Release strategy and ME54N.
Hi,
I can't perform the release with trx ME54N for a purchase requisition.
In the screen layout I don't see the release button in "Release strategy" view,
it seems not enabled.
Best regards
Hi,
Actually to criteria to meet release of any document is defined via class and characterstics so you first check the purchase requisition you are raising come under that release criteris.
For example any PR above rs 100000 is subjected to release.So you check in release startegy what threshold value or other characterstics are given in relative class.
This you can check in this link
http://www.sap123.com/showthread.php?t=59
I Hope this will work for you
Regards
VS
-- Reward if helpful
Similar Messages
-
Release Strategy and workflow in Purchase Requisition
Hello All,
My client wants to activate the release strategy and workflow at the purch req and PO levels. They allow users to create a Preq and reference that preq to the PO, or users may create a PO without referencing a Preq. Since they have the release strategy and workflow working on both levels, what they want done is, if a PO has a Preq reference, it does not need to go through another approval process on the PO level as it has already been approved on the Preq level. Therefore if a Preq is reference in a PO, the PO workflow and release strategy should not be taken into account. Can this happen as a standard config, or will this need a "user exit"?
Thanks in advance for your help!!You will need to activate the user exit. This will keep the PO release strategy simple.
Have a flag (use USRC1 or USRN1). In your PO release strategy classification, maintain only X in this characteristic.
In the user exit, check whether the PO is created with reference to PR. If yes, pass "blank" to USRC1, else pass "X". The release will be triggered only in case of X.
Just a couple of points:
1) What will you do if one item in PO is created with reference to PR and the another item is not?
2) What will you do if one item is partially referenced to PR (i.e PR quantity is 100, PO quantity is 200 - of which 100 is referenced to PR and other 100 is not - this is possible by changing in delivery schedule)?
Hope this helps
Lakshman -
PR release strategy and Standard Workflow suddenly doesn't work
Good day,
I have PR release strategy and Workflow activated. My workflow is copied from standard PR release workflow in SAP. The only changes I made in the WF is Agent Assignment. It worked like a wonder.
However this week when I was creating PR, Release Strat still works but WF doesn't kick in. No change was done to both PR release strat and WF.
Any help/suggestion for this? Is there a period of activation in WF?
Regards,
SiHi Diwakar,
I was able to activate it already yesterday. What I did was to test the workflow in SWDD. After the test, all workflow items were created. Am still wondering though why WF would suddenly stop (not generate workflow items) even with no changes made.
Thanks for the info and link. Points awarded.
Regards,
Si -
Query on Release strategy and WFL?
Hi Friends
what is the diff bet Release Strategy and WFL
Regards
EmilBy WFL if you are referring to Workflow, then these two are not something you should look for differentiating. Worflow is tool provided by SAP to automate a series of business process activities based on business rules. In case release strategy it helps in automating the whole approval process.
Workflow is used to trigger e-mails to approvers once a purchasing document is subjected to release strategy. It can used to write the approval rules and in what scenario who is the approver, are there multiple approvers etc. -
Dynamic release strategy and static release strategy
Hi,
What is the difference between dynamic release strategy and static release strategy.
What the customization setting required to activate dymanic and static release strategy.
Thank you
REgards,
YshuDear Yshu,
What do you mean by dynamic and static release strategy. In SAP, we don'y have this term.
Please kindly give more explanation so we can help you.
We only have with classification and without classification.
Normally, release strategy without classification is used in R/2, and out of support in
R/3. However the functionality still available in case you want to use it.
You can not use Release without classification and Release with classification.
If there is an entry present in Release Group table (T16FG-FRGOT), only release with
classification can be used.
If you are in R/3, then forget the release strategy without classification but just
use the release strategy with classification as it had more flexibility than the old
system design.
Thanks
Ian -
Purchase Order Release Strategy and SAP user RelationShip
Hi,
We are currently developing a work flow to streamline PO release in our company . What we want to achieve is that
E.g
A purchase order 100001 is creates and a release strategy s1 is applied to it which is a 3 level relase statrgy having release code c1,c2,c3 which are uniquely assigned to user/employee of the company and no 2 users'employee can have the same release code.
Now when c1 release the purchase order a work item should be created to for the user/employee who is assigned the c2 code.
Currently this workflow is not implemented in our company adn the relase stategy is handeled by authorization oobjects and when ever a po user relase the po he calls up the other persona next in relase strategy to notify him about the work he has to do .
I am need to know can we develop a relationship b/w the release code and sap user or employee
Regards
Kamran ellahiHi,
We are currently developing a work flow to streamline PO release in our company . What we want to achieve is that
E.g
A purchase order 100001 is creates and a release strategy s1 is applied to it which is a 3 level relase statrgy having release code c1,c2,c3 which are uniquely assigned to user/employee of the company and no 2 users'employee can have the same release code.
Now when c1 release the purchase order a work item should be created to for the user/employee who is assigned the c2 code.
Currently this workflow is not implemented in our company adn the relase stategy is handeled by authorization oobjects and when ever a po user relase the po he calls up the other persona next in relase strategy to notify him about the work he has to do .
I am need to know can we develop a relationship b/w the release code and sap user or employee
Regards
Kamran ellahi -
Release strategy and code authorizations
Hi,
We need to create a new release strategy for PO. After setting strategy, we are assigning existing release codes A1 and A2 to strategy. The same release code is also used in existing release strategy.
Now, will this create any authorization issue if we assign same release codes to different strategies, and different users in user roles.
Thanks
AlexHi,
I am confused with your requirement. When you have a business requirement to control the release, may be a new department created or new character value requires for adding to release process.
Option-1:--- >When you decided to create new release strategy, you should have gone for creating new release codes & design your release process with new release strategy with new release codes. Do not use same release codes, use different release codes for new release strategy which will be easy to control for authorization based on respective users.
Option-2:--- > When you added a new release characteristic to release class based on requirement, then check assignment of release group to release class ( just make change & TR need to be transported),release strategy design which trigger on how release is to be affected & which manner with a logic. Also check the new value you are entering with your release class, release group & release strategy in Cl20N/CL24N t.codes. Also check during creation of new release characteristic, you have values with correct field name.
Regards,
Biju K -
MIR7 doesn't get PO and PO release strategy
I can see PO item 10, 10000 MYR in ME23N, and it is already released.
In MIR7, PO reference tab, I put PO number and item number, but mesages says no item number. and it didn't populate item from PO.
what's the reason?
also I create PR and released PR, but when I run ME59N and input PR number, it says No suitable purchase requisitions found
Message no. ME261? I can't generate PO automatically. I have to use ME21N, what's the wrong with my system?
I tried one purchase group and PO can't be released, but when I change purchase group, it is ok, may i know the SPRO configuration to define certain purchase group for release strategy?
also how can we set certain PO document type with release strategy and some PO document type without release strategy ?Hello
For first question, Please check in the PO line item level Invoice tab, whether GR based invoice verification is checked. If yes, then system will allow you perform MIR7 after Goods receipt.
Second question:
ME59N should display the open PRs for PO creation. Please cross check once agian the input selection parameters.
Third Question
Yes, you can configure the Release procedure based on Purchasing document type/Pur group. You need to define the paramter as Charactetristic and assign to the Release class.
warm regards
Ramakrishna -
Hi,
I have a unique requirement in PO release strategy. The requirement is if the PO doesn't have any contract it should be subjected to 2 step release process. If there is a contract then it should be subjected to 1 step release process.
Now i have created 2 release strategies one with 2 step release and the other one with 1 step release with the same charecteristic values. The only exception is i have used the 'USER DEFINED CHARECTERISTICS' - USRC1 with the value of X in one step release strategy and the value of BLANK in 2 step release strategy.
After doing all these settings Release strategy is not trigerring at all. Firstly it has to trigger the release then using the exit we can change the release strategies depending upon the conditions.
Any suggestions are highly appreciated to fix this issue.
Regards
SudhakarHello,
After you have done config for the release strategy please execute " Check Release Strategies". This will also help you in giving first round of check/errors in your config.
regards
anand -
Hi,
Is there a report for PR/PO release strategy?
Thanks in advance!Hey
In that case you must query the tables from release strategies, i suggest to you:
T16FS - to get release group, release strategy, and releases codes.
AUSP / KLART=032 - to get Cost Center or others characteristics.
More detailed information get from tables T16F... C/D/E/G/H/K/L/M/T/V and KSSK.
Cya
Jony -
Issue with PO Release strategy
Hi experts,
I have problem with Po release strategy in 5 to 10 purchase orders, i have created few purchase orders(2000 Po's) with same document type and company code ..etc and saved, then release strategy has been triggered.
For few purhcase orders release strategy has not been triggered.
If i take 1 po from that few purchase orders(Release strategy has not triggered) as reference and again if i create PO,new purchase order have getting created with release strategy.
Can some body tel how this ican be possible, hope this might be standard syatem behaviour.
Hope i should delete thos e purchase orders and i should create new PO's instead of of old PO's (Without release strategy).
Some experts can share their experiance in this regard.
And how i should proceed further with this issue.??
ThanksHi,
You issue in your system has 2000Nou2019s purchase orders with release strategy has been triggered but 5 to 10 purchase orders do have release strategy.
& when you are creating a new PO with reference to old purchase orders (which release strategy has not triggered) and on saving NEW PO created with triggering release strategy.
Cause for above:
PO which release strategy does not trigger because the purchase orders are created before setting release strategy for PO. Those PO triggered release strategy and all are created after setting release strategy for PO.
Action:
Its completely business call for business users to go for options:
Option-- >1# You can use same old PO which release strategy does not triggered, do GR and all other process
Option-- >2# You can create new PO with reference old PO which release strategy does not triggered and upon saving you will have new PO number with release strategy triggered, then release PO & do GR and other related process.
Regards,
Biju K -
Creation of release order possible during release strategy
Hi folks,
we have currently contract and purchase order release strategy parallel in place. Both are working fine.
We are using quantity and value contracts.
Quantity contracts are changed frequentely by the business; with every change (adding new items, changing prices of existing items), the release strategy is pulled again.
Our release indicator is set to 6 and has value change 0,00%.
The business requirement is now to release a contract with status X (e.g. 10 items and a total item value of 10.000EUR). After release, call offs can be created for all the released line items.
If a new line item 11 is added, it should still be possible to create call offs for item 1-10 but not for item 11.
Item 11 should undergo a new release.
Has anyone ever come across such requirement?
I have tried version management. However, version management will only force a new release whenever the version is completed.
Even then, the complete contract is subject to release strategy and it is not possible to create call offs.
We dont want to set error message ME347 "Release orders against contract xxxx not possible (contract not released)" to warning, as this will allow to always create call offs regardless of the contract being released or not.
Any ideas greately appreciated.
Thanks!!I suppose program checks in EKKO whether contract is released,, irrespective of version exist it or not. IF you are able to direct it to EREV, then may be version 0 or ( current - 1 ) released can be returned.
Isn't it a special case that your version 0 data is intact in version 1; Even if someone change lines 1 to 10 , with or without adding line 11, it still triggers version 1. How do you ensure that lines up to 10 are not changed. you may have to look in CDPOS CDHDR with object Revision..
This is just an idea which you may discuss with your developer to see whether a copy of the program can be modified.. -
Scheduling Agreement Release Strategy Issue
Hi,
We have a typical problem in Scheduling Agreement Release Strategy.
Once the SA is released for the first time it should restart the release strategy again if there is a change in Quantity or Value or Purchasing group. The release strategy is getting restart for some of the release strategies and not for others. I compared the characteristics, class for both the release strategies and I am not seeing any difference.
Can anyone please help me in this regard.
Thanks in advance.
Regards
Ramrelease strategy can be rerigger in case where qty or price change and the changes is over the percentage you defined for Release indicator
goto release indicator config and in SPRO for release strategy and check the Value change %
maintian 0.1 here
so any change above 0.1 will retrigger
and maintian value 4 in chgable field. -
PO release strategy not triggered after PO printout
Hi Experts,
I have configured PO release strategy and have given 10% tolerance to PO value.
When I change PO value (more than 10%) after releasing the PO, but before taking Print out of PO, the system triggers new release strategy.
But when I change the PO value (More than 10%) after taking PO print out, system do not trigger the new release strategy.
I want the system to trigger new release strategy after PO print out (if its going beyond the tolerance).
Please help.
regards,
AnandHi Anand,
you cannot reset the release once the PO is printed.
When the purchase order is printed/faxed the vendor will deliver the goods. Therefore it would make no sense if the system resets the strategy.
Please ensure that changeability of the release indicator should be 5 or 6.
Sanjeev -
Multiple release of Service Entry sheet in ML85 with a release Strategy
Hello Techies,
We have requirement where in we need to each release service entry sheet created in each month.
We have created a release strategy and now using ML85 for releasing SES instead of ML81N.
Is there any process so that all the SES are released at once(Mass release) .
Thanks
JayashreeHi Dear,
you select the SES as per your Release code and Code Grp, henceofrth the no of service entry sheets will be display you can choose the multiple Entry sheets and select the green flag w/o coming to the same T-Code again and again.
Hope it will help you.
Regards,
Yawar Khan
Maybe you are looking for
-
When I add a folder to my library it doesn't add the song information
I had to do a factory reset on my Laptop. I had all my music backed up and when I added it to iTunes it was mostly fine but for some reason a handful of albums import into iTunes with little or no track information as show in the picture. The file it
-
How to connect Time Capsule wirelessly (without hard wire connection)
Okay, so just bought a Time Capsule, and in the process of setting it up, I am being told by Airport Utility that I need to hardwire the TC to my wireless router in order for it create a network..... My question: Is there anyway around this? Is the
-
A diagonal line across every cover in the cover flow view
I have a black diagonal line across every cover when use the cover flow view. Even in the iTunes store, in the tv shows or music videos, in cover flow view, I still see a black diagonal line across the cover. I reinstalled iTunes 7.0.2 a few times, b
-
Photo Deluxe 2 on the iPad?
I just love my photo deluxe 2 software. But it will not go on windows 7 or 8. Could I buy a Ipad and use a external CD to install the software on a Ipad?
-
So what exactly is this iphone 5 rattlling noise?
Whenever i get a text message, my phone vibrates. After the vibration theres also this faint rattling noise that i hear. Like something loose inside my phone. You also hear it when you tap on the back or you place it down. Its annoying and makes the