Release Strategy for inter Storage Loc Material transfer within same Plant

Hi Guru's
I hope all are doing good. I gota small concern to share with you. Is it possible to apply Release Strategy between two Storage Locations within same Plant for Material Movement?
Many Thanks
SONAL

Release Strategy cannot be assigned in material document.
However you can restrict this at authorisation level for T code MIGO_TR.
Regards
Bhavesh Mistry

Similar Messages

  • Release strategy for PR with materials having different prices

    Hai Gurus
    Can we make a release strategy for a variant configured material ?
    I mean create a strategy in such a way that price is critical factor and the materials what ever we choose for the PR has different characteristics dependencies like for example ( A chair having different characteristics like color, material ( like steel, leather etc) and other features like wheels etc and whatever characteristics we choose has a different price.......... so when v come to the release strategy it has to be approved by the next level if it reaches $ 1000 and so on.
    please help me out in this issue

    Hello Arif Mansuri
    thanks for your reply, yes I have taken it as total value only. The scenario is I am asked to use three different characteristics ( total value, materials, MRP Controller) and assign them to a class and if the customer picks any number of different materials and if the price is more than 1000 then it has to reach to the next level for approval. i thought i am suppose to use object dependencies here......... can we do this in a normal release order if so how would be the strategy played here?
    thanks for your time

  • Transfer between storage location to storage location within same plant

    Dear Gurus,
    We r doing storage location to storage location transfer within same plant through purchase order.
    Due to excise requirement we have to raise excise invoice for the same for captive consumption purpose.
    Is it possible to make it One step procedure so that GR will take place at same time as GI the way it works for plant to planrt.
    In ECC 6.0 option is there for transfer between storage location. I configured but it is not working.
    Please check the same.
    Rgds,
    Saurabh

    Hi Saurabh,
    The proceedure you are following is a bit wierd. But I think this is as per your business requirements.
    You can continue to follow the same proceedure as this may  not be possible through one step movement type.
    Best Regards,
    Prateksha.

  • Release Strategy for a new material type in PR

    Dear Friends,
    One of our client require new Release Strategy for a particulat material type PR. Can u pl provide me the steps to configure a new release strategy for PR for a particular Material type.
    Regards,
    Ask

    Hi,
    Create a Char for your material types in CT04(MARA-Table,Field-MTART) and assign the same to your Class in CT02.
    Then follow all the cusmozation path for your PR release startegy .
    For Config part refer the below wiki link it may help you.
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/RELEASE+PROCEDURE
    http://wiki.sdn.sap.com/wiki/display/ERPLO/ReleaseprocedureforPurchaseRequisitioninMM?focusedCommentId=195723808#comment-195723808

  • PR release strategy for material group

    Hi,
    I have 2 different line items in PR with 2 different mat groups. How can I set up a release strategy for this scenario. Ex-line No 1 has mat group X and line item 2 has mat group Y. Do I release at header level or item wise release is possible

    Hello
    In PR you can set up this release strategy without classification release strategy.
    w/o classification strategy you can define the release line item wise. so you can give diiff materual group you can enter with line item wise.
    Laxman

  • Release strategy for PO and RO

    Hi All
    My release strategy for Purchase order and Release Order is same.My release strategy has material group and PO/RO value as characteristics. What I want is that my releaase strategy for PO should be based on value whereas for RO it should be based on material group. Is this possible since we cannot have different release group for PO and RO.
    Pl suggest how to go about?

    HI Satish,
    In the characteristic value screen we not only can give single values ,but also multiple values
    and also range of values.
    Since the Data type for this Feild is character ,that is the reason it is not taking Ranges
    So the same is not working for PO,I too Checked the same.
    So it is that you have to have material group ,then there is no other go but entering all the values for the same.
    As we cant add a new Release Class also
    Becoz the release class cant be different ,so as the characteristic values would be same.
    if i could find something else will post you soon.
    but as of know we cant do nothing in this case but create all the material group as charecterics values and add to that strategy.
    Thanks
    Anjanna.

  • MM:Release Strategy for Release Order again Approved Contract

    Hi,
    Release strategy for Release Order is required or not against approved contrat??
    As fas as I know once the contract is approved, release order is not required to approve again.
    This is the standard setting from SAP or We need to do some setting for this??
    In my support project I have studied the release procedure and found that, same release strategy and release Group has been used for Purchase Order and Contract.
    Please let me know if anyone have faced this rquirement  or I have to go for Z development for this requirement.
    Thanks you.

    Hi Lalita,
    Thank you for your quick suggestion.
    yes definitely the release stratergy and release group should be set up separately but here both are same
    that is the reason this is  picking of the same release procedure again evenif the contract is approved.
    we have following release characterstic for the release procedure.
    1) Purchasing Group
    2)Total Net Order Value
    3)Order Type
    4)Purchase Organisation
    5)Material Group.
    I think for the above characterstic we must a separater value for PO and Contract but Currently all are merge
    in this only
    But Can you tell me "Release Order should be subjected to release procedure" this is correct or not .
    If yes then what is the base for this, I mean is it working on the concept that " If do relevent
    release characterstic value is found then no release procedure and this is treated as autorelease in sap"
    Thanks you.

  • Release Strategy for Contract

    Hello Experts
        I am using release starategy for contract and using communication structure CEKKO in characteristics. I want to use other parameter such as material master number (MATNR) for characteristics. I see that CEKKO has component .INCLUDE (Communication Structure: PO release for User Exit). Does any one know how to use it in characteristics and if I use it can I design release strategy for particular materials?
    Thanks
    Ankit

    this has been discussed multiple times on this forum - "Release strategy at item level for purchasing docs - PO/SA/Contract" not possible...
    refer below threads
    Why release strategies for PO at header level only
    PO Release Strategy
    Release strategy - item level
    yogesh

  • Release strategy for GR?

    Hi,
    My company has requirement that GR should be subject to approval process before it can be posted. As far as I know there is no standard functionality in SAP for this (at least in ECC, as in SRM there is one).
    Has anyone encounter this before? And how you deal with this? I have tried to persuade the user to drop this, but the problem is they already have this functionality in their legacy (which is custom made web based application), so it is pretty hard to argue with them in this area.
    Any help will be appreciated.
    Best regard

    Hi Yosea,
    Yes you said is right that there is no Release strategy. And can't imagine the situation in the legacy as well for this approval process thru Release strategy while doing the GR. But there is another way of accepting the goods either partial or full using movement types, you can do so.
    My question is why do you (i.e., your client or company) want to control (through the approval process) at Goods receipt level. That makes complex and un logical as well, thats why there is an approval process comes into picture at PO (Purchase order is an external purchase document and is going out to an external party /vendor /supplier) against that they can supply the material /provide the services to the Organization/company and is required to control before issuing this perticular document called PO (i.e., work order and is required to be controlled thru Electronic release strategy in SAP) instead of manual before in legacy since there is money matter involved and needs to control over investment on Inventory /services purchases.
    But where as GR, this is an incoming document, what the meaning in controlling it through approval process. That is the way you have to conveincene the client or company.
    Ok fine. If still they want this functionality to be implemented (that is to controlling at the GR level for the goods coming in. Then there is another way to control it through receiving the stocks into different stock types using the respective movement types, but not through Release strategy such as Blocking (GR blocking), Quality stock (for checking the quanlity standards thru Quality Inspection) and then later you can move these stocks to Unrestricted use stock, so that this can be allowed to use further.
    I dont think there is a functionality in the SRM as well. As I know that you can receive the Goods in SRM through Online Desktop confirmation that too partial or full quantity, that is nothing accepting/approval for the Partial or full quantity that is received against the PO which is created wrto to respective Shopping cart. And that is how you can control the goods that are coming inside / received at Stores/WH inorder to maintain the good quality of Inventory.
    Note: Controll always suggested at the time of making agreement  (i.e., Release strategy for the PO) but not at the time of receiving the goods. Here while receiving the goods only thing that a Stores person can see tmainly is needs to check for the Quantity, Quality of the goods that are ordered, Delivery time, Mode of transport, Shipping instructions, etc. This will help them further in evaluating the vendor.
    Hence there is no logic is going for that option
    Hope it clarifies,
    Regards,
    Sapsrin

  • Release strategy for manual reservations

    hi!
    Is it possible to have a Release strategy for manual reservations ? how?
    Regards,
    Rajiv Kane

    Dear,
    There is no release procedure exists for Reservations in SAP.
    1. Either remove authorizations for MB21 to the low level employees and give authorizations for CREATE / CHANGE / DELETE reservation trans to management only.
    2. Or else instruct inventory people to only make movements (issues) against the printed signed copy of reservation from the concerned manager. Only the user brings the reservation print with manager sign or seal, then only the material can be issued.
    Meantime, instruct the management to time follow goods issues reference to reservations timely.
    Regards,
    Syed Hussain.

  • Release strategy for PO and Contract

    Hi,
    I maintain characteritic for PO
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    I maintain characteristic  for contract
    Company code
    Target Value
    Doc Type
    Purchasing group
    My class consist of
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    Company code
    Target value
    Q1: Do i need to maintain ALL characteristic value when i define my release strategy for PO or Contract as some characteristic only apply to PO only or contract only?
    Q2:  What option do i have if i need to maintain all characteristic value ? leave it blank ? empty
    Currently my PO release is working fine but when i try to maintain the contract release inside the class . my PO release is not triggering . I maintained diffrent release group for both PO and Contract .
    Thank for your advice

    First of all
    For purchasing like PO,pr,contract you can able to get in ekko table.No need to maintain separate release unless if it your business requirement.Take Document type as one of the characteristics it will distinguish whether it is PO or contract.
    You have to maintain all the characteristic value then only it will trigered release.
    Check the release indicator as well.
    Hope it will help.

  • Release strategy for quantity contract

    Hi Gurus,
    In quantity contract ..  target value will not filled by the value(in header details) as it is quantityt contract.
    We may have different line items with different cost..
    my doubt is how the release strategy will be triggered for the quanityt contract and how the system will consider the whole value of the contract..
    please explain/clarify
    regards
    subbu

    Hi,
    The release strategy for the contract will work in the exact mechanism as for the PO i.e. it will be determined  based upon the total net value of the entire purchasing document.
    Cheers,
    HT

  • Release Strategy for SA/Contract/PO

    Hi friends,
    Should we have different release groups and release codes in contracting/ SA/ PO.
    Because...
    I have maintained 4 characteristics in release strategy for PO _[ Comp Co, plant, porg, total net order value].
    But i want to maintan only 2 characteristics in release strategy for contract  [plant, total net order value]
    because the same is reflecting in contract config also.
    Is it possible..please help me frnds.
    Prabhu

    Hi Prabhu,
    Unfortunately you need to maintain characteristics of all possible values for company code and plant for contractsu2019 to subject the release.
    Wish that SAP would be more flexible with release of PO, Contract and RFQ but it does not.
    Regards

  • Release Strategy for Contract is not getting picked whereas it is ok for PO

    Dear Experts,
    I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    Kindly resolve the issue.
    Satish

    S0004830404 wrote:
    Dear Experts,
    >
    > I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    > I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    >
    > Kindly resolve the issue.
    >
    > Satish
    hi,
    use create other characteristic for value CEKKO-GNETW in this use the mk , wk values in value field and assign this characteristic to your class and save.
    Thanking you

  • Release strategy for Schedule lines in SD

    Hello All
    Can we create a release strategy for Schedule Lines in Scheduling Agreement? If Yes How?
    I have already maintained a release strategy for Item Level... which I want to put it for Schedule line as well....
    Thanks in advance.

    Hello,
    I think you are in the wrong forum. Please choose the right forum category and post it there.
    Matthias

Maybe you are looking for

  • Entity with nested entities, create method generated incorrectly

    For the sake of this question, assume I have two entities: Header, and LineItem.  The Header has 0..n LineItems.  I've modeled this in the CAS by creating two entities, with a nested relationship between teh two.  Tables were created correctly, every

  • Suddenly my Macbook Pro got very slow/started freezing

    I opened Logic Pro 9 and found that it was really slow, so I restarted the Macbook. When I got logged in again, I noticed that the icons for battery and Airport and clock took several minutes to load. I tried starting Safari, and the machine froze fo

  • Printing from macbook pro and iPad using same printer

    Have a macbook pro and an ipad. Can print from either using my epson XP-310 but not from both without resetting settings for whichever device I wasn't printing from . Is there a way to set up my Epson 310 wifi so it can see both devices and let eithe

  • Asha 501 - Anti-virus

    My nokia asha 501 can't run any anti-virus software can u help Moderator's note: We have provided a subject-related title to help other forum users easily view and respond to this post. Solved! Go to Solution.

  • Mailboxes 'from' and 'to'

    I have created two additional mailboxes. One is email from a clients and the second email I've sent. Is it possible to set up different columns for the two different mailboxes, to show 'From' and for the second mailbox 'To'? At the moment I have to m