal TAN instead of LPN, I can input value for configuration.
    Why?
    Does SAP do not allow configurable material in scheduling agreement or quantity contract?
    Thanks in advance for any suggestion.

    Deat Amy,
    Please check the item category settings related  to configuration through VOV7 transaction.
    Go to VOV7 transaction then select item category LPN then go in to the detain here you check the configuration related settings under Bill Of Material /Configuration tab.
    If want you refer the standard Config.at Mat.Levl itemcategory TAC settings, same way you can do settings for your item category then try.
    Note:- Not advaisable to change the standard one, so you copy the standard itemcategories do the changes,
    I hope this will help you,
    Regards,
    Murali.
    Edited by: Murali Mohan.Tallapaneni on Nov 13, 2008 5:20 AM

  • Material variant replacement in sales order for Configurable Material

    HI
    I am using variant configuration. In this i have created material A as configurable material and have Preconfigured Material B as its variant by assigning configurable material in MRP 3 view.
    Now when i am creating Order for material A i.e. Configurable material and the characteristics values are same as that of Preconfigured material system is not replacing Configurable material with Preconfigured material.
    Please help me out.
    Regards,
    Anand.

    Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
    The setting in item category for configuration is.
    Config. Strategy     01(Sales Order Strategy (TAC, TAM))
    Mat. Variant Action  4 (Replace configurable material (Append and change))
    ATP material variant 2 (Do not substitute if not completely available)
    Structure scope      D (Configuration, poss. with BOM explosion)
    I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
    Please suggest if missing something.

  • Configurable Material as BOM component in SALES Order BOM

    Hi Gurus
    I have following
    1. Material ABC is a configurable material (variant)
    2. BOM of this ABC has further configurable materials
    Is it possible to maintain requried charasterstic of the compoents which are configurble at the time of SALES ORDER BOM CREATION.
    If yes, how. please explain.
    Thanks in advance
    sunil

    Dear Sunil,
    Please refer to the following link:
    http://sap-img.com/sap-sd/sales-bom-implementation.htm
    I will suggest you to visit  http://sap-img.com/sap-sd.htm. It will give you the overview of SAP SD module.
    Moreover there is a separate section of FAQs with answers which will help you in great deal.
    Do let me know in case of any queries.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Create a configurable material with reference to another config material

    Hi,
    I want to create a configurable material with reference to another configurable material from different system.
    Please tell me what data i need to check to see if that material has been created (copied manually) successfully.
    Thanks.

    Hi,
    In case of configurable material most important thing is configuration so please check weather the configuration is copied perfectly with all characteristics or not. Similarly check the valuation class and price control is proper or not.
    Regards,
    Umesh

  • BAPI_SALESORDER_CREATEFROMDAT2 with configurable material

    Hello everybody.
    I have been looking for information and I can't find how to do it. I can create the sales order, but without any configuration value.
    Please, Can anyone tell me who I have to call BAPI_SALESORDER_CREATEFROMDAT2 with configurable material?
         lv_configid = ld_itm_number1."item position
          lv_inst_id = lv_inst_id  + 1.
          CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
            EXPORTING
              input  = lv_inst_id
            IMPORTING
              output = lv_inst_id.
          lv_root_id = lv_root_id + 1.
          CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
            EXPORTING
              input  = lv_root_id
            IMPORTING
              output = lv_root_id.
          li_order_cfgs_ref-posex = ld_itm_number1.
          li_order_cfgs_ref-config_id = lv_configid.
          li_order_cfgs_ref-root_id = lv_root_id.
          APPEND li_order_cfgs_ref.
          li_order_cfgs_part_of-config_id  = lv_configid.
          li_order_cfgs_part_of-parent_id  = lv_inst_id.
          li_order_cfgs_part_of-inst_id    = lv_inst_id.
          li_order_cfgs_part_of-obj_type   = 'MARA'.
          li_order_cfgs_part_of-class_type = '300'.
          li_order_cfgs_part_of-obj_key    = it_pedidos_pos-matnr.
          APPEND li_order_cfgs_part_of.
          li_order_cfgs_refinst-posex     = ld_itm_number1.
          li_order_cfgs_refinst-config_id = lv_configid.
          li_order_cfgs_refinst-inst_id   = lv_inst_id.
          APPEND li_order_cfgs_refinst.
          li_order_cfgs_inst-config_id = lv_configid.
          li_order_cfgs_inst-inst_id   =  lv_inst_id.
          li_order_cfgs_inst-obj_type      = 'MARA'.
          li_order_cfgs_inst-class_type    = '300'.
          li_order_cfgs_inst-obj_key = it_pedidos_pos-matnr.
          li_order_cfgs_inst-quantity = 1.
          CONDENSE  li_order_cfgs_inst-quantity.
          li_order_cfgs_inst-complete      = 'T'.
          li_order_cfgs_inst-consistent    = 'T'.
         li_order_cfgs_inst-persist_id_type = 'G'.
         li_order_cfgs_inst-quantity_unit = 'ST'.
          APPEND li_order_cfgs_inst.
          li_order_cfgs_value-config_id = lv_configid.
          li_order_cfgs_value-inst_id = lv_inst_id.
          li_order_cfgs_value-charc = 'Z_MC_NOMBRE'.
          li_order_cfgs_value-value = it_pedidos_pos-nombre_serigr.
          APPEND li_order_cfgs_value.
          li_order_cfgs_value-inst_id = lv_inst_id.
          li_order_cfgs_value-charc = 'Z_MC_LETRA'.
          li_order_cfgs_value-value = it_pedidos_pos-tipo_letra.
          APPEND li_order_cfgs_value.
    Thank you in advance.
    Regards.

    Hi REIS did you get any answer to your pb I have exactly the same request .
    these internal id for instance and configuration are confusing .
    Thanks for your return if your pb has been solved since .
    Rgards
    Yvon

  • How to do the Partial delivery for configurable material ?

    Hi All,
    I am creating a sales order  for a configurable material and is trying to do the partial delivery for the same. But, after the outbound delivery the status of the sales order is shown as completed although I have done the partial delivery.
    Here are the steps I followed.
    1. material I used here is a configurable material.
        Main settings.
      a. In Basic Data tab, marked as configurable
      b. Procurement type='E' in MRP 2 tab
      c. Strategy group as 82 in MRP 3 view.
    2. I created a sales order for quantity 10
    3. Created a production order followed by goods Movement thereby increasing the stock.
    4. Did the outbound delivery for  quantity 5.
    Now if I checked for the status of the sales order using VA02, the status for the line item as well as for the sales order was "Completed" although I had done partial delivery.
    I have checked for setting in Customer master record, item category in VOV7. Everything seems to be fine.
    I checked for all the information in the FORUM without any help.
    Can you please help me?
    Kind Regards,
    Anupama

    Hi,
    For Info, I am creating a sales order for Item category TAC.
    1. In my case, after completing the partial delivery, in the document flow for Order, the status is shown as completed.
    2. In status overview for this item, delivery status indicator is set as  'Fully delivered'.
    I did check in the customer master record and the field
    Partial delivery per item  is set to Blank(  Partial delivery allowed)                
    3. I did run the report RIBELF20  and I am getting this error for all the sales order I created for partial delivery for configurable material.
    For Normal item, the status is showing properly.
    Is there any other settings I have to check?
    I needed this to be working. Please help

Maybe you are looking for

  • Report engine(rwrun60) is crashing one by one

    Below is the setting of my reports server parameter on 11.5.10.2. maxconnect=300 cachedir="/u02/EPFH/epfhora/8.0.6/reports60/server/cache" cachesize=1000 minengine=16 maxengine=24 initengine=16 maxidle=30 security=1 englife=50 mailprofile="$Header: R

  • Customise page size in crystal report

    Post Author: rameshkunkumalla CA Forum: Crystal Reports Hi We are using crystal reports in .net 2003 we want to print the page as 10inch * 4 inch page we are not getting he size even we are not abele to found the custom size

  • Problem with Grouping Tag in iTunes

    Hi, I am trying to use getID3 to read the 'Grouping' tag from iTunes. It would seem that iTunes is writing these tags to my MP3 files, as, when I open them in Media Rage the Grouping Tag shows up OK. However, when I then upload the tracks to my serve

  • Help with recurring paper jam on psc 2410

    My printer is an HP psc 2410 all in one photosmart and I get a recurring paper jam.  The paper stops feeding half way through and I get a message that the printer is out of paper.  When I open the back, I see that the paper is half way through and I

  • Can i use post-gre with ADF -BC ?

    Hie I do have postgre database with me.. and can i use ADF-BC with it? Vik