Release of Production Order at operation level

Dear Experts,
Production order to be released at operation level automatically one by one, after confirmation of operation.
Let us suppose
Op 10 ...... 10 Confirmed
Op 20 ...... 10 Confirmed
then in the Op 30 ..... 4 Qunatity to be released automatically once Operation 20 is confirmaed.
Please give your valuble inputs
regards
Ram Kumar

Dear Experts,
Production order to be released at operation level automatically one by one, after confirmation of operation.
Let us suppose
Op 10 ...... 10 Confirmed
Op 20 ...... 10 Confirmed
then in the Op 30 ..... 4 Quantity to be released automatically once Operation 20 is confirmed.
How to create trigger point for this?
Can anybody give clear idea, what all the fields I need to maintain ?
regards
Ram Kumar

Similar Messages

  • BAPI/FM for Confirmation of Production order at operation level

    Hi ABAPers,
    I am using the 'BAPI_PRODORDCONF_CREATE_ACT'for Confirmation of Production order at operation level.
    I am able to pass the Production order number and Active Operation get the confirmation done.
    But the Confirmed Qty is not being updating in AFKO table.
    The 'BAPI_PRODORDCONF_CREATE_HDR' cannot be used for Confirmation of Production order at operation level as there is no Operation/Activity(Vornr) field in the input table. Hence using this bapi confirmation of Prod order can be only at Order level.
    Can someone know any FM/BAPI which can be used for the Confirmation of Production order at operation level(not order level).
    Thanks in Advance
    Ramesh Babu Cikka

    Hi Ramesh,
    Please use FUNCTION 'BAPI_PRODORDCONF_CREATE_TT'.
    This will work as like as T/Code "CO11".
    I hope this will help you.
    Example :
      CALL FUNCTION 'BAPI_PRODORDCONF_CREATE_TT'
        EXPORTING
          POST_WRONG_ENTRIES = '0'
          TESTRUN            = ' '
        IMPORTING
          RETURN             = ZRETURN
        TABLES
          TIMETICKETS        = ZBAPI_PP_TIMETICKET
          DETAIL_RETURN      = ZBAPI_CORU_RETURN.
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
        EXPORTING
          WAIT = 'W'.
    Lanka

  • FM/BAPI to update Production Order at Operation Level

    Hi Friends,
    Can any one help me in this issue.
    My rek is, needs to update Production Order Sequence Number(AFVC-CY_SEQNRV) at operation level.
    There are some Production Orders under one Project.User is updating theSequence Numberfor the first order in that group (TCode CO02),at the time of save remaining Orders in that group needs to be updated with the same Sequence Number.
    Please provide me with FM/BAPI(operation level not at header level)
    Points Rewarded,
    Thanks in advance,
    PRBode.

    Prathap,
    Have you tried using the Bapi :  BAPI_PP_TIMETICKET
    This would confirm at operation level..
    Hope it is useful.
    Regards
    Ram

  • Release the order on operation level

    Hi,
    Currently we are releasing the complete production order. But Now we want to release the order operation by operation. How can we do that?
    Regards
    deepak sharma

    Hi Deepak,
    I think that you have already realesed the order at header level and now you want to realese the production order at operation level. If this is correct,then follow step as below.
    1.Goto CO02
    2.Select Function,then Read PP master data.continue,enter & save. So status of order will be changed to created.
    3. Now follow the step given by SAP PP consultant.
    Hope this help you.
    Regards,
    Raja.

  • Sap pp-releasing the production order?

    at are the activities carried out while releasing the production order?

    Hi,
    Order Release
    Use
    A production order must be released, before it can be processed. You can use the time period between creating and releasing a production order, for example, to carry out company checks and preparations. If you do not require this time period, you can automatically release the production order when it is created (see Automatic Release).
    A newly created production order initially receives the status CRTD (created). The following restrictions apply to a production order that has been created:
    Confirmations for the order cannot yet be executed.
    Shop floor papers cannot be printed.
    Goods movements for the order cannot yet be executed.
    Releasing the order lifts these restrictions.
    Features
    Order release can be executed at the following levels:
    With Release at Order Header Level all operations are released. The order and the operations receive the status REL (released).
    With Release of an Operation the operation receives the status REL and the order receives the status PREL (partially released). If all operations in an order have been released, the order has the status REL.
    Hope this helps.
    Revert if you need more information.
    Regards,
    Tejas

  • Release a production  order for partial quantity

    Hi gurus,
    Can you please tell me how can i release a production  order for partial quantity without splitting the order?
    Regards
    Rajib Pathak

    Dear,
    Best way you can conver the planned order to production oreder in partial in CO40.
    Or from MD04 screen click the planned order, choose pratial release and enter the quantity you want to release and press Generate button. the order gets converted to production orders of yr specified quantity and rest planned order remains for further processing.
    Or,
    Create order
    Goto operation overview
    Select the operation and click on release button...which will release the opration alone instead of releasing the order. If you release the order, then all the eperatios are released onec for all.
    If you go for operation release...you can release operation by operation, which will be partial release of order at header level.
    at operation level - partial release
    Hope it will help you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 12, 2008 9:44 AM

  • Error when release the production order

    Hi all,
    while release the production order i am getting the error :-   Plant 1000 is not the only plant assigned to valuation area 1000 , how to resolve this error .
    & can we release the prod order without calculating the cost ?
    Thanks & regards
    satish

    Hello,
    I'm facing the same issue when trying to create a production order using tran. CO01 with inputs (Material:  P-100, Production plant: 1000, Order type: PP01. Next the total quatity of material is chosen freely, Dates/start is set to todays date, Scheduling is set to Forwards scheduling).
    Error message :
    "Plant 1000 is not the only plant assigned to valuation area 1000"
    Message no. CK238
    As explanation SAP says:
    "Diagnosis
    You are attempting to use material costing or order costing. However, the system has determined that plant 1000 is not the only plant assigned to valuation area 1000.
    Costing is only possible when each plant has its own valuation area to which no other plants are assigned.
    System Response
    It is not possible to cost in your system.
    Procedure for System Administration
    Go into Customizing for the Corporate Structure and check the valuation level. The valuation level must be the plant level"
    The error message implies that the user is not given the opportunity to create and save a production order.
    I have secured the followings:
    1. Valuation level is set to Plant level so that the valuation is now done at plant level. (The other option was at Company code level, which is not checked.)
    Question:
    Is there a solution to this problem?
    Thanks and Regards!
    Edited by: WilliamG on Feb 16, 2010 4:04 PM

  • Error while release of production order u201CNext period is not openu201D

    Hi Experts,
    Need your opinions on this issue where my client is facing a problem while create and release a production Order on the last day of the month (Last day of period change).
    While create and release of production order for Plant xxxx, system uses to give the error; period Next (e.g. 12) is not open. Same thing if I have created the order using T. code CO01; but when I tried to release and save the order through T. code CO02 then it gave me the same error (Next period is not Open), it checks for the next period to open.
    The above scenario happens only on last day of the month. Earlier this kind of error was not there so the question is why the period check is happening while saving the production order.
    After speaking to the user, it is determined that they are facing this problem since upgrade (Since last 8 month). Hence need to check what additional check has been implemented with upgrade from R/3 4.7 to ECC 6.
    Error Message No F5201
    Appreciate your help how to dig up this issue.
    With Regards
    Anant

    Hi Guys,
    Please throw some light why on the last day of the month (Last day of period change) at the time of release the order user is getting error: Period Next (FI Next period) is not open ( message No. F5201).
    My question is why system carried out period checks at the time of release of Production Order.
    With Regards
    Anant

  • Re:No release of production order without standard cost estimate

    Hello Experts
    I do not want to release any production order without standard cost estimate
    I have come acroos the same problem raised by some other users and can you please suggest how to achieve this?
    Is there any way to achieve this without user exit?
    Thanks and Regards
    Subbu

    Hello Subbu,
    In this case, you need to put the status as "B4" Blocked in costing 1 view of material master, when you create the costing view and change it to "03" status when you released the cost estimate.
    Please note that this field can be overwritten in MRP view also. Hence please get the good control of material master and good coordination with PP team to achive this.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Please reward points if helpful.

  • IDOC on create or release of production order

    Hi All,
    I want to create IDOC on creation or release of production order (CO01), can anyone provide me steps and setting that i need to do to achieve this functionality. Business object used for his is BUS2005, and on release of Production order RELEASED event of object type AFVC_PM  is getting triggered.
    Thanks

    Check below badis.
    AFABD_CHANGE
    CAUFVD_CHANGE
    SIDAT_UPDATE
    Regards,
    Mkhan

  • Automatic release of production order for perticular work center

    hello,
    any body please help me how to set automatic release of production order when creation for a particular work center. please suggest me.
    Thanks & Regards
    Bhakta

    Dear,
    Use T Code COHVOMRELEASE here select work center as ZPACK then in header menu Program--Schedule in background here define as perodic job and set ferquency as Hr.
    Or Use Transaction SE38 to create  the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Problem while releasing the production order.

    Hai gurus,
    When i release the production order , SAP doesn't block when i have a deficit of stock for some materails.I checked all the customizing and found every thing is fine.
    As the materials that has defict stock has back flush indicator, is that the reason why the system is assuming the stock when releasing.

    Hi,
    You need to consider the following customization settings
    (1) OPJK - For the Plant/Order type/Availability check-2 for the material availability - Release material - set the indicator '3' No release if parts are missing
    (2) OPJJ - For availability check & checking rule - check what all elements are considered as part of ATP check.
    With these settings - in the production order if the order header has status MSPT - Missing parts (i.e. components are missing) only then system will stop the release of the order.
    I hope this addresses your query
    Warm regards,
    Umesh

  • Control availability check during release of production order

    friends,
    Can you guys help me find the user exit/BADI which will allow me to control the release of production order after the availability check is complete.
    In detail, the scenario is that : based on a flag on material master, I should be able to ignore this product's availability during release. I cannot change the availability check to "KP" ( No check) as this product can be sold seperately. So what I thought was that if I get to control the availability check during production order release I would be able to ignore this product before check or may be after check and before the status change.
    I found PPCO0021 exit and function module EXIT_SAPLCOZR_003 which is actually intended for release control for automatic batch determination. I am not sure if I can use this.
    Please let me know if you guys have any idea.
    Thanks
    Prod_Planner

    Let me rephrase the scenario :
    I have a production order for a product P1 which consumes raw materials R1 and R2. R1 is supplied by a nearby vendor every 1 hour to my plant so I do not need to worry about the availability of it when releasing the order but R2 availability should be taken into consideration. So, function 1 or 2 in OPJK will not work (as release need to be stopped if R2 not available) hence I will be using 3. If I use 3, R1 availability is also considered hence the whole order is not released. I will maintain a flag on material master so if R1 has flag, I need to ignore R1's availability but still considering R2.
    As mentioned, I found PPCO---21 which could help me but need your help to understand if there is any other way.
    Thanks
    Prod_Planner

  • Exit or Badi: On release of Production Order

    Hi,
    Module PP.
    Q) Say, equipment is under maintanance so it should give warning message while releasing the Production order through CO01.
    Note: it should give message while releasing the Production Order and not when saving it.
    Regards,
    Sujit

    Check below badis.
    AFABD_CHANGE
    CAUFVD_CHANGE
    SIDAT_UPDATE
    Regards,
    Mkhan

  • Error during release of production order - AFS Specific

    Hi SAP gurus,
    Iam getting error during release of production order in AFS specific system during COHV transaction. Error is ''Error calling ATP server'' and message no is AG022. But when we read the PP master data then this error is cleared and production order is released.
    Thanks & Regards,
    N. Laxman

    hi
    1. When mass conversion of AFS planned order to production order is performed via COHV, the resulting production order does not contain the SKU details of the component.
    2. When a planned order is converted to a production order & an ATP is carried out on the production order, Message no.AG022 - 'An error occurred during Remote Function call on the ATP Server' is issued by the system.
    so you need to use the note 1087613.
    read the note and apply with the help of technical team ABAP and BASIS
    -ashok