Release status for planned order

Hi All
      I am running MRP weekly,system is generating the Planned order  once MRP is completed.Here my requirement is i want release status for planned order, at the same time once planned order is released i dont want user to change any data in planned order.
       Somebody explain me about the settings of action control of planned order.
Regards
Srinivasan.P

Hi,
Sorry to say but there is nothing like system status for Planned orders.
Check below thread,
[Release of Plan orders|Planned Order Release]
Regards,
Dhaval

Similar Messages

  • Setup time not seen for Planned Orders/ Man Orders in GPB

    Hi all,
    I'm facing an issue where I'm unable to see the Setup activity(green bar) in the Graphical Planning Board for Planned Orders and Manufacturing Orders.
    At first I thought this was only happening for Planned Orders in Released status. However this behavior seems to be erratic with some orders on the same Product showing Setup whereas others are not.
    Any ideas?
    ~Rishi

    Hi,
    I am assuming you are using setup matrix .
    In case of setup matrix system will take setup time from setup matrix.
    If two planned order are created for the same product, system will consider the setup time for the first. For the second it will not show setup time (becasue most probably you have maintained product x to product x - o times).
    Regards
    Amlan

  • Creation of Reservation for planned order

    Hi Team,
    Is it possible to create reservation for planned orders after MRP run?
    My opinion was the reservation can only be created with reference to production order after MRP. The reservation can not be created with reference to planne dorders after MRP run because planned orders are intermident document which will not exist in the system always. The planned order details will not be available in the system once it get converted into production order.
    How the reservation will be processed which was created with reference to planned order after converting the planned order to production order?
    Kindly need ur guidance.
    Thanks
    psk

    Dear PSK,
    In a typical discrete manufacturing setup production orders are the promised receipt for which reservations gets generated as
    soon a production order is created.But only if the order is released goods movements can be posted against the reservation
    details through MIGO/MB1A for 261 movement.
    It's not required to create any reservation at the planned order level or which may not help you in any means to your business.
    But however in a REM scenario MF60 is used to create stock transfer reservations for 311 movement where planned orders
    are used for production backflush.To explain in detail even without any planned orders you can do a stock transfer reservation
    for a production quantity.
    Check and revert back.
    Regards
    Mangalraj.S

  • Release strategy for Purchase order

    Hi Friends,
    My client was using Release strategy for purchase order. Now we want to know the T-code for showing list of Rejected Purchase orders,  T-code for for showing list of approved purchase orders, T-code for showing list of blocked purchase order.
    Thanks and regards
    Krishna

    HI,
    You can go to SE16N view table name EKKO
    FRGKE   Release ind.  = B 
    FRGZU   Release status = <blank> 
    mean, this PO yet to approve/ rejected.
    FRGKE   Release ind.  = R
    FRGZU   Release status = X
    means, this PO has been approved.
    Hope this helps

  • User Status for PM Order

    Hi everybody,
    I have created a user status for PM orders. the problem is when Order status in CNF ( confirmed ) and I use IW45 to cancel confirmation, the user status doesn't change to Release and still remain CNF. I couldn't find any business transaction for that.
    what do you do for such case?
    thanks in advance

    Hi Daniel,
    I doubt that some communication gap is going on.
    System Status
    - An Order with status TECO CNF ... converts to REL CNF ...  when the TECO cancels.
    - This status further changes to REL PCNF when you cancel any Operation Confirmation (IW45).
    - Similarly  TECO PCNF  also possible.
    If I remember correctly, you were asking about User Status trigger upon change of System Status,
    If you agree with the very 1st line of this post, you may start a fresh by explaining the requirements again, if possible more clearly. The probability for fresh thinking and responding from forum would increase.
    Best wishes
    Jogeswara Rao K

  • ESYU: Planner Workbench Release process가 다른 user로부터 planned orders를 release

    Purpose
    Materials Requirement Planning - Version: 11.5.9 to 12.1
    Information in this document applies to any platform.
    11.5.9 ~ R12 version:
    두 명의 users가 MRP Planner Workbench에서 Release를 위해 records updating을 진행하는 경우, 두 명 중 한명만이 update 후 실제로 release를
    submit 했으나 두 명 user의 모든 records가 release 되어 버린다.
    User1은 자신의 Planned Orders 만을 release 할 수 있고, User2 또한 자신의 저장된 Planned Orders 만을 release 해야 한다.
    STEPS:
    1. User 1이 MRP Planned Workbench로 log
    2. User 1은 특정 planner code를 위한 current planned order recommendations 을 찾는다.
    3. User 2가 MRP Planned Workbench로 log
    4. User 2가 특정 planner code를 위한 current planned order recommendations 을 찾는다.
    5. User1은 All for Release를 선택
    6. User2도 All for Release를 선택
    7. User1은 checking process를 끝낸 후 저장
    8. User2는 아직 checking process를 끝내지 못해 save를 아지 않은 상태로 남아 있다.
    9. User1이 [Release] button을 선택
    10. User1이 [Release] button을 선택시 User1과 User2에 의해 저장되거나 check 된 모든 planned order recommendations이 Work in Process와
    Puchasing modules로 released 되어 버림
    Cause
    이 issue의 원인은 현재 MRP planning의 경우 expected functionality 이다.
    MRP Workbench Release process는 모든 planner에 의해 check 되거나 저장된 모든 planned orders를 항상 release 한다.
    Bug 891669 : Enhancement Request
    PLANNER'S WORKBENCH SHOULD RELEASE ORDERS BASED ON PLANNER NAME NOT BY BATCH
    It is explained that this is current functionality in the following rejected Enhancement Request:
    Bug 891669 : PLANNER'S WORKBENCH SHOULD RELEASE ORDERS BASED ON PLANNER NAME NOT BY BATCH
    Solution
    Solution을 적용하기 위해 아래 steps을 실행:
    1. 모든 planner에 의해 check 되거나 저장된 모든 planned orders가 [Release] button에 의해 항상 release 되는것은 현재 MRP Workbench
    Release process에서는 correct functionality 이다.
    2. ASCP Planning의 경우엔 Planner/User에 의해 Release process가 아래 option에 의해 처리 가능하다.
    -- profile MSC:Released Only By User
    -- Standard MRP에서는 이 option은 사용할 수 없고 고려되지 않는다.
    Reference
    Note 311053.1

  • Material shortage for Planned Order (Discrete Job) in PWB

    Client has planned orders on planner workbench (PWB) ready to release as Discrete Jobs but, because they have frequent revisions, they waits till all components (required to build job) are onhand before releasing from PWB.
    They would like an easy way to either check or be notified when the last component required for job is received into inventory so they can release from PWB. They cannot use the standard "Discrete Job Shortage Report" as the job is not created yet. And they don't want to release from PWB till ALL material is onhand
    Could we create a custom report perhaps (using same logic as "WIP Mass Load" to determine all component required versus onhand), but does anyone have a better solution how we can solve this?
    Regards,
    Hugh
    Edited by: user13050057 on 13-May-2010 02:09
    Edited by: Hugh Parker on 13-May-2010 08:13

    1) Why would you check for components of subassemblies? e.g. Say your BOM looks like this.
    FG1 is made up of SA1 and SA2 and COMP1.
    SA1 is made up of COMP2 and COMP3.
    Say you are releasing planned order for FG1. As long as the planned order is pegged to onhand for SA1, SA2 and COMP1, you are good. Right?
    2) If you have to add custom logic, I would do it using a when-validate-record personalization on the PWB. The personalization will call a function that accepts order number ; does all pegging checks and returns true or false. If it returns false, then the personalization returns error and does not allow release of the planned order. The function will have to be an interative program that traverses the pegging loop to ensure that all lowest level demands are pegged to onhand.
    Hope this helps
    Sandeep Gandhi

  • Release Procudure for Purchase Order

    Hi Experts,
    I am new Release Procudure.My client wants release procedure for two users.
    End user wants create Purchase Order then other user wants release that purchase order and then another user wants final release. Please tell how can map this process in sap.
    Thanks in advance,
    Chandhu
    Edited by: chnadu9 on Jan 5, 2011 5:48 AM

    Hi,
    The release code is a two character ID allowing a person to release (clear, or approve) a requisition or an external purchasing document. The release codes is basically controlled via a system of authorizations (authorization object M_EINK_FRG).
    Use SE12, structure CEKKO to check all the fields available for controlling the Purchase Order.
    An example of configuring a Purchase Order Release Strategy
    If the total value for the Purchase Order exceeds 10,000, release strategy 01 is assigned to the Purchase Order. There is only one characteristic created in this example. For controlling the Purchase Order type, create characteristic for CEKKO-BSTYP and the value NB.
    Steps for configuring the PO release strategy
    Create the PO Characteristic
    Transaction code : CT04 - Create Characteristic e.g. NETVALUE
    Click Additional data tabstrips
    Table name CEKKO Field name GNETW and press enter and you will see this information message :-
    Format data taken from Data Dictionary (press enter)
    (for currency dependent field, you are prompt to enter the currency which the system then converts the currency of the Purchasing document into this currency)
    In the Basic data tabsritps (X refers to tick),
    X Mutliple values
    X Interval values
    In the Value data, in the Char. value column, type >=10000 (equal or greater than 10000) and press enter
    Save your data
    Create the Class of the PO Release Strategy
    Transaction code : CL02 - Class
    Class - Create REL_PUR
    Class type - 032
    Click Create button
    Description - Release Procedure for Purchase Order
    In the Same Classification section, click Check with error
    In the Char. (characteristic) tabstrips, type NETVALUE to assign your characteristics to the class
    Save your data and this message will appear :-
    Class type 032: Class REL_PUR created
    Define the Release Procedure
    OMGS - Define Release Procedure for Purchase Order Type
    Release Group - New entries
    Rel.group Rel. Object Class Description
    02 REL_PUR Rel. Strategy for PO
    Save your entries.
    Release codes - New entries
    Grp Code
    02 01
    Save your entries.
    Release indicators - New entries
    Release indicators Release Description
    0 Blocked
    1 X Release
    Save your entries
    Release Strategy - New entries
    Release group 02
    Rel.strategy 01 - Release
    Release codes 01
    Release status 0 - Blocked
    1 - Release
    Click the Release prerequisities button
    Click the Relase statuses button the click the Continue button
    Click the Classification button
    Choose your check values
    Click the Back button
    Save your entries
    Check your PO release configuration
    Finally, check your PO Release Strategy configuration to make sure that there are no errors.
    OMGSCK - Check Release Strategies
    (make sure there are no error messages)
    Once the Purchase Order is not release, buyers will not be able to print the Purchase Order.
    Goods Receipts will be shown with Message no. ME 390 - Purchasing document XXXXXXX not yet released.
    In 4.6c, Purchase Order with Release Strategy have a tabs at the end of the Header. This allowed the buyers to check the release status of the Purchase Order.
    The person with the release authorization have to use ME28 to release the Purchase Order.
    Regards,
    Mohar

  • What is release strtegy for sales order

    hi gurus
    what is release strategy for sales order
    can any one throw some light
    points awarded.
    kishore

    Dear Rama,
    There is nothing like release strategy for sales order. There is a release strategy for purchase order. A bit of search on sdn forum in MM section will help you a lot on this area.
    For your reference, The release code is a two-character ID allowing a person to release (clear, or approve) a requisition or an external purchasing document. The release codes is basically controlled via a system of authorizations (authorization object M_EINK_FRG).
    Use SE12, structure CEKKO to check all the fields available for controlling the Purchase Order.
    e.g. If the total value for the Purchase Order exceeds 10,000, release strategy 01 is assigned to the Purchase Order.  There is only one characteristic created in this example.  For controlling the Purchase Order type, create characteristic for CEKKO-BSTYP and the value NB.
    CT04 - Create Characteristic   e.g.  NETVALUE
    Click Additional data Table name CEKKO      Field name  GNETW    and press enter
    (for currency dependent field, you are prompt to enter the currency which the system then converts the currency of the Purchasing document into this currency)
    In the Basic data (X refers to tick),
    X    Mutliple values
    X    Interval values
    In the Value data, in the Char. value column, type >10000 and press enter
    Save your data
    CL02 - Class
    Class - Create REL_PUR
    Class type - 032
    Click Create
    Description - Release Procedure for Purchase Order
    In the Same Classification section, click Check with error
    In the Char. (characteristic) tab, type NETVALUE to assign your characteristics to the class
    OMGS - Define Release Procedure for Purchase Order Type
    Release Group - New entries
    Rel.group   Rel. Object   Class                 Description
      02                                 REL_PUR        Rel. Strategy for PO
    Release codes - New entries
    Grp         Code
    02           01
    Release indicators
    Release indicators           Release        Description
          0                                                        Blocked
          1                                     X                Release
    Release Strategy
    Release group   02
    Rel.strategy    01
    Release codes   01
    Release status   0
                            1
    Classification   Choose your check values
    OMGSCK - Check Release Strategies
    (make sure there are no error messages)
    Once the Purchase Order is not release, buyers will not be able to print the Purchase Order.
    Goods Receipts will be shown with Message no. ME 390 - Purchasing document XXXXXXX not yet released.
    In 4.6c, Purchase Order with Release Strategy have a tabs at the end of the Header.  This allowed the buyers to check the release status of the Purchase Order.
    The person with the release authorization have to use ME28 to release the Purchase Order.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh
    P.S. you can send me a mail at my mail id [email protected] for any specific details

  • Release Strategy for Sales Order-IMP

    Hi Gurus,
    I want to know regarding <b>Release Strategy for sales orders</b>. I want to know the detailed step-wise procedure for SO and not for PO. My understanding is that standard SAP does not support Release Strategy for SO in SD Module. Please l want the following queries to be answered
    1) Is my understanding on Release Strategy for SO correct as mentioned above?
    2) What are the other alternatives and the steps of configuration step-wise.?
    Kindly help me post this information as it is required urgently. Suitable full Reward Points will be given to all answers.
    Many Thanks,
    Pankaj Mishra
    E-Mail : [email protected]

    Pankaj,
    There is no release strategy for sales order.
    You can try it doing Authorisation /Status  profile with your BASIS person...
    REWARD IF U FINDS THIS AS USEFUL...
    Regds
    MM

  • Define Release Procedure for Purchase Orders

    Hi Friends,
    We are changing Release procedure for purchase orders for one department from > $ 5000 to > $ 10000.
    We defined three characteristics for the class namely Purchasing Order Document, Purchasing Order Type and Ner Order Value which is Currency data type. I Defined Release Procedure for Purchase Orders in configuration master. It's working fine, I mean the Net order Value field is updated in Configuration Client.
    After transporting the above change to the Testing Client, the Net Order Value field did not update in testing Client even though I created Characteristics in Testing Client (as characters are not transportable, I created them seperately in Testing Client). I can't update the Net Order Value manually in Testing Client as it says "Client 010 (test) has status 'not modifiable' "
    Please tell me how to update that field, as the net order value didn't change even after transport. I can't change manually in testing Client as the status is "not modifiable"

    Hi,
    Yes I have already done that.
    In SPRO,
    After hitting the following:-
    MM --> Purchasing --> Purchase Order --> Release Procedure for Purchase Orders --> Define Release procedre for Purchase Orders
    I have to process the objects in the following sequence,
    Release Group, Release Code, Release Indicator, Release Strategy & Workflow.
    Upto Release Indicator it is fine. After hitting Release Strategy, I should select the release strategy (which I just created) and display. Then 4 buttons will be displayed namely,
    Release Prerequisites, Release statuses, Classification, Release simulation.
    Upto Release statuses it's fine. Afeter hitting Classification,
    the values of Purchase document & Order type are populated, but the Total Net Order Value is Blank. It is supposed to populate the amount & 10,000. But it is not.
    Actually that amount will be stored in the field GNETW of table CEKKO. But CEKKO is a Structure not a table. So I can't update the field.
    Please advice me...
    Thank You,
    Nag

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • How to connect MAPL and PLPO to derive work center for planned order

    Hi,
    Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
    Please help asap.
    Regards,
    Mitali

    I guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
    1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
    2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
    3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
    Hope it solves ur prob.
    Cheers
    SKC

  • Extractor for Planned order

    Hi Experts,
    I am looking for the stabdard extractor for the Planned order, Basically I need the fields from the table PLAF.
    Please let me know any standard extractor available or any extractor need to enhance.
    Thanks
    sai

    Hi Sai,
    Take a look at 2LIS_04_P_MATNR and see if it is usefull:
    http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm
    Else it seems that you should create a generic extractor directly on the table according to this thread:
    Re: Extractors for Planned orders and Proces Orders
    Hope this helps.
    BR
    Stefan

  • Set User-status for PP order

    Hi All,
    How can I set the user-status for a PP order, also let me know which user exit suits this requirement, as I know I have to make use of a FM or a BAPI which sets the user-status in the user-exit somewhere.
    Thanks
    Mark

    Hi,
    Try the following enhancements/exits for setting the status for PP order.
    STATTEXT
    CCOWB001
    COIB0001
    Regards,
    Anji

Maybe you are looking for

  • Can't see and open a pdf in a mail with ipad

    I there, working with ipad2 can't understand , got sometimes pictures of my house from an architecte . these're send as pdf often I can't see the attachement and so impossible to see anything ! BUT when opening the mail on a Mac OS everything is ok

  • Low quality web gallery photos??

    I have used the web gallery feature successfully for smaller albums of around 30 pictures. The quality of the photos stayed high in these cases(1.2 MB). But I tried to load an album of much larger size (171) and the quality of the photos was reduced

  • Poor Audio Playback for High-Pitched Music

    After a few experiences with high iPOD, I have realized that while listening to high-pitched music (e.g electronic music) on high volume levels there is an irritating sound coming from iPOD original headphones. In my opinion, a superior equipment lik

  • Is there any way to recover deleted documents in pages?

    Is there any way to recover deleted documents in pages, or off of icloud?

  • IPhone5 bluetooth can not connect to macbook air?

    hi my iPhone5 bluetooth can not connect to macbook air (mid 2012). is bluetooth on iPhone 5 designed so that it CANT connect to computers?  thanks