Regarding XI-BW Integration

Hello Experts,
What are the design and configured steps in XI with BW 3.5 Integration?
Thank you

Hi! Ravi
I think the above contirbutors has give some links hence here I want to explain the steps to be done while sending Data from XI to BW..
In the mean time check the below link...
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/18dfe590-0201-0010-6b8b-d21dfa9929c9
Steps:
SLD and IR part
1. First Create RFC Destination between XI and BW.
2. First Create SLD Objects like Products and Software Component Version, and Technical Systems and  
    Business Systems....and then Import those to IR and ID
3. Now Create Sender DT, MT, MI and no need of creating Receiver Side ok
4. Now Import coresponding RFC and do Message and Interface Mappings.
ID:
1. Now after importing Business Systems create 2 Communication channels
1. Sender as FILE :
File parameters:
Adapter Type = File
Transport Protocol= File NFS / FTP (lets take FTP)
Message Protocol=File
Adapter Engine=IS
FILE ACCESS PARMETERS:
Source Directory= you FTP Source Sender location ( Create one path in FTP location Pick the files and
                              also anotehr to Archive also)
File Name=  XXXXXXXX ( please make sure that no spaces and the file you are placing in this path should
                                  be same as given in this CC)
Processing Prameters
QOS: If it s Asynchronous means EXACTLY ONCE
Poll Interval = its your choice based on the req (Lets =10/20)
Processing Mode= Delete
Pleasse note that you are selecting an option Delete so that it can delete the file once after the file is picked
also by selecting Archive Dierectory radio button and enter the Archive path so that it nmay delete there and save a copy here in this path ok
Now enter Authentification Details
i.e., FTP Server path
USer Name :
PWD***********  REtype PWD****************
Port No:**
now select Active
2. RFC Communication Channel:
Adapter Type=RFC
Receiver
TP=RFC
MP=RFC(RFC
Enter Application Server name and
System NO
Authentification Details of BW and
Cleint Details
now select Active..
remaining Agreements and Determinations are same....
Finally Activate all of you IR and ID objects..
Testing:::
Note:: Before placing the file in FTP make sure that your FTP path has RWX red and write access permission ....
logon to FTP and place the XML document as the same name as which you have given in your Sender CC without spaces........in the FTP Source Directory path
and press REFRESH..
based on the poll interval it will   pikcs and delete there and keep and maintain a copy in the archvie directory
Note:: WHile configuring the sender File CC please select ADD TIME STAMP..so that it may enter with time and date while archiving..
Now Go to SXMB_MONI....and check the status whether it s SUCESS or ERROR flag
if it is sucess....
MAIN POINTS PLEASE REMEMBER
1. Logon on to BW System..
2. Enter Tcode: RSA7
note your RFC and check no of messages if it is previously 6 and after sending it will add one and show as 7
means your Job is over at this part later BW team will check and invoke that data...
If it is ERROR flag:
Go to RWB -Message Moni and check where teh mEssae fails I mean either at Integration ENgne level or adapter Engine level adn check the AUDIT LOG at both the levels..
you canalso check this at Communication channel monitorinng...........
or else if it as queues go to
SMQ1 and SMQ2 and release the queues..
Regards:
Amar Srinvias ELi
I hope it will be useful to you in final case...Suppose if it is useful to you please close this and award points to the repective contributors if it is useful to you..
Regards:
Amar Srinivas EL
Edited by: Amar Srinivas Eli on Oct 22, 2008 9:21 AM

Similar Messages

  • ** Regarding Oracle Data Integrator Companion 11gR1(11.1.1.7.0)

    Hi Experts,
    I would like to Know regarding..
    Oracle Data Integrator Companion 11gR1 (11.1.1.7.0)
    Includes: Oracle Data Integrator Application Adapters for Hadoop, Oracle Applications, SAP ERP and BW (Hadoop is Newly added when compared with the older versions)
    Which i found in the oracle downloads link and so i want to know the below points
    1) What is the use of Oracle Data Integrator Companion 11gR1 (11.1.1.7.0)
    2) if it is something like an additional adapter tool to be installed to access, where and how we need to install.
    I would like to get the complete details and usage of this particular Oracle Data Integrator Companion 11gR1 (11.1.1.7.0).
    Request you to kindly guide me..
    Awaiting your inputs.
    Many Thanks,
    Pavan Kumar

    Hi Pavan,
    Oracle Data Integrator Companion 11gR1 (11.1.1.7.0) contains additional adapters for use with Hadoop, SAP etc which does not come with normal installation. However, you will need license for industry use of these adapters. This is especially good for a developer. However for server installs you must use one of the normal installers which additionally comes with Java EE agent capabilities which may not be the case with Companion.
    Speaking of Installation procedure, this works with a simple extraction of the zip file and does not come with an installer.
    Additionally, it comes with ODI Demo Environment with a local HSQL repository which can be used for training and learning purposes.
    Functionally, for a developer there is no difference between normal and companion install.
    Regards,
    Rickson Lewis

  • Query regarding PM-PP integration

    Hi Experts,
    I want to know the Integration b/w PM and PP. how can i get the information , if our any equipment is under maintenance , then system should not allow to maintain production order
    gaurav

    Dear,
    let clear one thing dat the Equipement is work center for the PP and for Plamnt maintenance it is equipment only.When creating order or plan some maintenance work on that equipement which workcenter for the PP. In PP module der is standard functinality Capacity planning of work center in Routing when ur maintenance work is going on dat equipement den work center capacity get reduced due to ur maintenace work which will reflect in PP capacity planning. according dat reduced capacity planning production order release.der is no std functinality dat u can intimate the PP dat ur work center is in maintenance not use it. it will reflect in capacity planning of PP routing.According dat reduced capacity PP plan the production scheduling.
    Regards,
    Rakesh

  • Doubts-Regarding Cisco unity integration

    One of our client is planing to add cisco unity to the setup. Currently we dont have an AD or exchange for them in our premise as its an offshore development center.
    Our CUCM is 7.1 and Unity is 7, which is going to be installed on VMWare
    As am newly appointed and am not aware about Unity.. can anyone throw some light on this regarding,
    1, Steps for Unity installation on VMWare
    2, How to go ahead like what all requirements i have to put in front of the client, like AD and Exchange.
    I read that voice messages are stored in Exchange, so in that case, is AD mandatory?
    Also am not able to get a full idea on working of Unity.. if some one can share some documents, it would be really grateful..
    Regards
    TT

    TT,
    I hope that you have adequate time and equipment to practice on before building this live. Unity is one of the more complicated applications when you get started with it. Fortunately, the documentation on getting Unity on line is plentiful. You must ensure you read the installation guide thoroughly.
    Here are the Cisco Unity install guides:
    http://www.cisco.com/en/US/partner/products/sw/voicesw/ps2237/prod_installation_guides_list.html
    Start in the 7.x section but please note that the 5.x install guides are used for 7x installs as well.
    Design guide for Unity virtualization:
    http://www.cisco.com/en/US/docs/voice_ip_comm/unity/virtualization_design/guide/cuvirtualdgx.html
    I don't know if you have options, but I would recommend that if you are looking to do a new build that you look at Unity Connection instead of Unity. Unity Connection is getting the bulk of Cisco's development investment. Unity is being maintained but don't expect it to get new features.
    HTH.
    Regards,
    Bill

  • Regarding Functions of Integration Builder (Design)

    Hi friends,
    I am new to XI.
    In Message Mappings ,in data flow editor ,in a particular scenerio I have both source and target fileds and connection between them.How to insert function between those two.
    With Best regards,
    sagar

    Hi,
    At the bottom  that is below the mapping object you can find Functions. In that select function and double click  on that.
    Regards
    Agasthuri Doss

  • Query regarding SAP XI - Integration Builder

    Can any one pls explain the diffrence between business service and a business system. On what basis do we choose either one of these.
    Regards,
    Bharath

    Hi,
    what is a Business system? What is use of creating it?-->
    Business System have an entry in the SLD and Buiness Service do not.
    Business Systems are used when you are sending data to and from an R3 system and can be of ABAP, JAVA and Third Party Types.
    Business System is a logical representation of a Technical System.
    Business Service is a abstract representation of a System. For instance, www.google.com have a several system working together and IPs of this machines change eventually. When we use a Business Services like google we reference a computer that we don't know the phisical implementation.
    Business Service and Business System difference-
    What is the difference between Business System and Business Service?
    Difference between Business System and Business Service.
    Difference between Business System and Business Service
    Thanks,
    Satya Kumar

  • REgarding XI -Seibel integration

    Hello Expert,
    What are the design and configured steps in XI with Siebel Integration? If possibe sent me with screen shots.
    Thank you

    Hi,
    Check this link
    Re: Configuring iWay Siebel  Sender/Receiver adapter in SAP XI.

  • Help regarding XML-Based Integration with XAware

    If any one have some tutorial related with this topic:
    XML-Based Integration with XAware Kirstan Vandersluis

    It's a book. Go and buy it. Why would any part of it be available for free on the web?

  • Oracle Integration Adapter for SAP R/3

    I am working with a customer implementing Oracle EBS Release 12.2.
    The customer has implemented SAP for financial modules and the oracle solution considers an EBS - SAP Integration for Receivables. Does anyone have any experience integrating Oracle EBS Receivables with SAP? Can you give us some guidance regarding EBS - SAP Integration best practices?
    We have found a paper regarding Oracle Integration Adapter for SAP R3. We would like to have some information about what are the Oracle products we can integrate with SAP using Oracle Integration Adapter for SAP R3.
    In case Oracle EBS can integrate with SAP using Oracle Integration Adapter, we would like to know if anyone has experience integrating Oracle EBS Receivables with SAP using Oracle Integration Adapter for SAP R3 for AR transactions and Receipts?
    Any help would be very much appreciated.

    Thank you veyr much Manoj for your reply. I just tried it now buit no fruits.
    I wonder if it can really be due to privileges given to my account, which allows to connect thru SAP Front-end but does not allow to connect by any other means. I can not think of any other possible reason.

  • Integration Directory

    Hi all,
    Can any body please provide me link to some blog / tutorials which could give me the entire understanding about integration Directory. For example when is the business system used, what are the steps invloved in configuring various scenarios.
    Any help will be appriciated.
    Thanks and best regards,
    Kulwant

    Hi Kulwant,
    Regarding to the Integration Directory..
    First according to the scenario u have to decide whether to use a party, service without party in which it contains business system, business service , business scenario..
    The creation of Objects will be like this ...
    *Communication Party or Service
    Communication Channel
    Receiver Determination
    Interface Determaination
    Sender Agreement
    Receiver Agreement*
    Business scenario is used when a scenario is developed using BPM's
    Based on your needs, you can select from the following service types:
    Business System: Address a particular business system as the sender or receiver of messages.
    A business system is an actual application system in a system landscape. A business system
    (service) comprises information about the inbound and outbound interfaces and the software
    component versions of the business system. The business system services are used when
    configuring internal company processes.
    Business Service: Address an abstract business entity as the sender or receiver of messages.
    Using a business service, you can define the technical or business subunits of the companies
    involved and then assign them the relevant interfaces. The business services are used when
    configuring cross-company processes.
    Business Process or Integration Process Service:  Address an integration process as the sender or receiver of messages.
    Prerequisites
    The business system must be entered in the SLD.
    A communication party has been created.
    1Create Business System as Service with Party
    Procedure
    1. In the Configuration: Integration Builder, navigate to Objects tab.
    2. Expand Party.
    3. Right-click on Business System and choose Assign Business System.
    4. In Business System Wizard, skip the step 1 Introduction by choosing Continue.
    5. In step 2 Assign Party, for example, enter Buyer.
    6. In step 3, select systems from the list that you want to define as the business system
    service.
    7. Choose Finish.
    Create Business Service as Service with Party
    Procedure
    1. In the Configuration: Integration Builder, navigate to Objects tab.
    2. Expand Party.
    3. Right-click on Business Service and choose New.
    4. In the Create Object Wizard, choose a communication party. For example, select
    Seller.
    5. Enter a service name, for example, PCK_Service.
    6. Enter a description for the service.
    7. Choose Create and Save.
    After Creating the Systems u need to choose the Adapter based on the scenario.. we call this as communication channel, and we shuld configure the communication channel to fetch the file from the source and to drop the files to the target directory..
    Then it should follow with Logical Routing and Collaboration Agreements..
    Logical Routing consists with Receiver Determination and Interface Determination
    Collaboration Agreements consists with Sender Agreement and Receiver Agreement..
    In Receiver Determination u have to specift the what are all the receivers that are going to receive the message and u have a provision of delivering the message based on the payload by using an option of condition editor.
    In Interface determination u will be specifying the Interface mapping which was developed in the design in between Outbound and Inbound Interfaces
    In Sender agreement we give the communication channel which is developed in the sender side w.r.t the business system/service.
    In Receiver agreement we give the communication channel which is developed in the receiver side w.r.t the business system/service.
    for further clarifiction revert back with the queries..
    regards
    Kishore

  • Training, Time and Payroll Integration

    Hi
    We are currently implementing SAP HCM in ECC 6.00 SP60
    Could you please clarify the following queries:
    1. How can i pay  Internal Instructor / Trainer for few Business Events through Payroll.
    When i create a internal trainer for a Business Event, automatically attendance type gets recorded in IT2002 based on below mentioned configuration, unfortunately for all business events only one attendance type for instructor and attendee gets recorded in IT2002
    SEMIN     AINST     0001     Attendance type for instructor in T554S
    SEMIN     APART     0002     Attendance Type for Attendance in T554S
    But is there any way where i can send different attendance types for different Business Events for a instructor /Trainer? So that in payroll i can query on the attendance type in IT2002 and pay him depending upon the attendance type.
    Else
    Is there any other way where i can pay the internal trainer automatically from TEM to Payroll?
    Regards
    Srinivasa Naidu

    Hi Marry,
    please check this document by Woody
    Integrating Negative Time and Payroll
    some usefull links and information regarding the configuration
    integration between Time and Payroll
    Best Regards.

  • Action in Integration Scenario

    Hi
    I have a doubt regarding " Actions" in Integration Scenario in IR. I have an interface which is actually a clubbed one, there are two interfaces together and there are two sender interfaces and two receiver interfaces.
    So how many should I create in Actions ? Should there be four actions ?
    Ajith

    Hi Ajith,
    Yes, you were correct go ahead.
    Refer the below link:
    http://help.sap.com/saphelp_nw70ehp2/helpdata/en/68/88a440df800160e10000000a1550b0/content.htm

  • What are the steps for integration FI to PP

    hai
    what are the steps for integration with FI to PP
    Thanks & regards,
    PG BABU

    Hi,
    Integration is with CO and PP
    In CO, Cost Centers are Created using T.code KS01.
    In CO, Activity Types are created using T.Code KL01.
    Both should be combined Using T.code KP26.
    Cost Centers are assigned to Work Centers using T.Code CR02.
    Please let me know if you need more information.
    Assign points if useful.
    Regards
    Sridhar M

  • MSP Integration with Oracle Projects

    Hi Dina,
    Does the integration between MSP and Oracle Projects work without any issues in R 12.1.3? We've tried using it in the past with R 12.0.6 but have to say the experience was not good. It used to work at times and fail on other times. Most of the times the first time import from MSP to Oracle Project used to work but subsequent changes to the WBS used to give issues while trying to import into Oracle Projects (even though the link to the Oracle Project existed in MSP).
    One of our new customers (Construction Company) wants to create the WBS in MSP (Microsoft Project ver 2003 or 2007) and then import it into Oracle Projects to track progress, effort and cost. Any changes to the WBS (which happens frequently) will be done in MSP and imported back into Oracle Projects. Does the above mentioned requirement work consistently in R 12.1.3? Please let us know.
    Thanks
    Regards,
    Sri

    The MSP integration requirements that you describe should work in the latest versions of 11i e.g. (FP.M RUP4) as well as R12.1.3.
    My experience is that providing all scheduling is done in MSP then the integration functionality works well.
    The recommended process flow for MSP integration is:-
    •     Oracle Projects: A project manager creates a project in Oracle Projects from a project template containing information for deliverables, work breakdown structures, and resource assignments
    •     MSP: The unscheduled resource and workplan data is downloaded to Microsoft Project for scheduling
    •     MSP: The project is scheduled in Microsoft Project based on task assignments, task dependencies, task constraints, and other attributes
    •     MSP: The scheduled workplan data is uploaded to Oracle Projects for publishing
    •     Oracle Projects: The project workplan is published in Oracle Projects
    •     Oracle Projects: After the workplan is published, the project is accessible to all team members working on the project. Team members work on their assignments and report their progress in Oracle Projects
    •     Oracle Projects: The team members' progress on the tasks is collected for updating the project plan
    •     Oracle Projects: The project plan is updated with the team members' progress
    •     MSP: The project is now unscheduled. The unscheduled project plan is downloaded to Microsoft Project for rescheduling
    •     MSP: The project plan is rescheduled in Microsoft Project and the task information is updated
    •     Oracle Projects: The rescheduled workplan is uploaded to Oracle Projects for publication
    Andy.

  • + TIME MGMT KABA Integration

    HiGurus
    We are implementing the SAP + time management.Currently we are integrating KABA Application with sap.Can somebody tell me if there is any possibility to take out single punches from KABA if yes then what logic???
    Thanks & Regards
    Vidushi Kaushal

    Hi Marry,
    please check this document by Woody
    Integrating Negative Time and Payroll
    some usefull links and information regarding the configuration
    integration between Time and Payroll
    Best Regards.

Maybe you are looking for

  • 4.2 update but phone still not does not work with Motorola T505

    I use an iPhone 3G and on 3.1 it could rebroadcast iTunes signals by FM to my car stereo. 4.1 lost this capacity. I was hoping to get it back with 4.2 but so far no success, even re-pairing the 505. (Otherwise the upgrade much improved the responsive

  • Why is the iTunes Match setup process causing iTunes (and my machine) to freeze?

    I purchased iTunes Match several days ago, and it continues to freeze iTunes, subsequently locking up my machine. It keeps getting stuck on step 1 of the setup process (analyzing my library); I have left it overnight several times with no luck. At th

  • Upgrading Weblogic 8.1, SP2 to Weblogic 8.1, SP6

    wanna to the code changes that are required in web application while upgrading Weblogic 8.1, SP2 to Weblogic 8.1, SP6.

  • Function of lot size PB,FS.

    Hello SAP Gurus,    Can you help in understanding the function of lot size PB(period lot size=posting period) and FS (Fixing and Splitting).      I mean i what to know how these lot sizes works.With this also share that where can i get study material

  • Faster exports for BluRay: Use .avi or mp4?

    Hello, I have digitized about 20 movies to .avi files.  In total, the are about 300GB.  My goal is to use Premier to create a movie with these files and to insert chapter markers to separate them.  Next, export the movie to Encore to build an H265 Bl