Release strategy for info records

Hi All,
Can I have a release strategy procedure for Inforecords to create PO?
Please suggest some answers My client want to configure info record release strategy.
Thanks in Advance,
GANESHA

Hi,
Inforecords are master data and we need not have release strategy for that.we have release strategy only for the purchasing documents .
thanks
Roopavathy

Similar Messages

  • Release Strategy for Condition Records

    Hi,
    This is a requirement from my client. The client needs to give 4 levels of release strategy for the condition records created. The selling price for the products will be entered by person 1. This has to be approved by the sales execute (person 2); then by the sales manager (person 3); finally by the General Manager (Person 4). The selling price of the products ranges from 10 lakhs to 40 lakhs. so, the release strategy is needed. This type of release strategy is available in MM for PR and PO. Please let me know whether similar facility is available in SD. Any alternative is also solicited.
    Regards,
    K Bharathi

    Hi,
    Thanks for your valuable reply.
    I defined 3 Processing status (Menu path: SPRO >> SD >> Basic Fn >> Pricing >> Define Processing status). They are EU-End user, KU-Key user, MD-Final authority. These processing statuses are assigned to Release status. First two processing status EU, KU were assigned to A (Blocked). The third processing status MD was assigned to Blank (Released). The purpose is: at processing status EU one person will upload the price master. Second person will check the price and will change the processing status to KU if he satisfies with the accuracy of the price master. The third person (final authority) will check the price and set the Processing status MD. Once the condition record gets the status MD, the prices can be used for creating sales order because it is released.
    In the condition record for PR00, when I enterthe processing status  EU or KU the release status shows 'Blocked' release statuses. When I enter MD in the processing status, the release status show 'released'.
    My question is how can assign the responsibilities of changing the processing statuses EU to KU, KU to MD to two different persons.
    Regards,
    K Bharathi

  • Release Strategy for PO not kicking in

    Hello SAP Experts,
    I have gone through all the steps of configuring release strategy for PO. I checked at the end with the transaction code OMGSCK and everything is good with no error. But when I test the strategy by creating a PO, the 'Release Strategy' tab does not come on in the PO Header. This means that the Release Strategy did not work. I have troubleshot over and over again right from the Characteristics/Class, all the way to the Release Strategy, but no breakthrough.
    I will appreciate and award points for helpful hints.
    Thank you in advance.
    Joel.

    Please list all your char you have created and the value of char.
    Than please tell the PO details.
    once i got this info than only i can see the problems.
    you can do one more thing
    goto CL30n and enter the class and class type 032
    than hit enter and enter the value of char which you have used in the PO and then hit find initial class button from top menu
    see if any release strategy is pulled or not?
    if it is determine morethan one that means you have same value exist in more than one release strategy

  • Release strategy for PO and Contract

    Hi,
    I maintain characteritic for PO
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    I maintain characteristic  for contract
    Company code
    Target Value
    Doc Type
    Purchasing group
    My class consist of
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    Company code
    Target value
    Q1: Do i need to maintain ALL characteristic value when i define my release strategy for PO or Contract as some characteristic only apply to PO only or contract only?
    Q2:  What option do i have if i need to maintain all characteristic value ? leave it blank ? empty
    Currently my PO release is working fine but when i try to maintain the contract release inside the class . my PO release is not triggering . I maintained diffrent release group for both PO and Contract .
    Thank for your advice

    First of all
    For purchasing like PO,pr,contract you can able to get in ekko table.No need to maintain separate release unless if it your business requirement.Take Document type as one of the characteristics it will distinguish whether it is PO or contract.
    You have to maintain all the characteristic value then only it will trigered release.
    Check the release indicator as well.
    Hope it will help.

  • Release strategy for quantity contract

    Hi Gurus,
    In quantity contract ..  target value will not filled by the value(in header details) as it is quantityt contract.
    We may have different line items with different cost..
    my doubt is how the release strategy will be triggered for the quanityt contract and how the system will consider the whole value of the contract..
    please explain/clarify
    regards
    subbu

    Hi,
    The release strategy for the contract will work in the exact mechanism as for the PO i.e. it will be determined  based upon the total net value of the entire purchasing document.
    Cheers,
    HT

  • Release Strategy for SA/Contract/PO

    Hi friends,
    Should we have different release groups and release codes in contracting/ SA/ PO.
    Because...
    I have maintained 4 characteristics in release strategy for PO _[ Comp Co, plant, porg, total net order value].
    But i want to maintan only 2 characteristics in release strategy for contract  [plant, total net order value]
    because the same is reflecting in contract config also.
    Is it possible..please help me frnds.
    Prabhu

    Hi Prabhu,
    Unfortunately you need to maintain characteristics of all possible values for company code and plant for contractsu2019 to subject the release.
    Wish that SAP would be more flexible with release of PO, Contract and RFQ but it does not.
    Regards

  • Release Strategy for Contract is not getting picked whereas it is ok for PO

    Dear Experts,
    I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    Kindly resolve the issue.
    Satish

    S0004830404 wrote:
    Dear Experts,
    >
    > I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    > I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    >
    > Kindly resolve the issue.
    >
    > Satish
    hi,
    use create other characteristic for value CEKKO-GNETW in this use the mk , wk values in value field and assign this characteristic to your class and save.
    Thanking you

  • Release strategy for Schedule lines in SD

    Hello All
    Can we create a release strategy for Schedule Lines in Scheduling Agreement? If Yes How?
    I have already maintained a release strategy for Item Level... which I want to put it for Schedule line as well....
    Thanks in advance.

    Hello,
    I think you are in the wrong forum. Please choose the right forum category and post it there.
    Matthias

  • Release strategy for Scheduling Agreement(SA)

    Dear Forum,
    This issue is with regards to the release strategy for Scheduling Agreement(SA)
    Until now release has only been applicable to contracts at our client site. But we now plan to introduce it for SA as well. Such a feature is available in SAP but the problem is that with the given release strategy GR is not allowed until the release is affected. The system allows you to post the delivery schedule.
    Now what I want is that after making the SA the system should not allow to make delivery schedule if release is not affected.
    We also have MRP run at client site..Kindly suggest the procedure as, how to configure it.Are der any User Exit for the same,if so please discuss..
    Warm Regards
    Nainesh
    SAP ECC 6.0

    Hi,
    What's the SA Type that was created via MRP.
    If it's LP (without release document), release will not do anything BUT
    If it's LPA (release document), then you will not be able to Post the GR until release is affected.
    Thanks.
    Scheduling Agreement can be categories as
    1) LP (without release document) and
    2) LPA (with release document)
    If use LP, you can do GR without release but with LPA, you need to release the schedule line via ME38.
    Thanks.
    NanoSAP  
    Posts: 58
    Registered: 1/5/09
    Forum Points: 6 
       Re: release strategy for Scheduling Agreement(SA)  
    Posted: Jun 26, 2009 8:32 AM    in response to: sathish.kumar           Reply 
    Dear Mr.Satish,
    Thanks a lot for your earliest reply...But my point is i want the system should not allow to make delivery schedule if release is not affected...Though schedule lines are generating through MRP run...Is is possible,by any chance...??

  • How to setup a release strategy for store generated purchase order

    Hi there,
    Does anybody know how to setup a release strategy for store/plant generated purchase order? I have a request from our client, but I never cross this before. Please help and let me know the step with every single detail.
    Greatly thank for your help.
    Kind Regards,
    2tea

    Please go thru the below Release Procedure and check whether you have maintained all the settings properly.
    PO RELEASE STRATEGY
    The release code is a two-character ID allowing a person to release (clear, or approve) a requisition or an external purchasing document. The release codes is basically controlled via a system of authorizations (authorization object M_EINK_FRG).
    Use SE12, structure CEKKO to check all the fields available for controlling the Purchase Order.
    e.g. If the total value for the Purchase Order exceeds 10,000, release strategy 01 is assigned to the Purchase Order. There is only one characteristic created in this example. For controlling the Purchase Order type, create characteristic for CEKKO-BSTYP and the value NB.
    CT04 - Create Characteristic e.g. NETVALUE
    Click Additional data Table name CEKKO Field name GNETW and press enter
    (for currency dependent field, you are prompt to enter the currency which the system then converts the currency of the Purchasing document into this currency)
    In the Basic data (X refers to tick),
    X Mutliple values
    X Interval values
    In the Value data, in the Char. value column, type >10000 and press enter
    Save your data
    CL02 - Class
    Class - Create REL_PUR
    Class type - 032
    Click Create
    Description - Release Procedure for Purchase Order
    In the Same Classification section, click Check with error
    In the Char. (characteristic) tab, type NETVALUE to assign your characteristics to the class
    OMGS - Define Release Procedure for Purchase Order Type
    Release Group - New entries
    Rel.group Rel. Object Class Description
    02 REL_PUR Rel. Strategy for PO
    Release codes - New entries
    Grp Code
    02 01
    Release indicators
    Release indicators Release Description
    0 Blocked
    1 X Release
    Release Strategy
    Release group 02
    Rel.strategy 01
    Release codes 01
    Release status 01
    Classification Choose your check values
    OMGSCK - Check Release Strategies
    (make sure there are no error messages)
    Once the Purchase Order is not release, buyers will not be able to print the Purchase Order.
    Goods Receipts will be shown with Message no. ME 390 - Purchasing document XXXXXXX not yet released.
    In 4.6c, Purchase Order with Release Strategy have a tabs at the end of the Header. This allowed the buyers to check the release status of the Purchase Order.
    The person with the release authorization have to use ME28 to release the Purchase Order.
    Regards,
    Ashok

  • Purchase Order not subject to release strategy for contract rel. strategy

    Hello, I am trying to set release strategy for contracts (TCODE: ME31K). I have created characteristic, which use table CEKKO and field name BSTYP in Addnl data tab. I have checked values, and they are correct. Then I have assigned in release strategies in classification view value contract. But when I try to check release strategy in ME31K with green flag, it display error: Purchase Order not subject to release strategy. (I have tried to do the same strategy in purchase order, of course with value Purchase order, and it works nice).
    So I have checked this release strategy with this codes:
    CL24N ok,
    CT04 ok,
    CL30N ok,
    CL20N ok,
    Release simulation in release strategy works,
    Then I found out that I should check SE38, SE37 but I do not understand how to use them (according: Purchasing Document Not Subject to Release Strategy).
    Thank you for your help in advance.

    I haven't said to use EKPO table in characteristics. You have to use CEKKO - BSTYP in characteristics.
    I've just said the compare the value which you have given in Release strategy - Classification and EKPO table for the particular contract.
    Also compare your release strategy settings with many existing documents in SCN.
    Check your Classification should be like that.
    You may see the error message in ME31K. Just save the contract then go to ME32K/ME33K or ME35K you can see the release strategy will effect for the contract.

  • Release strategy for Release POs

    Hi Every one,
    We have a requirement.
    A contract is created and approved as per the regular strategy.
    The releases (POs) are created against it and sent directly to the vendor.
    As the Contract is already approved, standard SAP does not apply the release strategy for the POs created for the contract.
    But the business wants the PO releases too to follow the release strategy.
    Can you please look in to this and let me what changes we need to make this happen.
    Regards
    Pavan

    As the Contract is already approved, standard SAP does not apply the release strategy for the POs created for the contract
    This statement is not correct, it's upto you to use or Not to use Release Process for release Orders (PO) created w.r.to Contract.
    As the table & fields are Common for both Contract & PO release ..you need to choose the PO relevant fields & values in the Release Strategy..
    So that the Release Process is applicable to PO's created w.r.to Contract also..
    For ex: if you use the field purchase Doc category as a Character  in  the Release , it differentiates whether it is PO or Contract..
    So that you can define different Release Strategy for PO & Contract
    Or  if you maintain the Doc type of PO in the Contract Release Strategy in CL20N / CL24N trxn code..
    then the release strategy applies to PO also..

  • Reset Release Strategy for any change in the Purchase Order

    Hi,
    Is it possible in SAP standards to reset release strategy for even minor changes in the Purchase Order irrespective of whether it is value change or any change in the text or Purchasing group change or whatever it is?
    If so, where do we need to make the configurations.
    I have seen in some thread about resetting the release strategy for decrease in Purchase Order value.Even that was possible through some BAPI.
    Thanks in Advance.
    S.Raghavan

    hi sandesh,
    sorry, i know it's too late.
    i tried your suggestion, it works blocking the purchase order after release strategies are setted.
    sandesh, raghavan:
    i need to reset the strategies after to make any change in the po. i'll appreciate your help if you can give it.
    regards
    f

  • Want to change my existing Release strategy for - PR, PO & Service Entry

    Hallow Experts ,
    Here i have a requirement to change the existing Release strategy for Purchase Requisitions, Purchase Order and Service Entry sheet. Already There are unreleased Purchase Requisitions and Purchase Orders in Production system with the existing Release strategy.
    1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
    2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my  service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
    thanks in advance.
    regards
    vb

    Dear Vikrant,
    1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
    Sol:  Not  Required but , doing it is recomandaed
    2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
    thanks in advance.
    Sol: No Only thing you have to  do is that   go to your class 32 and   chek what is the charaterstic define for the purchasing group  copy it
    2 Now go to  Tr.code: CT04, give that charaterstic and go to change mode and give the additional Purchasing group there, and save it
    3 Now go to Release strategy where you want to add that Purchasing group, go to classification tab and tik that new purchase group ,  that  group will now in fact of release Strategy

  • Release strategy for PO on Payment terms..

    Dear friends,
    Is it possible to have Release strategy for PO on Payment terms.....
    I checked in CEKKO, no field availble for payment terms.
    Is there any other way..........
    Plz help
    Rgds,
    Navin

    Hi,
    You can append Communication Structure "CEKKO" and add Payment Term (ZTERM)
    Use User Exit "M06E0004" (Changes to communication structure for release purch. doc.)
    Function module "EXIT_SAPLEBND_002" (Changes to Communication Structure for Release of Purchasing)

Maybe you are looking for

  • Is there a work around to use two Apple IDs across and iPhone and a MB Pro?

    iPhone 5 and Macbook Pro Retina late 2013.  iOS 8.1 and Yosemite.  It's a company iPhone and a personal MBP.  Phone has an Apple ID associated with company credit card and MBP personal Apple ID with personal credit card. There is a cross platform iss

  • Restoring window layout hanging.

    deleted layout folder. checked appnap. fcp launched in the background but useless. Lot's of work to do took me an hour to get this far. Anyone had the same issue?

  • Subreport causing an extra blank space in PDF export of SSRS 2008 report

    Hi All, I have a requirement of showing individual report and a Supervisor report. In the individual report, I will run the SSRS report for a particular worker. In the supervisor report, I am supposed to show the report for each worker working under

  • Changing a Template Layout

    I selected the Basic template from the Template Chooser, as it was the closest to the design I wanted to use.  My problem is this, when I started my first chapter I selected a Chapter page type, which in this template consists of two halves. See Figu

  • Can't create a public connection

    I have searched the forums and none of the solutions worked. When I try to create a discoverer connection through AS control, I get this error: An error occurred:oracle.disco.oem.configuration.DiscoConfigurationException: Failed to create new Connect