Related Integration server for Business System  in SLD

HI All,
IN SLD we have one Technical System for PI and one TS for R/3 System.
When I crating Business System for R/3 in R/3 TS, in Integration Tab what I have to select for Related Integration Server option.
It is having None and Business System of PI TS System.
Please help me in this.
Regards,
Sree

Hey
Looks like you are defining this Business system as a Integration server.
See here is what you need to do.
Step 1:First of all create a business system for XI system itself,this business system will have details of XI system and its role will be Integration server.You can have only 1 Integration server(hence you are getting the error).
Step 2:Now define a business system of type Web as ABAP for R/3 system,this system will have role as Application system but the related integration server will be the name of the business system of PI system(the one which you defined in Step 1).
As of now,are you getting any business system name in the drop down box for related integration server while creating business system for R/3 in SLD?
If yes,then simply select that
Thanx
Aamir

Similar Messages

  • How to change the ROLE: Integration server in business system in SLD

    Hi,
    I am facing error in communication, becuase the integration server has been attached to in correct business system with incorrect client (001 instead of 700).
    In SLD, business system, 'integration' tab there is button "Associate with XI'.
    I have selected the role as integration server for the corrrect business system and aslo gave the correct pipeline url for integration server.
    When I press the button "Associate with XI" and Save nothing happened.
    How do i change my integration server.
    Please help.
    Regards,
    Rehan

    Hi Gaurav,
    I have checked the teachnical system  and its of type WEB AS ABAP. and when i click on the business systems tab, there are two business systems. When i double click on the business systems
    I realised that both the business systems has been defined with role: integration server.
    IN one business system i can see that there is "associate with XI" button.
    But when i want to chnage the business system with correct client 700 , i tried pressing the button after entering the correct pileline url.... nothing happens.....
    Can you please let me know the procedure to chnage the technical system with respect to integration engine???
    PLease help as our project is held up due to this.
    regards,
    Rehan

  • Related integration server in business system

    Hi Gurus,
             I am trying to create a business system of type WebAS ABAP , in the last step ( Integration Step )  i have selected
    <b>  Business System role :</b> Application system
      But in the   <b>Related integration server :</b> drop down i am not getting any values .. what could be the reason . What should i do to get values ??

    Hi,
    In your SLD , is there a Business System that has been registered with the Role <b>Integration Server?</b> . You need to do this as a part of your post installation activities of XI and I think this is not done.
    Once you create a Business System of role Integration Server you will then be able to find the option Related Integration Server with a value to be selected.
    Regards
    Bhavesh

  • Can't select related integration server for bs

    Dear All,
             I got new xi server.i am doing file 2 idoc scenario.i created tech system and business system for r3_800.Next i tried to create business system for file sender.while creating business system for file sender i have given logical system name.it's given error as "already one business system is there with that logical system name".After that while checking by mistake i deleted the default business system which came with installation.Now i can not select related integration server during creation of technical and business systems.Earlier it was showing 2 options NONE and D10.Now it's not showing integration server D10.how can i get back that default business system to select related integration server option????
    any help would be appreciated.Thanks in advance.
    Vinay

    solved problem.......
    Maintaining a Business System for the Integration Server
    http://help.sap.com/saphelp_nw04s/helpdata/en/9b/da0f41026df223e10000000a155106/frameset.htm
    Vinay

  • Logical Sys Name for Business system in SLD for Third Party

    Hi !!
    I have little doubt what will be the logical system name for creating Business systems in SLD for third party?
    thanks
    Gowri

    Hi Gowri,
    sorry, i dont agree with the other answers. The logical system name is required for ALE partner finding. If you dont want to communicate with IDocs you dont need it. If you want to send messages from third party system to R/3 via IDoc adapter, then you should (can) give a name. It can be configured in IB directory as well (adapter specific identifiers). Choose any name, this name will be used for the partner agreement in R/3.
    Regards,
    Udo

  • Related Integration Server

    Hello All
    Regarding this subject I found threads in this Forum, but had no answer.
    My question is in "Related Integration Server:" In  Business System I see 
    "No Integration Servers defined".
    Could someone help, what is missing, why there is no Integration Server listed ?:
    Pls note : the XI was installed recently by the Admins.
    Thanks
    Vinod

    Hi Vinod,
    I think post installation configurations are not completed yet. Can you check with the admin whether PI is configured or not.
    if not follow this steps for PI configuration
    1.first run all the post installation configuration templates. then you will get a technical entry.
    2.procedure to run the Post installation templates.
    3.go to this http link
    http://<xihostname>:50000/index.html
    then go to SAP NetWeaver Administration
    4.Deploy and change and run the templates for NWD,SLD and PI templates.
    5.After post installation, import the XI BASIS Content to the design environment.
    installtion/configuration guides
    http://help.sap.com/bp_bpmv130/html/Specific_Info.htm
    Regards
    Ramesh P

  • Transport target for business system not found in System Landscape Director

    Folks,
    We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
    We are getting following error when we try to import an interfaces in to new PID system:
    Import failed because of business system transfer object
    Communication component XID_FileSystem: Obligatory
    transport target for business system XID_FileSystem not found in
    System Landscape Directory
    We are yet to install PIQ system.
    All the interfaces in the old XID system have transport target of XIQ system.  I removed the  transport taget for the interface, but transport target is still showing in the Business system under transport target head.
    How can we overcome this issue as we will not have PIQ system atleast for two weeks.
    Thanks in advance,
    Regards
    Chandu

    Hi,
    You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
    Illustrated with DEv & PRD here.
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the Following .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    Edit GroupsGroup1) Select the Business systems 
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Change the Releated Integration Server for all Business Systems

    Hello,
    follow Scenario:
    We export the SLD entries from a Development System in a file.
    Now we want to import the Entries in our Prod.-System, and we
    have to assign (or change) to other Related Integration Server.
    e.g. the esported Business System has in Development the
    Related Integration Server D12, but in the Productive System we
    need P12.
    Is there a other possibility as  to change first things first.
    Thanks for your help.

    Hi Stephan,
    I think this is not the correct approach because development and productive systems are different. You must register your technical systems by means of RZ70 transactions. If you have two different landscapes (DEV, PROD) you must register on two SLD servers.
    Doc about SLD: https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b09fe69e-46be-2a10-9fb0-9c11aeaa3557

  • How to create Business System in SLD with Role "Integration Server"

    Hi,
    We were trying to create a Business system of role "Integration Server" in SLD. However, we are getting an error saying "There is already an Integration Server defined foer the selected Technical System. Select as Application System."
    We could not find any relevant BS with the role "Integration Server" for that Technical System.
    Please advice.
    Warm Regards,
    Bhaswar

    hmm
    I have same situation on a fresh installation.
    Also error "There is already an integration server defined for the selected technical system; select the Application System role".
    But, there is no Business system at all visible and also the Business system tab of the technical system is completely empty.
    What to do?
    BR Patrik

  • [XI] Missing related integration server in SLD

    Hi Experts.
    I'm very new in SAP Netweaver and it's components. Now I study <b>XI</b> and I would like to config some simple scenarios (FILE-XI-FILE etc). My colleague have installed XI on our machine and everything set up as well. I started with <b>SLD</b> in order to configure Technical systems and Bussiness systems. At first, I configured <b>Technical system</b> as <b>Third-Party system</b> and then I start to configure <b>Bussiness system</b>. I used Third-Party system as well and when I was on the last step of the Business system wizard. The Business System role was preddefined (Application System) and unabled to change. I wanted to choose from the List of Related Integration Servers, but there is <b>nothing in the list</b>. Now I'm helpless and I don't know how to get the name of the integration server to the list. Could anyone help me with my issue? Any help would be welcome. Thanks

    Hi
    Thank you for your help. Your posts were helpful, but it didn't solve my problem yet. Look at that scenario: <a href="/people/srinivas.vanamala2/blog/2007/02/05/step-by-step-guide-xml-file-2-xml-file-scenario-part-i:///people/srinivas.vanamala2/blog/2007/02/05/step-by-step-guide-xml-file-2-xml-file-scenario-part-i. I have exactly followed <b>that scenario</b> and in the <b>step 6</b> I wanted to choose <b>related integration server</b> (in that scenario it's <b>SXI</b>) but I have an <b>empty list</b> of my related integration servers. In SLD I tried in Administration->Content Maintenance->(subset)Landscape Description->(class)XI Domain and I found out that there are <b>XI Contained Adapter and XI Contained Integration Server</b> associated with it. So is there needed some configuration in Content maintenance in order to solve my problem. Probably my question isn't very well described, but I'm sorry because I don't have any experience with XI and I just started with it. <u><i><b>So my question again: How will I get the name of my integration server to be in that list (like in that scenario in step 6 ...)?</b></i></u>

  • Use of Related integration Server in SLD

    Hi all,
         I understand that ‘Related integration Server’ from SLD is used when we have proxies. Is there any other use for it?
    cheers
    danus

    Hi,
    The Related Integration Server is used to assign your Business System to a Transport Group.
    When you create a Transport Group in the SLD you assign the corrsponding Integartion server to this transport Group.
    Now, when your create a Business System and assign the Related Integration server , this assigns the Business System to the correspinding Transport Group.
    The best use case is when you have a single SLD being shared between Dev , QA and Prod.
    The Related Integartion Server has nothing to do with proxuies.
    Regards
    Bhavesh

  • Do I need to enter Pipeline URL in SLD for Business System in PI ?

    Hi PI experts ,
    I am having problems with my file adapter sender adapter .There is error :
    2008-09-30 18:40:17 Success The message status set to DLNG.
    2008-09-30 18:40:17 Error Transmitting the message to endpoint http://xxxxxx2230.wdf.sap.corp:51080/sap/xi/engine?type=entry using connection File_http://sap.com/xi/XI/System failed, due to: com.sap.aii.af.ra.ms.api.RecoverableException: java.net.UnknownHostException: xxxxxx2230.wdf.sap.corp.
    2008-09-30 18:40:17 Success The message status set to WAIT.
    More info : I don't have anything enter for Pipeline URL under Integration right now
    Do I need to enter Pipeline URL  under Integration under Business System in SLD?
    I don't have anything right now? Shouldn't this entry be automatic?Why I need to enter manually if I need to at all?
    Please help!
    Thanks
    Bob

    Do I need to enter Pipeline URL under Integration under Business System in SLD?
    --> yes, we shd provide this in SLD.
    I don't have anything right now?
    --> http://<ur server>/sap/xi/engine?type=entry
           give your server at <ur server>
    Shouldn't this entry be automatic?
    -->it shd be entered in SLD once.
    Why I need to enter manually if I need to at all?
    --> if you configure it in SLD once then there is no need for you to do it again.
         By giving this URL yoou are connecting your adapter engine to Integration engine. once your adapter picks the message, it will check the BS and based on the configuration of BS it will push the message.
    some times we can configure our adapter engine as a stand alone system with out IE or with different IE's, that is the reason SAP allows us to configure it.

  • Obligatorytransport target for business system not found in SLD

    Dears,
    We implemented CTS+ in our PI three system landscape.
    While implementation we configured local SLD and after that for dev and QAs we configured a central SLD.
    And for Production we have seprate SLD.
    In DEV SLD we have three buisness systems:
    File_Dummy   of type DEv
    File_Dummy_Q of type QAS
    File_Dummy_P of type PRD
    Now in transport target group of File_Dummy I put File_Dummy_Q and in File_Dummy_Q I put File_Dummy_P but for BS File_Dummy_P target group is empty.
    Now I put all these BS into a request and import them in QAS then I get error:
    Obligatorytransport target for business system File_Dummy_P not found in System Landscape Directory
    Now I am not getting what to put in transport target of File_Dummy_P as it is of type.
    I tried to put their File_Dummy_P but we can not put PRD type BS there.
    I also tried with dev and qas BS there but still same error.
    Please suggest how to resolve this error.
    Regards,
    Shivam

    Hi,
          did you transported the associated technical systems of your business systems....?
    Also I assume you have assoicated the targets foryour business systems in SDL..
    like for D targets are Q and P
    for Q source is D and Target is P
    for P sources are D and Q... if not assoicate the same...
    and also make sure the three groups are available for three environments...
    HTH
    Rajesh

  • Obligatory transport target for business system BS_DEV in SLD

    Hi all,
       We are moving receiver detrmination from QA to PRD, there we are getting one error
    "com.sap.aii.ibtransportclient.XiTransportException: caused by: ClientServerException exception:Impo
    >>>rt failed because of business system transfer of object Receiver Determination   BS_DEV  
    >>>   *   *: Obligatory transport target for business system BS_DEV not found in Sys
    >>>tem Landscape Directory caused by: com.sap.aii.ib.core.transport.api.PostprocessingException: Import
    >>>failed because of business system transfer of object Receiver Determination   BS_DEV  
      *: Obligatory transport target for business system BS_DEV not found in Syste
    >>>m Landscape Directory caused by: com.sap.aii.util.hmi.api.HmiMethodFault: caused by: ClientServerEx
    >>>ception exception:Import failed because of business system transfer of object Receiver Determination
    >>>  BS_DEV      *   *:Obligatory transport target for business system WP
    >>>C_Dev not found in System Landscape Directory caused by: com.sap.aii.ib.core.transport.api.Postproce
    >>>ssingException: Import failed because of businesssystem transfer of object Receiver Determination
    >>>  BS_DEV     *   *: Obligatory transport target for business system BS_
    >>>DEV not found in System Landscape Directory"
    I am moving the same object from development to production, i feels ther is some problem in setting transport target.
    BS_DEV target system is BS_QA, in development sld
    BS_QA source system is BS_DEV anf target system Is BS_PRD in Quality sld
    BS_PRD source system is BS_QA, in production.
    The above error occurs when we are moving same object which i moved from development to quality to production.
    whether i need to take obejct from quality and need to move that one to production, or i can use the same development object to production...?
    Regards
    Pradeep P N

    Hi,
    Even I am facing the same problem.
    we have given the Transports Target as mentioned, but still facing the same error:
    Deployment
    Transport request   : DPIK900141
    System              : QPI
    tp path             : tp
    Version and release: 375.30.25 710
    CTS Deploy Service - Version 0.92 06.03.2007
    ========================================================================
    Deploy Web service destination = CTSDEPLOY
    Directory = /usr/sap/trans/data
    SDM Deploy URL =
    SLD Deploy URL =
    XI Deploy URL = http://sqnpi1.sap.sgroupit:51600
    Double-stack system QPI
    Deploy for XID
    Deploy File = 2f8021d0f9ca11dea81e001a64925608
    Start of Web service log
    Deploy Service called with following parameters:
    CommunicationData-Type:1
    CommunicationData-Address:http://sqnpi1.sap.spoolzgroupit:51600/dir
    CommunicationData-Host:sqnpi1.sap.sgroupit
    CommunicationData-Port:51600
    CommunicationData-User:'filled'
    CommunicationData-Password:'filled'
    Deployable(0)
    Deployable-Type:1
    Deployable-Id:/usr/sap/trans/data/DPIK900041/2f8021d0f9ca11dea81e001a64925608
    com.sap.aii.ibtransportclient.XiTransportException: caused by: ClientServerException exception:Impo
    >>>rt failed because of business system transfer of object Receiver Determination   DPI   SI_POS_CH_SN
    Returncode:'8'
    Deployment
    End date and time : 20100105151741
    Ended with return code:  ===> 8 <===
    Can anyone guide to solve it.

  • Error CIM_ERR_FAILED - Configure the integration server for sld

    Hi,
    I´m running the Configuration Wizard SLD in "PI_00_This wizard will execute Postinstall steps of technical configuration for the PI Usage". In step 33/142 Configure the integration server for sld, I got following error:
    Error: CIM_ERR_FAILED: Qualifier MAX(1) violated for property reference SAP_XIIntegrationServerLogicalIdentity.SameElement
    Someone help me?
    Regards,

    The version is 7.0. I skip this step and finished with sucess. No run the step:
    PI_00_This wizard will execute Postinstall steps of technical configuration for the PI Usage  Cancelled
    PI_01_This template checks if the necessary services are started                                         Cancelled
    PI_05_This wizard will configure the integration server for sld                                                 Incompletely executed
    These steps are with the same error.
    Error: CIM_ERR_FAILED: Qualifier MAX(1) violated for property reference SAP_XIIntegrationServerLogicalIdentity.SameElement

Maybe you are looking for

  • Is there a way of consolidating my apps in one account, I have 3 now?

    I want to consolidate my apps from 3 sepparate accounts into one account

  • Firewire to iMac?

    How do I attach my Epson R2400 photo printer to the new iMac 27" since there isn't a firewire port on the iMac?

  • Transport of class OK in SE24 & TADIR of destination, won't appear in SE80

    Hello everybody! We have a NW 7.0 environment (CRM 5.0). I have this problem. I have created a transport request for a whole custom class (Z...) belonging to a custom package (Z...). I have released the transport and the SYSADM has successfully broug

  • What means this error

    Exception occurred during event dispatching: java.lang.NullPointerException      at ticks.paint(ticks.java:211)      at sun.awt.RepaintArea.paint(RepaintArea.java:293)      at sun.awt.windows.WComponentPeer.handleEvent(WComponentPeer.java:191)      a

  • Error in ABAA - Depreciation is not posted

    Friends I am trying to post unplanned depreciation through transaction code ABAA with 640 as transaction type. We are posting values in depreciation areas 01 (bbolk dep), 15 (tax dep), 30 (group) and 32 (gloab acurrency) and the following error is di