Hi All,
At our client side some are using  ECC 6 and few are on EHP7.We need to define the release strategy in a such a way that both the user can approve the PR in cross system.For example- user A is  using ECC6 and he created PR ,now he need to take approval from his manager and manager is using the system EHP7 in such scenario-
how does the system understand who is the approver?
How to maintain the same user in both the system? so that approval process can not be disturb .
What about the release code ? how to define release code in both system for single release strategy
Thanks

Hello,
1st thanks for reply.
We have ECC 6.0 as live system but getting used in only A & B country.We bought new fresh,blank system EHP7 for C county. We defined release strategy in EHP7 but we have HR module in ECC6 .So all portions are defined in ECC 6.
For example- I am creating PR in EHP7 & last level approver is in ECC 6 .
The issue is, in the ECC 6 system  how will he get the email notification of approval mail.?in EHP7 there is no HR module configured.
Thanks,
Snehal

Similar Messages

  • Release strategy should refresh when deleted PR  is undeleted .

    Hi all,
    My client requires as below for PR's,
    The PR release strategy should get to intial at any stage if the PR is released for some releae codes earlier, deleted & after the PR is undeleted.
    Regards
    Ashish

    This cannot be achieved through standard release strategy configuration.
    Basically the requirement is any change on PO price should result in blocking of the PO. You can create a custom field in the PO header that will function as a Price Change Indicator. Add this indicator to the release class and trigger the release strategy when the Price Change indicator is set to "Yes". Populating this custom field with value "Yes / No" should be carried out using a user-exit by invoking it in the PO change transaction.

  • Release strategy should revert

    hi
      in PO we r using only release strategy not version management .
    our scenario is like this , once a PO has released and if any body tried to do any change in PO after that , then those  release strategy should revert to  unreleased status.
          guide us where to do right configuration .
    what currently happening is , if in changing mode we are giving Quantity more then previous it is reverting release strategy other wise not .
    regards
    sachin sharma

    Sachin,
    As SAP standard, release strategy will be reset if:
    - the changeablity of relesae indicator set to '4' incase of PR and '4' or '6' in case of another purchasing doc (PO, RFQ, contract)
    -the document stii subject to previous release strategy
    -the new TOTAL NET ORDER VALUE is higher then the old one
    For release strategy reset in PO i suggest to use user exit.
    Reward if useful

  • New release strategy should not trgger for PO released with old Rel Strategy

    Hi All,
    Please suggest. Po has been fully released with Release Strtgy V1 XX. Now I m replacing release strategy  XX with ZZ. If I change any po which has old rel str XX , system will reset new release strategy as in config changeability indicator 4 maintained.
    But requirement is if there is  any change or value decreasing in fully released Pos with old strategy  it should not retrigger new release strategy. If value Increases then New strategy should retrigger.
    Please help me on this.
    regards,
    Rohit

    HI Rohit
    A reset of the release strategy only takes place if
           -  the changeability of the release indicator is set to '4' in
              case of a purchase requisition and '4' or '6' in case of
              another purchasing document (purchase order, request for
              quotation, contract, scheduling agreement),
           -  the document is still subject to the previous release
              strategy,
           -  the new TOTAL NET ORDER VALUE is higher than the old one.
    The most important thing to consider in to avoid changes to release strategy customizing once the release strategy is used.
    The commom steps are:
    1- make sure all of the old POs should have been released.
    2- don't delete/change the original release strategy. create a new release strategy with copy function, then the old release strategy will not be replaced.
    3- if you delete the original release strategy and add a new release strategy which the characteristics in classification is same as old release strategy then the PO (have been approved) will be replaced with the new release strategy.
    Kind regards,
    Lorraine

  • PR/PO release strategy should be revoked

    Hi Experts,
    How to revoke the release of a PR /PO if value is decreased.  In standard only value increase will revoke the release strategy.  I am having overall release of a PR.
    Regards

    This cannot be achieved through standard release strategy configuration.
    Basically the requirement is any change on PO price should result in blocking of the PO. You can create a custom field in the PO header that will function as a Price Change Indicator. Add this indicator to the release class and trigger the release strategy when the Price Change indicator is set to "Yes". Populating this custom field with value "Yes / No" should be carried out using a user-exit by invoking it in the PO change transaction.

  • Release Strategy should be effected even if the PO Price is lowered?

    Hi users,
    Another doubt of mine is based on the release strategy (the Purchase order goes for rerelease) only in case of the increase in the PO Order Price (that is if the price is manually increased in a PO or if it indirectly increased by the increase in quantity)
    Requiremnent: the current requirement is the po should go for a rerelease even if there is a decrease in the po price. alternately any change in the PO effecting a rerelease would also be acceptable.
    anticipating an rearly answer.
    thanks and regards
    vinay

    This is standard SAP. Release strategy will be reset only on increase in value.  You have to make the release strategy think that the value has increased (even if it has decreased).
    Please see (the second part of) my comment in
    Re: release strategy is not reset in PO?
    Reproduced here for your ease:
    You can use the release user exit. If the PO is in change mode and Save option is selected, then increase the value in the user exit (This does not increase the PO value actually, just fools the release strategy into thinking that the value has increased).
    Hope this resolves.
    Lakshman

  • Purchase Requisition Release Strategy wont trigger

    All:
    I have set up what i thought was a simple purchase requisition release strategy. Parameters are as follows:
    1.) Doc Type = NB set up as CEBAN-BSART
    2.) Acct Assn Category = k set up as CEBAN-KNTTP
    3.) Purch Org = 300 set up as CEBAN-EKORG
    4.) Overall Value = 0-1000, 1000-10000, 10000-50000, >50000 set up as CEBAN-GFWRT
    Release group is set for overall release, i've checked the release strategy with OMGQCK and everything was good to go, checked CL30N and everything was triggering, checked table T16FS and there weren't any fishy entries. Oh also, i've tried deleting and recreating the entire release strategy at least 3 times.
    Whenever i create a purchase requisition, i get no release tab. Not sure what else i'm missing here.
    Any help is appreciated!

    I created 4 characteristic with the above mentioned criteria (doc type, purch org, net value, & account assignment category). I assigned all 4 of these characteristics to a class.
    Matrix is as follows:
    0-1000, doc type NB, purch org 3000, acct  assignment 'k' needs approval from release code 01
    1000-10000 doc type NB, purch org 3000, acct  assignment 'k' needs approval from release code 01 & 02
    10000-50000 doc type NB, purch org 3000, acct  assignment 'k' needs approval from release code 01, 02, & 03
    >50000 doc type NB, purch org 3000, acct  assignment 'k' needs approval from release code 01, 02, 03, & 04

  • I cannot send emails; looks like my smpt parameters are wrong; what difference is there between my incoming and outgoing servers and should they have different parameters (ID and password)?

    I cannot send emails; looks like my smpt parameters are wrong?? What difference between the incoming and out coming servers? Do I have different user names and passwords?
    I would appreciate some assistance
    Thanks

    I cannot send emails; looks like my smpt parameters are wrong?? What difference between the incoming and out coming servers? Do I have different user names and passwords?
    I would appreciate some assistance
    Thanks

  • Different system drive and  applications drive

    I recently added a Raptor Drive and wanted to use it as a system drive and then use my 160GB drive that came with the computer as an application drive.
    Well after moving my stuff over to the Raptor Drive and tried to open Final Cut is said something to the effect that this was not the correct device or hardware. I think that is a feature of copy protection so you can't just copy Final Cut...you have to install it.
    So here is my question...will I have to reinstall Final Cut and all my other programs from scratch if I continue with this process? It is already on the 160GB drive in the same machine. Seems like a huge inconvenience. Is there another way??
    Thanks in advance
    FatherTime
    DP 2.0 G5 1GB RAM, iBook   Mac OS X (10.4.7)  

    I used Carbon Copy Cloner to clone my existing system drive onto the Raptor. That way, I didn't have to reinstall a single thing or have to reset any application preferences.
    I had to pare down the size of my existing drive (which was a 500 GB model) so that I could clone to the Raptor. I got it down to about 70GB by moving items to another external drive and then did the clone.
    So, my setup has the OS, Applications, and (most of) my user folder on the Raptor. I moved DVD Studio Pro's templates, GarageBand's and Soundtrack Pro's audio library, and LiveType's various items to the 500 GB drive. I also moved my iTunes library and my iPhoto library to the 500 GB drive. All of this allowed me to keep sufficient free space on the Raptor.
    If you don't want to clone your hard drive to the Raptor, you could try dragging Final Cut Pro over. However, you'd also need to drag over the items in /Library/Application Support/Final Cut Pro System Support as well as the items in ~/Library/Preferences/Final Cut Pro User Data. And, there's still no guarantee that it'll work properly.
    If you need to move other (non-Apple) applications to your other drive, you'll probably be OK in doing that. It's really only the Apple applications that need to remain in the /Applications folder.

  • R/3 extraction to 2 different systems (QA and PRD)

    Hi, I have to make initial loads form R/3 to BW-QA and BW-PRD, my question is:
    I need to fill the setup tables for each system (one for QA and one for PRD) or just one is necessary??

    Hi,
    Do you have one source attached to 2 BW systems?  If yes, then setup in the source is the same irrespective of which system picks up data, it will feed from the same set of setup tables.  You only need one setup.
    Cheers,
    Neeraj

  • Cfthread of coldfusion on different systems-windows and RedHat

    Recently I use cfthread writing a multithread samples. Each thread ask a http request.When I run this cfc file with coldfusion9 on windows, it runs well. Then I run the same cfc file on coldfusion9 on linux(RedHat and centOS), unfortunately, it seems do not work, I found the multi thread do not run parallely, they run one by one. The both coldfusion configuration files are same, and the web server use the built-in one of coldfusion. Is there anyone meet the same probelm? And is there something wrong with cfthread to run on linux? Really need your help. Many thanks!

    <cfloop index="pageIndex" from="1" to="#num#" step="1">
                            <cfthread name="thr#pageIndex#" threadIndex="#pageIndex#" action="run">
                                            <cftry>
                                                <cfhttp url="#watson_url#"  method="post" charset="utf-8" timeout="26000000" useragent="#CGI.http_user_agent#" result="THREAD.GETTREAD">
                                           <cfhttpparam type="formfield" name="appGUID" value="#guid#">
                                           <cfhttpparam type="formfield" name="userId" value="#user_id#">
                                           <cfhttpparam type="formfield" name="password" value="#user_pass#">
                                           <cfhttpparam type="formfield" name="sql" value="#TempArr[threadIndex]#">
                                              </cfhttp>
                                              <cfset result_Arr = #DeserializeJSON(THREAD.GETTREAD.Filecontent)#>
                                              <cfset resultArr[threadIndex]=result_Arr >
                                              <cfcatch type="any">
                                      </cfcatch>
                                        </cftry>
                           </cfthread>
         </cfloop>
    TempArr is an array for sql,each thread run a sql and get result from http request.

  • Contract Release strategy

    Dear Guru,
    We have three types of contracts like A type, B type, C type......with these three types of contracts we have release strategy with different conditions.
                   For A type of contract : Release Strategy should trigger on cost center and value base.
                   For B Type of Contract :  Same conditons like above.
                   For C type of contract : it should trigger on duration base like.....if contract create for one year itshould trigger manager........if one year to two years it should trigger to director........if above two years it should trigger to CEO.
              This is my requirement.....how to configure this pls explain me.
    Best Regards,
    Bhaskar.

    Hi,
    You can only have one class and so you will have to use all of the characteristics from each type of check that you want.
    So you would need a characteristic of Cost centre, one for Value and one for start and end date. (in addition to whatever characteristic you are using to determine if the contract is type A, B or C.)
    With the release strategies you need to ensure that for type A and B contracts the date range characteristic is not checked and so you need to specify that all date ranges are included (so if the difference between the two dates is one day to 999 years).
    then on the release strategy for the type C contract, make sure that the cost centre and value characteristics are set to include all too (so cost centre 0000 to ZZZZ and value from 0.01 to 9999999, if you don't want either to be checked).
    this should work, the basic idea is that you ahev to have ALL characteristics included in every strategy but you use the values to make sure that you ignore certain characteristics in certain situations.
    Steve B

  • Relation between Version and Release Strategy at Purchase Order level

    Our requirement is as follows:-
    Case: "Document Type" + "Purchase Group"+ "Price-A" ==== Release Strategy "XX" , and it got release by approving authority "YY"
    now, if i edit the vallue of above case to "Price-B", in such a case a new release strategy should trigger and it should go to approving authority "ZZ" in all the cases
    Price-A can be equal to Price- B, Less than or greated than.
    I come to know that, to acheive this we need to activate the version management, MM>>Purchassing>>Verion managemet>>for external document ( Here i have maintaned the veriosn for "F", and "Dcoument type" for "Purchase Org"
    Now the issue is when i created the version with REVNO and CEKKO table, and when i maintain the version for the release strategy , system dont show the tab of release strategy in PO screen, means release strategy is not getting applied on the PO,
    and when i delete the version condition, we can see the release strategy tab in the PO.
    Thanks in advance,
    Vikas Rander.

    Our requirement is as follows:-
    Case: "Document Type" + "Purchase Group"+ "Price-A" ==== Release Strategy "XX" , and it got release by approving authority "YY"
    now, if i edit the vallue of above case to "Price-B", in such a case a new release strategy should trigger and it should go to approving authority "ZZ" in all the cases
    Price-A can be equal to Price- B, Less than or greated than.
    I come to know that, to acheive this we need to activate the version management, MM>>Purchassing>>Verion managemet>>for external document ( Here i have maintaned the veriosn for "F", and "Dcoument type" for "Purchase Org"
    Now the issue is when i created the version with REVNO and CEKKO table, and when i maintain the version for the release strategy , system dont show the tab of release strategy in PO screen, means release strategy is not getting applied on the PO,
    and when i delete the version condition, we can see the release strategy tab in the PO.
    Thanks in advance,
    Vikas Rander.

  • Po release strategy - if value decreased

    Dears,
    If the Po value is decreased, I need the release strategy to be re triggered. As I know in standard its not possible. But can you help Is there any BADI or user exits can be used to accomplish this task.
    Regards
    Kamesh

    Hi,
    Use release indicator '4' or '6" during designing of release strategy.
    And
    If you want PO release strategy should trigger for reduced value ,then you can for User exit EXIT_SAPLEBND_002 or check to modify standard function module ME_REL_STRATEGIE_EKKO which help to reset existing release strategy for reduced/increased and/or values.
    For more check the SAP note:493900
    Regards,
    Biju K

  • PO release strategy on Overall limit of the PO

    HI All,
    Presently release strategy in R/3 Purchase order is triggered on Total net order value ( i.e. CEKKO - GNETW ) > 250.
    For limit PO it triggered on Expected value but we want to trigger it on Overall Limit value.
    ( If Overall limit = 1000 and Expected value = 100 release strategy should trigger on Overall limit)
    Please help on this.
    we have used the enhancement used :  M06E0004 , Exit EXIT_SAPLEBND_002.
    But I do not find the table or field showing the overall limit of the PO so that I can put the same in my purchase order release stucture.
    Thanks in advance, will appreciate any help on this regard,
    Anurag Goel

    Hi
    The expected value is the value that the item is not likely to exeed. in std SAP the expected value serves as a creterian for a possible release procedure for limit p.o
    Thanks

Maybe you are looking for

  • Hdmi input to the mini displayport

    Hi, is it possible to plug a hd-videocamera with mini-hdmi to the mini displayport to send a live-stream? the new hd-cameras have no firewire anymore. I need the video- and audio-signal. Thanks, Joachim

  • Can't make font bold, shortcut stopped working

    In the last week or so a few of our users have no longer been able to use the keyboard shortcut to make some fonts bold even though you can go select the bold from the type menu so obviously the bold version is installed and active. After talking wit

  • Trouble with touch screen

    I own a Photosmart Premiyn c309g   it's a touchscreen-well it's supposed to be!  Quite often I can't get it to touch on; which means I can't access the menu and thus can't copy or scan.  Also, the on/off button has never worked.  Not sure if any of t

  • Call graphical calc view with parameters

    Hello, We want to call a graphical calculation view that requires parameters via CE functions. Is this possible? How can we do that? Thanks, Oshrit.

  • Turn off close window icon

    Does anybody know how to disable the X in a JDialog so that it cannot be closed by the user? How do I do that? I see a setDefaultLookAndFeelDecorated(boolean) on JDialog and could set that to false but then what would I do? thanks, dean