Regular Preventive Maintenance schedule for xsan volume ??

hi
Is there is any weekly , monthly regular Preventive Maintenance schedule which we should perform for xsan volume like defragment , some commands etc
What are the steps for regular Maintenance for xsan ,servers which apple recommends ?
thanks

Hi,
I do not do such maintainance. However every night a cvfsck -nv is run. This is a readonly file system check. If in the result of this a line exist which says:
Filesystem would have been modified
Then a real filesystem check is needed.
A defrag is only performed on files, not on empty space. It takes very very long, and I do not expect much of it. So I do not do this.
Hope this helps,
Regards
Donald

Similar Messages

  • Preventive Maintenance Schedule

    Hi,
    The issue is monthly as well yearly function wise preventive maintenance schedule is not generating automatically, Actually we uploaded the data in SAP for specific function wise as per monthly schedule, But right now we are not getting the schedule wise calls.
    Production person put the entries as manually through the t-code IW38,
    So, Where will be the mistake or any configuration setting is missing?
    Please help.
    Regards,
    Althaf

    Hi,
    Hope your maintenace plan,task list and items within plan are in place.Also config is in place with no range,call object type as maintenace order,pm order type you have mentioned in plan etc.
    If all of above are in place then check for following:
    1. Check scheduling parameters for both monthly and yearly frequency jobs.Check scheduling period for monthly job it should be greeater than 1 month..suggest to put 365 days.
    2.For yearly jobs your scheduling period should be greater than year,may be you can put 2-5 years so that system can do scheduling on this basis.
    3.Possibly you can restart scheduling thr IP10.You can check scheduled calls by pressing schedule overview list.
    4.You can lso check scheduling overview and do simulation through IP19.Give period in furture for plans and select maint plan simulation in start mode of maint scheduling overview.
    5.If you are able to see calls in scheduling overview then there is a problem in your deadline monitoring.In IP30 check parameters Interval of call objects and it should be nearer to scheduling period you mentioned in IP19.You can crete two different variants for monthly and yearly jobs.So you will able to maintain to differnt IP30 parameters for them.
    Please note unless you give detailed and exact problem we will not able to provide solution.
    People will generally avoid to elaborate like above.So please try to limit and specific to your problem.
    regds,
    atul

  • How to take list of preventive maintenance jobs for every month- kindly hel

    dear friends,
    kindly help -how to take the list of preventive maintenance jobs for month basis.
    kindly provide me T-CODES.
    regards,
    g.v.shivakkumar

    Shivakumar,
    Use transaction "IW38" to select all PM orders for the month. The selection can be based on specific "order type", Status ", "Equipment"/ "Functional Location" or " "maintenance plan" with period interms of date.
    Hope this helps...Reward your points and close the thread.
    Regards,
    Prasobh

  • Consider preventive maintenance schedule into PP order capacity planning

    Hi PP experts,
    My client's requirement is that when a preventive maintenance order is created in PM module for a particular work center (used in production) on a given date, NO production order (which is processed on that work center) should get released or confirmed. In other words, the capacity should be blocked at all for the subject work center.
    Could you please guide how to make this effective?
    We are using discrete manufacturing with capacity planning. At the time of PP order release, system shows capacity situation so as to decide whether go-ahead even with overloaded capacity.
    Regards,
    HKV...

    First, you should assign the PP work center in the location tab of the PM equipment which refers this workcenter.
    Secondly you should enter the sytem condition in the task list of the equipment.
    During preventive schedule  the work center  will be reserved by PM orders for maintenance and this can be seen from capacity planning from PP side.
    regards

  • Hardware Preventive Maintenance Schedule

    I'm trying to find a recommended schedule for Sun Server maintanence. If anyone can point me in the right direction it would be greatly appreciated.

    Dear Makarand Gurjar
    The purpose of the report is, every month begining maintenance person will give the list of equipment scheduled for preventive maintenance to production department.  If that list has planned time for preventive maintenance, it will be very useful for them to release the equipment for preventive and plan the production accordingly.  In IW38 / IW39, we will get only the equipment for which preventive maintenance order is created.  Say for Eg. If an equipment is scheduled for every month preventive maintenance and the scheduled date is 25th of every month and call horizan is 90%, then the order will be released only on 22nd.  If we take the report on 1st of the month it will not come.
    In IP24 we can get all the equipment schedule for that month, but in the planned time is not there .
    Regards,
    Babu R

  • Preventive Maintenance Schedule Feature available?

    Hello,
    we want to use CRM on demand as a our service management system. I'm trying to find out if it is possible to create scheduled service requests for assets. I.e. Asset 1 gets a service request created automatically every 3 months, Asset 2 gets one every 6 months, etc.
    Anybody aware of such a feature or add-on?
    Thanks
    Tobias

    Hello Tobias
    I don't think this type of facility is available as of now. But It can be done by developing a webservice application
    Dinesh

  • Maintenance schedule for every month /3 months

    Hi Guys
    I hope you can advice about my requirement.The subject is that client is installing the machine at client location and they are carrying the periodic visits also. The requirement is that after installation of equipment the perdiodic calls should be genearted for everey months for 3 months. After 3rd month , the next  periodic calls will go every 3 months.
    Here important thing is that, These maintenance plans should be generated automatically once the equipment is installed. The installation date has to fetch by the system automatically based on the sales delevery to the customer.
    Do you any idea about the implementing this process.

    Hi
    Yes it is possible, but we cant do. Since the equipment installation is happening on frequent mode.Also the installation work is doing by the nurse and they will not have SAP access. Always they work with PDA device. We need the maintenenance plan creation automatic mode once they are delevered the equipment to patients. The delevery completed tick mark selection they do.
    All rest of things in back ground system has to take care. Should not be any manual work.
    Regards
    Thenna

  • How to change duration of Preventive Maintenance cylce in strategy plan?

    Hi,
    How one can change duration of Preventive Maintenance cylce in strategy plan?
    e.g. In IP11 we set Preventive Maintenance schedule as monthly and we want to change it as quarterly i.e. every 3 months from starting date.
    With Best Regards,
    Rajkumar

    Hi Mr Ramesh
    Thanks for reply .
    Kindly guide us about as what steps /Tcode need to be used to perform the following actions as suggested by you :
    a) Delete orders.
    b) Go to IP10 and Do a 'manual call' by entering the planned date to create orders for the deleted packages.
    Or
    Reschedule the Whole Maintance plan by entering appropriate dates.
    c) Also please clarify , that how the new Orders will get generated against the Deleted Orders .
    With Thanks and Rgds
    Sonia

  • Maintenance plans for Backward counter

    Is it possible for having a preventive maintenance plan for a measurement point that counts backwards?
    Your inputs on this will be appreciated!

    Help !
    I am looking for help with Counters and Timers and using them with a Maintenance Plan. We have about 10 count down timers mounted in one of our facilities. These timers are tied to the machine and measures the time until a mini or major PM will occur. These count down timers were previously used with the old CMMS system to assist in the scheduling of maintenance activities. We have recently converted them from the old CMMS to SAP PM but I am struggling with getting the count down timers to work in SAP. These timers are reset at 5000 hrs and as the machine operates, time is removed from the timer. A technician periodically reports these times to the system for scheduling purposes.
    I have created the Measurement Point for a Functional Location.
    I have identified that it is a counter.
    I have it identified that it Counts Backwards.
    When I try to assign this measurement point to a Maintenance Plan, I get the error "Only counters that run forwards can be entered"
    How can I use the countdown timers to create pre configured (PM) work orders?
    Thanks in advance.

  • Maintenance Schedule Approval

    Hi Experts
    There is a particular requirement at my client side wherein a preventive maintenance schedule has to be approved by maintenance incharge. How can this be mapped into system?
    I tried exploring user status for maintenance plan. In SPRO maintenance plan is being shown as object type for user status, but for some reasons which i couldnt figure out, it (User Status) wasnt assigned to the maintenance plan.
    Please share if somebody has worked upon such requirement before.
    Regards
    Ruhail

    Hi Joey and Balachandar
    Thanks for the response.
    In some industries it is a common practise that maintenance supervisors prepare the preventive schedules and thereafter it is sent to maintenance head of department (Incharge) for approval. Its more or less a formality but it has to be carried out.
    In SAP if approval is sought after scheduling there is no way that it can be changed (Ofcourse schedule schedule can be restarted but calls with status 'called' remain as so). And moreover if it is rejected then it will lead to creation of junk data in the system.
    Maintenance schedules are as such prepared in Excel and approval in form of signature is sought from deptt head.
    Thats why i was interested in knowing if somebody has come across such a requirement before and what could be possible solution be?
    Regards
    Nalin

  • PM & PP integration during preventive maintenance

    Dear Experts,
    Once maintenance dept . will schedule preventive maintenance plan for a machine for a year , is it possible to block production order or to show capacity load in CM29 on the maintenance date?? I have assigned PP work center in the equipment & also put system condiiton as zero in maintenance plan & also in task list. Frequency of the maintenance plan is 1 month.Request your help on this.Thanks in advance.
    rgds
    rajib

    Hi,
    Let clear one thing that  the Equipement is work center for the PP and for Plant maintenance it is equipment only.When creating order or plan some maintenance work on that equipement which workcenter for the PP. In PP module ther is standard functionality Capacity planning of work center in Routing when your maintenance work is going on that equipement then work center capacity get reduced due to your maintenace work which will reflect in PP capacity planning. according that reduced capacity planning production order release.there is no std functinality that you can intimate the PP that your work center is in maintenance not use it. it will reflect in capacity planning of PP routing.According that reduced capacity PP plan the production scheduling.and Production work will get adjusted or deayed according available capicity of PP work center.
    Regards,
    Rakesh

  • Can't mount 3rd party DAS storage and Xsan volume simutaneously

    Xsan client(MacPro) equipped an Apple FC HBA card can't mount SGI TP9300 DAS storage and Xsan volume simutaneously when powering on or restarting.
    Among 2 FC ports, one port is used for Xsan volume using Xserve RAID, and the other port is used for SGI TP9300 storage which is directly connected to that Mac.
    When booting, Xsan volume is always mounted normally, but SGI TP9300 volume is not.
    Sometimes TP9300 volume is mounted about 20~30 minutes later.(I attached system.log file)
    The LUN of TP9300 is seen at Disk Utility, so it's not physical problem.
    It seems that actual volume information is not correctly processed at booting time.
    While, after booting the system with the FC cable for TP9300 disconnected and confirming that Xsan volume mounted normally, then connecting the FC cable for TP9300, the TP9300 volume is mounted immediately.
    Mac OS X 10.4.8, Xsan 1.4 is being used.

    Yes, I think you screwed your xsan volume. You can not remove luns from pools, and you can not remove volumes from volumes.
    How important is your existing data? In your case I would concentrate on that. This is not trivial. Theorotically you have lost your data allready. In practise you might have luck.
    Once I was in your kind of twilight zone, and managed to keep the data. It is a complete cli job. You have to be very carefull about with your config files. You could hire an experienced xsan consultant. If that is not possible, read the manpages very carefully before doing anything on the volume.
    Regards
    Donald

  • How Preventive Maintenance Order Gets Generated Automatically

    Dear Sir,
    We have defined an equipment requiring Preventive Maintenance  every month  . We want that Preventive Maintenance Orders for this Equipment should get generated automatically for next  comming 3 months . 
    Kindly guide us as what steps need to be followed  so that Orders are generated automatically .
    With Thanks & Rgds
    Sonia

    Hi for this please refer below link as u want call object in monthly basis kindly use single cycle plan for this.
    [Please see|http://help.sap.com/saphelp_erp60_sp/helpdata/en/3c/abbcf6413911d1893d0000e8323c4f/frameset.htm]
    Revert for any queries.
    Rip

  • Preventive maintenance and calibration process flow

    Hi Experts,
    I am totally new to Plant Maintenance. My client has the below requirements.
    1) Machine preventive maintenance schedule.(monthly/yearly)
    2) Measuring instruments Calibration.
    3) Maintenece schedules of PRT/Test equipment.
    How to manage all the above requirements. Would be of great help if expalined the entire process flow in detail.

    You can refer following SAP help link to get intro idea about same topic:
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/b0/df293581dc1f79e10000009b38f889/frameset.htm]
    SDN discussion:
    [Claibration in sap;
    [Calibration Order Process]

  • Maintenance schedule - Multiple counter

    Hi,
    For the following
    Maintenance schedule for every 2 weeks or 3,000 miles:
    1. Check engine oil, transmission fluid and coolant.
    I need to generate  a  notification  at 3000 miles or 14 days  whichever is occured earlier  (i.e.., only one notification should generate)
    How we can map this scenario in PM module ?

    Also this is my scenario
    Maintenance schedule for every month or 1,000 miles:
    2. Check tire pressure - with tire gauge.
    3. Check transmission fluid.
    4. Check brake fluid.
    5. Wax car (to protect finish).
    6. Check belts and hoses.
    Car maintenance schedule for every 3 months or 3,000 miles:
    7. Change oil and oil filter
    8. Lubricate chassis.
    9. Check transmission fluid.
    10. Check all drive belts (fan belts) frayed or cracked belts.
    Maintenance schedule for every 6 months or 6,000 miles:
    11. Change oil and filter
    12. Inspect suspension.
    13. Rotate tires.

Maybe you are looking for

  • Calendars in iCal disappeared

    HI All of the individual calendars I had set up within iCal (they show in the left panel) have disappeared and when I open iCal all the days are blank....no events or appts. are there! If I click on the 'search results list' button a list of all my a

  • New features for 3d-pdf in AR XI?

    Where the release notes for Adobe Reader XI are hidden? I want to know about new functions/support for 3d-pdf files.

  • Third Party Applications Cshing

    I recently updated my firmware to version 2 and I tried installing some applications such as Parlingo and Apple Remote. Every time I click on them they open and then crash. How do I fix this?

  • Best practice: Webdynpro in a large system landscape

    Dear Sirs, I have a few questions about using Webdynpro (WD) in a large system landscape.  After doing some research I understand there are a few alternatives, and I would like to get your opinions on the issue and links to any relevant documentation

  • Gradient Feather Settings CS3 JS

    Hello: Hi -- Odd thing with the following snippet: for (var i = (app.activeDocument.rectangles.length - 1); i >= 0; i--) { var myrec = app.activeDocument.rectangles[i];           if (myrec.label == "mygraphic") { myrec.transparencySettings.gradientFe