Release codes more than 8 in a release strategy

Hello,
Is it possible to have more than 8 release codes in a strategy? I have read this is possible via a user-exit.
However would like to get some direction on how this can be acheived.
Thanks for your help in advance.
saurabh

http://wiki.sdn.sap.com/wiki/display/ERPLO/ReleaseprocedureforPurchaseRequisitioninMM
regards

Similar Messages

  • Release codes more than 8

    Hi experts
    id' like to know if there is a way in order to create a Release Strategy with more of 8 release codes by customizing.
    Regards
    andrea

    Hi there
    In STD settings/Config it is not possible,
    You can acheive this through Enhancement, after the 8th Code completion  you can set up the new rel strategy to trigger to go through the approvel (i.e. 9 to 16)
    Get the help from the ABAPer to define the table to capture the 8 codes approved PO/PR and trigger it to the new strategy,,
    Thanks
    Senthil

  • TS1292 How come it doesn't show the amount of money there is s gift card?  I tried putting in the code more than once, but all it says is that the card has already benn redeemed?

    How come it doesn't show how much money there is left in my iTunes gift card?  I have tried putting in the code more than once, but all my tablet says is that the card has already been redeemed.

    I haven't got access to the server right now (so I can't provide the complete details), but something like 6-700 GB (which is more than it shows in the client time machine windows, but less than what is true (which was around 1,5 TB))

  • Release code addition in an existing release strategy

    Dear All,
    Kindly let me know what are the implications when we have to add a release code in already working release strategy?
    Thanks,
    Sam

    Hi,
    Addition of new release code will not affect previously created POs .
    but for newly created POs it will add one more level.I think it is desirable results.
    regards,
    sujit

  • N70 unlocking codes - more than five failures

    Dear All,
    I started a new contract with Orange last december with a Nokia N70 as handset. Unfortunately only three months into the contact I had to relocated abroad due to a family member being terminally ill. No need to say that my foreing sim card was not working on my Orange N70. As you can imagine I am still paying the hefty monthly bill without using neither the free minutes available nor the handset as it is blocked. A couple of weeks ago out of frustration I bought some unlocking code generator software from the web. Needless to say I was not aware that after 5 failing attempts the handset cannot be unblocked by codes any more and I went through all my 5 chances with no luck (claimed success rate of the software 60% - it was not my case). I understood that there was a problem only when after paying £20 to Orange for an unlocking code that did not work either. The only solution that Orange can offer at this stage is for me to ship the handset to them and let them do the job. To be honest sending my handset across Europe is the last thing I want to do. I can see lots of things that can go wrong and I'am sure they will. Anyone has any advice or similar experiences? Thank you

    to be honest, just send it to them.
    there is loads of software going on ebay that state they can unlock series 60 phones, they are all fakes - you just cannot do it at home.
    the only people who can do this are the network. that information is all over these boards, in fact if you google search for it, this board turns up in the results.
    if it is a problem, then it is your own fault. you have to resign yourself to it, send it away.

  • [CS3] Script method in a plug-in code: More than one parameter?

    Hello!
    I am writing a scriptable plug-in. I want to use a script method with two parameters. But odfrz is only accepting one parameter.
    This accepts odfrz:
    Event
    kImportCandleChartEventScriptElement,
    e_ExportData,
    "import data",
    "Load a candle chart from comma separated file",
    VoidType,
    c_Param1, "from", "A file to import candle data", StringType, kRequired,
    This not:
    Event
    kImportCandleChartEventScriptElement,
    e_ExportData,
    "import data",
    "Load a candle chart from comma separated file",
    VoidType,
    c_Param1, "from", "A file to import candle data", StringType, kRequired,
    c_Param2, "from", "A file to import candle data", StringType, kRequired,
    What do I wrong?
    Alois Blaimer

    Try declaring both parameters within the same curly braces.
    Event
    kImportCandleChartEventScriptElement,
    e_ExportData,
    "import data",
    "Load a candle chart from comma separated file",
    VoidType,
    c_Param1, "from", "A file to import candle data", StringType, kRequired,
    c_Param2, "from", "A file to import candle data", StringType, kRequired,
    - Amit Gupta
    InDesign Consultant
    www.metadesignsolutions.com

  • Release strategy: User should release only with his highest release code

    Hello,
    Because of personel absences we want to configure the release strategy so that:
    User A or user B releases in the normal case the first level of a PO (with release code 01).
    User C (Manager) releases after release code 01 with release code 02.
    User A is deputy of user C. In this case user B will release with code 01 and user A will release with code 02.
    Because user A can use depending of the case release code 01 or 02 (C deputy) it must be avoided that user B sets release code 01 and 02 for the same purchase order.
    Do you know about a solution for this issue
    Br
    Manuel

    Dear W1N,
    But the systems knows that A released with code 01 and when A tries to release  with code 02 the system knows that the same person of release code 01 is trying with release code 02.
    <b>The aim is to avoid the second release from the same person and not to automate the release strategy.</b>
    In such a case A has to cancel the release for code 01 (ME28) and wait until B is reachable to do the release of code 01.
    When C is absent A knows that his task is to release code 02.
    Is this check really not possible?
    Best regards
    Manuel

  • More than 8 level of release

    Dear Friends ,
    If more than 8levels of release for perticular release statergy , how i can go head 9th level . Is it through user exits.
    RB

    Hello,
    This is a system limitation. It is not possible to have more than 8.
    Best Regards,
    Arminda jack

  • PO release change in release code

    Hi Gurus,
    Earlier a PO was being released by code A1. This employee has left the company so all the release of POs have been held up. So i want to change it & assign it to a different code B2 , please guide.
    Regards,
    Kumar

    Hi,
    Try to minimize headache. There may be so many factors/characters involves and you need to study the system 1st and then see the other implications too change or NOT.
    Example:
    You may have release groups, release codes and respective values to be released are following
    Release Group A
    Release Code: A5u2026 more then 2000K
    Release Code: A4u2026.750K to 2000K
    Release Code: A3u2026.250K to 750K
    Release Code: A2u2026.50K to 250K
    Release Code: A1u2026.0 to 50K
    Release Group B
    Release Code: B5u2026 more then 2000K
    Release Code: B4u2026.750K to 2000K
    Release Code: B3u2026.250K to 750K
    Release Code: B2u2026.50K to 250K
    Release Code: B1u2026.0 to 50K
    u2026 see example A & B are may be different department. If user get B2 release code instead of A1 ,he can release greater value etcu2026u2026u2026
    Regards,
    Biju K

  • To know release codes and strategies

    Dear Gurus,
    I want to view release codes & strategies for relevant material in contract...For this what is the T code or any other simple way is there..
    Thanks in advance.

    u can get the release codes from table T16FC and release strategies from T16FS thru SE11/SE16.
    u can also try out thru ME3M,here after running the report by giving all the required input and placing Scope of list as ALV,choose change layout (shift+f8) bring release strategy from hidden column to displayed column and choose enter.......
    regards,
    indranil

  • Authorisation object for Purchase order release codes

    Hi,
    Can anyone let me know the authorisation object to be used for the PO release codes to be assigned in the ME28 and ME29N for the users.

    Hi,
    Release code and groups detials for the PO authorisation is as follows.
    M_EINK_FRG Release Code and Group (Purchasing)
    FRGCO      Release code
    M_EINK_FRG Release Code and Group (Purchasing)
    FRGGR      Release group
    Regards,
    Sakthi

  • Release code-Release group

    Can there be 1 or many Release Groups assigned to a Release code and vice versa?
    Please clarify.
    - Pallu

    hi,
    Yes its possible..
    Reason:
    The object which is linked to the class and characteristics, may have different characteristics assigned, and for which you have different release codes assigned to release them differently...
    So, those objects you assign to R. group and then in tnext tcode you assign these groups to the codes which will be responsible for the release of each document individually....
    Ex: diff. release codes may be  for one release based on document type other based on price etc...
    Regards
    Priyanka.P

  • Can you any body tell about release codes in workflow

    Hi,
    Can any body tell about release codes in workflow.
    Regards,
    Boddu Rosaiah.

    Hi Naidu,
    You use this component if you wish to set up approval procedures for purchase requisitions or other purchasing documents. Under such a procedure, if a purchase requisition or external purchasing document fulfills certain conditions (e.g. the total order value exceeds $10,000), it has to be approved (by the cost center manager, for instance) before it can be processed further. This process of approving (clearing, or giving the "green light" to) a proposed item of expenditure is replicated in the SAP System by the "release procedure".
    It is sensible to define separate release procedures for different groups of materials for which different departments are responsible, and to define separate procedures for investment goods and consumption goods.
    <b>Features</b>
    Each person involved in the release procedure effects release (signifies approval) via a release transaction, using his or her release code. Once effected, a release can also be cancelled with the same code (that is to say, the original status is reinstated).
    If linkage to <b>SAP Business Workflow</b> has been defined for a release code, rejection is also possible. This is only possible for purchase requisitions.
    <b>Which Documents Can be Released (Approved)?</b>
    Release procedures can be defined for the following documents:
    Purchase Requisition
    The external purchasing documents purchase order (PO), contract, scheduling agreement, request for quotation (RFQ), and service entry sheet
      <b></b>

  • Assign Release Code to user

    Where/How do I assign the release code to the individual.

    Hi,
    Release code assignment to the roles is generally done by Basis team.
    PFCG settings required  and  the authorization object is  M_EINK_FRG and also and need to assigned the release codes to it.
    Regards,
    Nani.

  • Issue while configuring PO Rel Strategy with more than 17 rel conditions

    Hi all,
    I am trying to change a PO Rel startegy which has 8 release codes and about 25+ different release conditions already defined. When I am trying change the release status configuration tab I can only see upto 17 conditions. I don't see any work flow activation and I am not sure how intially they maintained all these conditions. Please let me know how to over come this issue.
    Thank you for your time,
    Srav

    Hi all,
    I am trying to change a PO Rel startegy which has 8 release codes and about 25+ different release conditions already defined. When I am trying change the release status configuration tab I can only see upto 17 conditions. I don't see any work flow activation and I am not sure how intially they maintained all these conditions. Please let me know how to over come this issue.
    Thank you for your time,
    Srav

Maybe you are looking for

  • Can't install Snow Leopard to iMac

    When I try installing snow leopard on my iMac I get the message, can't install this disc currently used for time machine backups (the disc is the iMac's internal hard drive). I tried installing with the computer already on and by booting directly fro

  • Spry does not appear to be functioning?

    I'm trying to set up a simple page, with Spry password verification upon blur. So I set up a simple form with three text fields, labeling the first one pwd1, the second pwd2, and the the blur (inventive names, no?) And tried using the various insert

  • Power Mac G5 frozen

    When tried to send my first fax, my G5 froze (spinning pizza - nothing would work). I have shut down computer, unplugged and rebooted several times. After several attempts and disconnecting non-essential connection and even another outlet for power s

  • Itunes wont recognize commercial CD

    I have a problem with itunes that sometimes when i insert a commercial CD doesn't recognize it, or if by any chance the CD has a scratch strats looping and the only way I can stop is forcing iTunes to quit. Any suggestions on how to solve this withou

  • Time Machine hourly backup seems a tad large

    Hi all Occasionally, my hourly Time Machine incremental backups to my Time Capsule seem a tad large. One hour the backup is a sensible size, then an hour later, when I've been doing very little on my machine, the backup is massive (as in, several gig