Release Strategy to be reset for any change in purchase order

Hi Experts,
At present the release strategy configured is for any change in the value of the purchase order, the release strategy is reset. Now the the client wants that for even any text change of a word, text, quantity, value, addition, deletion the release strategy should be reset.
Can any one guide to configure the release strategy for any change. Also please provide the list of standard parameters/scenario (E.g. change of price, change of quantity etc) for which the release strategy can be configured to be reset.
Thanks in advance.
AJ

Hi Diwakar,
I too have the same problem. I tried with Changeable indicator "1". The system does not allow to make any change to the Purchase Order even after the first level of Release. But the requirement is that the system should Reset the Release Strategy for even minor Change in the PO.
Regards,
S.Raghavan

Similar Messages

  • Release strategy does not reset after PO change - tried changeability 4 & 6

    Hi,
    After my PO is released, I change the item quantity/price such that the net PO value (increased) is changed MORE than the tolerance % set in the changeability.  I expect that the PO release should be reset but it does not.
    However if my PO value is changed (increase) such that my PO value is now in a different "release bracket/range" -- as it falls into a different release strategy, then the release is reset.
    Could anyone advise me what is wrong?  I tried everything - i tried changeability = 4 and 6. i deleted the whole release class, release strategies and recreated -- nothing.
    According to OSS note 493900 below, it should reset when the tolerance % is breached.
    I'm on SAP 4.7.
    Anyone could advise?
    thanks!
         3.  Question :
         Why is the release strategy not reset ?
         Answer :
         A reset of the release strategy only takes place if
                -  the changeability of the release indicator is set to '4' in
                   case of a purchase requisition and '4' or '6' in case of
                   another purchasing document (purchase order, request for
                   quotation, contract, scheduling agreement),
                -  the document is still subject to the previous release
                   strategy,
                -  the new TOTAL NET ORDER VALUE is higher than the old one.
         The total net order value is linked to CEKKO-GNETW for a purchase order,
         CEBAN-GSWRT for a purchase requisition item-wise release and CEBAN-GFWRT
         for a purchase requisition overall release.
         If you have maintained a Tolerance for value changes during release
         (V_161S-TLFAE), the release strategy is reset when the value of the
         document is higher than the percentage you have specified and if the
         document is still subject to the previous release strategy.

    Hi,
    Thanks.
    The release strategies are able to be determined correctly when the PO is created so I guess that means its all setup correctly?
    The issue is only with PO change - how to cause the reset when the PO value increases by more than the tolerance %.
    cheers.

  • How to block changes in purchase order after purchase release

    Dear all
    Can u please tell us how to block any changes in purchase order after purchase order is released...
    (We don't want any line items addition or quantity addition or any changes once purchase order is released..)We wanted this for a particular purchase order type only
    Regards
    Sudha

    Dear Sudha
    Yes it is possible to confiquire your system insuch a way where once if the PO  gets final relase then it cannot be changed.Only possiblity that will be available for the user to make chanegs in PO is possible when the final release is to be reset and then make the changes.
    Release Indicator: specicfies whether the PO documents is blocked or can be processed for the follow functions.
    You can define the release indicators you need for your release procedure:
    •The Released indicator is used to specify whether messages (PO documents in output format) may be transmitted for a purchase order with this indicator.
    •The Changeability indicator shows the effect of changes to the PO (a change to a PO may require a new release strategy to be determined, for instance).
    •By means of the Value change indicator, you can specify that the release strategy is to be re-started if a PO is changed and the value of a PO item thereby increases by a certain percentage (e.g. 10%). Set the Changeability indicator to "4 - Changeable, new release in case of new strategy or value change" or "6 - Changeable, new release in case of new strategy or value change/outputted" and enter a percentage in the Value change field.
    And after that you can specify release statuese where you can specify which release indicator/status a PO is to have after having been released via a certain release code.
    and after release simulation .
    Test for the PO change after final release System will not allow you tomake changes by giving the message that the release  indicator doesnot allow you make the changes in PO.
    Regards
    Sunny

  • Restricting Changes in Purchase Order

    We have a scenario where we do not want to use release strategy owing to vast no of transactions in Purchase Order creation.
    But we want to restrict users to make changes in Purchase Order afte one day of Purchase Order Creation.
    For Ex : if a user has created a purchase order on 31/12/2010 , he can make changes to that purchase order n number of times. But when he tries to make changes to the same purchase order on 01/01/2011, he gets an error message and only this right of changing the PO will be assigned to one Login ID.

    Hello skbagaria1977,
    As far as I know there is no standard solution for that, you will probably have to create you own checking routine ! This scenario is too expecific for a "standard solution" !
    Sorry for not being able to give you a more positive answer =/
    Cheers!
    Plauto

  • Re-Release of PO in case of any changes

    All SAP Gurus,
    We have a release strategy for PO.
    Our requirment is 'if we do any changes in the released PO (may it be the text or any thing)' the released PO should go for re-release.
    How it can be done?
    Regards,

    Hello Rajan,
    If you want to have control based on change in any value release st. should re trigger you will have to go for some enhancement, but for any Value change release st will re trigger if you use the changeability (which determines how a Purchase document react to change in value) as 4 set under release indicators set in the release strategy design. this will solve your problem.
    Also release strategy is determined based upon the Characteristic Values maintained under classification data for release strategy.
    So in this case if you want to have a design like new rel st should trigger for any changes done to PR/PO then you should ask for some enhancement, but other way control, based upon change in value can be done by solution mentioned above.
    regards,
    Prashant Rathore.

  • LOVE Firefox! I have just launched a website. One designer told me it takes 7-10 days for any changes to appear. Why? I have cleared caches and cookies etc. I need to be more responsive than 7-1o days. I need changes to appear within 24hrs.

    LOVE Firefox! I have just launched a website: www.animalhealingandhumans.com. My web designer told me it takes 7-10 days for any changes to appear. Why? I have cleared caches and cookies etc. I need to be more responsive than 7-1o days. I need changes to appear within 24hrs. How can I achieve a much better response time to good feedback?

    Hello binbingogoABC,
    Shopping on BestBuy.com should be easy and fun and not fraught with the kind of trouble that you describe. I regret very much that this has been your experience.
    Using the information you provided when you signed up for Best Buy Unboxed I was able to locate your cancelled orders. I have requested more information from my back-office partners. As soon as I have additional details about your situation, I will reply again to this message. In the interim, I'm sorry that I must impose upon your patience.
    I'm very grateful that you wrote to us with your concerns.
    Sincerely,

  • Why should I recompile report for any changes in the database ?

    Hi All
    I call a report (.rep) from a form using RUN_REPORT_OBJECT, and everything is OK
    For any change in the database, for example :
    1- Export Dump file for the schema.
    2- Drop the schema
    3- Re-create the schema again
    4-Import the taken dump to the schema
    When i call the report again, the report doesn't run. If i recompile the report again it will work.
    I read too much posts about this issue, most of them are taLking about the command line parameter RECURSIVE_LOAD=NO ,
    v_url :=' COMPANY_NO='||:global.company_no|| ' RECURSIVE_LOAD=NO';
    SET_REPORT_OBJECT_PROPERTY(repid,REPORT_OTHER,v_url);
    But , Still the problem not solved
    Notes :
    1- The report type is .REP
    2- if I used the .JSP report, it is working fine , But i can't copy the source code for the report at the customer side.
    Please Help

    Well, first of all this would not be the correct forum. There is a dedicated reports forum for reports related questions. And secondly this most certainly depends on your report. If you have a query like
    select * from my_tableor e.g. are using %rowtype records in your report then you most certainly will have to recompile it after you do an exp/imp.
    cheers

  • CC wants to make changes - write your administrator code - no info on which changes it wants to make - keeps alerting me. I didn't ask for any changes.

    Every five seconds I get a notification that Adobe CC cannot install or uninstall Adobe add-ons without admin rights. I did'nt ask for any changes.
    If I press the upcoming alert, I get a window saying that CC wants to make changes, please write my admin code, but it doesn'r say which changes it is about to make.
    What do I do?

    Hi. I'm sure you've already tried this but are both you and your wife's accounts set as administrators?

  • How to restrict the user from making any changes in Sales order- item level

    Hi to all
    How to restrict the users from making any changes in sales order at item level if the same sales order is released by senior user through status profile.
    Regards
    Anish Parikh
    Edited by: anish parikh on Jan 24, 2008 5:16 AM

    Hi Anish,
    This can be achieved through the roles and authorization.
    This can be done through the basis team. they can create user profiles and roles.
    For the roles they assign some transaction codes so that they can view the only assigned tr. codes.
    Like that ur requirement can be done.
    Also u can prevent the user to change any fields in the sales order screen (VA02). for that please modify the authorisations.
    Hope i answers.
    Reward points if useful.
    Edited by: kaleeswaran bhoopathy on Jan 24, 2008 9:57 AM

  • !!!How to restrict user for making  changes in Sales order , partner level

    Hi all,
    Can anybody tell me how to restrict user for making  changes in Sales order  at partner level, is it through user exit?

    Hi Ruchi
    I hope u had gone to the screen fields which u want them not to be editable. So there u select all the fields contents which u do not want to to be changed and check the boxes with W.content and Display and save it. Once evrything is done u have to activate the particular transcation going in to the standard variants and put the name and click the activate button.
    Hope its clear
    Reward if help ful
    Sri

  • Missing Part list for Plant to Plant Purchase order

    Hi,
          I need the following requirement in CO24,
          In CO24 its shows the missing parts for Sales order, similarly we want the missing parts list for Plant to Plant Purchase order in the same report. Also the report,
    1.It  should not consider the Planned order for a sales order.
    2.It should not consider the planned order which can be convert into purchase requisition.
    3.The procurement type should be "E" or "X".
    Kindly guide me is there any standard layout changes in available or any development we have to do.
    Thanks
    Muthamil Murugan.G

    Hi Purushothaman,
    If you have the following settings in OPJK:
    Plant                 XXXX
    Order Type       XXXX
    Availability Check    2
    [X]Status Check
    [X]Check material availability when saving order (may not need)
    Checking Rule        PP PP checking rule
    Component Check Type    ATP check
    Release material     2  Release permitted despite missing parts
    Then in COHV you try to mass release the order with the following parameter:
    List: Order Header
    Selection: Your selection criteria
    Mass processing:
    Function: Release
    Max. No.of Processes 99
    Save Log: Always
    Release control order: Collective Order Release
    Then after the order is released, you can find the missing part list of that order in CO03 menu path:
    Goto->Missing Parts->Missing parts list
    Hope it helps.
    Regards,
    Rachel

  • Report for advance payment relevant purchase order

    Dear Sapgurus,
    Logistics people raise one purchase order and release procedure also from logistic teqm onlly after we need approval from finance head we had created one more release finance procedure how they will identify these are purchase order i have to pay advance payment is their any report can u please tell me.
    Regards
    Umi

    Amit kulkarni,
    For this requirement you have to do validation of the amount field for advance payment againest PO.
    i thiought this is only way to get your requirement
    May be this information is useful to you
    Regards
    Surya

  • Change of  purchase order

    hi can any one tell how to change the Purchase Order Header text and Item Text.
    if possible please provide the code for the same.
    thnks,
    Vaasu

    Hi
    You need to write BDC program, u can not do it through LSMW
    with regards
    Bhargava
    reward if useful

  • Change of Sales Order  automatically changes the purchase order

    Hi 
       I am working on a scenario where a  as soon as a sales order is created it will also create a purchase order on plant which will supply the item to the plant on which sales order is created.This works fine.
    Now when I change sales order( order qty ,requested delivery date, new item added) . On saving the sales order it should change the purchase order which has already been created by updating the schdule lines in the purchase order with new values from the sales order. It is all in same SAP instance.
    Here are possible ways I can think of:-
    1 Change of SO will create a SO IDOC . The SO IDOC should supply required values to the PO Idoc . The PO IDOC should get posted to SAP to change the existing PO.  Client does not have XI so we cant use XI for conversion.
    2 Changing a SO will trigger workflow.The Workflow executes ABAP program which takes data from SO and calls BAPI to change the purchase order and sends notification that PO has changed.   Which BAPI?
    Any thoughts are welcome. We are on 4.7 and we dont have XI. So please do not suggest XI based solution.
    Prashanta

    Prashanta,
    For your 2nd part of question, you can use 'BAPI_PO_CHANGE' to change the PO.
    Thanks

  • SAP VB script for updating texts in purchase orders

    Hello,
    I am trying to create a SAP script for updating texts in purchase orders. It is in the last third - Item Detail,  Texts tab.
    The script is ok apart from the fact that it always deletes whatever text is in there and than add a new one.
    I would like to keep history in the texts tab and always just add one line to existing texts. Is there any way (command) how
    to keep existing texts and only add a new line to the top?
    Thanks a lot!
    Jan

    Yes, you are exactly right. I have already figured it out as well. I did not expect it would be that easy. But thanks a lot anyway for replying on this!
    Now I am struggeling with changing SAPLMEGUI in vb scripts for ME22n. Sometimes, there is SAPLMEGUI:0010 and sometimes SAPLMEGUI:0015. Even when the users have the same screens in the beginning the SAPLMEGUI number differs. They also do one item by hand and than it changes. It keeps changing between SAPLMEGUI:0010 and SAPLMEGUI:0015
    Is there a way how to have the same number of SAPLMEGUI or how to eliminate this issue?
    Thanks a lot
    Jan

Maybe you are looking for

  • Combining results with a Query of Queries - NOT QUITE THERE!!!

    I have included a small sample of my database, specifically the four tables I am trying to work with in the hopes that someone can steer me down the right path. Here are the four tables and the bottom is a visual desciption of what I am trying to ach

  • Task list timings are not copied to the Productio order

    Dear Frndz, I have created a task list for an item say FGA, where I have mentioned the SETUP Time as 15 Min, MACHINE time as 10 Min and LABOR time as 10 Min.But, when I create a production order for the same item these timing details are getting copi

  • Using a shift register to detect input...

    Hi guys, I'm creating a LabVIEW VI that needs to be able to detect when a user changes an input. I read a previous post that suggested using clusters and shift registers to compare previous data. My question is how do I use shift registers? I've crea

  • Display and Tower are hot the to touch

    Now that Summer is upon us, I've noticed the temperatures of both my monitor and Tower are higher than usual. The actual internal temp of the G5 is 130 F, which I understand is around normal. The display (20" Aluminum Apple Cinema) is physically too

  • No Layer Names  in FlashCS3 from Illustrator Import

    Is there a way to get the layer names to across when you import Iillustrator files to keyframes into Flash? It worked fine from Illustator 10 into Flash 8 but no longer seems to work in Illustrator and Flash CS3. It's a big problem when you are impor