Release stratergy not effecting

Hi,
after making any changes in PO release statergy is not effecting ?
Regards
rahul

Hi There
In release strategy config settings, you might have maintained the Tolerance for the Qty/Value change which is less than the Actual Vs changed,,
Also how the system has to behave at the time of change in Relased PO is defined in Config, check the settings you made..
Also in release indicator:
For purchase requisitions:
Provides information whether the referring document / item may be changed by , e.g., purchasing or material planning runs and control after the start of the release procedure, whether an RFQ or a PO may be created with reference to the PR item, whether a new strategy is determined, or whether already existing releases have to be revoked when certain changes are performed to the document.
For other purchasing documents:
Provides information whether the document maybe changed by purchasing functionalities after the start of the release procedure, or whether a new strategy is determined, or whether existing releases have to be cancelled in the event of changes.
Hope it helps you
Senthil

Similar Messages

  • PO release strategy not effected

    Hi Experts,
    I did all the standard settings for PO release strategy based on net value, doc type , purchasing group but it is working fine in my development server and same is not working in my quality server where as i configured the same settings.Kindly guide me .
    Regards,
    Sri..........

    Hi,
    Go to CL20N and check wether all chacterstics Values are maintained or not.
    these values are sometime not transported and you have to maintain in each client.
    also go to cl24N
    HOPE HELP U !
    Regards,
    Pardeep Malik

  • HT201320 This last week, I updated my iPhone with iOS6 and now my Yahoo Mail no longer works.  I've deleted and restored the account without fixing the problem.  The iOS update did not effect my iPad.  Anyone have a suggestion?

    This last week (of 17 Sep 12) I updated my iPhone 4 to iOS 6 and now my Yahoo mail does not work.  I keep getting a "Yahoo server busy" message.  This problem has not effected the update to my iPad 3 - it works fine.  In addition, I have deleted and added my Yahoo mail - same result.  Looking for ideas on repairing the link between iOS 6 and Yahoo.  Cheers

    Same here, albeit with a 3G and both a work Exchange account and personal Gmail are out of action.  Reentered my password on the Gmail to no avail.
    Unfortunately it seems that increased success has come too fast to Apple, it's starting to display Microsoft-like behaviors, e.g., releasing stuff and letting the customers serve as the beta / guinea pigs.

  • Purchase order Release Stratergy-Error in Class CL01

    Purchase Order Release Stratergy:
    In CL01(create class) i have created the class FRG_EKKO and saved.Then in CL02(change class) under Basic data-Administrative data we found Assignment field tick is not selected and that is not in changeable mode.
    Because of that reason Error occured like Error in Class in SPRO release stratergy. Release is taking place in Development Server but not in Production server.
    Regards,
    Wilson Babu G

    Hi
    This indicator shows that objects are assigned to this class.
    The indicator is set automatically by the system.
    once you assign the class to any objects then this flag will come automatically.
    Please check if you have assigned the characteristics to the Class in CL02
    Please check if you have assigned the release strategy to the Class in CL24N
    Thanks & Regards
    Kishore

  • Release stratergy

    Hi all,
    We r processing PO through Release stratergy.
    some time we need to change the  payment terms after the release of PO.
    So its amendment of PO & we need to process the PO again through Release process.
    but its not happening so.
    Regards,
    Supriya.

    Hi Supriya
    Did you have a characteristic for the field Payment terms as a char? I guess not. Please remember release strategy will work (again) provided you have the characteristics for the filed you wish to change in your rel class and in turn if it is assigned to your rel. group. You also have to set the release indicators as 6 for re_appear of the stg if you change the char value. Please use chars. which you can validate and change often and more importantly exists in CEKKO structure.
    Regards

  • PR release stratergy

    Hi,
    While creating PR with multiple line item with multiple plants relase stratergy not trigarring ? i have checked with all characteristics which are fullfilled for this statergy still it is not triggaring ?
    it is observed that for multiple line item with same plant it is trigarring but with mutiple line item with multiple plant it is not trigarring so i checked all plants are available in that perticualer stratergy.
    regards
    Rahul

    Dear Rahul,
    As per u r details,  Please chek weather other plant also in that release strategy,
    1 What are the charterstic for that release strategy?
    2 Chek  plant  is ticked in that release strategy
    3 what is the busines requirement for creating different plant in 1  PR ?
    4 Create a PR  for the only that for plant which Release strateg is not picking, If again the strategy not picking that means there is prob lem with your release strategy chraterstic
    Let me know

  • PO approval Workflow based on the Release Stratergy.

    Hi ,
    i am creating PO workflow based on the release Stratergy, in which release group = aa , release stratergy = a1 , a2 ,a3 .
    If the PO is created according to a1 then it should goto 1 level approval, if a2 then to 2 level approval and if a3 then 3 level approval.
    i have taken BO as BUS2012 and using singlesteprelease as event for triggering the workflow. i am checking the multicondition say if taking bus2012.releasestratergy = a1 then 1 approval if a2 then 2 approval if a3 then 3 approval.
    my problem is the workflow is getting triggered but it is not accepting the values from multiple condition box and going to other part and getting struck or getting no where.
    please suggest.
    thanks in advance

    Hi Abhi,
    I Guess the approach your doing is different from the standard one (WS20000075) No need to go for any multiple conditions.
    1. Copy the standard workflow.
    2. Create a Rule (Refer Rule 168) with container elements as POnumber, Release strategy and Release Code (Depending on your requirement).
    3. Write an FM which will have 2 table parameter fields ACTOR_TAB and AC_CONTAINER and fill ACTOR_TAB with approver name.
    4. Use this rule in Release of PO step and correct binding and everything will work fine.
    Please revert back if you need more information.
    Regards,
    Gautham

  • PR (Header level) release strategy not working

    Hi all,
      I have configured release procedure for PR - Header level release(i.e. With classification). My scenario is as below,
    If  PR value is <=1000 INR and Plant 1000 Two persons will release the PR. I.e., Release codes A1 and A2.
    If  PR value is >1000 INR and Plant 1000 Three persons will release the PR. I.e., Release codes A1,A2 and A3.
    i have created Two charac(for Plant and Value), one class(Assigned the characs to it), one group, 3 release codes, and 2 Release stratergies (i.e.S1 and S2). All the settings are fine. But when I create PR, system takes only the first Release stratergy by default. That is irrespective of the valuation price in PR system by default takes S1 release stratergy only. Even for higher value PR system is not taking S2 stratergy. I have given correct values in the classification field. Why does this happen? Release procedure without classification is not configured.
    Note:  I have even ticked overall release for document type NB
    Any inputs? Thanks in advance.
    Regards,
    Ayyappan.

    Hi all,
    One thing is clear now. System is not all considering the value characteristics. Its only considering Plant character(WERKS). Thats why by default its taking first release stratergy since both have plant value as 1000 in classification view.
    Just now i checked by using sinlge character. For release class with plant as character the release procedure is working fine but for  class with value as character release is not at all getting hit.
    Note:
    1.My company code currency is EUR. My characteristic currency is USD. While i create PR in valuation price system by default selects EUR. I am manually changing it to USD. Is that correct?
    2. Still my new posting period is not yet open.
    Is there the problem is somethig related to above?
    Regards,
    Ayyappan

  • Trouble shooting Purchase requstion Release stratergy with classification

    Hi,
    I am trying tos Set up a release startergy for Purchase requistion items with classification
    I am trying to capture Requestions with the following characteristics.
    Purchasing document type (ref to CEBAN -BSART)
    Total Item Value (ref to CEBAN-GSWRT)
    Purchasing group (ref to CEBAN-EKGRP)
    I have set up the release stratergy. However when I create a requisition with the criteria matching the release stratergy the PO does not get activated.
    I want to see what Charactersitics my PR has at runtime so that I can try to reslove the issue.Does anyone know of a transaction or report I can check to see what charatersitics my PR picks at runtime?
    Thanks,
    Ishan.

    Hi,
    Go into trx CL30N and enter the values of the document :
    1.If you don't get a result> check in customizing definition of release strategy and check
    In trx OLME > PR > define document type 
    "Overall release of purchase requisitions" flag ( fiield V_T161-GSFRG ) should not be SET
    In TRX OLME > OR > release staregy > Release Groups
    also FRGFG should not be set
    2. If you get one result> check
    If  you have activated the userexit 'EXIT_SAPLEBND_001'
    (Include ZXM06U13) This exit is relevant for the individual release.
    If you activating the userexit, please ensure that you implement
    the coding line E_CEBAN = I_CEBAN. in the include or deactivate the
    exit. Please refer to point 3) of the note 365604.
    BR
    Nadia Olrandi

  • How to Turn off Release stratergy Temporarly

    Can you please help me in knowing, How to Turn off Release stratergy Temporarly

    Thank you for your quick response
    I did not find any value in classification or may be be i'm wrong , could you please explain me in detail.

  • PR Release Stratergy Workflow

    Hello Experts,
    I am tring to implement a workflow for PR Release Stratergy.
    For releasing PR 3 person are being invloved.
    For this i am using SAP Standard workflow WS20000077
    I did all the manual configuration in SPRO and activate the workflow
    I create a PR and release it through transaction ME54N but i didn't found any changes
    No workflow was trigger...
    Please help on how do i will test ?? what is the right way doing it for PR Release Stratergy ???

    Hi,
    1. Make sure your event linkage is active. This you can check in Basic Data --> Start Events .
    Here column 'A' should be green for your event.
    2. If this is fine, then turn on SWELS tcode, turn event trace on.
    Create a PR and see if any event in traced in SWEL tcode.
    3. If not, try forcibly triggering your workflow using SWUE tcode. If it triggers successfully, then ask your MM functional to check the configuration and you can create a entry in SWEC tcode of Business Object BUS2105 and event RELEASESTEPCREATED.
    You can find the change document object name from SWED tcode.
    Test it again. Hope the magic works.
    Regards,
    Raj

  • RFQ release stratergy

    Hi Gurus,
    I have configured the release stratergy for PO ,RFQ,SES,And contract it is working fine, but when i add the character *Gnetw* (Net order value) RFQ release is not getting triggered.
    i have checked the release strategies all are showing green.
    what could be the reason, please help us in resolving the issue.
    Thanks,
    Naga.

    Hi Naga,
    RFQ release will not work if GNETW is one of your characteristics since there is no price determination in ME47. I had also same issue and open a ticket to SAP and the answer they have given is;
    u201CThe release strategy is determined when you create a RFQ in transaction ME41. In ME41 there is no price, so that CEKKO-GNETW can't be used here. The price is determined in ME47, but in ME47 there is no determination of the release strategy. So you will have to set net value as 0"
    But I asked them to change the logic and they said they forwarded my message to next support level for further processing.
    I will let you know when there is any progress.
    Regards

  • PO-release Stratergy

    Guru,
    I did the PO -Release stratergy set up,
    1. Created Character for Document type in CT04
    2. Assign the character to CL02
    3. Set the release group and Code in IMG
    All the Set up did an it was working in Devlopment client then Moved to Quality Client.
    Now the  release set up is working fine in Quality Client,
    But in devlopment client while im creating PO now the release is Not triggering.  im unable to find out the issue. we have all the set up same in QA and DEv.
    Please recomend how to identify the route cause to resolve the issue?
    Regards,
    Arjun.R

    Hi Ashwin,
    After moving  transport request to Quality server did u make any changes in DEV server? check again
    check assignment of characteristics to Class,
    check classification data
    simulate release strategies
    Have u or some one  created one more class with same characteristics ???
    Regards,
    Uzair Hussain

  • Reg release stratergy

    Hi
    Suppose in release stratergy customization 032 (class) is not mentioning wat will happen.

    Hi
    SAP has defined 032 class type  specificaly for release strategy.
    based on the calss the system will checks the values as per the class for the po, reqs, contract etc if u did not define it  RS will not triggerd
    Vishal...

  • Release stratergy doesnt appear.

    hi,
        I have noticed that some times when user creates a PO, release stratergy doesnt appear.
    when he deletes it, and creates a new PO with same data, the release stratergy appears.
    i am clueless why this happens??
    i would be grateful if you could throw some light.
    thanks and regards
    rahul.

    Check the data what he is inputting when release strategy appears and when release strategy doesnot appear. There may be some data different in input. Release strategy works in combination of characteristics. If one characteristic is missing, the release strategy does not appear.
    In your case look up, in classification tab of release strategy, will tell you what characteristics are maintained there and then see the PO where release strategy didnot show up, there should be one of the characteristic missing in that PO, which is not letting the release trigger.

Maybe you are looking for

  • Only first page of pdfs will display in Reader for iPad?

    When I attempt to open some (not all) pdf files, only the first page of the document will display. The remaining pages show up blank, with the top toolbar also not displayed. These files are downloaded from my university's Blackboard app, with some w

  • Solution to slow navigation Motorola QIP 2500-P3

    Have you been having slow navigation with the old sd stb Motorola QIP 2500-P3 I have found that if you connect the stb via video cable instead of rf cable the speed improves dramatically, still not perfect but much better than connecting via cable co

  • Realtek vs. Via Vinyl, which is better sound quality

     I downloaded the Via Vinyl Codec in an attempt to fix the Internet noise sound talked about in this https://forum-en.msi.com/index.php?topic=75995.0 post and all is well since.  Tiresmoke, or anyone else using Via Vinyl, what do you think of the sou

  • FEBAN automatically closed the Open item for Debtor

    Open items in our company usually closed manually. But this time FEBAN closed an open item (Debtor). Where can i change the configuration for not automatically closing the open item by EBS. Any help? Points will be awarded.

  • ZDM Agent "Invalid Drive Path"

    We use Zenworks to install software and use the Zenworks folders to display the program shortcut icon. After installed, it will launch (Run options tab > Application > Path to file) and the program will start. I'm having an issue for the last couple